Date : 16th - 22nd August , 2010Venue : Dacon Inspection Services Co.,Ltd. 78/4 Moo 6, Sukhumvit Road, BanChang, Rayong, 21130
API 570Piping Inspector days Training Course7
Dacon Inspection Services Co.,Ltd.78/4 Moo 6, Sukhumvit Road, BanChang, Rayong, 21130Tel : 038 880788, Fax : 038 880727
Course DescriptionThis course gives a broad knowledge about “In-ServicePiping Systems” and prepares students for the API 570exam. The course is an intensive one-week course with aspecial emphasis on the use of the related codes andcalculations.This course content includes:♦ Using B31.3 ♦ API 570♦ Piping Calculations ♦ B16.5 & other♦ Section IX Welding ♦ Exam
Course ObjectiveThe course provides participants with the knowledgenecessary to: ♦ Successfully pass the API 570 piping inspector certification exam ♦ Effectively use major codes: ASME B16.5 & B31.3; ASME B&PV Sections V & IX ♦ Perform all basic piping calculations needed for the API exam (e.g. tmin, test pressure, MAWP, MDMT, corrosion rates, remaining life, etc.) ♦ Use API’s requirements during inspection, repairs, and alterations of piping ♦ Review welding procedures (WPS/PQR) and welder performance qualifications (WPQ)
Students should bring to class: a calculator, a straight edge(or triangle), pencils, highlighters, lots of questions, and a“CAN-DO” attitude. Also, participants must bring theappropriate codes required for the API exam.
Bring to Class
Students should have 3 years of experience ata petrochemical or industrial facility and have at least1 year of inspection experience.
However, participants who do not meet this requirementare also welcomed to attend this Training to further theirknowledge in the related areas.
Class Participants
Piping inspection engineers and managers, Inspectionpersonnel, plant operating engineers and managers,who wish to appear for API 570 examination.Maintenance engineers and technicians and peopleinvolved in trouble shooting of plant operations.
Who should join
This is an intense course with daily homework and a finalexam (similar to the API 570 exam). A study guide isissued to direct participant’s pre-class study.
Notes
8:00a.m. – 5:00p.m.(Workshop)
Daily Schedule
API ApplicationThe scheduled dates for API 570 Inspector CertificationExamination is as below:
API INFOThe API Web-site offers some useful information (i.e.application form, sample test question, required codebooks). Here’s the web-site that takes you directly to thedata. www.api.org/icp
Examination Dates Sep 22nd, 2010
Submissions to API July 10th, 2010(Original copy)
Submissions via Dacon June 25th, 2010(Original copy)
Date : 16th - 22nd August , 2010Venue : Dacon Inspection Services Co.,Ltd. 78/4 Moo 6, Sukhumvit Road, BanChang, Rayong, 21130
API 570Piping Inspector days Training Course7
Tentative training scheduleDAY 11) Welcome & Introduction2) ASME B16.5 – Flange Code Learn how to determine: ♦ Maximum Flange Pressure ♦ Maximum Flange Temperature ♦ Appropriate Flange Class ♦ Maximum Hydrotest Pressure ♦ Flange Dimensions ♦ Maximum allowed Flaw Size on Flange Face3) API 570 Sections 1-4, 6 ♦ Purpose of API 570 ♦ Scope of API 570 ♦ Responsibilities defined in API 570 ♦ Inspection Types & Intervals ♦ Tips on how to memorize information in API CodesEvening Session: ASME B16.5 & API 570 HomeworkPractice all Calculations covered in Class.
DAY 21) ASME B31.3 - Piping Code Includes understanding: ♦ Purpose & Scope of the Code ♦ Organization of the Code ♦ Piping Classes specified by the Code ♦ Roles specified by the Code ♦ Tips on how to find information in the Code2) ASME B31.3 – Calculations & Charts Learn how to determine: ♦ Quality Factor – “E” ♦ Allowable Stress – “S” ♦ Minimum Thickness for a Pipe ♦ Appropriate Pipe Schedule for new Pipe ♦ Minimum Thickness for a Blank (Blind)3) API 570 – Section 7 ♦ Inspection Data Evaluation ♦ Calculate MAWP of a Piping SystemEvening Session: ASME B31.3 & API 570 HomeworkPractice all Calculations covered in Class.
DAY 31) ASME B31.3 - Piping Code Includes understanding: ♦ Basic concepts of Piping Flexibility ♦ Selection of Piping Materials ♦ Fabrication Requirements2) ASME B31.3 – Calculations & Charts Learn how to determine: ♦ Thermal Pipe Growth ♦ Minimum Design Temperatures ♦ Welding Preheat Requirements ♦ PWHT Requirements3) API 570 – Section 8-9 ♦ Repairs, Alterations & Rerating ♦ Underground PipingEvening Session: ASME B31.3 & API 570 HomeworkPractice all Calculations covered in Class. Also, completethe Corrosion Rate/Remaining Life Self-Study Module
DAY 41) ASME B&PV Section IX - Welding Code Understand the following key concepts. ♦ Purpose of the Code ♦ Roles of the Welding Inspector ♦ Organization of the Code ♦ Welding Positions – Test and Field ♦ Testing Requirements and Acceptance Criteria ♦ Welder Qualification Process and Restrictions ♦ Tips on how to find information in the Code2) ASME B&PV Section IX Review and Evaluate a WPQ (Welder Qualification). Understand ♦ Essential Variables for welder qualification ♦ Testing required for welder qualificationEvening Session: Section IX Homework. Evaluatetwo WPQ’s.
