Abstract of leads and lifts 48 COM-LDLFT Abstract LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS FOR THE YEAR: 2012-13 COM-LDLFT 1. For total lead upto 150 m ( including initial lead ) lead charges by head load only shall be adopted irrespective of mode of conveyance. 2. For total lead exceeding 150 m conveyance by mechanical means only shall be adopted irrespective of mode of conveyance. 3. The rates for loading at quarry including idle hire charges of trucks and hire charges per for each kilometer and upto 5 km are cumulative and inclusive of total charges for preceding lead. 4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones are for loose volume and not for compacted or in-situ volume. 5. The rates for lift charges,lead charges hire cahrges are cumulative are c inclusive of rates for preceding lift,laed and hire cahrges 6. Lift charges are not payable where conveyance of materials is by mechanical means to final placing point. 7. Loading and unloading charges are not payable for conveyance by head load. 8. Loading charges are not payable for conveyance by mechanical means for disposal of excavated materials beyond initial lead of 50 m wherever specified. 9. Loading and unloading charges are not payable for conveyance by mechanical means for disposal of excavated materials beyond initial lead of 1 km wherever specified. 10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble, size stone and cut stone are inclusive of stacking. 11. Hire charges are per 1KM for tippers and trucks for tranport of materials from work site to dump yard and other places are cumulative& includes previous km upto 5 kms 14% COM-LDLFT-1 A. (Lead) Conveyance Charges for materials by head load FOR THE YEAR: 2012-13 Sl No. 1 2 3 4 5 1 initial lead initial lead initial lead 2 Total lead upto 100 m 40.70 23.80 51.80 3 Total lead upto 150 m 81.40 47.50 103.60 Notes: 1. No loading or unloading charges are admissible for conveyance by head load. 2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be adopted irrespective of mode of conveyance. 3.The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges COM-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading and idle hire charges of machinery. FOR THE YEAR: 2012-13 ( No loading and unloading charges allowed for machinery loading and unloading ) Sl No. Distance 1 2 3 4 5 6 1 Lead upto 1 km 28.00 26.70 16.70 39.30 2 Lead upto 2 km 39.20 37.40 23.40 55.00 3 Lead upto 3 km 52.20 52.20 32.70 76.80 4 Lead upto 4 km 63.40 63.40 39.60 93.30 5 Lead upto 5 km 74.60 74.60 46.60 109.70 6 11.20 11.20 7.00 16.50 7 9.30 9.30 5.80 13.70 Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges 12. The lead & lift charges are inclusive of contractor's profit and overhead charges of Total distance ( Total lead includes initial lead ) Rubble / Coarse aggregate Rs/Cum Cement / Reinforce- ment steel Str steel Rs / tonne PCC slab/ Shahbad slab / CC block/ BS slab/ Late- rite / Wood Rs / cum Total lead upto 50 m (covered by item rate) (Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/ per cu.meter (Lead) charges for trucks and tippers for Rubble/Size stones/ Cut Stones/ Coarse aggregate per cu.meter (Lead) charges for trucks and tippers for Cement/ Steel/ RCC poles/ AC & GI sheets/ Packed materials/tonne (Lead) charges for trucks and tippers per cu.meter for PCC slabs/ Shahabad slabs/ CC & Laterite blocks/ Wood/ cum for Every km beyond 5 km upto 30 km for Every km beyond 30 km

Upload: rvkumar3619690

Post on 29-Oct-2014

137 views

Category:

Documents


8 download

DESCRIPTION

AP Standard Data for Irrigation Estimates

TRANSCRIPT

Abstract of leads and lifts

48

COM-LDLFT Abstract LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS

FOR THE YEAR: 2012-13

COM-LDLFT 1. For total lead upto 150 m ( including initial lead ) lead charges by head load only shall beadopted irrespective of mode of conveyance.2. For total lead exceeding 150 m conveyance by mechanical means only shall be adoptedirrespective of mode of conveyance.3. The rates for loading at quarry including idle hire charges of trucks and hire charges per for each kilometer and upto 5 km are cumulative and inclusive of total charges for preceding lead.4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stonesare for loose volume and not for compacted or in-situ volume.5. The rates for lift charges,lead charges hire cahrges are cumulative are cumulative and inclusive of rates for preceding lift,laed and hire cahrges6. Lift charges are not payable where conveyance of materials is by mechanical means tofinal placing point.7. Loading and unloading charges are not payable for conveyance by head load.8. Loading charges are not payable for conveyance by mechanical means for disposal ofexcavated materials beyond initial lead of 50 m wherever specified.9. Loading and unloading charges are not payable for conveyance by mechanical means fordisposal of excavated materials beyond initial lead of 1 km wherever specified.10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble,size stone and cut stone are inclusive of stacking.11. Hire charges are per 1KM for tippers and trucks for tranport of materials from work site to dump yard and other places are cumulative& includes previous km upto 5 kms

12. The lead & lift charges are inclusive of contractor's profit and overhead charges of 14%

COM-LDLFT-1 A. (Lead) Conveyance Charges for materials by head loadFOR THE YEAR: 2012-13

Sl No.

1 2 3 4 5

1 initial lead initial lead initial lead2 Total lead upto 100 m 40.70 23.80 51.803 Total lead upto 150 m 81.40 47.50 103.60

Notes: 1. No loading or unloading charges are admissible for conveyance by head load. 2. For total lead exceeding 150 m conveyance charges by mechanical means only shallbe adopted irrespective of mode of conveyance.3.The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

COM-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading and idle hire charges of machinery.

FOR THE YEAR: 2012-13

( No loading and unloading charges allowed for machinery loading and unloading )

Sl No. Distance

1 2 3 4 5 6 7 8

1 Lead upto 1 km 28.00 26.70 16.70 39.30 16.40 44.502 Lead upto 2 km 39.20 37.40 23.40 55.00 22.90 62.293 Lead upto 3 km 52.20 52.20 32.70 76.80 30.50 83.064 Lead upto 4 km 63.40 63.40 39.60 93.30 37.10 100.855 Lead upto 5 km 74.60 74.60 46.60 109.70 43.60 118.65

6 11.20 11.20 7.00 16.50 6.50 17.80

7 9.30 9.30 5.80 13.70 5.50 14.84

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

Total distance ( Total lead

includes initial lead )

Earth / Sand /Gravel / Murrum/ Lime/ Surki/ Size stone / Cut stone

Rubble / Coarse aggregate Rs/Cum

Cement / Reinforce-ment steel Str steel

Rs / tonne

PCC slab/ Shahbad slab / CC block/ BS

slab/ Late-rite / Wood Rs / cum

Total lead upto 50 m (covered by item rate)

(Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/ Lime/ Surki/

per cu.meter

(Lead) charges for trucks and tippers for

Rubble/Size stones/ Cut Stones/ Coarse

aggregate per cu.meter

(Lead) charges for trucks and tippers for Cement/ Steel/ RCC poles/ AC & GI sheets/ Packed

materials/tonne

(Lead) charges for trucks and tippers per

cu.meter for PCC slabs/ Shahabad slabs/ CC & Laterite blocks/

Wood/ cum

(Lead) charges for trucks and tippers per cu.meter for water/

1000 litres

(Lead) charges

for trucks per 1000 Nos. of Bricks

for Every km beyond 5 km upto 30 km

for Every km beyond 30 km

Abstract of leads and lifts

49

COM-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)

Sl No. Description of item cement in Rs/tonne steel in Rs./tonne

1 2 3 4 5 6 71 Loading 13.50 27.10 44.70 53.60 37.302 Unloading 6.75 13.55 44.70 53.60 37.30

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

COM-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )

Sl No. Description of item cement in Rs/tonne steel in Rs./tonne

1 2 3 4 5 6 71 Loading 94.40 108.00 133.70 142.60 184.102 Unloading 33.60 54.00 133.70 142.60 184.10

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

COM-LDLFT-5 E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)

Sl No. Description of item

1 2 3 41 Loading 47.50 95.002 Unloading 14.10 14.10

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

COM-LDLFT-6 F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD

Sl No.

1 2 3 4 5

1 Initial lift Initial lift Initial lift

2 4.80 3.40 6.30

Note:The Lead & Lift Charges are inclusive of 14% Contractor's Profit and Over Head Charges

Earth / Sand /GravelMurrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/ Coarse

aggregate,Lime in Rs/cum

brick work Rs/1000 No

Earth / Sand /GravelMurrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/ Coarse

aggregate,Lime in Rs/cum

brick work Rs/1000 No

Earth / Sand /GravelMurrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/ Coarse

aggregate,Lime in Rs/cum

Total lift( Total lift includes initial lift

)

Earth / Sand /GravelMurrum/ Lime/ Surki/Size stone / Cut stone

Rubble / CoarseaggregateRs / cum

Cement /Reinforce-ment steelStr steel

Rs / tonne

PCC slab/Shahbadslab / CCblock/ BS

slab / Laterite/ Wood

Rs / cum

Total lift upto 3 m (covered by item rate)

For Every 1.00 Lift beyond initial lift of 3 meters

COM-LDLFT

328

COM-LDLFT Chapter VII

LEAD/LIFT/LOADING & UNLOADING CHARGES(WLL BE WITH E-N-C & TO INCORPORATE CHANGES YEARLY/ AS NEEDED)

FOR THE YEAR : 2012-13 LEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MATERIALS

COM-LDLFT 1. For total lead upto 150 m ( including initial lead ) lead charges by head load only shall beadopted irrespective of mode of conveyance.2. For total lead exceeding 150 m conveyance by mechanical means only shall be adoptedirrespective of mode of conveyance.3. The rates for loading at quarry including idle hire charges of trucks and hire charges per for each kilometer and upto 5 km are cumulative and inclusive of total charges for preceding lead.4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stonesare for loose volume and not for compacted or in-situ volume.5. The rates for lift charges,lead charges, hire charges are cumulative and inclusive of rates for preceding lift,laed and hire cahrges6. Lift charges are not payable where conveyance of materials is by mechanical means tofinal placing point.7. Loading and unloading charges are not payable for conveyance by head load.8. Loading charges are not payable for conveyance by mechanical means for disposal ofexcavated materials beyond initial lead of 50 m wherever specified.9. Loading and unloading charges are not payable for conveyance by mechanical means fordisposal of excavated materials beyond initial lead of 1 km wherever specified.10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble,size stone and cut stone are inclusive of stacking.11. Hire charges are per 1KM for tippers and trucks for tranport of materials from work site to dump yard and other places are cumulative& includs previous km upto 5 kms12. The lead & lift charges are inclusive of contractor's profit and overhead charges of 14%

COM-LDLFT-1 A. (Lead) Conveyance Charges for materials by head loadFOR THE YEAR: 2012-13

Sl No.

1 2 3 4 5

1 initial lead initial lead initial lead2 Total lead upto 100 m 40.70 23.80 51.803 Total lead upto 150 m 81.40 47.50 103.60

Notes: 1. No loading or unloading charges are admissible for conveyance by head load. 2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be adopted irrespective of mode of conveyance.

COM-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucksexcluding loading, unloading and idle hire charges of machinery.

FOR THE YEAR: 2012-13

( No loading and unloading charges allowed for machinery loading and unloading )

Sl No. Distance

1 2 3 4 5 6 7 8

1 Lead upto 1 km 28.00 26.70 16.70 39.30 16.40 44.50

2 Lead upto 2 km 39.20 37.40 23.40 55.00 22.90 62.293 Lead upto 3 km 52.20 52.20 32.70 76.80 30.50 83.064 Lead upto 4 km 63.40 63.40 39.60 93.30 37.10 100.855 Lead upto 5 km 74.60 74.60 46.60 109.70 43.60 118.65

6 11.20 11.20 7.00 16.50 6.50 17.80

7 9.30 9.30 5.80 13.70 5.50 55.00Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

COM-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)

Sl No. Description of item cement in Rs/tonne steel in Rs./tonne

1 2 3 4 5 6 71 Loading 13.50 27.10 44.70 53.60 37.302 Unloading 6.75 13.55 44.70 53.60 37.30

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

COM-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )

Total distance ( Total lead includes initial lead )

Earth / Sand /Gravel / Murrum/ Lime/ Surki/ Size stone / Cut stone Rubble / Coarse aggregate Rs/ Cum

Cement / Reinforce-ment steel Str steel Rs / tonne

PCC slab/ Shahbad slab / CC block/ BS slab/ Late-rite / Wood Rs / cum

Total lead upto 50 m (covered by item rate)

3. The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

(Lead) charges for trucks and tippers for Earth / Sand /Gravel / Murrum/

Lime/ Surki/ per cu.meter

(Lead) charges for trucks and

tippers for Rubble/Size stones/ Cut

Stones/ Coarse aggregate per

cu.meter

(Lead) charges for trucks and tippers for Cement/ Steel/ RCC poles/ AC &

GI sheets/ Packed materials/tonne

(Lead) charges for trucks and tippers per

cu.meter for PCC slabs/ Shahabad

slabs/ CC & Laterite blocks/ Wood/ cum

(Lead) charges for per cu.meter for water/ 1000

litres

(Lead) charges

for trucks per 1000 Nos. of Bricks

for Every km beyond 5 km upto 30 km

for Every km beyond 30 km

Earth / Sand /GravelMurrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/

Coarse aggregate,Lime in

Rs/cum

brick work Rs/1000 No

COM-LDLFT

329

Sl No. Description of item cement in Rs/tonne steel in Rs./tonne

1 2 3 4 5 6 71 Loading 94.40 108.00 133.70 142.60 184.102 Unloading 33.60 54.00 133.70 142.60 184.10

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)

COM-LDLFT-5 Sl No. Description of item

1 2 3 41 Loading 47.50 95.002 Unloading 14.10 14.10

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD

COM-LDLFT-6 Sl No.

1 2 3 4 5

1 Initial lift Initial lift Initial lift2 For Every 1.00 Lift beyond 4.80 3.40 6.30

initial lift of 3 meters

Note: The Lead Charges are inclusive of 14% Contractor Profit and Overhead charges

I. GENERAL DATA FOR LEAD / LIFT / LOADING & UNLOADING:A . DATA FOR LEAD CHARGES BY HEAD LOAD :

For the purpose of working out conveyance charges by head load the category of materials asclassified in ( I ) above are grouped together as under :CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate /Rubble stone / Size stone / Cut stone In this group materials which are comperatively lighter and generally conveyed by head loadby light / heavy mazdoor are included. Method of conveyance, approximate weight per loadand time required to cover specified additional distance will be generally sameTherefore common data is considered for conveyance by head load for materials under this category.

CATEGORY : Cement in bag / Reinforcement steel / Structural steel sections In this group the materials in packed / rolled / fabricated condition which are heavier per loadcompared to the materials under Category above and which can not be split into smallquantities for the purpose of conveyance are included. The unit of measurement for thesematerials is per tonne.

CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood In this group the materials in moulded condition / cut to standard size which are heavier perload compared to materials under Category above are included.

COM-DTL-LDLFT-1 A. (Lead) Conveyance Charges for materials by head loadCATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stoneLead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m 25 mAverage speed of conveyance by head load 60 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working( 2 x 25 x 60 / 50 / 60 ) 1 minNo. of trips per day for additional lead ( 8 x 60 / 1 ) 480Quantity of material by head load per load 0.015 cumQuantity of material by head load per day ( 480 x 0.015 ) say 7 cumDeploy one mazdoor for every 50 m additional lead beyond initial lead.

Unit: 7 cum

Sl No. Description Unit Quantity Amount in Rs.1 Mazdoor Day 1 250 250

Total Rs: 250

14% 35

7 cum Rs: 285Rate per cum Rs: 40.70

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 7 cum

Sl No. Description Unit Quantity Amount in Rs.1 Mazdoor Day 2 250 500

Total Rs: 500

14% 70

7 cum Rs: 570Rate per cum Rs: 81.40

Earth / Sand /GravelMurrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/

Coarse aggregate,Lime in

Rs/cum

brick work Rs/1000 No

Earth / Sand /GravelMurrum/ / Surki/

Rs / cum

Rubble/ size stone/ cut stone/

Coarse aggregate,Lime in

Rs/cum

Total lift( Total lift includes

initial lift )

Earth / Sand /GravelMurrum/ Lime/ Surki/Size stone / Cut stone

Rubble / CoarseaggregateRs / cum

Cement /Reinforce-ment steelStr steel

Rs / tonne

PCC slab/Shahbadslab / CCblock/ BS

slab / Laterite/ Wood

Rs / cum

Total lift upto 3 m (covered by item rate)

Ratein Rs.

