append 8
DESCRIPTION
Appendix ABTRANSCRIPT
ESTABLISH LINES OF COMMUNICATIONCONFIRMATION ON BONDING INSURANCEAND NOTIFICATION OF WCBCONTRACTOR'S SCHEDULE ANDINTRODUCTION OF SUB-CONTRACTORS
ISSUES ON ENVIRONMENT AND UTILITIESCONTRACT DOCUMENTS
ASSIST PROJECT MANAGERIN CONVENING PRE-CONSTRUCTION MEETING
PRE-CONSTRUCTION
PRE-TENDER
REVIEW AND BE FULLY INFORMED ON CONTRACTDOCUMENTSSITE INSPECTION ANDCONFIRMATIVE SURVEY
PREPARE AND DISTRIBUTEMINUTES OF MEETING
CONSTRUCTION
AUDIT CONTRACTOR'SLAYOUT
QUANTITY SURVEYS CALCULATIONS/AGREEMENTFROM CONTRACTOR
ASSESSMENT OF MATERIALS ANDWORK PERFORMANCEMONTHLY PROGRESS ESTIMATESAND REPORTSDAILY WORK REPORT ON EXTRA WORK, CONTENTIOUS ITEMS ANDPROVISIONAL SUMS
PROJECT MANAGER
EXCAVATIONS
SHORINGDEWATERINGSILT CONTAINMENTFOUNDATION SUITABILITY
PILE DRIVINGEQUIPMENTWELDING CERTIFICATION
PILE DRIVING RECORD
ADVISE GEOTECHNICALENGINEER ON PDA TEST
PRE-POUR INSPECTION
CERTIFICATION OF BEARINGS,STRUCTURAL COMPONENTSAND MISCELLANEOUSSTEELWORK
FORMWORK
REINFORCING BARS
LOCATIONGRADESSTRUCTURE
CHECK MILL CERTIFICATESSELECT RANDOM SAMPLLESFOR TESTINGREVIEW ORDER LISTS ANDBENDING DIAGRAMS
PLACEMENTACCESSMETHOD
MIX DESIGNBATCHINGPLASTIC TESTSPLACINGCURING
CONCRETE
ERECTION (INSTALLATION)
REVIEW BY PLANTINSPECTION ANDINSTALLATION ENGINEERCOMPLIANCE WITH APPROVED PROCEDURES
SOURCE OF AGGREGATESADMIXTURESLOCATION OF BATCHING PLANTFORMWORKREBARSCREED RAILSPLACING FINISHINGEQUIPMENTPRE-POUR MEETINGPLACINGCURING
DECK PLACEMENT
RECORD KEEPING
OPERATIONAL ISSUES
PROJECT SUPERVISOR
HAMMER TYPEENERGY RATINGBLOW COUNTFINAL PILE TIP ELEVATIONSCUSHION MATERIAL
QUANTITYSPACINGCLEARANCES
MARK UP PRINTS FOR "AS BUILTS"DECK CONCRETE DATA &
WEEKLY CONSTRUCTIONREPORTS
DAILY RECORDSPROGRESS PHOTOGRAPHS
CONTRACTUAL ASPECTS
CONSTRUCTION AND TECHNICAL ISSUES
PROJECT MANAGER
CONSULTANT ORDESIGNER
GEOTECHNICALENGINEER
IF UNRESOLVEDMANAGER OF BRIDGECONSTRUCTION/BRIDGECONSTRUCTION SECTION
MANAGER OF BRIDGECONSTRUCTION
PROJECT MANAGERDIRECTOR OF BRIDGE ENGINEERINGREGIONAL BRIDGE ENGINEERINGDISTRICT HIGHWAY MANAGER
COMPLETION RECORDS
CERTIFICATE OF SUBSTANTIAL COMPLETION
FINAL INSPECTIONAND ACCEPTANCE
PROJECT MANAGERREGIONAL BRIDGE ENGINEERDIRECTOR BRIDGE ENGINEERING
JOINT INSPECTION TEAMPROJECT MANAGERPROJECT SUPERVISORREGIONAL BRIDGE ENGINEERAREA MANAGER BRIDGESMANAGER OF BRIDGE CONSTRUCTION
PROJECT RECORD(2 COPIES)
PROJECT DESCRIPTIONSUMMARY OF PROJECT COSTSCONTRACTOR'S PERFORMANCESUMMARY OF TOTAL PAYMENTSSUMMARIES AND COPIES OFEXTRA WORK AND CHANGE ORDERSCONSTRUCTION PHOTOGRAPHSCONCRETE INSPECTION REPORTPILE DRIVING RECORDDRAWING-DECK CONCRETEDATA AND "AS BUILT" PROFILESUMMARY OF ROADWORKS-MATERIAL PLACEMENT
PROJECT MANAGER
FLOW CHARTGUIDELINES TO PROJECT SUPERVISORS
OCCUPATIONAL SAFETY & HEALTH PROGRAM
"AS BUILT" PROFILETYPICAL PILE DRIVING RECORDS
RE V. FE B 1 9 9 5
REGIONAL BRIDGEENGINEER
MANAGER, CONTRACTOR PREQUALIFICATION