APM200 Outdoor Power Supply System
User Manual
Version: V1.0
Revision date: December 12, 2005
BOM: 31011189
Emerson Network Power provides customers with technical
support. Users may contact the nearest Emerson local sales
office or service center.
Copyright 2005 by Emerson Network Power Co., Ltd.
All rights reserved. The contents in this document are subject to
change without notice.
Emerson Network Power Co., Ltd.
Address: No.1 Kefa Rd., Science & Industry Park, Nanshan
District 518057, Shenzhen China
Homepage: www.emersonnetworkpower.com.cn
E-mail: [email protected]
-
7/28/2019 APM2000- Power Supply Systm
2/67
Safety Precautions
To reduce the chance of accidents, please read the safety precautions
carefully before operation. The Caution, Notice, Warning and Danger
in this manual do not represent all the safety points to be observed, and
are only used as supplement to various operation safety points.
Therefore, the installation and operation personnel must be strictly
trained and master the correct operations and all the safety points
before actual operation.
When operating Emerson products, the safety rules in the industry, the
general safety points and special safety instructions specified in this
manual must be strictly observed.
Electrical Safety
I. ESD
Notice
The static electricity generated by the human body will
damage the static sensitive elements on PCBs, such as
large-scale ICs, etc. Before touching any plug-in board, PCB
or IC chip, ESD wrist strap must be worn to prevent body
static from damaging the sensitive elements. The other end of
the ESD wrist strap must be well earthed.
II. Shortcircuit
Danger
During operation, never short the positive and negative poles
of the DC busbar or the non-earthing pole and the earth. The
power system is a constant voltage DC power equipment,
short circuit will result in equipment burning and endangerhuman safety.
Check carefully the polarity of the cable and connection terminal when
performing DC live operations.
As the operation space in the DC distribution unit is very tight, please
carefully select the operation space.
Never wear a watch, bracelet, bangle, ring, or other conductive objects
during operation.
Insulated tools must be used.
-
7/28/2019 APM2000- Power Supply Systm
3/67
In live operation, keep the arm muscle tense, so that when tool
connection is loosened, the free movement of the human body and tool
is reduced to the minimum.
Others
I. Safety requirement
Notice Please use the same model MCB to replace the MCB.
II. Sharp object
WaringWhen moving equipment by hand, protective gloves should be
worn to avoid injury by sharp object.
III. Cable connection
NoticePlease verify the compliance of the cable and cable label with
the actual installation prior to cable connection.
IV. Binding the signal lines
NoticeThe signal lines should be bound separately from heavy
current and high voltage lines, with minimum 150mm binding
interval.
-
7/28/2019 APM2000- Power Supply Systm
4/67
Contents
Chapter 1 Overview ................................................................................................1
1.1 Theory .......................................................................................................1
1.2 System Features........................................................................................2
1.3 System Function ........................................................................................2
1.3.1 Protective Function..........................................................................2
1.3.2 Alarm Function ................................................................................3
1.3.3 Communication Function .................................................................7
1.4 System Composition..................................................................................7
1.4.1 Embedded Power Supply ................................................................8
1.4.2 Heat Exchanging Equipment And External Fan...............................8
1.4.3 Heaters ............................................................................................9
Chapter 2 Installation............................................................................................10
2.1 Precautions..............................................................................................10
2.2 Preparations ............................................................................................10
2.2.1 Inspecting Location........................................................................10
2.2.2 Distributing Goods .........................................................................10
2.2.3 Unpacking......................................................................................11
2.2.4 Preparing Tools .............................................................................11
2.2.5 Preparing Cables...........................................................................12
2.2.6 Opening The Cabinet Door............................................................13
2.3 Installing Cabinet .....................................................................................15
2.3.1 Installing Cabinet On A Concrete Stand ........................................15
2.3.2 Installing Cabinet On A Floorstand ................................................17
2.4 Installing Battery ......................................................................................19
2.5 Installing Rectifiers...................................................................................20
2.6 Connecting Cables ..................................................................................21
2.6.1 Precautions....................................................................................21
2.6.2 Cable Tube ....................................................................................22
2.6.3 Connecting Power Cables .............................................................22
2.6.4 Connecting Battery Cables ............................................................26
-
7/28/2019 APM2000- Power Supply Systm
5/67
Chapter 3 Testing .................................................................................................28
3.1 Introduction..............................................................................................28
3.2 Testing AC Distribution ............................................................................28
3.3 Testing Rectifier.......................................................................................29
3.4 Testing Monitoring Module ......................................................................29
3.4.1 Setting System Parameters ...........................................................30
3.4.2 System Function Test ....................................................................33
Chapter 4 Maintenance.........................................................................................36
4.1 Embedded Power Supply System Maintenance ......................................36
4.1.1 System Operation..........................................................................36
4.1.2 Indicator description ......................................................................37
4.1.3 Routine Maintenance.....................................................................38
4.1.4 Handling Of Common Faults .........................................................40
4.2 Battery Maintenance................................................................................414.3 Heat Exchanging Equipment ...................................................................41
4.4 External Fan Maintenance.......................................................................43
4.5 Replace Heaters And Relays...................................................................44
4.5.1 Replace The Heater In Equipment Compartment ..........................44
4.5.2 Replace The Heater In Battery Compartment................................47
4.5.3 Replace Heater Relays..................................................................48
4.6 Replace Door Status Sensors..................................................................49
4.7 SPD Maintenance....................................................................................50
Appendix 1 Technical Data...................................................................................53
Appendix 2 Definitions Of The Monitoring Expansion Board Interface .................55
Appendix 3 System Schematic Diagram...............................................................60
Appendix 4 System Wiring Diagram .....................................................................61
-
7/28/2019 APM2000- Power Supply Systm
6/67
-
7/28/2019 APM2000- Power Supply Systm
7/67
Chapter 1 Overview 1
APM200 Outdoor Power Supply System User Manual
Chapter 1 Overview
APM200 outdoor power supply system can be used directly outdoors. It can
supply as much as 60A electric current. There are two models of this
system: North model and South model. North model has an extra heating
unit compared with the South model.
1.1 Theory
The simplified theoretical block diagram is shown in Figure 1-1. The
detailed theoretical diagram is shown in Appendix 3 and 4.
Embedded powersupply
220
-48Vdc
Load 1
Vac
48Vdc220Vac
Distribution unitLoad 1
Load 11
220Vac
Figure 1-1 Simplified theoretical block diagram
The embedded power system rectifies the 220V AC power into -48V DC
power and exports the DC power to the distribution unit. It has functions of
battery management, LLVD (load low voltage disconnection), BLVD
(battery low voltage disconnection), data acquisition, alarm, and
communication with the host.
The distribution unit connects to AC mains and feeds the AC power to the
embedded power supply. In addition, it has routes of -48V DC output for the
loads.
-
7/28/2019 APM2000- Power Supply Systm
8/67
2 Chapter 1 Overview
APM200 Outdoor Power Supply System User Manual
1.2 System Features
Power factor of the rectifier can reach 0.99. The efficiency is higher
than 90%.
Wide AC input voltage range from 90V to 290V. When the input voltageis between 90~175Vac, the rectifier exports power- limited output.
When the input voltage is 90Vac, the minimum output power of the
rectifier is 37.5% of the rated power.
Perfect battery management. The system has BLVD function, and can
perform functions such as temperature compensation, auto voltage
regulation, stepless current limiting, battery capacity calculation, and
online battery test etc.
Rectifiers are hot pluggable. It takes less than 1min to replace a
rectifier.
Network design: Providing multiple communication ports, which
enables flexible networking and remote monitoring.
Perfect lightning protection at both AC side and DC side.
Complete fault protection and fault alarm functions.
All system components are accessible from the front.
The safety guideline satisfies IP55, and satisfies GR487 waterproof
requirement.
1.3 System Function
1.3.1 Protective Function
LLVD and BLVD
When mains failure occurs, the battery will supply power. When the battery
voltage drops to 47.5V (by default, adjustable), the monitoring module will
cut off the non- priority loads. When the battery voltage drops to the BLVD
voltage (default: 46.5V), the monitoring module will cut off all the loads to
avoid battery over- discharge. When the mains resumes, the power system
will go back to normal state.
-
7/28/2019 APM2000- Power Supply Systm
9/67
Chapter 1 Overview 3
APM200 Outdoor Power Supply System User Manual
Over- temperature protection
If the temperature of the equipment compartment remains over the
protection point (55C by default) for 30 seconds constantly, the monitoring
module will cut off the non- priority loads until the ambient temperature
drops below 45C. If AC side failure occurs, all the loads will be cut off.
This function is inhibitive by default, though the user can activate or prohibit
it through the host command.
Input under-voltage protections
When the AC input voltage is over 290Vac or below 90Vac, the rectifier will
perform self- protection. It can recover automatically, and the return
difference is more than 5Vac.
Output over-voltage protections
When the DC output voltage is over 60V, the rectifier will stop exporting
voltage or current. This protection cannot recover automatically.