Contractor's profit and overhead charges

Total for materials under this Category for

Ratein Rs.

Contractor's profit and overhead charges

Total for materials under this Category for

COM-LDLFT

330

CATEGORY : Cement in bag / Reinforcement steel / Structural steel sectionsLead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m 25 mAverage speed of conveyance by head load 30 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working( 2 x 25 x 60 / 50 / 30 ) 2 minNo. of trips per day for lead upto 100 m ( 8 x 60 / 2 ) 240Quantity of material by head load per load 50 kgQuantity of material by head load per day ( 240 x 50 / 1000 ) 12 tonneDeploy one mazdoor for every 50 m additional lead beyond initial lead.

COM-LDLFT

331

Unit: 12 tonneSl No. Description Unit Quantity Rate in Rs. Amount in Rs.

1 Day 1 250 250Total Rs: 250

14% 35

Total for materials under this Category for 12.00 tonne Rs: 285Rate per tonne Rs: 23.80

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 12 tonneSl No. Description Unit Quantity Rate in Rs. Amount in Rs.

1 Day 2 250 500Total Rs: 500

14% 70

Total for materials under this Category for 12.00 tonne Rs: 570Rate per tonne Rs: 47.50

CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood

Lead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m 25 mAverage speed of conveyance by head load 40 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working( 2 x 25 x 60 / 50 / 40 ) 1.5 minNo. of trips per day for lead upto 100 m ( 8 x 60 / 1.5 ) 320Quantity of material by head load per load 0.017 cumQuantity of material by head load per day ( 320 x 0.017 ) say 5.5 cumDeploy one mazdoor for every 50 m additional lead beyond initial lead.

Unit: 5.5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Mazdoor Day 1 250 250

Total Rs: 250

14% 35

Total for materials under this Category for 5.5 cum Rs: 285Rate per cum Rs: 51.80

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 5.5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Mazdoor Day 2 250 500

Total Rs: 500

14% 70

Total for materials under this Category for 5.5 cum Rs: 570Rate per cum Rs: 103.60

COM-DTL-LDLFT-2 B.( Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucksexcluding loading, unloading and idle hire charges of machinery.

CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki /

For total lead upto 1 km Unit: 5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Tipper hire charges Hour 0.15 454.40 68.16

Fuel charges Hour 0.15 239.10 35.872 Crew charges Hour 0.15 124.80 18.72

Total Rs: 122.75

14% 17.19Total for 5 cum Rs: 139.94Rate per cum 28.00

For total lead more than 1 km upto 2 km Unit: 5 cumSl No. Description Unit Quantity Rate in Rs. Amount in Rs.1 Tipper hire charges Hour 0.21 454.40 95.42

Fuel charges Hour 0.21 239.10 50.212 Crew charges Hour 0.21 124.80 26.21

Total Rs: 171.84

14% 24.06Total for 5 cum Rs: 195.90Rate per cum 39.20

For total lead more than 2 km upto 3 km Unit: 5 cum

Sl No. Description Unit Quantity Rate in Rs.1 Tipper hire charges Hour 0.28 454.40 127.23

Fuel charges Hour 0.28 239.10 66.952 Crew charges Hour 0.28 124.80 34.94

Total Rs: 229.12

Cement /steel handling mazdoor

Contractor's profit and overhead charges

Cement /steel handling Mazdoor

Contractor's profit and overhead charges

Contractor's profit and overhead charges

Contractor's profit and overhead charges

Contractor's profit and overhead charges

Contractor's profit and overhead charges

Amountin Rs.

COM-LDLFT

332

14% 32.08Total for 5 cum Rs: 261.20Rate per cum 52.20

For total lead more than 3 km upto 4 km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.34 454.40 154.50

Fuel charges Hour 0.34 239.10 81.292 Crew charges Hour 0.34 124.80 42.43

Total Rs: 278.22

14% 38.95Total for 5 cum Rs: 317.17Rate per cum 63.40

For total lead more than 4 km upto 5 km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.4 454.40 181.76

Fuel charges Hour 0.4 239.10 95.642 Crew charges Hour 0.4 124.80 49.92

Total Rs: 327.32

14% 45.82Total for 5 cum Rs: 373.14Rate per cum 74.60

For lead beyond 5 km upto 30 km for every km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.06 454.40 27.26

Fuel charges Hour 0.06 239.10 14.352 Crew charges Hour 0.06 124.80 7.49

Total Rs: 49.10

14% 6.87Total for 5 cum Rs: 55.97Rate per cum 11.20

For lead beyond 30 km for every km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.05 454.40 22.72

Fuel charges Hour 0.05 239.10 11.962 Crew charges Hour 0.05 124.80 6.24

Total Rs: 40.92

14% 5.73Total for 5 cum Rs: 46.65Rate per cum 9.30

CATEGORY : Coarse aggregate / Rubble stone / Size stone / Cut stone

For total lead upto 1 km Unit: 5 cum

Sl No. Description Unit Quantity1 Truck hire charges Hour 0.15 424.50 63.68

Fuel charges Hour 0.15 239.10 35.872 Crew charges Hour 0.15 117.00 17.55

Total Rs: 117.10

14% 16.39Total for 5 cum Rs: 133.49Rate per cum 26.70

For total lead more than 1 km upto 2 km Unit: 5 cum

Sl No. Description Unit Quantity1 Truck hire charges Hour 0.21 424.50 89.15

Fuel charges Hour 0.21 239.10 50.212 Crew charges Hour 0.21 117.00 24.57

Total Rs: 163.93

14% 22.95Total for 5 cum Rs: 186.88Rate per cum 37.40

For total lead more than 2 km upto 3 km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.28 454.40 127.23

Fuel charges Hour 0.28 239.10 66.952 Crew charges Hour 0.28 124.80 34.94

Total Rs: 229.12

14% 32.08Total for 5 cum Rs: 261.20Rate per cum 52.20

For total lead more than 3 km upto 4 km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.34 454.40 154.50

Fuel charges Hour 0.34 239.10 81.292 Crew charges Hour 0.34 124.80 42.43

Total Rs: 278.22

14% 38.95Total for 5 cum Rs: 317.17Rate per cum 63.40

For total lead more than 4 km upto 5 km Unit: 5 cum

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

COM-LDLFT

333

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.4 454.40 181.76

Fuel charges Hour 0.4 239.10 95.64

Ratein Rs.

Amountin Rs.

COM-LDLFT

334

2 Crew charges Hour 0.4 124.80 49.92Total Rs: 0.00 327.32

14% 45.82Total for 5 cum Rs: 373.14Rate per cum 74.60

For lead beyond 5 km upto 30 km for every km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.06 454.40 27.26

Fuel charges Hour 0.06 239.10 14.352 Crew charges Hour 0.06 124.80 7.49

Total Rs: 49.10

14% 6.87Total for 5 cum Rs: 55.97Rate per cum 11.20

For lead beyond 30 km for every km Unit: 5 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.05 454.40 22.72

Fuel charges Hour 0.05 239.10 11.962 Crew charges Hour 0.05 124.80 6.24

Total Rs: 40.92

14% 5.73Total for 5 cum Rs: 46.65Rate per cum 9.30

CATEGORY : Cement/ Steel/ Pipes/ RCC poles/ AC & GI sheets/ Packed materials

For total lead upto 1 km Unit: 8 tonne

Sl No. Description Unit Quantity1 Truck hire charges Hour 0.15 424.50 63.68

Fuel charges Hour 0.15 239.10 35.872 Crew charges Hour 0.15 117.00 17.55

Total Rs: 117.10

14% 16.39Total for 8 tonne Rs: 133.49Rate per tonne 16.70

For total lead more than 1 km upto 2 km Unit: 8 tonne

Sl No. Description Unit Quantity1 Truck hire charges Hour 0.21 424.50 89.15

Fuel charges Hour 0.21 239.10 50.212 Crew charges Hour 0.21 117.00 24.57

Total Rs: 163.93

14% 22.95Total for 8 tonne Rs: 186.88Rate per tonne 23.40

For total lead more than 2 km upto 3 km Unit: 8 tonne

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.28 454.40 127.23

Fuel charges Hour 0.28 239.10 66.952 Crew charges Hour 0.28 124.80 34.94

Total Rs: 229.12

14% 32.08Total for 8 tonne Rs: 261.20Rate per tonne 32.70

For total lead more than 3 km upto 4 km Unit: 8 tonne

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.34 454.40 154.50

Fuel charges Hour 0.34 239.10 81.292 Crew charges Hour 0.34 124.80 42.43

Total Rs: 278.22

14% 38.95Total for 8 tonne Rs: 317.17Rate per tonne 39.60

For total lead more than 4 km upto 5 km Unit: 8 tonne

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.4 454.40 181.76

Fuel charges Hour 0.4 239.10 95.642 Crew charges Hour 0.4 124.80 49.92

Total Rs: 327.32

14% 45.82Total for 8 tonne Rs: 373.14Rate per tonne 46.60

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

COM-LDLFT

335

For lead beyond 5 km upto 30 km for every km Unit: 8 tonne

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.06 454.40 27.26

Fuel charges Hour 0.06 239.10 14.352 Crew charges Hour 0.06 124.80 7.49

Total Rs: 49.10

14% 6.87Total for 8 tonne Rs: 55.97Rate per tonne 7.00

For lead beyond 30 km for every km Unit: 8 tonne

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.05 454.40 22.72

Fuel charges Hour 0.05 239.10 11.962 Crew charges Hour 0.05 124.80 6.24

Total Rs: 40.92

14% 5.73Total for 8 tonne Rs: 46.65Rate per tonne 5.80

CATEGORY : PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood

For total lead upto 1 km Unit: 3.4 cum

Sl No. Description Unit Quantity1 Truck hire charges Hour 0.15 424.50 63.68

Fuel charges Hour 0.15 239.10 35.872 Crew charges Hour 0.15 117.00 17.55

Total Rs: 117.10

14% 16.39Total for 3.4 cum Rs: 133.49Rate per cum 39.30

For total lead more than 1 km upto 2 km Unit: 3.4 cum

Sl No. Description Unit Quantity1 Truck hire charges Hour 0.21 424.50 89.15

Fuel charges Hour 0.21 239.10 50.212 Crew charges Hour 0.21 117.00 24.57

Total Rs: 163.93

14% 22.95Total for 3.4 cum Rs: 186.88Rate per cum 55.00

For total lead more than 2 km upto 3 km Unit: 3.4 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.28 454.40 127.23

Fuel charges Hour 0.28 239.10 66.952 Crew charges Hour 0.28 124.80 34.94

Total Rs: 229.12

14% 32.08Total for 3.4 cum Rs: 261.20Rate per cum 76.80

For total lead more than 3 km upto 4 km Unit: 3.4 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.34 454.40 154.50

Fuel charges Hour 0.34 239.10 81.292 Crew charges Hour 0.34 124.80 42.43

Total Rs: 278.22

14% 38.95Total for 3.4 cum Rs: 317.17Rate per cum 93.30

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

COM-LDLFT

336

For total lead more than 4 km upto 5 km Unit: 3.4 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.4 454.40 181.76

Fuel charges Hour 0.4 239.10 95.642 Crew charges Hour 0.4 124.80 49.92

Total Rs: 327.32

14% 45.82Total for 3.4 cum Rs: 373.14Rate per cum 109.70

For lead beyond 5 km upto 30 km for every km Unit: 3.4 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.06 454.40 27.26

Fuel charges Hour 0.06 239.10 14.352 Crew charges Hour 0.06 124.80 7.49

Total Rs: 49.10

14% 6.87Total for 3.4 cum Rs: 55.97Rate per cum 16.50

For lead beyond 30 km for every km Unit: 3.4 cum

Sl No. Description Unit Quantity1 Tipper hire charges Hour 0.05 454.40 22.72

Fuel charges Hour 0.05 239.10 11.962 Crew charges Hour 0.05 124.80 6.24

Total Rs: 40.92

14% 5.73Total for 3.4 cum Rs: 46.65Rate per cum 13.70

CATEGORY : water

For total lead upto 1 km Unit: 8000 litres

Sl No. Description Unit Quantity1 Water tanker hire charg Hour 0.15 408.80 61.32

Fuel charges Hour 0.15 239.10 35.872 Crew charges Hour 0.15 117.00 17.55

Total Rs: 114.74

14% 16.06Total for 8000 litres Rs: 130.80Rate per 1000 litres 16.40

For total lead more than 1 km upto 2 km Unit: 8000 litres

Sl No. Description Unit Quantity1 Water tanker hire charg Hour 0.21 408.80 85.85

Fuel charges Hour 0.21 239.10 50.212 Crew charges Hour 0.21 117.00 24.57

Total Rs: 160.63

14% 22.49Total for 8000 litres Rs: 183.12Rate per 1000 litres 22.90

For total lead more than 2 km upto 3 km Unit: 8000 litres

Sl No. Description Unit Quantity1 Water tanker hire charg Hour 0.28 408.80 114.46

Fuel charges Hour 0.28 239.10 66.952 Crew charges Hour 0.28 117.00 32.76

Total Rs: 214.17

14% 29.98Total for 8000 litres Rs: 244.15Rate per 1000 litres 30.50

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

COM-LDLFT

337

For total lead more than 3 km upto 4 km Unit: 8000 litres

Sl No. Description Unit Quantity1 Water tanker hire charg Hour 0.34 408.80 138.99

Fuel charges Hour 0.34 239.10 81.292 Crew charges Hour 0.34 117.00 39.78

Total Rs: 260.06

14% 36.41Total for 8000 litres Rs: 296.47Rate per 1000 litres 37.10

For total lead more than 4 km upto 5 km Unit: 8000 litres

Sl No. Description Unit Quantity1 Water tanker hire charg Hour 0.4 408.80 163.52

Fuel charges Hour 0.4 239.10 95.642 Crew charges Hour 0.4 117.00 46.80

Total Rs: 305.96

14% 42.83Total for 8000 litres Rs: 348.79Rate per 1000 litres 43.60

For lead beyond 5 km upto 30 km for every km Unit: 8000 litres

Sl No. Description Unit Quantity1 Water tanker hire charg Hour 0.06 408.80 24.53

Fuel charges Hour 0.06 239.10 14.352 Crew charges Hour 0.06 117.00 7.02

Total Rs: 45.90

14% 6.43Total for 8000 litres Rs: 52.33Rate per 1000 litres 6.50

For lead beyond 30 km for every km Unit: 8000 litres

Sl No. Description Unit Quantity1 Water tanker hire charg Hour 0.05 408.80 20.44

Fuel charges Hour 0.05 239.10 11.962 Crew charges Hour 0.05 117.00 5.85

Total Rs: 38.25

14% 5.36Total for 8000 litres Rs: 43.61Rate per 1000 litres 5.50

CATEGORY : Bricks (as adopted by R&B(Buildings))

For total lead upto 1 km Unit: 3000 bricks

Sl No. Description Unit Quantity1 Truck 10 T charges Hour 0.15 424.50 63.68

Fuel charges Hour 0.15 239.10 35.872 Crew charges Hour 0.15 117.00 17.55

Total Rs: 117.10

14% 16.39Total for 3000 bricks Rs: 133.49Rate per 1000 bricks 44.50

For total lead more than 1 km upto 2 km Unit: 3000 bricks

Sl No. Description Unit Quantity1 Truck 10 T charges Hour 0.21 424.50 89.15

Fuel charges Hour 0.21 239.10 50.212 Crew charges Hour 0.21 117.00 24.57

Total Rs: 163.93

14% 22.95Total for 3000 bricks Rs: 186.88Rate per 1000 bricks 62.29

For total lead more than 2 km upto 3 km Unit: 3000 bricks

Sl No. Description Unit Quantity1 Truck 10 T charges Hour 0.28 424.50 118.86

Fuel charges Hour 0.28 239.10 66.952 Crew charges Hour 0.28 117.00 32.76

Total Rs: 218.57

14% 30.60Total for 3000 bricks Rs: 249.17Rate per 1000 bricks 83.06

For total lead more than 3 km upto 4 km Unit: 3000 bricks

Sl No. Description Unit Quantity1 Truck 10 T charges Hour 0.34 424.50 144.33

Fuel charges Hour 0.34 239.10 81.292 Crew charges Hour 0.34 117.00 39.78

Total Rs: 265.40

14% 37.16Total for 3000 bricks Rs: 302.56Rate per 1000 bricks 100.85

For total lead more than 4 km upto 5 km Unit: 3000 bricks

Sl No. Description Unit Quantity1 Truck 10 T charges Hour 0.4 424.50 169.80

Fuel charges Hour 0.4 239.10 95.642 Crew charges Hour 0.4 117.00 46.80

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

COM-LDLFT

338

Total Rs: 312.24

14% 43.71Total for 3000 bricks Rs: 355.95Rate per 1000 bricks 118.65

For lead beyond 5 km upto 30 km for every km Unit: 3000 bricks

Sl No. Description Unit Quantity1 Truck 10 T charges Hour 0.06 424.50 25.47

Fuel charges Hour 0.06 239.10 14.352 Crew charges Hour 0.06 117.00 7.02

Total Rs: 46.84

14% 6.56Total for 3000 bricks Rs: 53.40Rate per 1000 bricks 17.80

For lead beyond 30 km for every km Unit: 3000 bricks

Sl No. Description Unit Quantity1 Truck 10 T charges Hour 0.05 424.50 21.23

Fuel charges Hour 0.05 239.10 11.962 Crew charges Hour 0.05 117.00 5.85

Total Rs: 39.04

14% 5.47Total for 3000 bricks Rs: 44.51Rate per 1000 litres 14.84

COM-DTL-LDLFT-3 C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges of trucks are not added)MORD -data

1 Loading of Lime, Aggregate, Stone Boulder,a) Loading Brick Aggregate, Kankar, Building Rubbish, Unit Quantity Rate Rs. Amount Rs.

Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 mUnit = cumTaking output = 5.5 cum LabourHead Mazdoor day 0.02 285.00 5.70Mazdoor day 0.5 250 125.00

Total in Rs. 130.70

14% 18.30Rate per cum = Rs. 27.10

b) Unloading 50% of the loading charg13.55

2 Unit Quantity Rate Rs. Amount Rs.a) Loading by manual means including a lead upto 30 m

Unit = cumTaking output = 5.5 cum LabourHead Mazdoor day 0.01 285.00 2.85Mazdoor day 0.25 250 62.50

Total in Rs. 65.35

14% 9.15Rate per cum = Rs. 13.50

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

Contractor's profit and overhead charges

contractor's profit and overhead charges

Loading of Earth, Sand, Moorum, Manure, Flyash

contractor's profit and overhead charges

COM-LDLFT

339

b) Unloading 50% of the loading charg6.75

3 Unit Quantity Rate Rs. Amount Rs.a) Loading including a lead upto 30 m

Unit = 1000 Nos.Taking output = 2000 Nosa) LabourHead Mazdoor day 0.01 285.00 2.85Mazdoor day 0.25 250 62.50Cost for 2000 Nos. = 65.35

14% 9.15Rate per cum = Rs. 37.30

37.30

4 Unit Quantity Rate Rs. Amount Rs.a) Loading including a lead upto 30 m

Unit = 1 tTaking output = 10 ta) LabourHead mazdoor day 0.06 285.00 17.10Mazdoor day 1.5 250 375.00Cost for 10 t = 392.10

14% 54.89Rate per 1 tonne = Rs. 44.70

100% of loading charges 44.70

5 Unit Quantity Rate Rs. Amount Rs.a) Loading including a lead upto 30 m

Unit = 1 tTaking output = 10 ta) Labourhead Mazdoor day 0.07 285.00 19.95Mazdoor day 1.8 250 450.00Cost for 10 t = 469.95

14% 65.79Rate per 1 tonne = Rs. 53.60

53.60

6 Unit Quantity Rate Rs. Amount Rs.

a) LoadingUnit = 1000 Nos.Taking output = 2000 Nos.a) Labourhead Mazdoor day 0.01 285.00 2.85Mazdoor day 0.25 250.00 62.50Cost for 2000 Nos. = 65.35

14% 9.15Rate per 1000 Nos. = Rs. 37.25

37.25

COM-DTL-LDLFT-4 D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire charges of trucks )

1 Loading of Lime, Aggregate, Stone Boulder,a) Loading Brick Aggregate, Kankar, Building Rubbish,

Building Rubbish, Crushed Slag, Stone for Masonry Unit Quantity Rate Rs. Amount Rs.Work by manual means including a lead upto 30 mUnit = cumTaking output = 5.5 cuma) LabourHead Mazdoor day 0.02 285.00 5.70Mazdoor day 0.5 250 125.00b) MachineryTruck 10t hour 0.5 780.60 390.30Cost for 5.5 cum = 521.00

14% 72.94Rate per cum = Rs. 108.00

Loading of Bricks by manual means

contractor's profit and overhead charges

b) Unloading + stacking

100% of loading charges i.e., Rs.

Loading of Cement by manual means

contractor's profit and overhead charges

b) Unloading + stacking

Loading of Structural Steel, Steel Bars by manual means

contractor's profit and overhead charges

b) Unloading + stacking

100% of loading charges I.e., Rs.

Loading of Bricks - 1000 Nos (Regular sizes - 225x140x70 mm) by manual means including a lead upto 30 m

contractor's profit and overhead charges

b) Unloading + stacking

100% of loading charges I.e., Rs.

contractor's profit and overhead charges

COM-LDLFT

340

b) Unloading 50% of the loading charges i.e., 54

2 Unit Quantity Rate Rs. Amount Rs.a) Loading by manual means including a lead upto 30 m

Unit = cumTaking output = 5.5 cum LabourHead Mazdoor day 0.01 285.00 2.85Mazdoor day 0.25 250 62.50b) MachineryTruck 10t hour 0.5 780.60 390.30Cost for 5.5 cum = 455.65

14% 63.79Rate per cum = Rs. 94.40

b) Unloading Unit Quantity Rate Rs. Amount Rs. by manual means including a lead upto 30 mUnit = cumTaking output = 5.5 cuma) LabourMate day 0.005 285.00 1.43Mazdoor(unskilled) day 0.125 250 31.25b) MachineryTruck 10t hour 0.166 780.60 129.58Cost for 5.5 cum = 162.26

14% 22.72Rate per cum = Rs. 33.60

3 Unit Quantity Rate Rs. Totala) Loading including a lead upto 30 m

Unit = 1000 Nos.Taking output = 2000 Nosa) LabourMate day 0.01 285.00 2.85Mazdoor(unskilled) day 0.25 250 62.50b) MachineryTruck 10t hour 0.33 780.60 257.60Cost for 2000 Nos. = 322.95

14% 45.21Rate per 1000 bricks = Rs. 184.10

100% of loading charges 184.10

4 Unit Quantity Rate Rs. Totala) Loading including a lead upto 30 m

Unit = 1 tTaking output = 10 ta) LabourMate day 0.06 285.00 17.10Mazdoor(unskilled) day 1.5 250 375.00b) MachineryTruck 10t hour 1 780.60 780.60Cost for 10 t = 1172.70

14% 164.18Rate per 1 tonne = Rs. 133.70

100% of loading charges 133.70

5 Unit Quantity Rate Rs. Totala) Loading including a lead upto 30 m

Unit = 1 tTaking output = 10 ta) LabourMate day 0.07 285.00 19.95Mazdoor(unskilled) day 1.8 250 450.00b) MachineryTruck 10t hour 1 780.60 780.60Cost for 10 t = 1250.55

14% 175.08Rate per 1 tonne = Rs. 142.60

Loading of Earth, Sand, Moorum, Manure, Flyash

contractor's profit and overhead charges

Unloading of Earth, Sand, Moorum, Manure, Flyash

contractor's profit and overhead charges

Loading of Bricks by manual means

contractor's profit and overhead charges

b) Unloading + stacking

Loading of Cement by manual means

contractor's profit and overhead charges

b) Unloading + stacking

Loading of Structural Steel, Steel Bars by manual means

contractor's profit and overhead charges

COM-LDLFT

341

100% of loading charges 142.60

COM-DTL-LDLFT-5 E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire charges of trucks)

COM-DTL-LDLFT-5-A 1 Loading of Lime, Aggregate, Stone Boulder, a) Loading Brick Aggregate, Kankar, Building Rubbish,

Crushed Slag, Stone for Masonry work by mechanical means including a lead upto 30 m Unit Quantity Rate Rs. TotalPlacing tipper at loading point, loading with front end loader excluding time for haulage and return trip.Unit = cumTaking output = 5.5 cumTime required for i) Positioning of tipper at loading point Min 1ii) Loading by front end loader 1 cum bucket capacityMin 7.33@ 45 / 25 cum per houriii) Manoevouring, reversing, dumping and turning Min - for returniv) Waiting time, unforeseen contingencies, etc. Min 2Total Min 10.33a) MachineryTipper 10 t capacity hour 0.17 818.30 140.88Front end-loader 1 cum bucket capacity @ 45 cum hour 0.12 2600.30 317.67per hourCost for 5.5 cum = 458.55

14% 64.20Rate per cum = (a+b)/5.5 Rs. 95.00

b) Unloading see below. COM-LDLFT-5-B

COM-DTL-LDLFT-5-B 2a) Loading

Placing tipper at loading point, loading with frontend loader excluding time for haulage and return trip Unit Quantity Rate Rs. TotalPlacing tipper at loading point, loading with frontend loader excluding time for haulage and return trip.Unit = cumTaking output = 5.5 cumTime required for i) Positioning of tipper at loading point Min 1ii) Loading by front end loader 1 cum bucket capacityMin 3.3@ 45 / 25 cum per houriii) Waiting time, unforeseen contingencies, etc. Min 2Total Min 6.3a) MachineryTipper 10 t capacity hour 0.105 818.30 85.92Front end-loader 1 cum bucket capacity @ 45 cum hour 0.055 2600.30 143.02per hourCost for 5.5 cum = 228.94

14% 32.05Rate per cum = (a+b)/5.5 Rs. 47.50

b) Unloadinglime, Aggregate, Stone boulder, Brick aggregate, Kankar, Building rubbish, Manure, Crushed Slag, Unit Quantity Rate Rs. Total

Placing tipper at unloading point, excluding time for haulage and return trip.Taking output = 5.5 cumTime required for i) Positioning of tipper at loading point Min 1ii) Loading by front end loader 1 cum bucket capacityMin 2@ 45 / 25 cum per houriii) Waiting time, unforeseen contingencies, etc. Min 2Total 5

Tipper 10 t capacity hour 0.08 818.30 68.19Cost for 5.5 cum = 68.19

14% 9.55Rate per cum = (a+b)/5.5 14.10

b) Unloading + stacking

b) contractor's profit and overhead charges

Loading of Earth, sand, Moorum, Manure, Flyash, by mechanical means including a lead upto 30 m

b) contractor's profit and overhead charges

Unloading of Earth, sand, Moorum, Manure, Flyash,

Flyash, Stone for Masonry work by mechanical means including a lead upto 30 m

a) Machinery

b) contractor's profit and overhead charges

COM-LDLFT

342

COM-DTL-LDLFT-6 F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD

FOR CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate /Rubble stone / Size stone / Cut stone

Lift : Upto 3.00 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.

Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT

For additional lift of 1m beyond initial lift of 3 m one meter lift is taken equivalent to 6 meters leadaverage speed of conveyance by head load 60 m/minuteRound trip cycle time for 1.00 m considering 50 min/ hr working1 x6x 60 / 50 / 60 ) 0.12 minNo. of trips per day for lift 1.0 m above 3 m ( 8 x 60 / 0..12) 4000Quantity of material by head load 0.015 cumQuantity of material by head load per day ( 4000x 0.015 ) 60 cumDeploy 1 mazdoor for every additional lift of 1.0 m beyond initial lift.Lift : Upto 3.00 m for materials under this Category Unit: 60 cum

Sl No. Description Unit Quantity1 2 3 4 5 6

Mazdoor Day 1.00 250.00 250.00

14% 35.00Total Rs: for 60 cum 285.00

Rate per cum 4.80FOR CATEGORY: Cement bag / Reinforcement steel / Structural steel sectionsLift : Upto 3.00 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.

Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT

For additional lift of 1m beyond initial lift of 3 m one meter lift is taken equivalent to 6 meters leadaverage speed of conveyance by head load 25 m/minuteRound trip cycle time for 1.00 m considering 50 min/ hr working1 x6x 60 / 50 / 25 ) 0.29 minNo. of trips per day foradditional lift 1.0 m above 3 m ( 8 x 60 / 0.29) 1655Quantity of material by head load 50 kgsQuantity of material by head load per day ( 1655x50x 0.015 ) 83 tonsDeploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoorLift : Upto 3.00 m for materials under this Category Unit: 83 TONS

Sl No. Description Unit Quantity1 2 3 4 5 6

Mazdoor Day 1.00 250.00 250.00

14% 35.00Total Rs: for 83 Tonnes 285.00

Rate per tonne 3.40FOR CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood

Lift : Upto 3.00 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.Lift : ADDITIONAL LIFT CHARGES FOR EACH 1 METER LIFT BEYOND 3 M INITIAL LIFT

For additional lift of 1m beyond initial lift of 3 m one meter lift is taken equivalent to 6 meters leadaverage speed of conveyance by head load 40 m/minuteRound trip cycle time for 1.00 m considering 50 min/ hr working1 x6x 60 / 50 / 40 ) 0.18 minNo. of trips per day for lift 1.0 m ( 8 x 60 / 0.18 ) 2667Quantity of material by head load 0.017 cumQuantity of material by head load per day ( 1667x 0.018 ) 45 cumDeploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoor

Lift : Upto 3.00 m for materials under Category Unit: 45 cum

Sl No. Description Unit Quantity1 2 3 4 5 6

Mazdoor Day 1.00 250.00 250.00

14% 35.00Total Rs: for 45 cum 285.00

Rate per cum 6.30

Ratein Rs.

Amountin Rs.

contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

contractor's profit and overhead charges

Ratein Rs.

