APPAREL QUALITY MANAGEMENT
CASE STUDY ON LARSEN AND TOUBRO TOUBRO
NATIONAL INSTITUTE OF FASHION AND TECHNOLOGY, CHENNAI
SUBMITTED BY-AAYUSHI HALDER (09/0208)SHASHI PRAKASH (09/0200)
![Page 2: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/2.jpg)
• Larsen & Toubro Limited (L&T) is one of India's largest engineering & construction conglomerates
• L&T's broad areas of business are Engineering & Construction Projects, Heavy Engineering, Electrical & Electronics, Cement, Information Technology and Communications
• LTM Business Unit is a part of the Heavy Engineering Division of L&T and offers a wide range of Rubber & Plastics Processing Machinery & Custom Engineered Products.
![Page 3: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/3.jpg)
MAJOR CUSTOMERS
![Page 4: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/4.jpg)
CASE STUDY
•As tyre technology evolved domestic and overseas customers began demanding high accuracy and special features on tyre-manufacturing equipments
•Customer requirements were not uniform because everyone started the development activity independently.
•LTM was following a mixture of manual and semi-automated processes
![Page 5: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/5.jpg)
•They were prohibitively expensive in terms of manpower
•They also meant a lot of time wasted in routine, repeated activities
•Due to such processes within the company errors occurred quiet frequently which led to poor quality of products supplied by the company.
![Page 6: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/6.jpg)
THE NEED
•Increasing pressure and decreasing efficiency
•Poor quality and human errors
•Costs shooting up
•Longer cycle time
![Page 7: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/7.jpg)
KEY CONCERN AREAS
•Process monitoring: Problems in follow-up of individual deliverables, project status and assessing overall progress.
•Document management: Problems in creating, storing, and retrieving files
•Intensive departmentalization :No collaboration among cross functional departments during product development
•Poor visualization of products
![Page 8: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/8.jpg)
STEPS TAKEN TO IMPROVE QUALITY•Shifted focus upon continuous
improvement of processes in manufacturing and engineering
• Involvement of management, workforce, suppliers, and even customers
• Improve the quality of process outputs by identifying and removing the causes of defects
![Page 9: Apparel Quality Management](https://reader031.vdocuments.us/reader031/viewer/2022013121/54487639afaf9f4d088b4a3f/html5/thumbnails/9.jpg)
REFERENCES• http://
www.larsentoubro.com/lntcorporate/common/ui_templates/homepage_news.aspx?res=P_CORP
• http://www.larsentoubro.com/lntcorporate/common/ui_templates/
HtmlContainer.aspx?res=P_ENC_BABT_DQLT • http://en.wikipedia.org/wiki/Larsen_%26_Toubro • http://www.docstoc.com/docs/24726076/LandT-Report • http://www.4-traders.com/LARSEN-TOUBRO-LIMITED-6491923/n
ews/LARSEN-TOUBRO-LIMITED-L-T-Construction-bags-new-orders-worth-Rs-797-crore-13768279/
• Mr. Anjani Ranjan Das Chief Engineer LTM