Output current- limit protection
The APM200 system can perform current- limited protection.
Output short- circuit protection
The APM200 system can perform short- circuit protection. It can short
circuit for a long while and recover automatically.
1.3.2 Alarm Function
The system provides alarm functions. It annunciates alarm in the event of
mains failure, mains over/ under- voltage, DC output over/ under- voltage,
charging over- current, load over- temperature protection, ambient over-
temperature, module failure, module protection, as shown in table 1-1.
-
7/28/2019 APM2000- Power Supply Systm
10/67
4 Chapter 1 Overview
APM200 Outdoor Power Supply System User Manual
Table 1-1 Alarm functions
Remote-
communication
values
Description
Mains shortage Alarm is raised when mains is below 50V, and resumes when mains is above 60V.
Mains over-
voltage
1. Setting range: between the under- voltage alarm point and 300V. The mains over-voltage alarm point must be set above the AC over- voltage alarm point, and the
mains over- voltage alarm point is 280V by default.
2. Alarm recovery conditions:
When the mains is below the alarm point minus 3V for 10 minutes constantly, the
alarm recovers.
3. The mains over- voltage alarm point can be set through the host. AC over/ under-
voltage alarm and module alarm are shielded when mains shortage.
Mains under-
voltage
1. Setting range: between 60V and the over- voltage alarm point. The mains under-
voltage alarm occurs when mains is below the under- voltage alarm point, and the
default mains under- voltage alarm point is 180V.
2. Alarm recovery conditions:
When the mains is above the alarm point plus 3V for 10 minutes constantly.
, the alarm recovers.
3. The mains over- voltage alarm point can be set through the host. Mains under-
voltage alarm is shielded when mains shortage.
DC over- voltage
1. The alarm point is settable. The setting range is 58V~60V, and the alarm point
must be above the boost charging voltage plus 1V. The alarm return difference is
0.5V.
2.Default: 58V. DC over- voltage alarm occurs when the busbar voltage is over 58V,
and vanishes when the busbar voltage is below 57.5V.
DC under-
voltage
1. The alarm point is settable. The setting range isbetween the low- voltage
disconnection point and float charging voltage minus 2V. The alarm return
difference is 0.5V.
2.Default: 48.5V. DC under- voltage alarm occurs when the busbar voltage is below
48.5V, and vanishes when the busbar voltage is over or equal to 49V.
3. The lower limit voltage is LLVD voltage when load low- voltage disconnection is
permitted.
4. The lower limit voltage is BLVD voltage when load low- voltage disconnection is
prohibited and BLVD is permitted.
5. The lower limit voltage is 35V when both load low- voltage disconnection and
BLVD are prohibited.
-
7/28/2019 APM2000- Power Supply Systm
11/67
Chapter 1 Overview 5
APM200 Outdoor Power Supply System User Manual
Remote-
communication
values
Description
Charging over-
current
1. The charging over- current alarm will plus 5A when charging current is over the
current- limit point for 5 minutes constantly..
2. Alarm recovers when charging current is below the current- limit point for 5
minutes constantly.
Load over-
temperature
protection
1.The non- priority load over- temperature protection can be set activated or not
through the host settings. It is prohibited by default.
2. If the function is activated and the circumambient temperature is over the over-
temperature protection point for 30s constantly, the monitoring module will cut off
the non- priority loads automatically. And the power will resume on automatically
when the circumambient temperature is lower by 10C than the protection point.
3. Setting range: 50C ~70C. The protection point is 65C by default.
4. The temperature sampling point is the external temperature sensor.
5. The non- priority load over- temperature protection can be set controllable by the
host. If controllable, the load over- temperature protection can be activated through
the host command.
Battery over-
temperature
protection
1.The battery over- temperature protection can be set activated or not through the
host settings. It is prohibited by default.
2. If the function is activated and the circumambient temperature is over the over-
temperature protection point for 30s constantly, the monitoring module will perform
battery disconnection automatically. And the battery will resume power- on
automatically when the circumambient temperature is lower by 10C than the
protection point.
3. Setting range: 40C ~70C. The protection point is 53C by default.
4. The temperature sampling point can be set to be battery temperature 1, and is
subject to the temperature compensation value.
Circumambience
over-
temperature
The available setting range is -50~100C. When over the over- temperature alarm
point, the alarm return difference is 3C. The alarm point can be set respectively,
and is 50C by default.
Circumambience
under-
temperature
The available setting range is -50~0C. When under the over- temperature alarm
point, the alarm return difference is 3C. The alarm point can be set respectively,
and is 0C by default.
n# module failure Stand for n# module failure (output over- voltage, output shortage, fan failure)
n# module
protection
Stand for n# module protection (over- temperature, intput over/ under-
voltageprotection).
-
7/28/2019 APM2000- Power Supply Systm
12/67
6 Chapter 1 Overview
APM200 Outdoor Power Supply System User Manual
Remote-
communication
values
Description
Battery loop
disconnection
1. One battery- string loop alarms.
2. Battery loop disconnection (MCB/ fuse, contactor or internal wiring disconnection)
brings alarm.
3. The battery loop is the path between the battery string MCB and the battery string
contactor.
BLVD
LLVD
1. Low- voltage disconnection (LVD) activation and LVD voltage can be set through
the host. LLVD is inhibited by default, and BLVD is activated by default.
2. The available setting range of BLVD voltage is between 35V and LLVD voltage,
and BLVD voltage is 46.5V by default.
3. The available setting range of LLVD voltage is between BLVD voltage and DC
under- voltage alarm point, and BLVD voltage is 47.5V by default.
4. LVD criterion
1) The system has either following setting cannot perform LVD control: the number
of system and power module is set zero or battery string capability is set zero.
2) LVD is activated in accordance with LVD conditions and the host command.Door status
sensorThe dry contact is disconnected when alarm.
SPD failure
alarmCheck the two- route SPDs. The dry contact disconnects when SPD exports alarms.
Fan failure alarm
If the fan rev. is measurable and the fan rev. is set to be maximum, the virtual fan
rev. is less than 80% of the normal rev., fan failure alarm should be raised.
If the fan rev. is un measurable, fan failure alarm performs in accordance with failure
description by fan manufacturer.
Heater failure
alarm of the
storage batterycompartment
When the mains is in normal state and the storage battery temperature is below 5C
for an hour constantly, heater failure alarm of the storage battery compartment is
raised.
Test on backup
digital data
1. 3 routes altogether. The monitoring module supplies 24Vdc or 12Vdc operation
power for the switchable signal examination, disconnect the correlative low power
level (0V~1V) and connect the correlative high power level (9~24V).
2. 8/20s impulse current can endure 300A, without damage (bio- transient
suppressor with model of1.5SMC39CA is commeded).
3. Alarm power level is adjustable.
-
7/28/2019 APM2000- Power Supply Systm
13/67
Chapter 1 Overview 7
APM200 Outdoor Power Supply System User Manual
Note:
Alarm levels can be set through the host. The alarm levels are divided as
critical alarm, observation alarm, and inhibit alarm. Alarms that may cause
load power interruption are defined as critical alarm by default, and the
rests are observation alarms. Door status sensor alarms, humidity alarms
and backup equipment alarms can be set as non- alarm and be shielded,
while the other alarms cannot. Except exposited ones, the alarm affirmance
time is 10 seconds.
1.3.3 Communication Function
The system can communicate with the user host through communication
port RS232 or RS485, and report sampling data and alarm data to the host.
The AMP200 system can report some alarms information to the host
through the 4 couples of dry contacts.
1.4 System Composition
The APM200 outdoor power supply is constructed by an equipment
compartment and a battery compartment. The equipment compartment
consists of embedded power supply, heat exchanging equipment, external
fan and distribution unit etc. The battery compartment has two layers, and a
set of batteries that supplies backup power can be placed in each layer.
Each heater is placed in the equipment compartment and in the battery
compartment in the North model system. See Figure 1-2.
-
7/28/2019 APM2000- Power Supply Systm
14/67
8 Chapter 1 Overview
APM200 Outdoor Power Supply System User Manual
Rings(4 pieces)Heat exchanging equipment
External fan
Monitoring expansion board
Reserved
Embedded power supply
Distribution unit
Heater in equipment
compartment (behind
distribution unit)
Battery string I
Heater in battery
compartment (underthe plate)
Floorstand
Batterycompartment
door
Battery string II
Equipment
compartment
door
Figure 1-2 Structure of APM200 outdoor power supply system
1.4.1 Embedded Power Supply
The embedded power supply consists of 3 rectifiers, one monitoringmodule, one distribution subrack and one monitoring expansion board. It
switches the 220V AC voltage to -48V DC voltage, and delivers the -48V
DC voltage to the distribution units of the system and then to the loads
through its distribution subrack.