Amountin Rs.

contractor's profit and overhead charges

Hire Charges

342

HIRE CHARGES OF MACHINERY

FOR THE YEAR : 2012-13

S.No Description of machinery Unit Hire charge in Rs

Total in Rs

1 2 3 4 5 6 71 Agitator car / Transit mixer 2 cum Hour 774.30 695.80 199.70 1669.802 Air compressor 5 cmm ( electric ) Hour 111.50 226.60 117.00 455.103 Air compressor 7 cmm ( diesel ) Hour 248.40 569.30 149.80 967.504 Air compressor 7 cmm ( electric ) Hour 134.60 302.10 117.00 553.705 Air compressor 8.5 cmm ( diesel Hour 280.70 711.60 149.80 1142.106 Air compressor 8.5 cmm ( electric) Hour 176.20 377.70 117.00 670.907 Air compressor 15 cmm ( electric) Hour 143.80 839.30 124.80 1107.908 Angle Dozer 90 hp Hour 1745.70 486.70 166.40 2398.809 Batching plant 0.5 cum( 6 cum/hr) Hour 119.10 100.70 239.60 459.40

10 Batching plant 2 x 1.00 cum(15 cum/hr) Hour 419.50 302.10 239.60 961.2011 Batching plant 2 x 1.50 cum(50 cum/hr) Hour 537.00 369.30 239.60 1145.9012 Bending machine 3000 x 12 mm Hour 46.10 100.70 93.60 240.4013 Clamp shell and hoisting ropes Hour 5.40 0.00 0.00 5.4014 Concrete bucket 1.5 cum Hour 16.60 0.00 0.00 16.6015 Concrete hand mixer 45 / 30 ltr Hour 5.80 0.00 0.00 5.8016 Concrete mixer 300 / 200 ( diesel) Hour 52.40 63.30 156.00 271.7017 Concrete mixer 300 / 200 ltr ( electric) Hour 50.60 33.60 156.00 240.2018 Concrete mixer 600 / 400 ( diesel) Hour 95.80 126.50 156.00 378.3019 Concrete mixer 600 / 400 ltr ( electric Hour 93.30 67.10 156.00 316.4020 Concrete paver 100 sqm / hr Hour 368.10 0.00 299.50 667.6021 Convey mucker Hour 840.40 233.60 124.80 1198.8022 Core drilling machine Hour 329.30 189.80 199.70 718.8023 Diesel generating set 30 KVA Hour 68.00 506.00 93.60 667.6024 Diesel generating set 50 KVA Hour 87.60 759.00 93.60 940.2025 Diesel Loco 45 hp Hour 390.00 426.90 117.00 933.9026 Dewatering pump 5 hp ( diesel ) Hour 11.10 63.30 78.60 153.0027 Dewatering pump 5 hp ( electric ) Hour 3.30 33.60 59.00 95.9028 Dewatering pump 10 hp ( diesel ) Hour 16.00 126.50 78.60 221.1029 Dewatering pump 10 hp ( electric Hour 7.40 67.10 59.00 133.5030 Dewatering pump 20 hp ( diesel ) Hour 50.70 253.00 78.60 382.3031 Dewatering pump 20 hp ( electric Hour 12.80 134.30 59.00 206.1032 Drifter Hour 331.20 0.00 249.60 580.8033 Drilling jumbo Hour 375.90 34.20 124.80 534.9034 Dumper 4.5 cum Hour 597.20 318.80 159.70 1075.7035 Geophysical Electric resistivity meter Hour 103.40 0.00 0.00 103.4036 Grouting pump Hour 25.90 33.60 187.20 246.7037 Guniting / sand blast equipment Hour 114.70 0.00 156.00 270.7038 Ice plant & accessories 30 t / day Hour 176.70 956.70 93.60 1227.0039 Jack hammer Hour 21.20 0.00 234.00 255.2040 Needle vibrator 40 mm ( petrol ) Hour 7.70 12.70 112.30 132.7041 Needle vibrator 40 mm ( electric ) Hour 8.50 6.70 112.30 127.5042 Needle vibrator 60 mm ( petrol ) Hour 8.10 19.00 112.30 139.4043 Needle vibrator 60 mm ( electric ) Hour 10.00 10.10 112.30 132.4044 Planing machine 4 m stroke Hour 122.00 100.70 149.80 372.5045 Plate shearing machine upto 12 mm Hour 43.20 134.30 99.80 277.3046 Pneumatic placer 0.5 cum Hour 174.50 0.00 61.40 235.9047 Pneumatic tamper Hour 21.20 0.00 187.20 208.4048 Pug cutting machine Hour 6.50 3.40 0.00 9.9049 Pusher leg Hour 13.20 0.00 0.00 13.2050 Road roller diesel 10 t Hour 201.50 569.30 149.80 920.6051 Shovel 0.50 cum 75 hp Hour 1027.10 379.50 166.40 1573.0052 Shovel 0.85 cum 110 hp Hour 1738.10 695.80 166.40 2600.3053 Stationery derric crane Hour 88.60 0.00 0.00 88.6054 Tipper 5 cum Hour 454.40 239.10 124.80 818.3055 Tipping tub 1.5 cum Hour 65.60 0.00 0.00 65.6056 Tower crane 5 tonne Hour 894.80 174.60 133.10 1202.5057 Transformer 250 KVA Hour 5574.40 0.00 0.00 5574.4058 Truck 10 t Hour 424.50 239.10 117.00 780.6059 Truck mounted derric crane 5 t Hour 528.30 239.10 117.00 884.4060 Upright drilling machine/Grinder Hour 23.70 33.60 138.50 195.8061 Ventilation fan 20 hp Hour 12.00 134.30 20.30 166.6062 Vibratory pad foot roller 8 t Hour 1375.40 822.30 187.20 2384.9063 Wagon drill Hour 193.60 0.00 199.70 393.3064 Water tanker 8000 ltr Hour 408.80 239.10 117.00 764.9065 Welding set Hour 16.60 80.60 0.00 97.2066 Winch 35 hp ( electric ) Hour 130.80 164.50 187.20 482.5067* Tractor with 2T roller Hour 345.00

* adopted from R& B in the year 2010-11

Fuel charge in Rs

Crew Charge in Rs.

Hire Charges (Annexure III)

69

HIRE CHARGES OF MACHINERY

FOR THE YEAR : 2012-13REFERENCE DATA ON CAPITAL COST & WAGES OF CREW

S.NoDescription of machinery

C Rs/Day Rs/Day1 Agitator car / Transit mixer 2 cum 2160000 355.00 285.00

Tyres and tubes 6 sets 860002 Air compressor 5 cmm ( electric ) 715000 315.00 285.003 Air compressor 7 cmm ( diesel ) 961000 315.00 285.004 Air compressor 7 cmm ( electric ) 863000 315.00 285.005 Air compressor 8.5 cmm ( diesel ) 1086000 315.00 285.006 Air compressor 8.5 cmm ( electric ) 1130000 315.00 285.007 Air compressor 15 cmm ( electric ) 1372000 315.00 285.008 Angle Dozer 90 hp 5491000 355.00 285.009 Batching plant 0.5 cum 1207000 355.00 285.00

10 Batching plant 2 x 1.00 cum 4252000 355.00 285.0011 Batching plant 2 x 1.50 cum 5443000 355.00 285.0012 Bending machine 3000 x 12 mm 555000 315.00 285.0013 Clamp shell and hoisting ropes 3000014 Concrete bucket 1.5 cum 5800015 Concrete hand mixer 45 / 30 ltr 1600016 Concrete mixer 300 / 200 ( diesel ) 145000 315.00 285.0017 Concrete mixer 300 / 200 ltr ( electric ) 140000 315.00 285.0018 Concrete mixer 600 / 400 ( diesel ) 265000 315.00 285.0019 Concrete mixer 600 / 400 ltr ( electric ) 258000 315.00 285.0020 Concrete paver 100 sqm / hr 2371000 315.00 285.0021 Convey mucker 3868000 315.00 285.00

Tyres and tubes 6 sets 8600022 Core drilling machine 1114000 355.00 285.0023 Diesel generating set 30 KVA 501000 315.00 285.0024 Diesel generating set 50 KVA 645000 315.00 285.0025 Diesel Loco 45 hp 2126000 315.00 285.0026 Dewatering pump 5 hp ( diesel ) 43000 315.0027 Dewatering pump 5 hp ( electric ) 26000 315.0028 Dewatering pump 10 hp ( diesel ) 62000 315.0029 Dewatering pump 10 hp ( electric 59000 315.0030 Dewatering pump 20 hp ( diesel ) 196000 315.0031 Dewatering pump 20 hp ( electric) 102000 315.0032 Drifter 1062000 355.00 285.0033 Drilling jumbo 1311000 315.00 285.00

Tyres and tubes 6 sets 8600034 Dumper 4.5 cum 1477000 355.00 285.00

Tyres and tubes 6 sets 8600035 Geophysical Electric resistivity meter 48900036 Grouting pump 104000 315.00 285.0037 Guniting / sand blast equipment 288000 315.00 285.0038 Ice plant & accessories 30 t / day 2287000 315.00 285.0039 Jack hammer 68000 315.00 285.0040 Needle vibrator 40 mm ( petrol ) 20000 315.00 285.0041 Needle vibrator 40 mm ( electric ) 22000 315.00 285.0042 Needle vibrator 60 mm ( petrol ) 21000 315.00 285.0043 Needle vibrator 60 mm ( electric ) 26000 315.00 285.0044 Planing machine 4 m stroke 786000 315.00 285.0045 Plate shearing machine upto 12 mm 426000 355.00 285.0046 Pneumatic placer 0.5 cum 584000 315.0047 Pneumatic tamper 85000 315.00 285.0048 Pug cutting machine 1600049 Pusher leg 5300050 Road roller diesel 10 t 852000 315.00 285.0051 Shovel 0.50 cum 75 hp 3775000 355.00 285.0052 Shovel 0.85 cum 110 hp 6388000 355.00 285.0053 Stationery derric crane 65500054 Tipper 5 cum 1631000 355.00 285.00

Tyres and tubes 6 sets 8600055 Tipping tub 1.5 cum 24200056 Tower crane 5 tonne 7488000 355.00 285.0057 Transformer 250 KVA 45300058 Truck 10 t 1496000 315.00 285.00

Tyres and tubes 6 sets 8600059 Truck mounted derric crane 5 t 1965000 315.00 285.00

Capital cost in Rs

Wages of Operator

Wages of Helper

Hire Charges (Annexure III)

70

Tyres and tubes 6 sets 8600060 Upright drilling machine 58000 355.0061 Ventilation fan 20 hp 266000 315.0062 Vibratory pad foot roller 8 t 2986000 315.00 285.0063 Wagon drill 655000 355.00 285.0064 Water tanker 8000 ltr 1425000 315.00 285.00

Tyres and tubes 6 sets 8600065 Welding set 4900066 Winch 35 hp ( electric ) 373000 315.00 285.00

OTHER DATA FOR WORKING OUT HIRE CHARGES

Rate of interest "r" : % per annum 12.00%Road tax : per annum. Rs: 15767.00Insurance per annum (p) : % per annum. 1.00%Diesel : per litre Rs: 46.00Petrol : per litre Rs: 75.00Lubricating oil : per litre Rs: 239.00Tyres & tubes for lorry : per set Rs: 17000.00Electric energy (Category:HT-2B) : per kwhr Rs: 7.50Salvage value ( as percentage of capital cost ) "s" : % 10%

STANDARD DATA FOR MACHINERY

Note: Life and repair charges are as per CWC guidelines except for truck, tipper and road rollerFor truck, tipper and road roller, the life is considered as per the prevailing norms in the Water Resources Department and repair charges are as per CWC guidelines'

S.No Description of machinery Life in years Life in hours Type Factor Duty Factor

n h r c1 c21 Agitator car / Transit mixer 2 cum 10 10000 120 0.50 1.00

Tyres and tubes 6 sets 1 800 252 Air compressor 5 cmm ( electric ) 10 16000 80 1.00 0.753 Air compressor 7 cmm ( diesel ) 8 10000 100 1.00 0.754 Air compressor 7 cmm ( electric ) 10 16000 80 1.00 0.755 Air compressor 8.5 cmm ( diesel 8 10000 100 1.00 0.756 Air compressor 8.5 cmm ( electric) 10 16000 80 1.00 0.757 Air compressor 15 cmm ( electric) 20 30000 80 1.00 1.008 Angle Dozer 90 hp 10 12000 200 0.57 0.759 Batching plant 0.5 cum 18 30000 75 1.00 1.00

10 Batching plant 2 x 1.00 cum 18 30000 75 1.00 1.0011 Batching plant 2 x 1.50 cum 18 30000 75 1.00 1.0012 Bending machine 3000 x 12 mm 15 30000 50 1.00 1.0013 Clamp shell and hoisting ropes 500014 Concrete bucket 1.5 cum 3 5000 25 1.00 1.0015 Concrete hand mixer 45 / 30 ltr 5 6000 80 1.00 1.0016 Concrete mixer 300 / 200 ( diesel) 5 6000 80 1.00 1.0017 Concrete mixer 300 / 200 ltr ( electric) 5 6000 80 1.00 1.0018 Concrete mixer 600 / 400 ( diesel) 5 6000 80 1.00 1.0019 Concrete mixer 600 / 400 ltr ( electric 5 6000 80 1.00 1.0020 Concrete paver 100 sqm / hr 16 20000 100 1.00 1.0021 Convey mucker 10 15000 100 0.58 1.00

Tyres and tubes 6 sets 1 800 2522 Core drilling machine 8 8000 80 1.00 1.0023 Diesel generating set 30 KVA 10 20000 100 1.00 1.0024 Diesel generating set 50 KVA 10 20000 100 1.00 1.0025 Diesel Loco 45 hp 10 16000 120 1.00 0.7526 Dewatering pump 5 hp ( diesel ) 8 10000 100 1.00 1.0027 Dewatering pump 5 hp ( electric ) 12 20000 70 1.00 1.0028 Dewatering pump 10 hp ( diesel ) 8 10000 100 1.00 1.0029 Dewatering pump 10 hp ( electric 12 20000 70 1.00 1.0030 Dewatering pump 20 hp ( diesel ) 8 10000 100 1.00 1.0031 Dewatering pump 20 hp ( electric 12 20000 70 1.00 1.0032 Drifter 10 8000 80 1.00 1.0033 Drilling jumbo 8 12000 100 0.30 0.10

Tyres and tubes 6 sets 1 1200 2534 Dumper 4.5 cum 8 10000 175 0.30 0.70

Tyres and tubes 6 sets 1 1200 2535 Geophysical Electric resistivity meter 5 10000 75 1.00 1.00

Repair cost % C

Hire Charges (Annexure III)

71

36 Grouting pump 10 10000 80 1.00 1.0037 Guniting / sand blast equipment 5 6000 100 1.00 1.0038 Ice plant & accessories 30 t / day 20 40000 75 1.00 0.7539 Jack hammer 10 8000 80 1.00 1.0040 Needle vibrator 40 mm ( petrol ) 3 5000 70 1.00 0.5041 Needle vibrator 40 mm ( electric ) 3 5000 70 1.00 0.5042 Needle vibrator 60 mm ( petrol ) 3 5000 70 1.00 0.5043 Needle vibrator 60 mm ( electric ) 3 5000 70 1.00 0.5044 Planing machine 4 m stroke 16 20000 100 1.00 1.0045 Plate shearing machine upto 12 mm 15 30000 100 1.00 1.0046 Pneumatic placer 0.5 cum 5 8000 100 1.00 1.0047 Pneumatic tamper 10 10000 80 1.00 1.0048 Pug cutting machine 10 8000 150 1.00 1.0049 Pusher leg 10 10000 80 1.00 1.0050 Road roller diesel 10 t 8 10000 80 1.00 1.0051 Shovel 0.50 cum 75 hp 10 12000 150 0.50 0.8052 Shovel 0.85 cum 110 hp 10 12000 150 0.50 1.0053 Stationery derric crane 10 16000 50 1.00 1.0054 Tipper 5 cum 10 16000 175 0.30 0.70

Tyres and tubes 6 sets 1 1200 2555 Tipping tub 1.5 cum 5 8000 80 1.00 1.0056 Tower crane 5 tonne 20 30000 120 1.00 1.0057 Transformer 250 KVA 15 180 25 1.00 1.0058 Truck 10 t 10 16000 175 0.30 0.70

Tyres and tubes 6 sets 1 1200 2559 Truck mounted derric crane 5 t 10 16000 175 0.30 0.70

Tyres and tubes 6 sets 1 1200 2560 Upright drilling machine 10 8000 150 1.00 1.0061 Ventilation fan 20 hp 12 58000 80 1.00 1.0062 Vibratory pad foot roller 8 t 8 8000 200 1.00 1.0063 Wagon drill 8 8000 80 1.00 1.0064 Water tanker 8000 ltr 10 16000 175 0.30 0.70

Tyres and tubes 6 sets 1 1200 2565 Welding set 10 8000 100 0.50 1.0066 Winch 35 hp ( electric ) 8 8000 120 1.00 0.70

RATE ANALYSIS FOR HIRE CHARGES OF MACHINERY ( EXCLUDING FUEL & CREW )

FOR THE YEAR : 2012-13

Capital cost of machinery / equipment : CSalvage value of machinery / equipment ( as percentage of capital cost ) : sRate of interest per annum : I Rate of Insurance per Annum : pLife of machinery / equipment in years : nLife of machinery / equipment in hours : hAverage capital cost C x ( n + 1 ) / 2 n : C'Repair charges ( as percentage of capital cost ) : r Depreciation charges ( 1 - s% ) x Capital cost / life in hoursInterest charges Av.Capital cost x Rate of interest x life in years/life in hours/100Repair charges Repair provision x Capital cost / life in hours / 100

( for value of ' r ' refer standard data table )Miscellaneous charges ( as percentage of repair charges ) : 10%

S.No Description of machinery

1 Agitator car / Transit mixer 2 cum 194.40 142.56 259.20 25.92 11.88 634.00Tyres and tubes 6 sets 96.75 12.9 26.88 2.69 1.08 140.30

