Use of Advance Planner and Optimizer in entire Supply Chain
Prepared By:Arava Santosh kumar
![Page 2: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/2.jpg)
Supply Chain ManagementSC:
The supply chain encompasses all activities associated with the flow and transformation of goods from the raw materials stage, through the end user, as well as the associated information flow both up and down the supply chain.
SCM:
Supply chain management is the integration of these activities through improved supply chain relationships, to achieve sustainable competitive advantage.
![Page 3: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/3.jpg)
Advance Planner and Optimizer
Advanced Planner and Optimizer is designed to help a company to improve its production planning, pricing, scheduling, and product shipping. APO can be integrated with the SAP R/3 and legacy enterprise resource planning (ERP) systems in entire supply chain.
![Page 4: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/4.jpg)
Purpose of APOSAP Advanced Planning and Optimization (SAP APO) offers a fully integrated pallet of functions that you use to plan and execute your supply chain processes.
SAP APO supports the following:
· Business collaboration on a strategic, tactical, and operational planning level.
· Co-operation between partners at all stages of the supply chain process; from order receipt, stock monitoring, through final shipping of the product.
· Cultivation of customer and business partner relationships.
· Constant optimization and evaluation of the supply chain network’s efficiency.
![Page 5: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/5.jpg)
Advantages of APO High performance using live cache technology.
Global Server : integrates multiple OLTP systems.
Collaborative planning via the internet.
Simultaneous material and finite capacity requirements planning.
Cross-plant optimization of the resource load.
Sequence and setup time optimization of orders.
Transportation optimization with route planning.
Evaluation and analysis of orders.
Seamless integration between APO and R/3.
![Page 6: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/6.jpg)
Modules in APO
Demand Planning
Supply Network Planning
Production Planning & Detailed Scheduling
Global Available to Promise
![Page 7: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/7.jpg)
![Page 8: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/8.jpg)
![Page 9: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/9.jpg)
Demand PlanningContents :
Demand Planning Tasks and Functions
Integration with Business Information Warehouse (BIW)
Forecast Toolbox
Life Cycle Planning
Promotions
![Page 10: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/10.jpg)
Demand Forecast ToolboxUnivariate Forecasting
Moving Average
Models (Constant , Seasonal, Trend and Seasonal Trend)
Exponential Smoothing Seasonal Linear Regression
Holt-Winters Croston’s Method (for sporadic demand)
Casual Analysis
Multiple Linear Regression
Composite Forecasting
Weighted Average of multiple models
![Page 11: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/11.jpg)
Life Cycle Management & Like Modeling
![Page 12: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/12.jpg)
![Page 13: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/13.jpg)
Aims of SNP Planning
SNP planning plans the mid to long term horizon. It creates a rough quantity basedcross-location production and distribution plan with individual rough bills of material(BOM) and routing.
The SNP BOM contains critical products that are produced on bottleneck resources andproducts with a long replenishment lead time.
SNP ensures that the right quantity is available on the right day without critical resources being overloaded. The smallest unit used for scheduling is days.
![Page 14: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/14.jpg)
![Page 15: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/15.jpg)
![Page 16: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/16.jpg)
Performing of SNP Mid-to-Long term planning Strategies:
Infinite Planning:
Heuristic : Resources and material availability are not checked when creating planned orders, Stock transfers and purchase requisition.
Finite Planning:
CTM and Optimizer :
Simultaneous quantity and finite capacity scheduling:SNP resources and material availability are checked during creation of orders.
![Page 17: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/17.jpg)
![Page 18: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/18.jpg)
Production Planning/Detailed Scheduling
Contents :
Consumption of planning by sales orders for forecast-controlled products in make-to-stock and make-to-order production.
Simultaneous material and capacity requirements planning at operation level in the production plant.
Tools for production planning and production scheduling. Schedule optimization in PP/DS.
Transfer of planning results to the execution system.
![Page 19: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/19.jpg)
![Page 20: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/20.jpg)
![Page 21: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/21.jpg)
![Page 22: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/22.jpg)
Global Availability Check in APO Rules-based availability check (multi step availability check ) : Check of Multiple locations and products.
Better integration between sales and distribution and production : Triggering of production when there is no availability ( integration PP/DS).
Multilevel component and capacity check (real-time operation).
Check against aggregated, memory-resident data.