1.4.2 Heat Exchanging Equipment And External Fan
The heat exchanging equipment dissipates the heat inside the cabinet with
the external fan. It consists of an internal fan and a heat exchanger. The
external fan aspirates the cold air outside and feeds it to the heat
-
7/28/2019 APM2000- Power Supply Systm
15/67
Chapter 1 Overview 9
APM200 Outdoor Power Supply System User Manual
exchanger, while the internal fan expels the heat air inside the cabinet to
the heat exchanger. The heat exchanger exchanges the heat between cold
air and hot air in it to dissipate the heat.
1.4.3 Heaters
The two heaters will start to work when the environment temperature is
below 5C5C to ensure the normal operation of the North model system
segments in low temperature environment.
-
7/28/2019 APM2000- Power Supply Systm
16/67
10 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
Chapter 2 Installation
2.1 Precautions1. Only qualified technical person can do the system installation and
maintenance.
2. Avoid fire or body injuries.
3. Provide suitable AC mains supply to the system.
4. Earth the system according to the requirement.
5. Keep the environment of the system clean and dry.
6. Avoid touching the bare part of a circuit.
7. Switch off the circuit breakers in case of system failure.
2.2 Preparations
2.2.1 Inspecting Location
Before installation, please inspect:
1. the cable routing such as cable tunnel and so on.
2. the conditions required for the normal operation of the system, such as
AC mains supply, earth cable and so on.
2.2.2 Distributing Goods
The user needs to distribute the goods if several systems with same model
are purchased at the same time. Every system has been tested and gone
through the burn-in test strictly before delivery. In order to ensure the
optimized operation and track the product quality conveniently, the
components should be installed in their corresponding cabinet, even
though these components can be installed in other systems.
Ensure that all components in the same system have the same No. that is
marked on the packing case.
-
7/28/2019 APM2000- Power Supply Systm
17/67
Chapter 2 Installation 11
APM200 Outdoor Power Supply System User Manual
2.2.3 Unpacking
Inspect the equipment strictly after unpacking to ensure successful
installation.
Unpack and inspect the equipment only after it arrives at the installation site.
The user representative and the representative from Emerson NetworkPower Co., Ltd. shall inspect the equipment together.
Open the packing case with a packing list in it first, take out the packing list,
and inspect according to the packing list, including customer name,
customer address, machine No., quantity, case No., contract No., and
others.
Check the goods one by one according to the packing list after unpacking.
The procedures are as follows.
Step 1: Check the quantity and serial number marked on the packing cases
according to the actual quantity of the packing cases.
Step 2: Check the correctness of the equipment packing according to the
packing list.
Step 3: Check the quantity and model of the accessories according to the
packing list.
Step 4: Check the correctness of equipment configuration according to the
system configuration.
Step 5: Check the goods visually. For example, check if the cabinet or
enclosure is distorted or affected with damp; shake gently the rectifier and
the monitoring module to see if there is any loose component or connection
caused by shipment.
Step 6: The user representative signs the packing list.
Do not unpack the components before installing them to avoid accessory
loss.
2.2.4 Preparing Tools
The installation tools include electric drill, wire cutters, crimping tools,
wrench set, screwdriver, and electric knife. The tools must be insulation and
ESD-proof processed before they are used.
-
7/28/2019 APM2000- Power Supply Systm
18/67
12 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
2.2.5 Preparing Cables
The cables to be installed include AC power cables, DC power cable and
grounding cable.
RVVZ cables such as flame retardant PVC insulation or jacket soft cable
with copper conductors are recommended.The cables should be able to withstand at least +70C temperature. The
colors of AC phase cable, neutral cable and grounding cable shall be red,
Cambridge blue and green and yellow respectively. If the cables have the
same color, they should be identified with IDs or color labels.
The sectional area of the AC power cable depends on the current,
temperature rise, voltage drop and mechanical strength of the cable. The
2.5A/mm2 current density is recommended to estimate the sectional area of
the AC power cables and the cable with less than 10mm2sectional area is
not recommended.
The sectional area of the DC power cable is shown in Table 2-1.
Table 2-1 Sectional area of the DC power cable
Rated current Max. output current Min. sect. area
Max. cable l. with 0.5V
voltage drop and Min.
sect. area
32 A 16 A 16 mm2
14 m
20 A 10 A 10 mm2
14 m
16 A 8 A 6 mm2
11 m
10 A 5 A 4 mm2
11 m
If the rated capacity of a MCB is much bigger than the actual output current,the MCB will not trip when overload happens. So the recommended MCB
capacity is 1.5 to 2 times of the maximum load current (it is two times in the
table above).
Note
The maximum output current that flows in the DC power cable is calculated
according to the full load of the system.
If the acceptable voltage drop is not 0.5V, determine the sectional area of
the DC power cable according to the following expression.
-
7/28/2019 APM2000- Power Supply Systm
19/67
Chapter 2 Installation 13
APM200 Outdoor Power Supply System User Manual
A=I%L/(KU)
Where:
Asectional area of a cable (m2)
Itotal current that flows in the cable (A)
Lcable length (m)U acceptable voltage drop in the cable (V)
Kelectric conduction coefficient, here K Copper=57
Recommended color labels for the positive and negative DC power cables:
Positive cable black
Negative cable blue
The sectional area of the grounding cable should be at least 16mm2. A
green and yellow cable should be used as the grounding cable.
Prepare the cables according to the cabling specification and quantity. Do
not join two separate cables together to form one cable. The blue and blackcables should be used as DC power cables. If the cables are routed outside,
they should be inserted into a corrugation sleeve.
2.2.6 Opening The Cabinet Door
The equipment or battery compartment door needs to be opened during
system installation or maintenance. The two doors can be opened with
same method, and the procedures are follows:
Step 1: Undo the hexagon socket head cap screw in the keyhole sheet with
the hexagon key widdershins. Remove the keyhole sheet. Insert another
key into the keyhole and turn the key clockwise until it cannot be turned any
more, as shown in Figure 2-1.
-
7/28/2019 APM2000- Power Supply Systm
20/67
14 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
Keyholesheet
Handle
Figure 2-1 Unlock sequence
Step 2: Turn the handle about 120 counter clockwise, and then pull the
door, as shown in Figure 2-2.
Handle
Figure 2-2 Handle position
Step 3: Use the position pole to fix the position of the door to prevent the
door from being closed automatically, as shown in Figure 2-3.
Position pole
Figure 2-3 Position Pole
Step 4: Place the pole to its original position before closing the door.
-
7/28/2019 APM2000- Power Supply Systm
21/67
Chapter 2 Installation 15
APM200 Outdoor Power Supply System User Manual
Note
Different cabinets have the same key. If different key is needed, notify Emerson in
advance.
2.3 Installing CabinetThe APM200 outdoor power supply system uses bottom cabling mode.
Make a concrete stand or a floorstand first, and then place the cabinet on
the concrete stand or the floorstand. The detailed installation procedures
are follows.
2.3.1 Installing Cabinet On A Concrete Stand
Step 1: Make a concrete stand
The dimensions of the stand are shown in Figure 2-4.
Cable tunnel
Cabinet door
300~500
800
250
100
800
Figure 2-4 Dimensions of concrete stand (Unit: mm)
Step 2: Mark the cabinet installation position
Determine the center point positions of every installation hole on the stand
according to the installation dimensions of the cabinet shown in Figure 2-5,
and mark them with a pencil or an oil pen.
-
7/28/2019 APM2000- Power Supply Systm
22/67
16 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
Cabinet door
800
480
800
530
Figure 2-5 Installation dimensions of cabinet base
Step 3: Drill holes
The size of the expansion bolt delivered with the accessories is M1055mm.
Drill a 70mm-depth hole at each marked point by using a 14 drill bit. Be
careful not to make the drill be off-center when drilling and keep the drilling
vertical. Clean the dust from the hole. Insert an expansion pipe into it, and
knock the pipe gently until its head is in the same level with the floor, as
shown in Figure 2-6.
Drillvertically
Clean thedust
Knock itinto place
Tightenthe bolt
Expansionpipe
Powercabinet
70~75mm 14
Figure 2-6 Drilling holes and Installing expansion pipe and bolt
Step 4: Place cabinet in position
Move the cabinet to the installation position, and align the installation holes
of the cabinet to those on the ground.
-
7/28/2019 APM2000- Power Supply Systm
23/67
Chapter 2 Installation 17
APM200 Outdoor Power Supply System User Manual
Step 5: Open the battery compartment door
Take the key from the ring on the cabinet top, and open the battery
compartment door according to the method introduced in section 2.2.6.
Step 6: Fix the cabinet
Adjust the cabinet horizontally and vertically. Insert an iron flake underneaththe lower edge or the corner that is closer to the ground to adjust the
vertical tilt to be within 5 degrees. Screw the expansion bolt with plain and
spring washers into the expansion pipe with a wrench, as shown in Figure
2-7.
Battery compartment
Expansion bolt
Expansion pipe
Concrete stand
Expansion bolt
Spring washer
Cabinet base
Expansion pipeConcrete stand
Spring washer
Figure 2-7 Screwing an expansion bolt
Shake the cabinet in different directions after the installation to check for
any loose component and loose installation of the cabinet.