2 Air compressor 5 cmm ( electric ) 40.22 29.49375 35.75 3.58 2.46 111.503 Air compressor 7 cmm ( diesel ) 86.49 51.894 96.10 9.61 4.32 248.404 Air compressor 7 cmm ( electric ) 48.54 35.59875 43.15 4.32 2.97 134.605 Air compressor 8.5 cmm ( diesel) 97.74 58.644 108.60 10.86 4.89 280.706 Air compressor 8.5 cmm ( electric) 63.56 46.6125 56.50 5.65 3.88 176.207 Air compressor 15 cmm ( electric) 41.16 57.624 36.59 3.66 4.8 143.808 Angle Dozer 90 hp 411.83 302.005 915.17 91.52 25.17 1745.709 Batching plant 0.5 cum( 6 cum/hr) 36.21 45.866 30.18 3.02 3.82 119.10

10 Batching plant 2 x 1.00 cum(15 cum/hr) 127.56 161.576 106.30 10.63 13.46 419.50

Depreciation (1-s%)xC/h in Rs

Interest C'xI%xn/h in Rs

Repair rxC/h/100 in Rs

Misce. rxC/h/1000 in Rs

Insurance p%xC'xn/h in Rs

Total

Hire Charges (Annexure III)

72

11 Batching plant 2 x 1.50 cum(50 cum/hr) 163.29 206.834 136.08 13.61 17.24 537.0012 Bending machine 3000 x 12 mm 16.65 17.76 9.25 0.93 1.48 46.1013 Clamp shell and hoisting ropes 5.40 5.4014 Concrete bucket 1.5 cum 10.44 2.784 2.90 0.29 0.23 16.6015 Concrete hand mixer 45 / 30 ltr 2.40 0.96 2.13 0.21 0.08 5.8016 Concrete mixer 300 / 200 ( diesel) 21.75 8.7 19.33 1.93 0.73 52.4017 Concrete mixer 300 / 200 ltr ( electric) 21.00 8.4 18.67 1.87 0.7 50.6018 Concrete mixer 600 / 400 ( diesel) 39.75 15.9 35.33 3.53 1.33 95.8019 Concrete mixer 600 / 400 ltr ( electric 38.70 15.48 34.40 3.44 1.29 93.3020 Concrete paver 100 sqm / hr 106.70 120.921 118.55 11.86 10.08 368.1021 Convey mucker 232.08 170.192 257.87 25.79 14.18 700.10

Tyres and tubes 6 sets 96.75 12.9 26.88 2.69 1.08 140.3022 Core drilling machine 125.33 75.195 111.40 11.14 6.27 329.3023 Diesel generating set 30 KVA 22.55 16.533 25.05 2.51 1.38 68.0024 Diesel generating set 50 KVA 29.03 21.285 32.25 3.23 1.77 87.6025 Diesel Loco 45 hp 119.59 87.6975 159.45 15.95 7.31 390.0026 Dewatering pump 5 hp ( diesel ) 3.87 2.322 4.30 0.43 0.19 11.1027 Dewatering pump 5 hp ( electric ) 1.17 1.014 0.91 0.09 0.08 3.3028 Dewatering pump 10 hp ( diesel ) 5.58 3.348 6.20 0.62 0.28 16.0029 Dewatering pump 10 hp ( electric 2.66 2.301 2.07 0.21 0.19 7.4030 Dewatering pump 20 hp ( diesel ) 17.64 10.584 19.60 1.96 0.88 50.7031 Dewatering pump 20 hp ( electric 4.59 3.978 3.57 0.36 0.33 12.8032 Drifter 119.48 87.615 106.20 10.62 7.3 331.2033 Drilling jumbo 98.33 58.995 109.25 10.93 4.92 282.40

Tyres and tubes 6 sets 64.50 8.6 17.92 1.79 0.72 93.5034 Dumper 4.5 cum 132.93 79.758 258.48 25.85 6.65 503.70

Tyres and tubes 6 sets 64.50 8.6 17.92 1.79 0.72 93.5035 Geophysical Electric resistivity meter 44.01 17.604 36.68 3.67 1.47 103.4036 Grouting pump 9.36 6.864 8.32 0.83 0.57 25.9037 Guniting / sand blast equipment 43.20 17.28 48.00 4.80 1.44 114.7038 Ice plant & accessories 30 t / day 51.46 72.0405 42.88 4.29 6 176.7039 Jack hammer 7.65 5.61 6.80 0.68 0.47 21.2040 Needle vibrator 40 mm ( petrol ) 3.60 0.96 2.80 0.28 0.08 7.7041 Needle vibrator 40 mm ( electric ) 3.96 1.056 3.08 0.31 0.09 8.5042 Needle vibrator 60 mm ( petrol ) 3.78 1.008 2.94 0.29 0.08 8.1043 Needle vibrator 60 mm ( electric ) 4.68 1.248 3.64 0.36 0.1 10.0044 Planing machine 4 m stroke 35.37 40.086 39.30 3.93 3.34 122.0045 Plate shearing machine upto 12 mm 12.78 13.632 14.20 1.42 1.14 43.2046 Pneumatic placer 0.5 cum 65.70 26.28 73.00 7.30 2.19 174.5047 Pneumatic tamper 7.65 5.61 6.80 0.68 0.47 21.2048 Pug cutting machine 1.80 1.32 3.00 0.30 0.11 6.5049 Pusher leg 4.77 3.498 4.24 0.42 0.29 13.2050 Road roller diesel 10 t 76.68 46.008 68.16 6.82 3.83 201.5051 Shovel 0.50 cum 75 hp 283.13 207.625 471.88 47.19 17.3 1027.1052 Shovel 0.85 cum 110 hp 479.10 351.34 798.50 79.85 29.28 1738.1053 Stationery derric crane 36.84 27.01875 20.47 2.05 2.25 88.6054 Tipper 5 cum 91.74 67.27875 178.39 17.84 5.61 360.90

Tyres and tubes 6 sets 64.50 8.6 17.92 1.79 0.72 93.5055 Tipping tub 1.5 cum 27.23 10.89 24.20 2.42 0.91 65.6056 Tower crane 5 tonne 224.64 314.496 299.52 29.95 26.21 894.8057 Transformer 250 KVA 2265.00 2416 629.17 62.92 201.33 5574.4058 Truck 10 t 84.15 61.71 163.63 16.36 5.14 331.00

Tyres and tubes 6 sets 64.50 8.6 17.92 1.79 0.72 93.5059 Truck mounted derric crane 5 t 110.53 81.05625 214.92 21.49 6.75 434.80

Tyres and tubes 6 sets 64.50 8.6 17.92 1.79 0.72 93.5060 Upright drilling machine 6.53 4.785 10.88 1.09 0.4 23.7061 Ventilation fan 20 hp 4.13 3.57724137931 3.67 0.37 0.3 12.0062 Vibratory pad foot roller 8 t 335.93 201.555 746.50 74.65 16.8 1375.4063 Wagon drill 73.69 44.2125 65.50 6.55 3.68 193.6064 Water tanker 8000 ltr 80.16 58.78125 155.86 15.59 4.9 315.30

Tyres and tubes 6 sets 64.50 8.6 17.92 1.79 0.72 93.5065 Welding set 5.51 4.0425 6.13 0.61 0.34 16.6066 Winch 35 hp ( electric ) 41.96 25.1775 55.95 5.60 2.1 130.80

RATE ANALYSIS FOR FUEL CHARGES OF MACHINERY FOR THE YEAR : 2012-13

Electric motor powered machinery:Energy consumption( in kwhr/hr) : 0.746 x BHP x c1 x c2

Hire Charges (Annexure III)

73

Diesel engine powered machinery:Diesel consumption ( in ltr / hr ) : 0.220 x FHP x c1 x c2c1 and c2 are type and duty factors ( refer standard data table for values of c1 and c2 ).Provision for Oil & Lubricants :Electric motor operated machinery : 20 percent of energy chargesDiesel engine operated machinery : 25 percent of fuel charges

S.No Description of machineryDiesel ltr / hour

1 Agitator car / Transit mixer 2 cum 110 12.10 556.60 139.15 695.802 Air compressor 5 cmm ( electric ) 45 25.18 188.83 37.77 226.603 Air compressor 7 cmm ( diesel ) 60 9.90 455.40 113.85 569.304 Air compressor 7 cmm ( electric ) 60 33.57 251.78 50.36 302.105 Air compressor 8.5 cmm ( diesel 75 12.38 569.25 142.31 711.606 Air compressor 8.5 cmm ( electric) 75 41.96 314.72 62.94 377.707 Air compressor 15 cmm ( electric) 125 93.25 699.38 139.88 839.308 Angle Dozer 90 hp 90 8.46 389.37 97.34 486.709 Batching plant 0.5 cum( 6 cum/hr) 15 11.19 83.93 16.79 100.70

10 Batching plant 2 x 1.00 cum(15 cum/hr) 45 33.57 251.78 50.36 302.1011 Batching plant 2 x 1.50 cum(50 cum/hr) 55 41.03 307.73 61.55 369.3012 Bending machine 3000 x 12 mm 15 11.19 83.93 16.79 100.7013 Clamp shell and hoisting ropes14 Concrete bucket 1.5 cum15 Concrete hand mixer 45 / 30 ltr16 Concrete mixer 300 / 200 ( diesel) 5 1.10 50.60 12.65 63.3017 Concrete mixer 300 / 200 ltr ( electric) 5 3.73 27.98 5.60 33.6018 Concrete mixer 600 / 400 ( diesel) 10 2.20 101.20 25.30 126.5019 Concrete mixer 600 / 400 ltr ( electric 10 7.46 55.95 11.19 67.1020 Concrete paver 100 sqm / hr21 Convey mucker 60 25.96 194.71 38.94 233.6022 Core drilling machine 15 3.30 151.80 37.95 189.8023 Diesel generating set 30 KVA 40 8.80 404.80 101.20 506.0024 Diesel generating set 50 KVA 60 13.20 607.20 151.80 759.0025 Diesel Loco 45 hp 45 7.43 341.55 85.39 426.9026 Dewatering pump 5 hp ( diesel ) 5 1.10 50.60 12.65 63.3027 Dewatering pump 5 hp ( electric ) 5 3.73 27.98 5.60 33.6028 Dewatering pump 10 hp ( diesel ) 10 2.20 101.20 25.30 126.5029 Dewatering pump 10 hp ( electric 10 7.46 55.95 11.19 67.1030 Dewatering pump 20 hp ( diesel ) 20 4.40 202.40 50.60 253.0031 Dewatering pump 20 hp ( electric 20 14.92 111.90 22.38 134.3032 Drifter33 Drilling jumbo 90 0.59 27.32 6.83 34.2034 Dumper 4.5 cum 120 5.54 255.02 63.76 318.8035 Geophysical Electric resistivity meter 0.0036 Grouting pump 5 3.73 27.98 5.60 33.6037 Guniting / sand blast equipment38 Ice plant & accessories 30 t / day 190 106.31 797.29 159.46 956.7039 Jack hammer40 Needle vibrator 40 mm ( petrol ) 2 0.22 10.12 2.53 12.7041 Needle vibrator 40 mm ( electric ) 2 0.75 5.60 1.12 6.7042 Needle vibrator 60 mm ( petrol ) 3 0.33 15.18 3.80 19.0043 Needle vibrator 60 mm ( electric ) 3 1.12 8.39 1.68 10.1044 Planing machine 4 m stroke 15 11.19 83.93 16.79 100.7045 Plate shearing machine upto 12 mm 20 14.92 111.90 22.38 134.3046 Pneumatic placer 0.5 cum47 Pneumatic tamper48 Pug cutting machine 0.5 0.37 2.80 0.56 3.4049 Pusher leg50 Road roller diesel 10 t 45 9.90 455.40 113.85 569.3051 Shovel 0.50 cum 75 hp 75 6.60 303.60 75.90 379.5052 Shovel 0.85 cum 110 hp 110 12.10 556.60 139.15 695.8053 Stationery derric crane54 Tipper 5 cum 90 4.16 191.27 47.82 239.1055 Tipping tub 1.5 cum56 Tower crane 5 tonne 26 19.40 145.47 29.09 174.6057 Transformer 250 KVA58 Truck 10 t 90 4.16 191.27 47.82 239.1059 Truck mounted derric crane 5 t 90 4.16 191.27 47.82 239.1060 Upright drilling machine 5 3.73 27.98 5.60 33.6061 Ventilation fan 20 hp 20 14.92 111.90 22.38 134.3062 Vibratory pad foot roller 8 t 65 14.30 657.80 164.45 822.3063 Wagon drill64 Water tanker 8000 ltr 90 4.16 191.27 47.82 239.10

FHP/BHP of machine

Ele power kwhr / hr

Fuel/power charges/ hr in Rs

Lubricant/ oil / hour in Rs

Total in Rs

Hire Charges (Annexure III)

74

65 Welding set 24 8.95 67.14 13.43 80.6066 Winch 35 hp ( electric ) 35 18.28 137.08 27.42 164.50

FOR THE YEAR : 2012-13

For the purpose of working out wages of crew on hourly basis the daily wages are converted toyearly wages by multiplying the daily wages with ( 26 days x 12 months). The yearly wages arethen divided by yearly usage of machinery in hours to get hourly wages of operating crew.Yearly usage of machinery in hours = Life of machinery in hours / Life of machinery in yearsExample: Operating crew charges for Air compressor ( diesel ) :

Operator compressor : 315.00 / DayHelper compressor : 285.00 / DayLife of Air compressor ( diesel ) in hours : 10000 hoursLife of Air compressor ( diesel ) in years : 8 yearsYearly usage of Air compressor ( 10000 / 8 ) : 1250 hoursYearly wages of Operator compressor = ( 26 x 12 x Daily wages ) Rs: 98280.00Yearly wages of Helper compressor = ( 26 x 12 x Daily wages ) Rs: 88920.00Total yearly operating crew charges for Air compressor ( diesel ) Rs: 187200.00Hourly operating crew charges= ( yearly crew charges / yearly usage of machinery) Rs: 149.76Rounded off to Rs: 63.65

S.No Description of machinery

No. of Helper

Total Yearly wages

Operator in Rs1 Agitator car / Transit mixer 2 cum 1 1 110760 88920 1000.00 199.702 Air compressor 5 cmm ( electric ) 1 1 98280 88920 1600.00 117.003 Air compressor 7 cmm ( diesel ) 1 1 98280 88920 1250.00 149.804 Air compressor 7 cmm ( electric ) 1 1 98280 88920 1600.00 117.005 Air compressor 8.5 cmm ( diesel 1 1 98280 88920 1250.00 149.806 Air compressor 8.5 cmm ( electric) 1 1 98280 88920 1600.00 117.007 Air compressor 15 cmm ( electric) 1 1 98280 88920 1500.00 124.808 Angle Dozer 90 hp 1 1 110760 88920 1200.00 166.409 Batching plant 0.5 cum( 6 cum/hr) 2 2 221520 177840 1667.00 239.60

10 Batching plant 2 x 1.00 cum(15 cum/hr) 2 2 221520 177840 1667.00 239.6011 Batching plant 2 x 1.50 cum(50 cum/hr) 2 2 221520 177840 1667.00 239.6012 Bending machine 3000 x 12 mm 1 1 98280 88920 2000.00 93.6013 Clamp shell and hoisting ropes14 Concrete bucket 1.5 cum 1667.00 0.0015 Concrete hand mixer 45 / 30 ltr 1200.00 0.0016 Concrete mixer 300 / 200 ( diesel) 1 1 98280 88920 1200.00 156.0017 Concrete mixer 300 / 200 ltr ( electric) 1 1 98280 88920 1200.00 156.0018 Concrete mixer 600 / 400 ( diesel) 1 1 98280 88920 1200.00 156.0019 Concrete mixer 600 / 400 ltr ( electric 1 1 98280 88920 1200.00 156.0020 Concrete paver 100 sqm / hr 2 2 196560 177840 1250.00 299.5021 Convey mucker 1 1 98280 88920 1500.00 124.8022 Core drilling machine 1 1 110760 88920 1000.00 199.7023 Diesel generating set 30 KVA 1 1 98280 88920 2000.00 93.6024 Diesel generating set 50 KVA 1 1 98280 88920 2000.00 93.6025 Diesel Loco 45 hp 1 1 98280 88920 1600.00 117.0026 Dewatering pump 5 hp ( diesel ) 1 98280 1250.00 78.6027 Dewatering pump 5 hp ( electric ) 1 98280 1667.00 59.0028 Dewatering pump 10 hp ( diesel ) 1 98280 1250.00 78.6029 Dewatering pump 10 hp ( electric 1 98280 1667.00 59.0030 Dewatering pump 20 hp ( diesel ) 1 98280 1250.00 78.6031 Dewatering pump 20 hp ( electric 1 98280 1667.00 59.0032 Drifter 1 1 110760 88920 800.00 249.6033 Drilling jumbo 1 1 98280 88920 1500.00 124.8034 Dumper 4.5 cum 1 1 110760 88920 1250.00 159.7035 Geophysical Electric resistivity meter 2000.00 0.0036 Grouting pump 1 1 98280 88920 1000.00 187.2037 Guniting / sand blast equipment 1 1 98280 88920 1200.00 156.0038 Ice plant & accessories 30 t / day 1 1 98280 88920 2000.00 93.6039 Jack hammer 1 1 98280 88920 800.00 234.0040 Needle vibrator 40 mm ( petrol ) 1 1 98280 88920 1667.00 112.3041 Needle vibrator 40 mm ( electric ) 1 1 98280 88920 1667.00 112.3042 Needle vibrator 60 mm ( petrol ) 1 1 98280 88920 1667.00 112.30