![Page 23: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/23.jpg)
![Page 24: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/24.jpg)
Adaptation of APO in Unilever
![Page 25: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/25.jpg)
Weekly Activities Monday Activity
Load Sales/Explored History Load MSO Stocks Run weekly (Monthly Stat.) – Various forecast profiles Run Short term Macros
Batch Jobs
MSO ActivitiesWork on improving forecast accuracy
Monday pm
Monday am
Batch JobsShort Term forecast MacrosRelease forecast to SNPMSO Heuristics
Load SU Intransit Stocks
![Page 26: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/26.jpg)
Tuesday Activity
Tuesday am
Batch Jobs
Load Intransits
MSO Activities
Finalize SNP forecast and Dependent Demand
Flow Thru Management
Repack Planning
Tuesday pm
Batch Jobs
Short Term forecast MacrosRelease forecast to SNPMSO Heuristics
![Page 27: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/27.jpg)
Wednesday Activity
SU Activities
Rough Cut mid term production planFocus on first 26 weeksUse SU Alerts & Stock Projection Report
MSO Activities
Repack PlanningForecasting (DP Only)Master Data
Batch JobsActual/Planned DispatchesMSO HeuristicsDeploymentMSO AlertsDelete ResponsesRe-Run MSO Heuristics ( re-generate the Request)
![Page 28: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/28.jpg)
Thursday Activity
SU Activities
Review MSO Alerts for Critical Stock IssuesAmend production plan in Short termFinish planning to 26 weeks
MSO Activities
Repack PlanningForecasting (DP Only)Master Data
Batch JobsLoad Actual/Planned DispatchesMSO HeuristicsDeploymentMSO Alerts
![Page 29: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/29.jpg)
Friday ActivitySU Activities
Review MSO Alerts for Critical Stock IssuesComplete & send out “Communication File”Final adjustments to Production Plan
MSO Activities
Review Stock Projection Report for NON-IVMI sitesEngage in critical stock discussions with SUMaster Data
Batch JobsDelete ResponsesLoad Actual/Planned DispatchesMSO HeuristicsDeployment (Final delivery plan)
Order Transport for following week
MSO Alerts
![Page 30: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/30.jpg)
Sunday Activity
House Keeping
Deletion of Live Cache Database
Deletion of all Database Sales Orders
![Page 31: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/31.jpg)
SUMI
SUMI++ is a web based platform, that supports 31 SUMI MSO’s & 16 SUMI SU’s by providing visibility to stakeholders in the extended supply chain.
It promotes a shared understanding of product requirements, projected deliveries and shipment tracking.
Introduction:
Navigation SUMI:
Top left corner of the home page is a button labeled location and is called location selector.
Once appropriate location (MSO or SU) has been selected, all information viewed in system will be in context of that location.
![Page 32: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/32.jpg)
Master Data :
Master data field in the home page of SUMI system has the following options:
Create, modify and block users New MSO and SU location creations New product creations (Portfolio) Create and modify unit of measures Sourcing Matrix Inbound & outbound connectivity Upload help & sample files Home page settings
![Page 33: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/33.jpg)
Sourcing Matrix:
Sourcing Matrix field helps to maintain new relationships between MSO’s and SU’s as mentioned below.
MSO SU Process
APO MSO SUMI SU Order At MSO
SUMI MSO APO SU VMI
Process runs on
Wednesday AM
Tuesday PM
![Page 34: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/34.jpg)
After maintaining the new relationship it should be activated. Products to be sourced between MSO and SU should be maintained in the active relationship.
Outbound and Inbound Connectivity:
Outbound connectivity for VMI process:• MSO Forecasts• MSO Stocks• MSO In transits• Dependent Demand
Outbound connectivity for Order at MSO process:• SUMI SU projected deliveries
![Page 35: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/35.jpg)
Inbound connectivity for VMI process:• APO SU projected deliveries• SUMI Dispatches (Shipments)
Inbound connectivity for Order at MSO process:• APO MSO demands
Actions:
Actions field enable users to upload, download, view and delete data for the following• MSO requirement at MSO • MSO Stocks (VMI)• MSO Forecasts (VMI)• Dependent Demand (VMI)• Projected Deliveries
![Page 36: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/36.jpg)
Planning: To view planning by start date for particular MSO To search orders with brand and category Planning Status
Shipments:Shipment logTo search shipmentsShipment report
![Page 37: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/37.jpg)
Interface between SUMI to APO:
• On Tuesday evening Intransits, MSO forecasts, MSO stocks and Dependant demands are transferred from SUMI MSO to APO SU through message broker.
• On Thursday evening SUMI SU send their responses to APO MSO through message broker
Interface between APO to SUMI:
• On Wednesday morning APO MSO send their demands to SUMI SU through message broker
• On Friday and Saturday evening APO SU send their responses to SUMI MSO through message broker
![Page 38: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/38.jpg)
As in traditional supply chains evolve into supply networks, collaboration becomes increasingly critical. For manufacturers and their suppliers, successful collaboration starts with making sure that everyone has clear visibility into inventory information, so suppliers know what their customers need and when they need it.
Often, however, that visibility is not easy to achieve. Supply networks are typically complex and involve a wide range of suppliers, making it difficult to share timely inventory information.
Inventory Collaboration Hub (ICH)
![Page 39: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/39.jpg)
Benefits of ICH
Interms of Cost:
A reduction in raw-material inventory buffers. Lower unplanned overtime as well as costs for setup and breakdown.Reduced administrative costs.
Interms of Customer Service:
Reduced risk of stock outs.Lower risk of production delays.Increased accuracy in production and delivery dates.
![Page 40: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/40.jpg)
Supports network-oriented planning and optimization. Provides flexible and adaptive advanced planning capabilities that support the full spectrum of planning requirements. Integrates and synchronizes planning and execution information for timely decision-making. Integrates supply planning with other network processes (e.g., CRM, SRM, PLM).
Enables manufacturers and their suppliers to collaborate on the right level of inventory to meet production schedules. Provides suppliers with complete visibility into the inventory they supply to each manufacturing plant. Integrates seamlessly into any manufacturer's existing back-end transaction and planning system.
SAP APO
SAP ICH
![Page 41: Apo scm overview](https://reader036.vdocuments.us/reader036/viewer/2022062902/58ef72eb1a28ab53168b45d7/html5/thumbnails/41.jpg)
Thank You