DAY 51) ASME B&PV Section IX - Welding Code Understand the following key concepts ♦ Weld Procedure Qualification Process and Restrictions2) WPS/PQR Review (Weld Procedure) ♦ Evaluate a WPS with the associated PQR
3) API 570 – Section 8 & 9 ♦ Repairs, Alterations & Rerating ♦ Underground Piping4) API 577 – Welding Inspection & MetallurgyEvening Session: Section IX Homework. Evaluate oneWPQ. API 570 Homework. Also, complete the API 578Self-Study Module
Tentative training schedule
Instructor Profile
DAY 61) ASME B&PV Section V – NDE Understand the following key concepts. ♦ Purpose of the Code ♦ Organization of the Code ♦ RT Techniques ♦ Purpose & Selection of IQI’s ♦ RT Film Density Requirements ♦ Key terms discussed in the Code ♦ Tips on how to find information in the Code
DAY 71) Course Review2) Practice Exam – Exam is similar to the API 570 exam
Date : 16th - 22nd August , 2010Venue : Dacon Inspection Services Co.,Ltd. 78/4 Moo 6, Sukhumvit Road, BanChang, Rayong, 21130
API 570Piping Inspector days Training Course7
Uday B. Kale.
♦ Master of Engineering: M.E. (Mechanical),♦ Chartered Engineer, Institution of Engineers (India)Professional Qualifications :♦ API 510 – Authorized Pressure Vessel Inspector♦ API 570 – Authorized Piping Inspector ♦ API 653 – Authorised Above storage Tank Inspector♦ API 580 – Risk Based Inspection♦ Certified Welding Inspector ( AWS)♦ CSWIP 3.1 Certificate No. 4613♦ ACCP Professional Level III (RT, UT, MT, VT) ASNT♦ RT 2 - Certified Site Incharge (BARC, India)♦ ASNT NDT Level III (RT, UT, MT, VT, PT), ASNT♦ Level III as per EN 473 (UT, RT, MT)♦ UT Level II in TKY Welds as per API RP 2X♦ IRATA Level I- Rope Access Technician
Memberships of Professional Organizations:♦ American Society for Non Destructive Testing♦ American Welding Society♦ Indian Society for Non Destructive Testing♦ Indian Institute of Welding♦ Institution of Engineers (India)Experience:Present Job: Director, M/s KUB Quality Services, Pune, India, Responsibilitieshandled include Plant inspection during shut-downs, Inspection duringfabrication Welding inspection & NDT services to various organizations.RBI Experience:Gone through specialized trainings in RBI and presently doing trainings in RBIand Integrity Assessment. Also member of RBI Study group for well knownOil Refineries in India.
ASME Codes:♦ B&PV Section V Non-Destructive Examination♦ B&PV Section IX Welding Qualifications♦ B16.5 Flanges & Flanged Fittings♦ B31.3 Process Piping Fabrication
2) API 570 Section 5 ♦ Inspection & Testing Practices3) API 571 - Damage Mechanisms in the Refinery IndustryEvening Session: ASME Section V & API 570 Homework.Plus the “Mega-Problem”. This exercise includes most of thecalculations & tables covered in the class.
Required codes for exam(Participants must bring the appropriate codes required for the API exam)
API Codes:♦ API 570 Piping Inspection code♦ API 574 Inspection of Piping Components♦ API 578 Material Verification Program♦ API 571- Damage Mechanisms in the Refinery Industry♦ API 577- Welding Inspection & Metallurgy
Note: See the API website at www.api.org/icp to determine which editions will be used for your exam.Codebooks can be obtained from Techstreet (www.techstreet.com) or Global Eng Docs (www.global.ihs.com)
REGISTRATION FORM
Date : 16th - 22nd August , 2010Venue : Dacon Inspection Services Co.,Ltd. 78/4 Moo 6, Sukhumvit Road, BanChang, Rayong, 21130
Dacon Inspection Services Co.,Ltd.78/4 Moo 6, Sukhumvit Road, BanChang, Rayong, 21130Tel : 038 880788, Fax : 038 880727
API 570Piping Inspector days Training Course7
Name : ............................................................................................................................................
Company name : ............................................................................................................................
Department : ..................................................................................................................................
Address : ........................................................................................................................................
Tel : ...............................................................Email : .....................................................................
Please fax / email your completedform, or for further information,contact:ChompunutMarketing CoordinatorDacon Inspection Services Co.,Ltd.78/4 Moo 6, Sukhumvit Road,T. BanChang, A. BanChang,Rayong, 21130 THAILAND.Phone: +66 38 880788 ext 125Fax: +66 38 880727Email:[email protected]
Please Tick accordingly,
Course Fee THB 55,000(per person) API Exam fee & processing charges THB 33,000(per person)Course fee+ API Exam THB 88,000
* Inclusive Of Lunches, All tea breaks, Course Materials(excluding code books )
Download Application:http://api.org/certifications/icp/apps/upload/API570-1109.pdf
Hotel Accommodation Required? Yes ( ) No ( ) If Yes, please fill in the followings,
Name Of Hotel: _______________ Check In On: ______________ Check Out On: ________________