RATE ANALYSIS FOR OPERATING CREW CHARGES

No. of Operator

Yearly usage of machinery in hours

Hourly Crew Charges in Rs

Helper in Rs

Hire Charges (Annexure III)

75

43 Needle vibrator 60 mm ( electric ) 1 1 98280 88920 1667.00 112.3044 Planing machine 4 m stroke 1 1 98280 88920 1250.00 149.8045 Plate shearing machine upto 12 mm 1 1 110760 88920 2000.00 99.8046 Pneumatic placer 0.5 cum 1 1 98280 1600.00 61.4047 Pneumatic tamper 1 1 98280 88920 1000.00 187.2048 Pug cutting machine 800.00 0.0049 Pusher leg 1000.00 0.0050 Road roller diesel 10 t 1 1 98280 88920 1250.00 149.8051 Shovel 0.50 cum 75 hp 1 1 110760 88920 1200.00 166.4052 Shovel 0.85 cum 110 hp 1 1 110760 88920 1200.00 166.4053 Stationery derric crane 1600.00 0.0054 Tipper 5 cum 1 1 110760 88920 1600.00 124.8055 Tipping tub 1.5 cum 1600.00 0.0056 Tower crane 5 tonne 1 1 110760 88920 1500.00 133.1057 Transformer 250 KVA 12.00 0.0058 Truck 10 t 1 1 98280 88920 1600.00 117.0059 Truck mounted derric crane 5 t 1 1 98280 88920 1600.00 117.0060 Upright drilling machine 1 1 110760 800.00 138.5061 Ventilation fan 20 hp 1 1 98280 4833.00 20.3062 Vibratory pad foot roller 8 t 1 1 98280 88920 1000.00 187.2063 Wagon drill 1 1 110760 88920 1000.00 199.7064 Water tanker 8000 ltr 1 1 98280 88920 1600.00 117.0065 Welding set 800.00 0.0066 Winch 35 hp ( electric ) 1 1 98280 88920 1000.00 187.20

HIRE CHARGES OF OF MACHINERYFOR THE YEAR : 2012-13

S.No Description of machinery Unit Hire charge in RsTotal in Rs

1 2 3 4 5 6 71 Agitator car / Transit mixer 2 cum Hour 774.30 695.80 199.70 1669.802 Air compressor 5 cmm ( electric ) Hour 111.50 226.60 117.00 455.103 Air compressor 7 cmm ( diesel ) Hour 248.40 569.30 149.80 967.504 Air compressor 7 cmm ( electric ) Hour 134.60 302.10 117.00 553.705 Air compressor 8.5 cmm ( diesel Hour 280.70 711.60 149.80 1142.106 Air compressor 8.5 cmm ( electric) Hour 176.20 377.70 117.00 670.907 Air compressor 15 cmm ( electric) Hour 143.80 839.30 124.80 1107.908 Angle Dozer 90 hp Hour 1745.70 486.70 166.40 2398.809 Batching plant 0.5 cum( 6 cum/hr) Hour 119.10 100.70 239.60 459.40

10 Batching plant 2 x 1.00 cum(15 cum/hr) Hour 419.50 302.10 239.60 961.2011 Batching plant 2 x 1.50 cum(50 cum/hr) Hour 537.00 369.30 239.60 1145.9012 Bending machine 3000 x 12 mm Hour 46.10 100.70 93.60 240.4013 Clamp shell and hoisting ropes Hour 5.40 0.00 0.00 5.4014 Concrete bucket 1.5 cum Hour 16.60 0.00 0.00 16.6015 Concrete hand mixer 45 / 30 ltr Hour 5.80 0.00 0.00 5.8016 Concrete mixer 300 / 200 ( diesel) Hour 52.40 63.30 156.00 271.7017 Concrete mixer 300 / 200 ltr ( electric) Hour 50.60 33.60 156.00 240.2018 Concrete mixer 600 / 400 ( diesel) Hour 95.80 126.50 156.00 378.3019 Concrete mixer 600 / 400 ltr ( electric Hour 93.30 67.10 156.00 316.4020 Concrete paver 100 sqm / hr Hour 368.10 0.00 299.50 667.6021 concete placer pump / hour Hour 102.00 2.00 16.80 120.8022 Convey mucker Hour 840.40 233.60 124.80 1198.8023 Core drilling machine Hour 329.30 189.80 199.70 718.8024 Diesel generating set 30 KVA Hour 68.00 506.00 93.60 667.6025 Diesel generating set 50 KVA Hour 87.60 759.00 93.60 940.2026 Diesel Loco 45 hp Hour 390.00 426.90 117.00 933.9027 Dewatering pump 5 hp ( diesel ) Hour 11.10 63.30 78.60 153.0028 Dewatering pump 5 hp ( electric ) Hour 3.30 33.60 59.00 95.9029 Dewatering pump 10 hp ( diesel ) Hour 16.00 126.50 78.60 221.1030 Dewatering pump 10 hp ( electric Hour 7.40 67.10 59.00 133.5031 Dewatering pump 20 hp ( diesel ) Hour 50.70 253.00 78.60 382.3032 Dewatering pump 20 hp ( electric Hour 12.80 134.30 59.00 206.1033 Drifter Hour 331.20 0.00 249.60 580.8034 Drilling jumbo Hour 375.90 34.20 124.80 534.9035 Dumper 4.5 cum Hour 597.20 318.80 159.70 1075.7036 Geophysical Electric resistivity meter Hour 103.40 0.00 0.00 103.4037 Grouting pump Hour 25.90 33.60 187.20 246.7038 Guniting / sand blast equipment Hour 114.70 0.00 156.00 270.70

Fuel charge in Rs

Crew Charge in Rs.

Hire Charges (Annexure III)

76

39 Ice plant & accessories 30 t / day Hour 176.70 956.70 93.60 1227.0040 Jack hammer Hour 21.20 0.00 234.00 255.2041 Needle vibrator 40 mm ( petrol ) Hour 7.70 12.70 112.30 132.7042 Needle vibrator 40 mm ( electric ) Hour 8.50 6.70 112.30 127.5043 Needle vibrator 60 mm ( petrol ) Hour 8.10 19.00 112.30 139.4044 Needle vibrator 60 mm ( electric ) Hour 10.00 10.10 112.30 132.4045 Planing machine 4 m stroke Hour 122.00 100.70 149.80 372.5046 Plate shearing machine upto 12 mm Hour 43.20 134.30 99.80 277.3047 Pneumatic placer 0.5 cum Hour 174.50 0.00 61.40 235.9048 Pneumatic tamper Hour 21.20 0.00 187.20 208.4049 Pug cutting machine Hour 6.50 3.40 0.00 9.9050 Pusher leg Hour 13.20 0.00 0.00 13.2051 Road roller diesel 10 t Hour 201.50 569.30 149.80 920.6052 Shovel 0.50 cum 75 hp Hour 1027.10 379.50 166.40 1573.0053 Shovel 0.85 cum 110 hp Hour 1738.10 695.80 166.40 2600.3054 Stationery derric crane Hour 88.60 0.00 0.00 88.6055 Tipper 5 cum Hour 454.40 239.10 124.80 818.3056 Tipping tub 1.5 cum Hour 65.60 0.00 0.00 65.6057 Tower crane 5 tonne Hour 894.80 174.60 133.10 1202.5058 Transformer 250 KVA Hour 5574.40 0.00 0.00 5574.4059 Truck 10 t Hour 424.50 239.10 117.00 780.6060 Truck mounted derric crane 5 t Hour 528.30 239.10 117.00 884.4061 Upright drilling machine/Grinder Hour 23.70 33.60 138.50 195.8062 Ventilation fan 20 hp Hour 12.00 134.30 20.30 166.6063 Vibratory pad foot roller 8 t Hour 1375.40 822.30 187.20 2384.9064 Wagon drill Hour 193.60 0.00 199.70 393.3065 Water tanker 8000 ltr Hour 408.80 239.10 117.00 764.9066 Welding set Hour 16.60 80.60 0.00 97.2067 Winch 35 hp ( electric ) Hour 130.80 164.50 187.20 482.50

Name of the Work:-

FDR works to the existing tank, vizianagaram

Name of the Circle :- Superintending Engineer Stamp PrintDam Maintenance CircleNSRS Srisailam Project

Kurnool Dist.,Name of the Divisiion:-

Executive Engineer Stamp PrintDam Maintenance Division

NSRS Srisailam ProjectKurnool Dist.,

Name of the Sub Divisiion:- Dy.Executive Engineer Stamp Print

Dam Maintenance Sub Division-INSRS Srisailam Project

Kurnool Dist.,Name of the Section:-

Assistant Executive Engineer Stamp PrintSpillway Section

NSRS Srisailam ProjectKurnool Dist.,

LEAD STATEMENT

Is VAT deduct for Cement & Steel in lead statement 5% YES

LEAD SOURCE

MR CT

NO 0 0 VIZIANAGARAM

NO 0 0 VIZIANAGARAM

Sand for filling (Including Seigniorage Charges) NO 25 0 VIZIANAGARAM

Gravel (M-008) NO 0 0 VIZIANAGARAM

40mm Nominal size NO 25 0 VIZIANAGARAM

25mm Nominal size NO 0 0 VIZIANAGARAM

20mm Nominal size NO 25 0 VIZIANAGARAM

12.5mm Nominal size NO 0 0 VIZIANAGARAM

10mm Nominal size NO 0 0 VIZIANAGARAM

6mm Nominal size NO 23 0 VIZIANAGARAM

5 to 10mm size NO 0 0 VIZIANAGARAM

<2.36mm NO 0 0 VIZIANAGARAM

80-40mm size NO 0 0 VIZIANAGARAM

40-20mm size NO 0 0 VIZIANAGARAM

20-10mm size NO 21 0 VIZIANAGARAM

10-4.75mm size NO 0 0 VIZIANAGARAM

Stones chips at Quarry NO 0 0 VIZIANAGARAM

Uncoursed Rubble stones at Quarry NO 24 0 VIZIANAGARAM

Fine aggregate/ sand(un-screened) for concrete items & filter items) (Including Seigniorage charges)

Fine aggregate /Sand (Screened) for mortar , plastering and sand blasting items. (Including Seigniorage charges)

Random Rubble stones NO 0 0 VIZIANAGARAM

Rough stones for revetment NO 21 0 VIZIANAGARAM

Cement (including loading charges) NO 0 0 LOCAL

Steel(including loading Charges)HYSD NO 0 0 LOCAL

Steel(including loading Charges) 6mm MS Rods NO 0 0 LOCAL

NO 0 0 LOCAL

Structural Steel (plates & flats etc.,) NO 0 0 LOCAL

RCC Hume Pipes 150mm dia NP-2 NO 35 0 VIZIANAGARAM

RCC Hume Pipes 225mm dia NP-2 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 300mm dia NP-2 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 300mm dia NP-3 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 450mm dia NP-2 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 450mm dia NP-3 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 600mm dia NP-2 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 600mm dia NP-3 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 900mm dia NP-2 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 900mm dia NP-3 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 1000mm dia NP-2 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 1000mm dia NP-3 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 1200mm dia NP-2 NO 0 0 VIZIANAGARAM

RCC Hume Pipes 1200mm dia NP-3 NO 0 0 VIZIANAGARAM

CERTIFICATES:- YES

Certified that the leads furnished above are correnct to the best of my knowledge. YES

Certified that the materials are sufficiently available in the above quarries YES

Certified that materials(coarse aggrigate)are inclusive of blasting charges YES

Certified that the reates are inclusive of seigniorage charges. YES

Provsions:-VAT @ 5.00% YES

Insurance Premium @ 0.44% YESLabour Cess@ 1.00% YES

miscllaneous items 3.00% NOstationary 2.00% NO

miscllaneous items 3.00% NOmiscllaneous items 4.00% NO

Use of Superplastisizer YES

Structural Steel (angle, channels, beams & bars etc.,)

Basic Data (Annexure II)

50

SCHEDULE OF RATES

BASIC DATA

FOR

REVISION OF DATA RATES

FOR THE YEAR : 2012-13

STATEMENT OF RATES FOR MATERIALS

GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS:

1 Average of the prevailing market rates, ignoring freak rates, shall be the criteria for fixing2 market rates for materials.3 The rates for materials shall be inclusive of all taxes, duties and other local levies.4 The rates for materials shall be inclusive of seigniorage charges wherever applicable.5 The rates for materials, except those for which lead charges are admissible as per the

statement of lead charges, shall be for all leads.6 The rates provided for useful rubble / stone chips from excavation shall be at dump yard.

Sl No. DESCRIPTION OF MATERIAL UNIT RATEin Rs.

1 Acetylene gas cum 306.002 Asphalt 80/ 100 Grade Kg 37.003 Binding wire Kg 65.004 Burnt stone slab 10 cm thick sqm 253.00

5 tonne 4761.90 June 2012 month rate

6 Chequered plate Kg 55.00

7 cum 788.00

8 Coarse aggregate 20-10 mm(including seigniorage charges) cum 1076.00

9 Coarse aggregate 40-20 mm(including seigniorage charges) cum 1024.00

Cement 43 Gr(including loading charges)* (As per monthly rate fixed by Sub-Committee)

Coarse aggregate 10-4.75 mm(including seigniorage charges)

Basic Data (Annexure II)

51

10 cum 588.00

11 Coir brush Each 39.0012 Copper sheet 16 SWG kg 607.00

13 Each 18.00

14 Each 22.00

15 Curing Compound ltr 123.0016 D - cord Rm 15.0017 Delay - noiseless trunk Each 1918 Detonating fuse coil Rm 10.0019 Detonating shock tube / Cord relays Rm 60.0020 Detonator delay type Each 21.0021 Detonator electric Each 12.0022 Detonator ordinary Each 8.0023 Empty cement bag Each 4.0024 Explosive ANFO kg 37.0025 Explosive ANFO high strength booster kg 71.0026 Explosive small dia ( Kelvex-220 or equivalent) kg 63.00

27 (a) cum 375.00

27 (b) Sand for filling (Including Seigniorage Charges) cum 288.00

28 cum 490.00

29 Geo-textile ( filter fabric ) 160 gsm sqm 98.0030 Geo-textile ( filter fabric ) 200 gsm sqm 115.0031 Geo-textile ( filter fabric ) 250 gsm sqm 138.0032 G I Pipe 100 mm dia B Class Rm 650.0033 G I Pipe 15 mm dia A class Rm 95.0034 G I pipe 25 mm dia A class Rm 145.0035 G I pipe 40 mm dia B class Rm 265.00

Coarse aggregate 80-40 mm(including bseigniorage charges)

The aggregate rates mentioned above (from Sl.No.7 to Sl.No.10) are inclusive of seigniorage charges of Rs.50/cum,blasting charges of Rs.70/cum and 25% machine crushing charges.However ,if the metal is obtained from hand broken,the blasting and crushing charges shall be deducted.The aggregate shall be HB Stone of Granite,Dolamite,Dolerite and Trap.(Quartzite and Basalt with aggregate impact of less than 20)

Coursed rubble stone 30 x 30 x 45 cm(including seigniorage charges)

Coursed rubble stone 30 x 30 x 60 cm(including seioniorage charges)

Fine aggregate/ sand(un-screened) for concrete items & filter items) (Including Seigniorage charges)

Fine aggregate /Sand (Screened) for mortar , plastering and sand blasting items. (Including Seigniorage charges)