2.3.2 Installing Cabinet On A Floorstand
Step 1: Mark the floorstand installation position
Determine the center point positions of the floorstand on the ground and
mark them with a pencil or an oil pen, as shown in Figure 2-8.
-
7/28/2019 APM2000- Power Supply Systm
24/67
18 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
Cabinet door14
4
50
400
Figure 2-8 Installation dimensions of floorstand
Step 2: Drill holes
The size of the expansion bolt delivered with the accessories is M1055mm.
Drill a 70mm-depth hole at each marked point by using a 14 drill bit. Be
careful not to make the drill be off-center when drilling and keep the drilling
vertical. Clean the dust from the hole. Insert an expansion pipe into it, and
knock the pipe gently until its head is in the same level with the floor, as
shown in Figure 2-4.
Step 3: Fix the floors tand
Align the installation holes of the floorstand to those on the ground. Screw
the expansion bolt with plain and spring washers into the expansion pipe
with a wrench, as shown in Figure 2-9.
and floorstand
Floorstand
Expansion bolt
Ground
Batterycompartment
Screw for fixing cabinet
Figure 2-9 Installing the cabinet and floorstand
-
7/28/2019 APM2000- Power Supply Systm
25/67
Chapter 2 Installation 19
APM200 Outdoor Power Supply System User Manual
Step 4: Place cabinet in position
Place the cabinet on the floorstand. Align the installation holes of the
cabinet to those of the floorstand.
Step 5: Open battery compartment door
Take the key from the ring on the top of the cabinet, and open the batterycompartment door according to the method described in section 2.2.6.
Step 6: Fix cabinet
Adjust the cabinet horizontally and vertically. Insert an iron flake underneath
the lower edge or the corner of the cabinet that is closer to the ground to
adjust the vertical tilt to be within 5 degrees. Screw the screws supplied
with the accessories to fix the cabinet on the floorstand with a wrench, as
shown in Figure 2-7.
Shake the cabinet in different directions after the installationto check for any
loose component and loose installation of the cabinet.
2.4 Installing Battery
Open the battery compartment door according to the method introduced in
Section 2.2.6.
The battery compartment has two floors. Each floor can be placed with one
battery string that has four cells. Install the battery cells according to the
battery user manual delivered with the battery.
The battery cells should be installed as close to the right side and rear side
of the cabinet as possible. Attach the acid and alkali integration box on theside panel of the cabinet.
Loosen the two baffles in the front of the battery compartment after
installing the battery cells, and then move the baffles vertically about 10mm
and screw the screws solidly to block the battery cells, as shown in Figure
2-8.
The installation tools must be insulation processed. Do not damage the
plastic cover of the battery cells and their output terminals during the
installation.
-
7/28/2019 APM2000- Power Supply Systm
26/67
20 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
Batterycompartment
Battery string IBaffle
Battery string II
Baffle
Figure 2-10 Installing battery strings
2.5 Installing Rectifiers
The subrack of the embedded power supply has been installed in the
cabinet of the outdoor power supply system. While the rectifiers of the
embedded power supply are packed and delivered separately and need to
be installed on spot.
Rectifiers should be installed in the three left slots of the subrack. Install the
rectifiers from left to right when there are less than three rectifiers to be
installed and mount dummy plate at the remaining position. The installation
procedures are as follows.
Step 1: Place the rectifier to the position shown in Figure 2-11.
Handle
Rectifier
Figure2-11 Positions of the rectifier and the handle
-
7/28/2019 APM2000- Power Supply Systm
27/67
Chapter 2 Installation 21
APM200 Outdoor Power Supply System User Manual
Step 2: Push the handle into the panel.
Step 3: Push the rectifier inward until it stops going forward. The rectifier is
fixed in the subrack.
Step 4: The procedures to unplug the rectifier-move the latch to Unlock
position first, and pull out the rectifier then.
2.6 Connecting Cables
2.6.1 Precautions
1. When doing engineering design, AC cables and DC cables should be
installed separately to avoid interfering with DC output caused by AC
power.
Note
At the point where the DC output cable is led out of the cabinet, drill the cablethrough a steel tube longer than one meter and then connect it to the load to
prevent radiant disturbance.
2. AC cables and DC cables should be identified with cable labels and
polarity markings. The markings should be attached on the cables at a fixed
distance.
3. The cables should be identified with different colors, as shown below:
Positive DC cable black
Negative DC cable blue
Grounding cable green and yellow
AC phase line red
Neutral line Cambridge blue or black
If the cables have the same color, black cable is preferred and they should
be identified with IDs.
4. The cables to be connected are AC power cables, DC power cables and
battery cables.
5. Safety and reliability are most significant factors in electrical connection.
-
7/28/2019 APM2000- Power Supply Systm
28/67
22 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
6. The AC and DC power cables and grounding cable should be routed
through the cable tunnel, the battery compartment and the cable tubes
between the two compartments, and should finally be connected to the
distribution unit.
7. The cables shall not have joint, damage or scratch.
2.6.2 Cable Tube
This system is configured of 15 cable tubes with different sizes. The
appearance of the tube is shown in Figure 2-10. The cable tubes are
located on the separating plate between the equipment compartment and
the battery compartment, as shown in Figure 2-11. User can select the
suitable tube to route the cable according to the cable size. Unscrew the
tube cap, then lead the cable through the tube, and finally screw the cap.
Cable tube
Distribution unit
Figure 2-12 Position of cable tube
2.6.3 Connecting Power Cables
Step 1: Remove the panel of the distr ibut ion unit
The panel is shown in Figure 2-13.
-
7/28/2019 APM2000- Power Supply Systm
29/67
Chapter 2 Installation 23
APM200 Outdoor Power Supply System User Manual
The panel of the distribution unit
Figure 2-13 Panel of the distribution unit
Step 2: Load Distribution
The system can supply 11 routes of loads, as shown in Figure 2-16. The
MCBs (LOAD1~LOAD6) of the distribution unit in the embedded power
supply controls the 11 loads. The positions of the MCBs in the subrack are
shown in Figure 2-14, and the relationship between these two levels of
MCBs is shown in Figure 2-15. The specifications of the MCBs are shown
in Table 2-2.
Table 2-2 MCB Specifications
MCB in
subrack
MCB in
distr. unit
MCB cap. in
distr. unit
Cable size
in distr. unitRemark
LOAD 1 1, 2 16A 25mm2
Total output of two MCBs
should be less than 15A
LOAD 2 3, 4 16A 25mm2
Total output of two MCBs
should be less than 15A
LOAD 3 5, 6 16A 25mm2
Total output of two MCBs
should be less than 15A
LOAD 4 7, 8, 9 16A 25mm2
Total output of three MCBs
should be less than 15A
LOAD 5 10 32A 25mm2
Total output of the MCB
should be less than 30A
LOAD 6 11 32A 25mm2
Total output of the MCB
should be less than 30A
-
7/28/2019 APM2000- Power Supply Systm
30/67
24 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
Load MCB Battery force- on buttonBattery MCB
Figure 2-14 MCBs in subrack of embedded power supply system
Route Route Route Route Route Route Route Route Route Route
LOAD2
Route1 2 4 5 6 7 8 9 10 11
LOAD4 LOAD5 LOAD6LOAD1 LOAD3
3
Figure 2-15 Relationship between two levels of MCBs
The embedded power supply system has LLVD and BLVD functions. When
the battery voltage is less than 47.5V (default), the embedded power supply
system will disconnect the load connected to the MCBs of LOAD5 and
LOAD6 automatically without interrupting the power to the load connected
to the MCB of LOAD1~LOAD4. LOAD1~LOAD4 will be disconnected
automatically when the battery voltage is less than 46.5V (default) to avoid
battery overdischarge. At this time, all loads are disconnected.
So the priority loads should be connected to the MCB of LOAD1~LOAD4,
that is the Route1 to Route 9 in Figure 2-16. The normal loads should be
connected to the Route 10 to Route 11 in Figure 2-16.
-
7/28/2019 APM2000- Power Supply Systm
31/67
Chapter 2 Installation 25
APM200 Outdoor Power Supply System User Manual
Step 3: Connect loads
As shown in Figure 2-15, connect the negative polarity of every load to the
lower terminal of the MCB with a negative cable, and connect the positive
polarity of the load to the bolt on the positive busbar that has one M6 bolt
and seven M4 bolts.
Note
The tools and body shall be insulated strictly before applying a load when the
system is powered on to avoid shortcircuit.
Terminal for
connecting loadPositive busbar Grounding bar AC phase line (L) Neutral line (N)
Figure 2-16 Terminals for connecting load and AC power
Note:
The L & N terminals above are divisional interface of AC SPD and power
subracks instead of AC input terminals.
