apparel manufacturing supply chain

Upload: sachin-pilaniwala

Post on 04-Apr-2018

239 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Apparel Manufacturing Supply Chain

    1/11

    APPAREL

    MANUFACTURINGValue PropositionOf Implementing

    GINESYS SCM SOLUTION

  • 7/29/2019 Apparel Manufacturing Supply Chain

    2/11

    WHATIS MANUFACTURING SUPPLY CHAIN ?

    InventoryVMI

    Warehouse Management

    GS1 Codification

    ProcurementVendor Management

    Logistics

    Purchase Lead Time

    Material Requirement Planning

    Production

    Sales & DistributionCustomer Management

    Order fulfillment

    Distribution

    Finance & AccountsPayables & Receivables

    Cash Flow Management

    Working capital Management

    Costing

    Production ControlJobber Management

    WIP Control

  • 7/29/2019 Apparel Manufacturing Supply Chain

    3/11

    PRESENT AUTOMATION SCENARIO

    LEGACY SOFTWARE

    InventoryWhich Stock should I release first?

    When will production come from factory?

    Which stocks are moving faster?

    Did the Supplier dispatch the

    Goods ordered?

    Sales & DistributionWho are my best customers?

    What quantity of Orders can I fulfill?

    What is the margin from my customers?

    How

    much is there in inventory?Can we produce more

    of this?

    ProcurementWhat to Purchase?

    What is required by Production?

    What is there in

    warehouse?

    What rate we purchased

    last time?

    ProductionWhat is the quantity to produce?

    Who are my best Jobbers?

    What is my cost of production?

    How long will it take to finish myOrders?

    FinanceHey! I need to submit

    Returns

    PROFIT! PROFIT!

  • 7/29/2019 Apparel Manufacturing Supply Chain

    4/11

    SUPPLY CHAIN PAIN AREAS

    InventoryTracking Issues & Receipts

    irregular Audit

    Logistics Tracking for GITProduct Identification

    Stocking

    Sales & DistributionLack of proper Customer Rating

    Margin Control

    Timely Order Fulfillment

    Dispatch SchedulingSales TrackingProcurementLack of Vendor Analysis

    Margin Control

    Product Quality Control

    and verificationPurchase Price ControlOptimal Procurement

    Productionimproper Jobber Management

    Production ControlItem Costing

    Lead Time Control

    WIP & Consumption

    Control

  • 7/29/2019 Apparel Manufacturing Supply Chain

    5/11

    GINESYS SUPPLY CHAIN FEATURES*

    Purchase

    I

    Purchase Order with Multi delivery Schedule tracking

    Import, Local and Interstate Purchase

    Vendor Rating with Margin Control

    Outright and consignment purchase

    Purchase Returns through LIFO, FIFO, ad-hoc

    Legal ComplianceLogistics Tracking of incoming and outgoing LR, Gate Entry

    Replenishment Planning of required stocks

    Multiple type Product classification with GS1 integration

    Image capturing with Material Requirement Planning

    Robust Stock Audit feature with proper inventory tracking

    Lot and Serial enabled Bar coding

    Item wise Inventory Movement methods like LIFO, FIFOInventory valuation on various factors

    Item Ageing and season control

    Merchandize planning

    Multiple Unit of Measurement like gram, Kg, pieces, meter, etc

    Production Planning from Sales Order

    Route and BOM based productionJobber as well as in house production

    Finished Goods Costing

    Lead Time Scheduling

    WIP Tracking with wastage, return and

    Consumption

    Production Receipts in parts tracking

    Service billing and Excise Duty

    Customer Management with Rating

    Multiple Distribution units and location

    Primary and Secondary Sales Tracking

    Sales Return on LIFO, FIFO, Invoice basis

    Outright, Consignment Sale and SORSales Tax compliance

    Track Dispatches right from Order - Production

    Accounts Integrated with

    all Modules

    AR/AP TrackingCash Flow & Working

    Capital Control

    Cost Centre Management

    Budget Vs Actual

    GL/SL Tracking

    Cheque Printing

    Complete Reporting

    BS, PL, etc

    Payment /Collection

    Outstanding

    Bill AgeingMulti Document

    Bank Reconciliation

  • 7/29/2019 Apparel Manufacturing Supply Chain

    6/11

    SUPPLY CHAIN BENEFITS

    Purchase

    I

    Daily PO updation helps in correct inventory projection

    Merchandize planning helps in better forecast

    Replenishment planning helps to control purchase cost

    and improves product quality

    Logistics tracking helps in accurate buy decision

    Proper GIT tracking helps in improved order fulfillmentImprove vendor relationship and control

    Demand forecasting helps in controlling lead time

    Regular Audit helps in improved item count

    Better inventory control helps to free budget rupees

    Helps to prepare Inventory hotlist for reorder and procurementReduce stock outs

    Better product identification leading to less ambiguity in inventory

    Efficient utilization of resource

    Lowering production cost

    Improved on time delivery

    Efficient material planning

    Reduced Inventory of Finished Goods

    and Work in progress

    Improved visibility

    Improved Customer Relationship

    Reduce cost of deliveries improving cash flow

    Faster order fulfillment Cycle

    Better margin through customer ratingReduce Sales Outstanding

    Improved on time shipment

    Auto posting of sales and

    purchase

    Reduction of staffElimination of human

    error

    Real time accounting

    reports

    Efficient Working capital

    management

    Better Analytics in terms

    of profitability and profit

    center performance

    Improve operating profit

    through efficient controlof expenses

    Better Return on

    Investment

    3-5% reduction in procurement cost

    7-9% reduction in Inventory holding cost & shrinkage

    3-5% reduction in production cost

    10% increase in inventory turnover

    10-15%improvement in

    Profitability

  • 7/29/2019 Apparel Manufacturing Supply Chain

    7/11

    ORGANIZATIONAL BENEFITS

  • 7/29/2019 Apparel Manufacturing Supply Chain

    8/11

    PROPOSED ARCHITECTURE

    Single LocationFor Companies

    having all

    functional Departmentswithin same premises

    Multi LocationFor Companies

    having their

    functional Departments

    at different locations

  • 7/29/2019 Apparel Manufacturing Supply Chain

    9/11

    GINESYS VALUE PROPOSITION

    GINESYSADVANTAGE

  • 7/29/2019 Apparel Manufacturing Supply Chain

    10/11

    PARTIAL CUSTOMERS LIST

    Purchase

    Mufti

    Twills

    Using Ginesys for more then 7 years

    End-to-End Integration - Manufacturing to retailing of Mens Ethnic wear

    Operates 165 EBOs and SIS

    Manages more then 1200 MBO retailers

    Supply Chain integrated with AccountsPan India Presence

    End-to-End Integration - from Manufacturing to Retailing

    Managing more then 1500 MBO and national wide distribution network

    Nearly 200 stores across India

    All format presence like COCO, COFO, FOFOManaging Centralized Replenishment for all stores

    Multiple warehouse Management

    End-to-End integration

    Using for last 4 years

    More then 40 stores

    Multiple warehouse and production unit

    Accounts integrated with other

    Functional departments

    OTTO Clothing

    Gaurav Gupta

    Ritu Kumar

    Stori

    Success

    Hoffman

    Camaro

    And others.

  • 7/29/2019 Apparel Manufacturing Supply Chain

    11/11