apollo scheduling - ignore function [compatibility mode]
TRANSCRIPT
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
1/27
TSX:GCM
Gemcom Software International Inc.Minex 5.2 Apollo Scheduling Ignore Function
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
2/27
APOLLO
Overview
Desi n
Apollo course
2
Volumes Reporting Scheduling
Plotting
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
3/27
APOLLO
Apollo course
SCHEDULING
3
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
4/27
APOLLO
SCHEDULING
SCHEDULING SIMLIFIED BY
4
MOVEMENT FILES
IGNORE LAYERS
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
5/27
APOLLO
IGNORE SWITCHES
5
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
6/27
APOLLO
IGNORE SWITCHES
FIRST UNDERSTAND
6
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
7/27
APOLLO
3 STAGES OF MINING
7
1 SURFACE2 PREMINING
3 MININGCopyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
8/27
APOLLO
STAGE 1 SURFACE MINING
TREE CLEARING
COAL CLEAN OFF
8
SURFACE MININGGENERALLY IGNORED
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
9/27
APOLLO
STAGE 2 PREMINING
DRILLING
RIPPING
9
PREMININGGENERALLY IGNORED
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
10/27
APOLLO
STAGE 3 MINING
DIGGING
EXCAVATION
10
MINING must be done
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
11/27
APOLLO
IGNORE SURFACE MINING
11
WE ASSUMETREE CLEARING & COAL CLEAN UPARE AUTOMATIC & ARE NOT SCHEDULED
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
12/27
APOLLO
IGNORE PREMINING
12
WE ASSUMEDRILLING BLASTING &RIPPING ARE AUTOMATIC
& ARE NOT SCHEDULED
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
13/27
APOLLO
STAGE 3 MINING
MINING HAS TWO PARTS
WASTE & COAL
13
Waste MINING must be doneCoal MINING can be ignored
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
14/27
APOLLO
IGNORE COAL MINING
14
WE ASSUMECOAL IS MINED AUTOMATICALLYWHEN WASTE IS REMOVED
WARNING MEANS NO INVENTORY
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
15/27
APOLLO
IGNORE COAL MINING
15
WE ASSUMECOAL IS MINED AUTOMATICALLYWHEN WASTE IS REMOVED
WARNING MEANS NO INVENTORY
Copyright 2007, Gemcom Software International Inc.
APOLLO
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
16/27
APOLLO 16
EQUIPMENT FILE DEFINES
TRUCK REQUIREDDRAGLINE HAS NO TRUCKS
Copyright 2007, Gemcom Software International Inc.
APOLLO
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
17/27
APOLLO
IGNORE TRUCKS
EXCAVATOR OR LOADER HAS
TRUCKS
17
Copyright 2007, Gemcom Software International Inc.
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
18/27
APOLLO
IGNORE TRUCKS
RATE = 100%
18
WE ASSUME LOADER IS FULLYTRUCKED AND OPERATESAT FULL RATE
Copyright 2007, Gemcom Software International Inc.
APOLLO
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
19/27
APOLLOIGNORE WEDGES
WASTE MINING ADVANCESLOWER WEDGEPRIME
UPPER WEDGE Upper wedgePrimeLower wedge
19
Copyright 2007, Gemcom Software International Inc.
APOLLO 20
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
20/27
APOLLOIGNORE WEDGES
UPPER WEDGE REQUIRES DOZERASSIST
BUT DOZER SCHEDULEING IS VERYDETAILED
20
Copyright 2007, Gemcom Software International Inc.
APOLLO21
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
21/27
APOLLO
IGNORE WEDGES
21
WE ASSUME DOZER WORKIS DONE
Copyright 2007, Gemcom Software International Inc.
APOLLO 22
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
22/27
APOLLOIGNORE WASTETHIN WASTE (AIB)IS MINEDAUTOMATICALLY
22
AIB
Copyright 2007, Gemcom Software International Inc.
APOLLO 23
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
23/27
APOLLO 23
IGNORE WASTE
AIB
AIBAIB
Copyright 2007, Gemcom Software International Inc.
APOLLO 24
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
24/27
APOLLO
EQUIPMENT FILE
DIG RATE= RATE x CALENDAR x UTILISATION x QUALITY VARIABLE
24
AIBAIB
Copyright 2007, Gemcom Software International Inc.
APOLLO 25
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
25/27
APOLLO
SCHEDULE SELECT
25
Copyright 2007, Gemcom Software International Inc.
APOLLO 26
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
26/27
APOLLOADDITIONAL IGNORE FUNCTION
IGNORE COAL MINING
Coal is automatically mined when its exposed without affected the waste equipment production
Have to put the coal equipment when coal exposed
IGNORE PARTIAL EXPOSURE
We can mine the coal without having it 100% exposedNotes: x Ignore coal mining to run x Ignore partial exposure
IGNORE EXPOSURE
To prevent underground miningNotes: Generally to make the scheduling run faster just tick off x Ignore Exposure & X Ignore Codes
Copyright 2007, Gemcom Software International Inc.
APOLLO 27
-
8/7/2019 Apollo Scheduling - Ignore Function [Compatibility Mode]
27/27
APOLLO
Set SMG_QUERY_DATABASE_ACCESS Yes
Notes: -Restart Minex- Open DBR Shared YES (Just read)
- Open DBS Shared NO (To rewrite before scheduling run.To report YES (to make a report after scheduling)
EQUIPMENT MOVEMENT VARIABLE
Production factor To make the schedule slower in certain block
EQUIPMENT CANNOT FIND AN EXPOSED LAYER TO START
Because theres a small/tiny layers (trivial layer). Always used minimum 5 in Build DBR
TO BREAK REPORT TO WEEKLY BASIS
Use date control file in c:/ Minex / etc / calendars / Date Control File
Copy this file into the directory and edit using text editor
POST VIEW
BACK STEP IN SCHEDULING
Copyright 2007, Gemcom Software International Inc.