Step 4: Connect AC power cables
Connect the AC input grounding cable to the grounding bar shown in Figure
2-16 or the grounding bar outside the battery compartment of the cabinet.
Connect the AC input neutral line to the wiring point below the MCB N
shown in Figure 2-16.
Connect the AC input phase line to the wiring point below the MCB L shown
in Figure 2-16.
Note
1. The grounding cable shall be connected first, then the neutral line and finally
the phase lines.
-
7/28/2019 APM2000- Power Supply Systm
32/67
26 Chapter 2 Installation
APM200 Outdoor Power Supply System User Manual
2. The AC cables should be routed from the MCB in the external distributionequipment prepared by user. They should be connected to the MCB just before thesystem is powered on. The external distribution equipment should have some
protection devices to fulfill the overcurrent, shortcircuit and lightning protection
functions.
3. The AC cables should be identified with color labels to identify the phase line,
neutral line and grounding cable.
4. The AC cables should be routed away from the DC cables.
Step 5: Re-install the cover
Re-install the cover to the distribution unit after completing the connection.
2.6.4 Connecting Battery Cables
Step 1: Switch on the AC input MCB and battery MCB
The positions of the AC input MCB and the battery MCB are shown in
Figure 2-17.
Battery MCB
AC input MCB
Figure 2-17 Position of AC input MCB and battery MCB
Step 2: Check if the polarities of the battery cables are correct
Check the polarities of the battery cables in the battery compartment with a
multimeter. The black cable should be negative pole and the red cable
-
7/28/2019 APM2000- Power Supply Systm
33/67
Chapter 2 Installation 27
APM200 Outdoor Power Supply System User Manual
should be positive pole. The cable in the middle is middle voltage sampling
cable of the battery, as shown in Figure 2-18. If the polarity is incorrect,
please contact Emerson.
Middle voltage sampling cable of the battery
Positive battery cable
Negative battery cable
Negative battery cable Middle voltage sampling cable of the battery
Figure 2-18 Battery cables
Step 3: Connect battery cells
Switch off the battery MCB and AC input MCB. Connect the battery cells
with the cables delivered with the battery according to the battery user
manual.
Step 4: Connect the battery string to the cabinet
Connect the blue and black cables in the battery compartment respectively
to the negative and positive terminals of the battery string. Connect the
voltage sampling cable to the middle voltage terminal of the battery.
Step 5: Recheck if the polarities of the battery cables are correct
Check the polarities of the battery cables again after completing the
connection. Make sure that the blue cable in the battery compartment is
negative and the black cable is positive. If the cable polarity is incorrect,
repeat Step 4.
-
7/28/2019 APM2000- Power Supply Systm
34/67
28 Chapter 3 Testing
APM200 Outdoor Power Supply System User Manual
Chapter 3 Testing
3.1 IntroductionThe cabinet, rectifiers and monitoring module are subject to vibrations
during shipment. More over, mistakes might be made during system
installation. If the system is powered on in haste, a fatal accident may occur
and the whole power supply system may be damaged. Therefore, the
system must be tested strictly after it is installed.
Conduct the test procedures carefully and observe the system in the mean
time. Shut down the system in case of any abnormal phenomenon and
continue the test after the fault is eliminated.
3.2 Testing AC Distribution
Step 1: Check if the PE cables are reliably connected and the AC cables
are correctly connected to the system according to the system schematic
diagram (refer to Appendix 3), and if the screws are loose before powering
on the system.
Step 2: Switch on the residual current operated circuit breaker (RCCB).
Switch off all MCBs (put the handles down) in the subrack and the
distribution unit. Switch on the SPD MCBs, as shown in Figure 3-1.
RCCB
Figure 3-1 MCB positions
-
7/28/2019 APM2000- Power Supply Systm
35/67
Chapter 3 Testing 29
APM200 Outdoor Power Supply System User Manual
Step 3: Make sure that there is no short circuit in the input and output
terminals of the AC
Step 4: Switch on the MCB in the external distribution equipment to power
the system. Measure the voltages of the input terminals of the AC MCBs.
Check the external distribution equipment if the voltages are abnormal.
Step 6: Switch on the battery MCB.
Step 5: Switch on the AC MCBs and the operation indicators (green) on the
rectifier panels should turn on. Otherwise, check the distribution unit
carefully.
3.3 Testing Rectifier
Step 1: Make sure that there is no short circuit in the input and output
terminals of the rectifier and there is no loose or damaged component
inside the rectifier.
Step 2: Switch on the AC MCBs. The green indicator on the rectifier panel
turns on and the red indicator is on for several seconds. The rectifier starts
after a start delay and then operates normally. At this time, only the green
indicator is on and the fan will stop several minutes later if no load is
applied to the system.
Step 3: Measure the DC output voltage of the system with a multimeter. It
should be 53.5V0.5V.
Note
Only the engineers from Emerson can adjust the output voltage of the rectifier.After the system test is completed, the output voltage needs not to be adjusted any
more unless the rectifier is replaced with a new one.
3.4 Testing Monitoring Module
The monitoring module must be tested with a host.
-
7/28/2019 APM2000- Power Supply Systm
36/67
30 Chapter 3 Testing
APM200 Outdoor Power Supply System User Manual
3.4.1 Setting System Parameters
Upon delivery, the default parameters of the monitoring module may be
inconsistent with the actual situation or your needs. In that case, you should
configure the system parameters through the host before the system
testing.According to the communication protocol, the parameters that you can
query through the host are listed in the following table.
Table 3-1 Parameters that can be queried
RemotelyAcquiredAnalogSignal
1) AC Input Voltage
2) DC Busbar Voltage
3) Rectifier Total Output Current
4) Battery String Current
5) AmbientTemperature/Humidity
6) Battery Temperature
RemotelyAcquiredAlarm/DigitalSignal
1) AC Mains On/Off
2) AC Mains Status
3) DC Bus Voltage Status
4) Load MCB Status
5) System Current-Limiting Status
6) Load Connection/Disconnection
Status
7) Battery Connection/Disconnection
Status
8) Battery MCB Status
9) Ambient Temperature/Humidity
Status
10) Door Status Sensor
11) Water Sensor Status
12) Smoke Sensor Status
13) Rectifiers Operation Status
14) System Control Mode and Battery
BC/FC Status
15) 7 Standby Digital Signal Status16) 2 Digital Signal Output Status
17) Battery Discharge Test Phase
Status
18) Battery Charge Over-Current
Status
Remote-ControlParameters
1) Rectifier On/off Control
2) BLVD & LLVD
3) FC/BC Status Control
4) Start/End Battery Capacity
Test
According to the communication protocol, the parameters that you can
configure through the host are listed in the following table.
-
7/28/2019 APM2000- Power Supply Systm
37/67
Chapter 3 Testing 31
APM200 Outdoor Power Supply System User Manual
Table 3-2 Configurable parameters
Parameter Range Default value
AC Input Under-Voltage
Alarm Point
> 60V and lower than AC Over-Voltage
Alarm Point180V
AC Input Over-Voltage
Alarm Point
Between AC Under-Voltage Alarm point
and 300V
280V
DC Busbar Low Voltage
Point
1, When LLVD enabled: LLVD Voltage
2, When LLVD disabled but BLVD
enabled: BLVD voltage
3, When both LLVD and BLVD disabled:
35V
46.5V/47.5V/35V
(depending on
the BLVD Status
and LLVD
Status)
DC Busbar Under-Voltage
Alarm Point
Between DC Busbar Low Voltage Point
and 2V below FC voltage48.5V
DC Busbar Over-Voltage
Alarm Point
58V ~ 60V and 1V higher than BC
voltage58V
LLVD Status Disabled, Enabled Disabled
LLVD Voltage
Between BLVD voltage (when BLVD is
disabled: >35V) and DC Busbar
Under-Voltage Alarm Point
47.5V
BLVD Status Disabled, Enabled Enabled
BLVD Voltage
35V but lower than LLVD voltage
(when LLVD is disabled, lower than DC
Busbar Under-Voltage Alarm Point)
46.5V
Ambient Temp Alarm
Lower Limit
-50C ~ 100C and lower than upper
limit0C
Ambient Temp Alarm
Upper Limit
-50C ~ 100C and higher than lower
limit50C
Ambient Humidity Alarm
Lower Limit
0%RH ~ 100%RH and lower than upper
limit10%RH
Ambient Humidity Alarm
Upper Limit
0%RH ~ 100%RH and higher than
lower limit80%RH
Standby Digital Signal
Alarm LevelHigh level alarm 1, low level alarm 0
High level alarm
1
Number and Addresses of
Rectifiers(1, 1), (2, 1, 2), (3, 1, 2, 3) (3, 1, 2, 3)
System Control Mode Host Control, Auto Auto
FC/BC Status BC, FC FC
-
7/28/2019 APM2000- Power Supply Systm
38/67
32 Chapter 3 Testing
APM200 Outdoor Power Supply System User Manual
Parameter Range Default value
BC voltage
43.2V ~ 57.6V, between FC voltage and
1V below DC Busbar Over-Voltage
Alarm Point
56.5V
FC voltage
43.2V ~ 57.6V, between BC voltage and
2V below DC Busbar Under-Voltage
Alarm Point
53.5V
Number of Battery Strings 0 ~ 1 1
Capacity of Battery String 30Ah ~ 600Ah
100Ah (when no
specific
requirement is
made)
Coefficient of Charge
Current Limiting Point0.1 ~ 0.25 0.15
Scheduled BC Interval 30 days ~ 240 days 60 days
Temp Compensation
Coef. of Battery String0mV/C ~ 500mV/C 80mV/C
Temp Measurement
Lower Limit-50C ~ 0C -50C
Temp Measurement
Upper Limit0 C ~ 100 C 50 C
Humidity Measurement
Lower Limit
0%RH ~ 100%RH and lower than
Upper Limit0%RH
Humidity Measurement
Upper Limit
0%RH ~ 100%RH and higher than
Lower Limit100%RH
Power Distribution Analog
Signal Calibration
Coefficient
Not configurable by the user
Battery Over-TempProtection Point
40C ~ 70C 53C
When setting system parameters through the host, please note that:
1. Make sure that the power system address set at the host is identical with
the address set through the DIP switch, or the communication will fail.