Basic Data (Annexure II)

52

36 G I pipe 50 mm dia A class Rm 290.0037 G I Pipe 80 mm dia B Class Rm 450.0038 G.I Bolts / Nuts and Washers kg 97.0039 G.I sheet ( plain ) tonne 57375.0040 Hariyala turfing sods sqm 25.0041 Hectometre stone one line dressed Each 208.0042 Hemp yarn kg 65.0043 Honne wood planks cum 49333.0044 Hume pipe with collar 150 mm dia Rm 288.0045 Hume pipe with collar 300 mm dia Rm 568.0046 J- Bolts 30 cm long Each 30.0047 Jungle wood planks cum 19833.0048 Khandki stone 15 to 20 cm height Each 10.0049 Khandki stone 20 to 25 cm height Each 12.0050 Khandki stone 25 to 30 cm height Each 14.0051 Kilometre stone one line dressed Each 385.0052 LDPE sheet ( Geo membrane ) 500 micron thick sqm 78.0053 LDPE sheet ( Geo membrane ) 750 micron thick sqm 113.0054 LDPE sheet ( Geo membrane ) 1000 micron thick sqm 160.0055 M S Bolts / Nuts / Washers kg 76.00

56 Murum(including seioniorage charges and loading charges) cum 110.00

57 Oxalic acid ltr 66.0058 Oxygen gas cum 45.0059 PVC sealing strip Rm 39.0060 PVC water stopper 310 mm wide Rm 435.0061 PVC pipe of 100 mm dia Rm 157.00

62 tonne 44761.90 June 2012 month rate

63 Resin bond Cement capsule Each 61.00

64 Each 21.00

65 sqm 200.00

66 cum 195.00

67 cum 337.00

Reinforcement steel(including loading charges) (HYSD/TMT)* (As per monthly rate fixed by Sub-Committee)

Rough stone 20 x 20 x 75 cm (including seigniorage charges)

Shahabad stone slab (including seigniorage charges and loading charges)

Stone chips ( at dump yard )(including seigniorage charges and loading charges)

Stone chips ( at quarry )(including seigniorage charges and loading charges)

Basic Data (Annexure II)

53

68 tonne 42000.00 June 2012 month rate

69 tonne 42000.00 June 2012 month rate

70 Super Plasticizer ( Conplast RP-264 or equivalent ) kg 69.00 6971 Synthetic Enamel paint 1st quality ltr 216.0072 Synthetic adhesive ( Resin + Hardener ) Kg 307.0073 Tarfelt joint filler board 12 mm thick sqm 370.0074 Tarfelt joint filler board 20 mm thick sqm 570.00

75 Each 21.00

76 Each 35.00

77 Each 55.00

78 cum 178.00

79 cum 293.00

80 Water proofing compound kg 66.0081 Welding electrodes 4 mm dia Each 12.0082 Wire brush Each 38.0083 Wire mesh 20 gauge sqm 193.0084 Zinc chromate red oxide primer paint ltr 156.0085 inorganic zinc silicate ltr 595.0086 solventless coal tar epoxy paint ltr 233.0087 Zinc phosphate primer ltr 189.0088 Allkyd based iron oxide paint ltr 169.00

Structural steel angle / channel / beam / bars(including loading charges)* (As per monthly rate fixed by Sub-Committee)

Structural steel plate / flats(including loading charges)* (As per monthly rate fixed by Sub-Committee)

Through stones 20 x 20 x 30 to 45 cm long(including seigniorage charges and loading charges)

Through stones 25 x 25 x 45 to 60 cm long(including seigniorage charges and loading charges)

Through stones 30 x 30 x 65 to 75 cm long(including seigniorage charges and loading charges)

Un-coursed rubble stones ( at dump yard/ Spoil )(including seigniorage charges and loading charges)

Un-coursed rubble stones ( at quarry )(including seigniorage charges and loading charges)

Basic Data (Annexure II)

54

89 (a) Cost of HDPE (80 mm dia) Rm 560

89 (b) Cost of light black MS casing pipe 80mm dia (4mm thick) Rm 605.00

90 welded steel wire fabric 100X100X5 mm size Kg 133.00

ADDITIONAL MATERIALS FOR GATES & HOISTSFOR THE YEAR : 2012-13

GUIDE LINES :a. For cast steel / Alloy steel / Forged steel / Bronze, alluminium alloy components the rates

shall be inclusive of cost of basic metal for these components, casting / forging charges,machining charges and applicable excise duty on finished alloy component.

b. For other materials the rates shall be prevailing market rates.

Sl No. DESCRIPTION OF MATERIAL UNIT RATEin Rs.

1 Alloy steel ( IS : 1570-carbon steel ) shafts kg 177.002 Alloy steel ( IS : 1570-stainless steel ) pins kg 375.003 Bolt / Nut / Washer ( hot dipped galvanized ) kg 114.004 Bolt / Nut / Washer ( stainless steel ) kg 296.005 Bronze / Alluminium alloy ( IS : 305 ) bearings / bushes kg 788.006 Cast iron blocks kg 74.007 Cast steel drums / gears kg 187.008 Cast steel pinions kg 181.009 Cast steel wheels / pulleys / hubs / rollers / retainers kg 163.00

10 Chemical for de-greasing/ derusting/phosphate coating ltr 124.0011 Coal tar epoxy paint ltr 187.0012 Forged steel hooks / shackles kg 237.0013 MS pipe 200 / 300 mm dia kg 159.0014 MS pipe 32 mm dia Rm 170.0015 MS pipe 25 mm dia Rm 136.0016 Rubber bottom seal ( IS : 11855 ) Rm 766.00

17 Rm 1864.00

18 Rubber side seal ( music note type uncladed ) ( IS : 11855 ) Rm 1467.00

19 Rubber side seal Z-type ( IS : 11855 ) Rm 2427.00

Rubber side seal ( music note type teflon claded ) ( IS : 11855 )

Basic Data (Annexure II)

55

20 Rubber corner seal ( teflon claded ) ( IS : 11855 ) Rm 3721.0021 Rubber corner seal ( uncladed ) ( IS : 11855 ) Rm 3089.0022 Stainless steel plates / flats kg 241.00

23 Each 16.00

24 Welding electrode 4 mm dia x 450 mm ( stainless steel ) Each 24.0025 Wire rope 6x37 constn ( IS : 2266 ) kg 227.0026 Zinc kg 149.0027 Zinc rich ( zinc content : 90 % ) epoxy primer ltr 592.00

MATERIALS FOR POWER SUPPLY WORKSFOR THE YEAR : 2012-13

For establishing Electrical Sub-Stations at the Project Sites wherever necessary, the rates approved by APTRANSCO may be followed.

DETAILS OF CAPITAL COST OF MACHINERY / EQUIPMENTFOR THE YEAR : 2012-13

GUIDE LINES FOR FIXING CAPITAL COST OF MACHINERY / EQUIPMENT:

1 The Capital cost of machinery / equipment shall be for new machinery / equipment andshall be inclusive of all taxes, duties, other levies.

2 The cost of transport vehicles / equipment shall be exclusive of cost of tyres and tubes.3 The cost of drill rods / drill bits / air hose / water hose / road tax / insurance charges and

other consumeable accessories shall not be included in the capital cost.4 In cases, where the current capital cost of machinery / equipment could not be collected

through enquiries, the capital cost considered for previous year may be updated on thebasis of average percentage increase / decrease in the index for machinery published inthe R.B.I Bulletin.

Sl No: DESCRIPTION OF MACHINERY / EQUIPMENT UNIT COSTin Rs:

1 Agitator car / Transit mixer 2 cum ( excluding tyres ) Each 2160000

Welding electrode 4 mm dia x 450 mm ( radiographic low hydrogen )

Basic Data (Annexure II)

56

Tyres and tubes 6 sets Each 860002 Air compressor 5 cmm electric Each 7150003 Air compressor 7 cmm diesel Each 9610004 Air compressor 7 cmm electric Each 8630005 Air compressor 8.5 cmm diesel Each 10860006 Air compressor 8.5 cmm electric Each 11300007 Air compressor 15 cmm electric Each 13720008 Angle Dozer 90 hp Each 54910009 Batching plant 0.5 cum with accessories( 6 cum/hr) Each 1207000

10 Batching plant 2 x 1.00 cum with accessories(15 cum/hr) Each 425200011 Batching plant 2 x 1.50 cum with accessories(50 cum/hr) Each 544300012 Bending machine Each 55500013 Clamp shell and hoisting ropes Each 3000014 Concrete bucket 1.5 cum Each 5800015 Concrete hand mixer 45/30 ltr Each 1600016 Concrete mixer 300/200 ltr(diesel) Each 14500017 Concrete mixer 300/200 ltr ( ele ) Each 14000018 Concrete mixer 600/400 ltr(diesel) Each 26500019 Concrete mixer 600/400 ltr ( ele ) Each 25800020 Concrete paver 100 sqm/ hr Each 237100021 Convey mucker ( excluding tyres ) Each 3868000

Tyres and tubes 6 sets Each 8600022 Core drilling machine Each 111400023 Diesel generating set 30 KVA Each 50100024 Diesel generating set 50 KVA Each 64500025 Diesel Loco 45 hp Each 2126000

26 Dewatering pump 5 hp diesel Each 43000

27 Dewatering pump 5 hp electric Each 2600028 Dewatering pump 10 hp diesel Each 6200029 Dewatering pump 10 hp electric Each 5900030 Dewatering pump 20 hp diesel Each 19600031 Dewatering pump 20 hp electric Each 10200032 Drifter Each 106200033 Drilling jumbo ( excluding tyres ) Each 1311000

Tyres and tubes 6 sets Each 8600034 Dumper 4.5 cum ( excluding tyres ) Each 1477000

Tyres and tubes 6 sets Each 8600035 Geophysical Ele.resistivity meter Each 48900036 Grouting pump Each 104000

Basic Data (Annexure II)

57

37 Guniting / sand blasting equipment Each 28800038 Ice plant with accessories 30 t / day Each 228700039 Jack hammer Each 6800040 Needle vibrator 40 mm petrol Each 2000041 Needle vibrator 40 mm electric Each 2200042 Needle vibrator 60 mm petrol Each 2100043 Needle vibrator 60 mm electric Each 2600044 Planing machine 4 m stroke Each 78600045 Plate shearing machine upto 12 mm Each 42600046 Pneumatic placer 0.5 cum Each 58400047 Pneumatic tamper Each 8500048 Pug cutting machine Each 1600049 Pusher leg Each 5300050 Road roller diesel 10 t Each 85200051 Shovel 0.50 cum 75 hp Each 377500052 Shovel 0.85 cum 110 hp Each 638800053 Stationery derric crane 5 t Each 65500054 Tipper 5 cum ( excluding tyres ) Each 1631000

Tyres and tubes 6 sets Each 8600055 Tipping tub 1.5 cum Each 24200056 Tower crane 5 tonne Each 748800057 Transformer 250 KVA Each 45300058 Truck 10 t ( excluding tyres ) Each 1496000

Tyres and tubes 6 sets Each 8600059 Truck mounted derric crane 5 t ( excluding tyres ) Each 1965000

Tyres and tubes 6 sets Each 8600060 Upright drilling machine Each 5800061 Ventilation fan 20 hp Each 26600062 Vibratory pad foot roller 8 t Each 298600063 Waggon drill Each 65500064 Water tanker 8000 ltr ( excluding tyres ) Each 1425000

Tyres and tubes 6 sets Each 8600065 Welding set Each 4900066 Winch 35 hp electric Each 373000

Basic Data (Annexure II)

58

ACCESSORIES TO MACHINERY / EQUIPMENTFOR THE YEAR : 2012-13

Sl No. DESCRIPTION OF MATERIAL UNIT RATEin Rs.

1 Casing shoe bit Each 100002 Diamond core bit BX size Each 100003 Diamond core bit NX size Each 120004 Double tube core barrel Each 130005 Extension drill rod with coupling sleeve Rm 20006 Jack hammer drill rod 1.5 m Each 40007 Jack hammer drill rod 2.5 m Each 60008 Nozzle for guniting / sand blasting gun Each 7009 Paving Cylinder Each 28000

10 Rails 30R ( 30 kg / m ) tonne 4900011 Reamer shell Each 500012 T.C.Cross bit 50 mm dia Each 500013 T.C.Cross bit 75 mm dia Each 1000014 T.C.Cross bit 100 mm dia Each 1200015 Tyres and Tubes for truck Set 1700016 Wire rope 16 mm dia Rm 26517 Excavation of drain with Excavator cum 30

AGGREGATE CRUSHING & PROCESSING PLANT

1 Jaw crusher 900 x 500 mm ( 120 tph ) with 50 hp motor Each 19340002 Jaw crusher 500 x 300 mm ( 60 tph ) with 30 hp motor Each 10980003 Jaw crusher 400 x 225 mm ( 10 tph ) with 25 hp motor Each 5610004 Jaw plates 900 x 500 mm ( serreted ) Set 1430005 Jaw plates 500 x 300 mm ( serreted ) Set 620006 Jaw plates 400 x 225 mm ( serreted ) Set 430007 Nylon Conveyor belt 3 ply 600 mm width Rm 20008 Nylon Conveyor belt 3 ply 1000 mm width Rm 3000

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENTFOR THE YEAR : 2012-13

Basic Data (Annexure II)

59

1 The rate provided for ' SUNDRIES' ( Lumpsum provision for unquantified inputs in the datarates ) shall be updated on the basis of general percentage increase / decrease in themarket rates or on the basis of R.B.I ' All Commodity' index.

2 The rate for structural steel fabrication shall include cost of all materials (except structuralsteel ), machinery, labour and one coat of primer painting.

3 Demand charges and electric power charges shall be as per prevailing APCPDCL tariff.4 Rate of interest on capital cost shall be as approved by Govt or other competent authority.

Sl No. DESCRIPTION OF MATERIAL UNIT RATE1 Air hose 25 mm dia Rm 1452 Air hose 50 mm dia Rm 2593 Demand charges ( HT-2B ) on power supply KVA / month 2414 Diesel ltr 465 Electric power ( HT-2B category ) including tax Kwhr 7.56 Excise duty on Gates / Hoist supplies % 0%7 Insurance charges on machinery % / annum 1%8 Interest on capital cost % / annum 12%9 Lubricants ltr 239

10 Petrol ltr 7511 Rivets kg 8612 Road tax on transport vehicles Rs./annum 1576713 Shalimastic sealing compound kg 7914 Shutter oil ltr 6815 Structural steel fabrication kg 2116 Sundries ( Lumpsum for unquantified inputs ) LS 3617 Water hose ( pressure ) 20 mm dia Rm 19018 Steel wedges LS 1419 Elbows / Nipple / Plugs etc., LS 1520 Soldering materials LS 1521 Steam circulation arrangement LS 1522 Fuel charges ( gas for heating ) LS 1523 Vulcanizing materials LS 1524 Other accessories / controls / junctions LS deleted25 Miscellaneous fittings / switches etc LS deleted26 Anchors / supports for cables / lights LS deleted

Basic Data (Annexure II)

60

27 Civil works for foundations / pedastals / duct etc LS deleted28 Gas cutting set ( 2 Nos 15 m hose and nozzle unit ) EACH 1235029 Grease Kg 22130 Welding holder set ( cable / holder / gloves / mask etc ) EACH 637531 Use rate of ropes LS 130

MATERIALS FOR GATES AND HOISTSFOR THE YEAR : 2012-13

Sl No. DESCRIPTION OF MATERIAL UNIT Rate in Rs

1 Worm reducers EACH 2040002 Electric motor 20 hp (Double Shaft) EACH 110000

Electric motor 17.5 hp (Double Shaft) EACH 780003 Electric motor 12.5 hp (Double Shaft) EACH 660004 Electric motor 5 hp (Double Shaft) EACH 300005 Electric motor 3 hp (Double Shaft) EACH 21000

Electric motor 2 hp (Double Shaft) EACH 110006 Floating shaft 300 mm dia Kg 1647 Manual operating system EACH 262008 Gate position indicator EACH 1780009 Ele-magnetic brake EACH 32000

10 Electric cable / switch / control panel etc LS 4580011 Wire rope sockets EACH 4200

seigniorage charges on Materials as per SSR FOR THE YEAR : 2012-13

Rs/cum 22

Rs/MT 92.50

Rs/cum 50

Sl.No Unit

1 2 3 4 51 Building Stone 50 92.50

Seigniorage charges of soil from borrow areas/ dump yards

Seigniorage charges of stone from quarry/ dump yards if not included in the material rate

(specific gravity of stones is assumed as

1.85 MT/M3)

Seigniorage charges of stone from quarry/ dump yards if not included in the material rate

Name of the Minor Mineral

Rates of seigniorage fee

(In Rupees) /cum

Rates of seigniorage fee

(In Rupees) / MT

M3/MT

Basic Data (Annexure II)

61

2 Rough Stone/Boulders 50 92.503 Road Metal & Ballast 50 92.503a Dimensional Stone used for Kerbs & Cubes MT - 80.00

4 Limekankar/Limestone MT

5 Limeshell MT Rs 80(Rupees Eighty)

6 Marble

7 Marble Chips MT Rs.40(Rupees Forty)

8 Moram/Gravel&Ordinary earth

9

10 Shingle Rs.15(Rupees Fifteen)11 Chalcedony Pebbles MT Rs.30(Rupees Thirty)

12 Puller’s Earth/Bentonite MT

13 Shale/Slate MT

14 Rehmati Rs.15(Rupees Fifteen)15 Limestone Slabs --

a(i) Colour

a(ii) White

M3/MTM3/MT

The rate of Royalty as applicable to

limestone(other than L.D.Grade) in respect of Major Minerals as

per the 2nd schedule of the Mines and Minerals

(D&R)Act 1957.