2. Make sure that the rectifier number is set consistent with the actual
condition. After a rectifier is added to or removed from the power system,
the rectifier number parameter must be accordingly modified, or a rectifier
alarm will be raised.
-
7/28/2019 APM2000- Power Supply Systm
39/67
Chapter 3 Testing 33
APM200 Outdoor Power Supply System User Manual
3. The battery string capacity is set to customer required specific capacity
according to order requirement before delivery. If there is no specific
capacity of the battery strings required in the order, the default battery string
capacity is 100AH. If the actual battery capacity is different from that, reset
the configuration through the host to make the configuration consistent with
the actual situation and prevent improper battery management. (Note: the
200Ah and 100Ah capacities are set through DIP switch. You can only set
other capacities through the host.)
4. The management over the battery strings is realized through a common
BLVD and a shunt, and the battery current measured by the monitoring
module is actually the total current of the two. Therefore, at the host, the
battery string number should be set to 1, and the battery capacity be set to
the sum of the two strings.
5. The DIP switch is in the PCB board of the monitoring module. Pull out the
monitoring module (hot pluggable) before changing the DIP switch settings.Then you can change the DIP switch settings
Description of DIP switch settings:
DIP switch 1~4: Address DIP switch. ON acts 1, OFF acts 0.
DIP switch 7: ON denotes that the battery string capacity is 200Ah; OFF
denotes that the battery string capacity is 100Ah. As shown in Figure 3-2.
DIP switch7 ON
DIP switch7 OFF
Figure 3-2 DIP switches
3.4.2 System Function Test
After setting the system parameters, you can go on to carry out the system
function test.
For the requirements of the test on system AC over/under-voltage alarm
and protection are rather strict, you do not need to do them. After all, the
system has passed strict tests before delivery.
-
7/28/2019 APM2000- Power Supply Systm
40/67
34 Chapter 3 Testing
APM200 Outdoor Power Supply System User Manual
Battery Auto-Management Test
Cut off AC mains supply and power the load with the battery for above 15
minutes (!1 minute), then recover the AC mains, all rectifiers will be in
current-limiting BC status.
During the current-limiting BC status, it is normal that the rectifier output
voltage is sometimes below 53.5V.
For the test of battery auto-management has strict requirements for the
system, it is not necessary to carry out this test if your test conditions are
limited.
Rectifier On/Off Test
Set the control mode to background control through the host software and
try turning on/off each module. The corresponding module should act
correctly.
Note to change the control mode to automatic control after the test is
finished.
Under-voltage Alarm And LLVD/BLVD Test
Cut off the AC power and power the load with batteries. Set the DC
under-voltage alarm point, LLVD and BLVD voltage to higher values to
shorten the test duration. Then observe the battery under-voltage alarm,
LLVD and BLVD situation. The monitoring module should send out the
corresponding alarms one by one. The red indicator on the front panel of
monitoring module should be on, and the dry contact controlling the
external audible/visual alarm equipment should output alarm signal.
Recover the AC power, restore the settings of under voltage alarm point,
LLVD and BLVD voltage, and the above alarms should disappear.
Rectifier On Position Test
Set the power system address and rectifier number correctly, insert and pull
out the rectifiers one by one, and the host should display the
communication state of corresponding rectifiers correctly.
-
7/28/2019 APM2000- Power Supply Systm
41/67
Chapter 3 Testing 35
APM200 Outdoor Power Supply System User Manual
Battery MCB Off Alarm Test
Connect the battery to the system, and switch off its MCB. There should be
a corresponding battery MCB off alarm raised at the host. The alarm will
disappear when the MCB is turned on.
Load MCB Off Alarm TestConnect a load to the system and switch off its MCB. There should be a
corresponding load MCB off alarm raised at the host. The alarm will
disappear when the MCB is turned on.
Note
1. If the terminal of corresponding load and battery route is not connected with
load or battery during the test, but is suspended, the MCB Off Alarm forcorresponding load or battery may not be reported accurately.
2. Make sure that system configurations are restored to normal status after the test.
Viewing Operation Information
After the system power on, you can get simple operation information
through the indicators on the monitoring module front panel. For detailed
information, you must query through the host.
Canceling Battery Protection
If you think it more important powering the loads than protecting the battery,
thus do not want the battery protection in the case of mains failure, you can
set the LLVD and BLVD status to Disabled through the host.
NoteWhen the battery is discharged to the BLVD voltage, the battery backup time isvery short. It is impossible to obtain long time operation of loads by sacrificing the
battery.
-
7/28/2019 APM2000- Power Supply Systm
42/67
36 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
Chapter 4 Maintenance
Inspect the outdoor power supply system periodically and shoot the trouble
in time.
4.1 Embedded Power Supply System Maintenance
4.1.1 System Operation
After installation and testing, the system is ready for use. When necessary,
it can be put into normal operation just by switching on the corresponding
MCB. During the operation, the following issues may call your attention:
Fan speed control technologyThe fan may run for a second and stop when the rectifier is powered on for
the first time. If load is connected to the system, the inner temperature of
the rectifier will increase after operation for a period of time, and the fan will
begin running and speed up with the increase of inner temperature. That
phenomenon is due to the fan speed adjusting technology, and thus
absolutely normal.
Over temperature protection
A rectifiers inner temperature may be high during operation. If you reset it
by turning it off and on at that time, you may observe that the rectifier has
no output but the fan is running. That is because the OTP circuit within is
working. The output will recover after the temperature decreases 1 minute
later.
If the fan does not run, and the rectifier has no output for more than 5
minutes, the rectifier may have been damaged. Please replace the faulty
rectifier or contact Emerson local service center.
-
7/28/2019 APM2000- Power Supply Systm
43/67
Chapter 4 Maintenance 37
APM200 Outdoor Power Supply System User Manual
4.1.2 Indicator description
Indicator description of the rectifier
The appearance of the rectifier is shown in Figure 4-1. There are 3
indicators on the panel: ALM (alarm indicator), FAN-ALM (indicator of fan
faulty alarm) and RUN (power indicator)
Figure 4-1 Rectifier appearance
When the rectifier runs in normal condition, the power indicator RUN is on,
and the other two indicators are off. When fan failure occurs, FAN- ALM
indicator is on and RUN indicator is off. When other faults or protectionalarm occur, ALM indicator is on and RUN indicator is off. The operation
state of the rectifier should be estimated according to the indicator state
when maintenance.
Indicator description of the monitoring modu le
The appearance of the monitoring module is shown in the following figure.
There are 2 indicators on the panel: RUN (power indicator) and ALM (alarm
indicator). Descriptions are as shown in Table 4-1.
-
7/28/2019 APM2000- Power Supply Systm
44/67
38 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
Figure 4-2 Appearance of monitoring module
Table 4-1 Monitoring module indicator description
Indicator
MeaningRUN indicator (green)
ALM indicator
(red)
Normal Slow blinking (Once per second) Off
No system alarm, with abnormal
communication Fast blinking (Once per 120ms) Off
System alarm, with normal
communicationSlow blinking (Once per second) On
System alarm, with abnormal
communicationFast blinking (Once per 120ms) On
4.1.3 Routine Maintenance
Fan Maintenance
Dust will accumulate on the baffle plate if the rectifier works in a dusty and
windy environment. To ensure long-term reliable and smooth operation ofthe rectifier, it is necessary to clean the fan regularly (once 6 months).
In addition, the fan performance will deteriorate after long-term operation.
You need to replace the fan regularly (once every 3-5 years).
Fan replacing method:
1. Remove the fan baffle plate
2. Remove the screws on the top right corner of the fan
3. Pull out the power cable
4. Replace the fan with a new one
-
7/28/2019 APM2000- Power Supply Systm
45/67
Chapter 4 Maintenance 39
APM200 Outdoor Power Supply System User Manual
5. Connect the power cable, and fix the fan with the screw on the top right
corner
6. Mount the baffle plate back
The fan structure is shown below:
Figure 4-3 Fan of the rectifier
Note
1. Only trained professionals are allowed to clean and replace the fan.
2. Do not touch any internal parts of the rectifier during fan maintenance.
Rectifi er Pull-Out & Plug-in
Upon abnormities, the rectifier may need to be pulled out and plugged in.
The rectifiers and monitoring modules are all hot swappable.
To pull out the rectifier, you should first draw out the handle at rectifier front
panel to detach the latch at rectifier bottom from the distribution frame.
Then you can pull the rectifier out by the handle. The handle position is
shown in Figure 4-4.
-
7/28/2019 APM2000- Power Supply Systm
46/67
40 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
When replacing new monitoring modules, communication cable and signal
cable shoule be connected as well. See Figure 4-4.
Handle of therectifier
Rectifier
Handle of themonitoringmodule
Monitoringmodule
Communicationcable to theexpanding board
Signal cable to theexpanding board
Figure 4-4 Handle of the modules
Note
The rectifiers connecting part is a delicate device. Although the rectifiers aredesigned to be hot swappable, the pull-out and plug-in operation should be gentle
lest the connecting part should be damaged. Non-professionals are not allowed to
replace the rectifier on-line.
4.1.4 Handling Of Common Faults
Fault Symptom1:
The rectifier quits operation automatically and a corresponding alarm is
raised at the host.
Solution: replace the faulty rectifier.
Fault Symptom2:
Rectifier(s) is/are shut down upon over-voltage and the corresponding
alarm is raised at the host.
Solution: 1) Upon single rectifier shutdown: Switch off the faulty rectifier.
Wait till its indicators are off, and switch it on again. If the over-voltage still
exists, the rectifier may have been damaged and need replacing. 2) Upon
multiple-rectifier shutdown: Pull output all rectifiers and insert them one by
-
7/28/2019 APM2000- Power Supply Systm
47/67
Chapter 4 Maintenance 41
APM200 Outdoor Power Supply System User Manual
one to find out the real faulty one. Replace the faulty rectifier after
confirmation.
4.2 Battery Maintenance
Refer to the battery user manual supplied with the battery. (Note: It isrecommended to use T12V100SEF/A battery within this system. If you
choose to use battery of other models, please consult with Emerson to
prevent improper configuration.)
4.3 Heat Exchanging Equipment
The heat exchanging equipment consists of an internal fan and a heat
exchanger. Its position is shown in Figure 4-5.
Heatexchangeequipment
Cableconnector
Fixingscrews
Figure 4-5 Position of heat exchanging equipment
The internal fan rev is settable. The higher the temperature of the
equipment compartment is, the larger the internal fan rev is.
Replace the internal fan or adjust the fan position if it stops running or there
is an abnormal noise in it. And clean the heat exchanger if there is much
dust on it. The procedures are as follows.
Step 1: Disconnect the cable connector at the left side of the heat
exchanging equipment, as shown in Figure 4-5. Do not disconnect when
power is on.
Step 2: Remove the fixing screws shown in Figure 4-5 and then remove the
heat exchanging equipment from the cabinet.
-
7/28/2019 APM2000- Power Supply Systm
48/67
42 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
Step 3: Remove the screws that fix the cover and the internal fan baffle and
then remove the cover and the baffle, as shown in Figure 4-6.
Cover
Screws for fixing the
cover (4 pieces)
Fan baffle
Screws for fixing the
baffle (3 pieces)
Figure 4-6 Remove the cover and baffle
Step 4: Remove the fixing screws of the internal fan shown in Figure 4-7.
Adjust the fan position or replace the fan with a new one. Take out the heatexchanger to clean it if there is much dust on it.
Heat exchanger
Fan screws
(4 pieces)Internal fan
position
Figure 4-7 Remove internal fan and heat exchanger
Step 5: Follow step 5 to step 1 to install the new fan and the clean heat
exchanger into the cabinet. Take care when installing the heat exchanger to
avoid damaging the waterproof bar on it.
-
7/28/2019 APM2000- Power Supply Systm
49/67
Chapter 4 Maintenance 43
APM200 Outdoor Power Supply System User Manual
4.4 External Fan Maintenance
The external fan rev is settable. The higher the temperature of the
equipment compartment is, the larger the external fan rev is. Replace the
external fan or adjust the fan position if it stops running or there is anabnormal noise in it. The procedures are as follows.
Step 1: Disconnect the cable connector at the left side of the heat
exchanging equipment, and disconnect the fan cables from the terminals,
as shown in Figure 4-8. Do not disconnect when power is on.
Heat ex-changeequipment
Cable con-nector of theheat exchangeequipment
Fixingscrews
Cable con-nector of theexternal fan
Fixingscrews
External fan
Figure 4-8 Positions of heat exchanger and external fan
Step 2: Remove the fixing screws of the heat exchanging equipment shown
in Figure 4-8, and then remove the equipment.
Step 3: Remove the fixing screw of the fan box shown in Figure 4-4 and
then remove the fan box.
Step 4: Remove the fixing screw of the external fan shown in Figure 4-9.
Adjust the fan position or replace it with a new one.
-
7/28/2019 APM2000- Power Supply Systm
50/67
44 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
External fan
Fixing screws
of external
fan (4 pieces)
Figure 4-9 Remove the external fan
Step 5: Follow step 4 to step 1 to install the new fan into the cabinet. Install
the heat exchanging equipment into the cabinet. Take care when installing
the heat exchanging equipment to avoid damaging the waterproof bar on it.
4.5 Replace Heaters And Relays
The two heaters of the system do not need to be repaired. Be sure to pay
attention to their operation status. The heaters will heat when the
environment temperature is below 5C5C, and stop heating above
15C5C. If they operate abnormally, check the heater relays (refer to
section 4.6.3). If the relays operate abnormally, replace them. Otherwise,
replace the heaters.
4.5.1 Replace The Heater In Equipment Compartment
Step 1: Switch off the AC MCB and the heater fuse, as shown in Figure
4-10.
-
7/28/2019 APM2000- Power Supply Systm
51/67
Chapter 4 Maintenance 45
APM200 Outdoor Power Supply System User Manual
Heater MCB AC input MCBPanel of distribution unit
Figure 4-10 Position of AC MCB and heater MCB
Step 2: Remove the panel of the distribution unit, as shown in Figure 4-11.
The position is shown in Figure 4-10.
Figure 4-11 Remove the panel of the distribution unit
Step 3: Unscrew the 4 pieces of screws on the panel of the distribution unit
and then remove the right segment of the distribution unit. Do not
disconnect its components and cables and be sure to pay attention to
personnel safety.
-
7/28/2019 APM2000- Power Supply Systm
52/67
46 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
Screw 1
Screw 2 Screw 3
Screw 4
Figure 4-12 Screw positions
Step 4: Unscrew the fixing screws of the heater cover and disconnect the
cable connector from the heater relays. The heater relays are the two
cables marked L and N in Figure 4-14. Remove the heater cover. The
heater is fixed on the heater cover, as shown in Figure 4-13.
Heater of the equipmentcompartment
Screws
Heater
Heater cover
Figure 4-13 Disassembly of the equipment compartment heater
Cable connector ofthe heater
Cable connector ofthe heater
Figure 4-14 Heater relays
-
7/28/2019 APM2000- Power Supply Systm
53/67
Chapter 4 Maintenance 47
APM200 Outdoor Power Supply System User Manual
Step 5: Unscrew the fixing screws of the heater on the heater cover and
then remove the damaged heater, as shown in Figure 4-12.
Step 6: Fix the new heater on the heater cover and mount the cover on the
cabinet. Connect the cable connector to the heater relay. Finally, mount the
distribution unit on the cabinet.
Step 7: Check if each cable connector is tight and the connection is reliable.
Switch on the AC MCB and heater fuse after making sure every thing is OK.
4.5.2 Replace The Heater In Battery Compartment
Step 1: Switch off the AC MCB and the heater fuse, as shown in Figure
4-10.
Step 2: Take out the battery string on the lower floor of the battery
compartment.
Step 3: Disconnect the cable connector from the heater relay. Remove the
heater cover after removing the screws on the cover, as shown in Figure
4-15.
Heater of the battery
compartment
Figure 4-15 Position of the heater in battery compartment
Step 4: Replace a new heater and fix it. Connect the cable connector to the
heater relay. Move the battery string to its original position.
Step 5: Check if each cable connector is tight and the connection is reliable.
Switch on the AC MCB and heater fuse after making sure every thing is OK.
-
7/28/2019 APM2000- Power Supply Systm
54/67
48 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
4.5.3 Replace Heater Relays
There are two heater relays in one heater circuit. When the environment
temperature is below 5C5C, the relay contacts are closed to switch on
the heater circuit. When the environment temperature is above 15C5C,
the relay contacts are opened to switch off the heater circuit. Replace therelay if its contact cannot be closed or opened normally. Every
compartment has two heater relays that are connected in series in the
phase line and the neutral line separately, as shown in Appendix 3.
The position of the heater relay in equipment compartment is shown in
Figure 4-14, and that of the heater relay in battery compartment is shown in
Figure 4-16.
Heater relay of thebattery compartment
Figure 4-16 Position of the heater relay in battery compartment
Replacement processes:
Step 1: Switch off the AC MCB and the heater fuse, as shown in Figure 4-7.Step 2: Disconnect the cable connector of the relay and remove the screws.
Step 3: Replace a new relay and connect the cable connector of the relay to
its terminal.
Step 4: Switch on the AC MCB and the heater fuse.
-
7/28/2019 APM2000- Power Supply Systm
55/67
Chapter 4 Maintenance 49
APM200 Outdoor Power Supply System User Manual
4.6 Replace Door Status Sensors
There is one door status sensors installed in the equipment compartment
and the battery compartment separately for detecting the close or open
status of the compartment doors. The two sensors are connected in series,so the monitoring module will generate an alarm when one of the doors is
open. The alarm will be eliminated only when both doors are closed.
The door status sensors are not intended for service or repair, just replace
them when they are damaged. If the doors are closed, when the door status
sensor alarm occurs, the sensors must have been damaged. The positions
of the sensors are shown in Figure 4-17.
Remove the sensor cap and then the two pieces of screws. Replace the old
sensor with a new one and finally fix the sensor and the signal cables with
the screws.
Door statussensor A inequipmentcompartment
Door statussensor B inequipmentcompartment
Door statussensor A inbatterycompartment
Door statussensor B inbattery
compartment
Figure 4-17 Replace door status sensor
-
7/28/2019 APM2000- Power Supply Systm
56/67
50 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
4.7 SPD Maintenance
The AC SPD is behind the distribution unit. The appearance is shown in
Figure 4-18.
Figure 4-18 AC SPD
Check the SPD indicator on the monitoring expansion board, as shown in
Figure 4-19. The position of the monitoring expansion board is shown in
Figure 1-2.
Alarm ind icato r of DC SPD
Alarm ind icato r of AC SPD
Figure 4-19 AC/ DC SPD indicator
If the indicator on the left is on, the DC SPD fails and needs replacement.
The replacement procedures of the DC SPD are easy to take and not
expatiated on here. If the indicator on the right is on, the AC SPD fails and
needs replacement.
The replacement procedures of AC SPD are as follows:
Step1: Switch off the AC MCB. The position is shown in Figure 4-10.
-
7/28/2019 APM2000- Power Supply Systm
57/67
Chapter 4 Maintenance 51
APM200 Outdoor Power Supply System User Manual
Step 2: Remove the cover of the distribution unit. The position is shown in
Figure 4-10.
Step 3: Remove the 4 screws shown in Figure 4-12, pull out the SPD alarm
interface and remove the right segment of the distribution unit, as shown in
Figure 4-20, Figure 4-21, Figure 4-22. Be sure to pay attention to personnel
safety.
SPD alarm
interface
Figure 4-20 Pull out the SPD alarm interface
Figure 4-21 Take out SPD and heater
-
7/28/2019 APM2000- Power Supply Systm
58/67
52 Chapter 4 Maintenance
APM200 Outdoor Power Supply System User Manual
Figure 4-22 SPD and heater
Step 4: Remove the 4 fixing screws of the SPD shown in Figure 4-21, and
screw4 and screw2 are on the cross. Disconnect the connection cables of
the SPD.
Figure 4-23 Remove the fixing screws of SPD
Step 5: Reverse previous steps 4~1 and replace the new SPD. Connect the
cables, fix the screws and the SPD.
Step 6: Fix the distribution unit to the cabinet.
Check if each cable connector is tight and the connection is reliable. Switch
on the AC MCB and restart operation after making sure everything is OK.
-
7/28/2019 APM2000- Power Supply Systm
59/67
Appendix 1 Technical Data 53
APM200 Outdoor Power Supply System User Manual
Appendix 1 Technical Data
Environmental parameters
1. Operating temperature:
North model: -40C to +45C; South model: -5C to +45C;
2. Storage temperature: -40C to +70C
3. Relative humidity: 5% to 100%, no condensing
4. Altitude: 0 to 2000m. The system should be derated where the altitude is
higher than 2000m. The highest operating temperature should be reduced
by 1C at every 200m higher. And the highest altitude is 4800m.
5. Solar radiation
Direct radiation:1120W/m
2
Dispersion radiation:224W/m
2
Electrical parameters
1. Rated input voltage: 220Vac
2. Input voltage range: 90Vac to 290Vac, single phase three wire. When the
voltage input is between 90Vac~176Vac, the rectifiers output is allowed of
linear derating. When the voltage input is 90Vac, the minimum rectifier
output power is 37.5% of rated power.
3. Maximum input current of the system: 25A (with no user connector- jack
output)
4. Maximum output current of standard configuration: 60A5. Rated frequency: 50Hz
6. Input frequency range: 40Hz to 65Hz
Mechanical parameters
Dimensions (H%W%D): 1600mm%600mm%600mm (without base)
Weight: 450kg
Audible noise
61dB.
-
7/28/2019 APM2000- Power Supply Systm
60/67
54 Appendix 1 Technical Data
APM200 Outdoor Power Supply System User Manual
Anti -erosive performance
Coating:
1. Adhesion test satisfies ISO2409 Class 0.
2. The pencil rigidity test satisfies ASTM D3363 2H.
3. Shock test satisfies 50kg.cm according to ASTM D2794.4. The coating is not changed after 500 hours salt-fog test according to
ASTM B117.
5. The coating of the external surface of the cabinet is suitable at the -40C
to +55C environmental temperature and 1120W/m2
solar radiation. The
coating should not blister, flake or flaw after 250 hours test according to
ASTM D822. But it is allowed to have slight pulverization, that is, a little
paint particle is allowed to adhere when the coating is wiped at full tilt. The
slight change of color is allowed, that is, it is acceptable if the color
difference value (NBS) is less than 6.0.
Protection requirement
1. The cabinet of the equipment compartment satisfies GB4208 IP55.
2. The cabinet of the battery compartment satisfies GB4208 IP23.
Lightning protection
1. The system has a Level B+C SPD on AC side.
2. The AC input can withstand the maximum strike through current capacity
of 60kA, and the nominal through current capacity is 25kA. The simulated
lightning strike is carried out in term of YD1235.1 and YD1235.2.
3. The test of which the DC side can withstand through current capacity of15kA requires: -48V-RTN can withstand the strike of 15kV with the
waveform 8/20s 5 times, for positive and negative polarity respectively of
10/700s 5 times, for positive and negative polarity respectively, and the
interval between every two tests is one minute; RTN-PE can withstand the
strike of 15kV with the waveform 8/20s 5 times, for positive and negative
polarity respectively of 10/700s 5 times, for positive and negative polarity
respectively, and the interval between every two tests is one minute
-
7/28/2019 APM2000- Power Supply Systm
61/67
Appendix 2 Definitions Of The Monitoring Expansion Board Interface 55
APM200 Outdoor Power Supply System User Manual
Appendix 2 Definitions Of The Monitoring
Expansion Board Interface
All the sensors are connected to the monitoring expansion board. The
screen print diagram of the wiring port of the monitoring expansion board is
as follows.
Screen print of Monitoring expansion board socket
Figure 1 Screen print diagram of the monitoring expansion board
Connector models of the monitoring expansion board terminals and
recommended connection cables are in the following table.
Table 1 Connector models and recommended connection cables
Signal portScreen print
marks
Socket- connector
model
commended
cablesAWG
Waterlogging J_WATER P2500-4 26~22
Circumambient
temperature/ humidityTEM_HU P2500-4 26~22
main distribution frame J_WIRE P2500-2 26~22
Smoke sensor J_SMOKE P2500-2 26~22
Door status sensor JTM1 P2500-2 26~22
Alarm dry contact JK1,JK2 P2500-2 26~22
Optical- coupler output JAC1,JAC2 P2500-2 26~22
-
7/28/2019 APM2000- Power Supply Systm
62/67
56 Appendix 2 Definitions Of The Monitoring Expansion Board Interface
APM200 Outdoor Power Supply System User Manual
Signal portScreen print
marks
Socket- connector
model
commended
cablesAWG
Backup digital data input J9 MSTB2.5/2-ST-5.08 26~22
RS422 communication
portJ8 MSTB2.5/4-ST-5.08 26~22
Preset dry contact port J12 MSTB2.5/2-ST-5.08 26~22
The functional definitions of port- pins of the monitoring expansion board
are shown in the following table.
Table 2 Port- pin definitions of the monitoring expansion board
Port nameScreen
print marks
Correlative
pinsSignal