M3/MTRs.150/60(Rupees one hundred and fifty/sixty)

M3/MTRs.20/12(Rupees Twenty/Twelve)

Ordinary Sand/Sand Manufactured from Boulders useful for Civil Construction

M3Rs.36(Rupees Thirty

Six)M3

Rs.100(Rupees Hundred)-White

Rs.40(Rupees Forty)-Off White

Rs.100(Rupees Hundred)

M3

Rs.6(Rupees Six)per Sq.Mt or

Rs.80(Rupees Eighty)per Mt Which

ever is higher

Rs.4(Rupees Four)per Sq.Mt or Rs.50

(Rupees Fifty)per Mt Which ever is higher

Basic Data (Annexure II)

62

(b) Black --

16

STATEMENT OF WAGES OF WORKERSFOR THE YEAR : 2012-13

GENERAL GUIDE LINES FOR REVISING WAGES OF WORKERS:

1 The basic wages shall not be less than the minimum wages fixed by the Government.2 The basic wages need not be revised every year and any revision, if warranted, shall take

into consideration the local conditions for perticular category of worker and the trend inquoted rates.

a. Current state annual average CP index : 2491.00b. Base state annual average CP index : 1309.00c. Amount of variable DA per point CP index Rs: 0.03d. Difference in index ( a - b ) : 1182.00

Variable DA / Day = ( Difference in index ) x ( rate of DA per point ) x 30 / 26Rs: 40.90 / Day

Note: Remove the items which are not relevantSl No. CATEGORY OF WORKER Basic wages per a day

in Rs:I. SKILLED CATEGORY:

1 Bar bender 330.002 Black smith / Tin smith / Rivetor 315.003 Blaster ( Licensed ) 355.004 Carpenter Cl- I 315.005 Electrician ( Licensed ) 355.006 Fitter Cl- I 315.007 Floor Polisher / Tile Layer 315.008 Foreman 355.009 Gauge reader 300.00

Rs.3(Rupees Three)per Sq.Mt or Rs.40(Rupees

Forty)per Mt Which ever is higher

Ordinary Clay, Silt and Brick Earth used in the Manufacture of Bricks including Mangalore Tiles

Rs 3500 (Rupees Three thousand and five hundred)per kiln

per annum for Bricks & Tiles

Basic Data (Annexure II)

63

10 300.00

11 Mason Cl- I / Brick layer Cl- I 315.0012 Mechanic Cl- I 315.0013 Operator Air compressor / DG set 315.0014 Operator Batching plant 355.0015 Operator Bus/Ambulance/ Lorry/ Tanker 315.0016 Operator Concrete / Asphalt mixer 315.0017 Operator Concrete / Asphalt paver 315.0018 Operator Concrete pump / Placer/ ice plant 315.0019 Operator Core drilling machine 355.0020 Operator Crane/ Tower crane/ Cable way 355.0021 Operator Drilling jumbo / Loco / Winch 315.00

Maistry / Work Inspector with non-technical qualification SSCL,SSC,HSC

Basic Data (Annexure II)

64

22 Operator Grouting/ Guniting/ Shotcreting 315.0023 Operator Jackhammer/Pneumatic tamper 315.0024 Operator Pump / Ventilation fan 315.0025 Operator Lathe/Drilling/Shearing machine 355.0026 Operator Bending / Planing machine 315.0027 Operator Road roller 315.0028 Operator Shovel / Scraper / Dozer 355.0029 Operator Spillway / Sluice gate 315.0030 Operator Crusher / Conveyor / Mucker 315.0031 Operator Tipper / Dumper / Transit mixer 355.0032 Operator Concrete vibrator 315.0033 Operator Vibratory plain / padfoot roller 315.0034 Operator Wagon drill / Drifter 355.0035 Painter Cl- I 350.0036 Plumber / Pipe fitter 350.0037 Sarang / Khalasi 315.0038 Spun pipe moulder 315.0039 Stone chiseller CI- I / Stone cutter Cl- l 315.0040 Struct. steel Fabricator / Marker / Erector 355.0041 Welder / Gas Cutter 315.0042 Welder (X-ray quality) 355.00

II. SEMI SKILLED CATEGORY:1 Asphalt Sprayer / Boiler attendant 285.002 Bhisti 285.003 Boatman with boat 300.004 Carpenter Cl- II / Erector shuttering 285.005 Cartman with double bullock cart 330.006 Cartman with single bullock cart 310.007 Chavali / Navagani 285.008 Crowbarman / Jumperman 285.009 Fitter Cl- II 285.00

10 Gangman / Head / Survey mazdoor 285.0011 Gardener / Trained mali 285.0012 Helper Air compressor / DG set 285.0013 Helper Batching plant 285.0014 Helper Blasting 285.0015 Helper Bus/ Ambulance/ Lorry/ Tanker 285.0016 Helper Bending/Shearing/Planing machine 285.0017 Helper Carpenter 285.0018 Helper Concrete / Asphalt mixer 285.00

Basic Data (Annexure II)

65

19 Helper Concrete / Asphalt paver 285.0020 Helper Core drilling machine 285.0021 Helper Crane/ Tower crane/ Cable way 285.0022 Helper Drilling jumbo / Loco / Winch 285.0023 Helper Fitter / Fabrication/ Electrician 285.0024 Helper Grouting/ Guniting/ Shotcreting 285.0025 Helper Jack hammer / Pneumatic tamper 285.0026 Helper Laboratory / Instrumentation 285.0027 Helper Road roller 285.0028 Helper Shovel / Scraper / Dozer 285.0029 Helper Crusher / Conveyor / Mucker 285.0030 Helper Tipper / Dumper/ Transit mixer 285.0031 Helper Vibrator 285.0032 Helper Vibratory plain/ padfoot roller 285.0033 Helper Wagon drill/ Drifter 285.00

Basic Data (Annexure II)

66

34 Lineman Electric / Telephone 285.0035 Mason Cl- ll / Brick layer Cl-II 285.0036 Mechanic Cl- II 285.0037 Painter Cl- II 300.0038 Patkari / Neeraganti / Sowdy 285.0039 Stone Chiseller Cl- II 285.0040 Stone breaker / Hammerman 285.0041 Valveman / Canal sluice operator 285.00

III. UN-SKILLED CATEGORY:1 Cement / Asphalt handling mazdoor 250.002 Civic worker 250.003 Heavy Mazdoor4 Light Mazdoor/Mazdoor 250.005 Watchman 250.00

IV. OTHER CATEGORY:1 Care-taker / conductor / Lift attender 300.002 Cook / Messman 300.003 Dhobi 300.004 Diploma Engineer / Surveyor 450.005 Diver with headgear 365.006 Graduate / Laboratory Assistant 350.007 Graduate Engineer/ Geologist 600.008 Horticulture Assistant / Photographer 300.009 ITI certificate holder / Tracer / Printer 350.00

10 Literate mazdoor 285.0011 Stenographer / Computer Operator 400.0012 Telephone / Wireless Operator 350.0013 Typist/ Job Typist 350.00

V. Miscellaneous Items

14 500.00

15 Jeep Driver 355.0016 Data Processing Operator 500.00

CAD Operator with diploma in Engineering/General degree with CAD certificate

Note: - 1)The wage should not be less than the minimum wages of schedule of employment, subject to out turn.

Basic Data (Annexure II)

67

Other Overheads included for the work items of Irrigation

14%

VAT @ 5.00%Add for blasting studies & monitoring vibrations etc @ 0.50%Add for shifting & re-erection of BP @ 2%Add for LH / RH shifting & erection of Paver @ 0.50%Add for ledge cutting / erection of tracks etc @ 1%Aportioned hire charges of machinery @ for lining slab 90%Aportioned cost of labour @ for lining slabs 90%Aportioned hire charges of machinery @ for lug slabs 10%Aportioned cost of labour @ for lug slabs 10%Add for repairs/ replacements/ catwalks etc., @ 15%Add for binding wire/ temperary supports etc., @ 5%Add for scaffolding @ 2.50%Add for labour for scaffolding @ 2.50%Add for scaffolding materials @ 2.50%Deduct salvage value on machinery @ 10%

0%

Add for transportation upto work site @ 3%Add for Air and Water line @ 1%Add for Ventilation @ 4.50%Add for Lighting @ 1.60%Add for Ele sub-station / Demand charges @ 2.50%Add for conveyor system @ 3%Add for trestle bridge for tower crane track @ 4%

2) 25% extra over the corresponding labour rates in respect of the work to be done during night time subject to issue of certificate accordingly by the concerned estimate sanctioning authority for providing in the data and by concerned Executive Engineer in charge of the work for payment. The night time allowance is applicable only to the works done under Greater Hyderabad Municipal Corporation ,Greater Visakhapatnam Municipal Corporation and Vijayawada Municipal Corporation limits only.

Add for Contrators' Overheads and profit including labour importation @

Add for excise duty on 75 percent cost excluding cost of materials @

GOVERNMENT OF ANDHRA PRADESH

IRRIGATION & CAD DEPARTMENT

MODERNIZATION OF PULIVENDULA BRANCH CANAL SYSTEM

FDR works to the existing tank, vizianagaram

LEAD STATEMENTName of the Work:- FDR works to the existing tank, vizianagaram

Description of Item

Sou

rce

of S

up

ply

S.S

.R S

l.No

Un

it

Inti

al C

ost

Lead in KM

Net

Tot

al

MR CT Total

1

CERTIFICATES:-

1 Certified that the leads furnished above are correnct to the best of my knowledge.

2 Certified that the materials are sufficiently available in the above quarries

3 Certified that materials(coarse aggrigate)are inclusive of blasting charges

4 Certified that the reates are inclusive of seigniorage charges.

Executive Engineer Dy.Executive Engineer Assistant Executive EngineerDam Maintenance Division Dam Maintenance Sub Division-I Spillway Section

NSRS Srisailam Project NSRS Srisailam Project NSRS Srisailam ProjectKurnool Dist., Kurnool Dist., Kurnool Dist.,

Sl.No

Con

veya

nce

ch

arge

s in

clu

din

g C

ontr

acto

r P

rofi

t @

14%

Ded

uct

Con

trac

tor

Pro

fit@

14%

on

C

onve

yan

ce c

har

ges

Ded

uct

VA

T@

5% (o

n

cem

ent

and

ste

el)

Abstract of work items

1

WORK ITEM RATES FOR THE YEAR - 2012-13

* Add Leads and Lifts, Area Allowance and VAT as applicable in the estimate** Area Allowance includes profit component also

S.NO Item description Unit Rate

1 2 3 4 5.00 6.00Chapter IIRR-DAW DAM AND ALLIED WORKS

IRR-DAW-1 EXCAVATION & FOUNDATION TREATMENT WORKS:

1 cum 107.90

Labour Component (including contractor's profit) cum 18.50

2 cum 143.10

Labour Component (including contractor's profit) cum 24.10

3 cum 215.60

Labour Component (including contractor's profit) cum 42.80

4 cum 385.50

Labour Component (including contractor's profit) cum 82.50

5 cum 593.30

Labour Component (including contractor's profit) cum 90.70

6 cum 817.10

Labour Component (including contractor's profit) cum 238.70

7 sqm 28.90

Labour Component (including contractor's profit) sqm 22.10

8 sqm 18.70

Labour Component (including contractor's profit) sqm 18.70

9 Rm 187.50

Beyond 6 m upto 12 m from surface : Rm 206.30Beyond 12 m upto 18 m from surface : Rm 226.90Beyond 18 m upto 24 m from surface Rm 249.60Beyond 24 m upto 30 m from surface Rm 274.60Beyond 30 m upto 36 m from surface Rm 302.10Beyond 36 m upto 42 m from surface Rm 332.30Beyond 42 m upto 48 m from surface Rm 365.50Labour Component (including contractor's profit) Rm 36.00

10 Rm 45.20

Labour Component (including contractor's profit) Rm 14.30

11 tonne 8596.60

Labour Component (including contractor's profit) tonne 2297.00

12 tonne 9377.10

Labour Component (including contractor's profit) tonne 2948.40

Chapterwise item No.

Itemwise unit rate for Labour

Component

IRR-DAW-1-1

Excavation for foundation in all kinds of soil including boulders upto 0.30 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-1-2

Excavation for foundation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6 m dia for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-1-3

Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-1-4(a)

Excavation for foundation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated rock neatly in dump area or stack yard including levelling as directed etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-1-5(b)

Excavation for foundation in hard rock of all toughness including boulders above 1.2 m dia. by controlled blasting method and controlling fly-rock by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete with lead upto upto 1 km and all lifts.

IRR-DAW-1-6(c)

Excavation for foundation in hard rock of all toughness including boulders above 1.2 m dia. by line drilling and smooth blasting and controlling fly-rock by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including dressing sides and bed to required level / profile, placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

i ) For the purpose of payment 1 m width of excavation along boundary of excavation shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be.ii ) The rate includes controlling fly-rock wherever required.iii ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval.iv ) In case, where the above criteria is not fulfilled payment shall be restricted to rate provided for excavation by normal blasting or controlled blasting as the case may be.

IRR-DAW-1-7

Preparing foundation bed for masonry or concrete by benching, stepping, removing all loose material by wedging / chiselling and disposing off the same as directed and cleaning the surface with air and water jet etc.,complete with initial lead upto 50 m and all lifts.

IRR-DAW-1-8

Preparing foundation bed for cut-off trench filling in rock portion by removing all loose materials by wedging / chiselling and disposing off the same as directed etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-1-9

Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete for drilling upto 6 m depth from surface.

The item rate for drilling through rock / masonry / concrete includes redrilling through partially set grout, if any, in the portion of the hole drilled and grouted.

IRR-DAW-1-10

Flushing grout holes of all sizes with water and air jets alternatively for an average period of 30 minutes including water intake observations after flushing, cost of all materials, machinery, labour etc., complete.

IRR-DAW-1-11(a)

Consolidation grouting with neat cement grout mix of suitable consistency under specified pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, redrilling if necessary etc.,complete with initial lead upto 1 km and all lifts.

IRR-DAW-1-12(b)

Curtain grouting with neat cement grout mix of suitable consistency under specified pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, redrilling if necessary etc., complete with initial lead upto 1 km and all lifts.

Check Box 119

Check Box 120

Check Box 121

Check Box 122

Check Box 123

Check Box 124

Check Box 125

Check Box 126

Check Box 127

Check Box 128

Check Box 132

Check Box 133

Abstract of work items

2

13 Each 965.70

Labour Component (including contractor's profit) Each 83.20

14 Each 883.30

Labour Component (including contractor's profit) Each 94.50

IRR-DAW-2 REINFORCEMENT & CEMENT CONCRETE WORKS :

15

tonne

56948.70

Labour Component (including contractor's profit) tonne 2701.80

16

tonne

57969.50

Labour Component (including contractor's profit) tonne 3599.60

17 cum 3390.00

Labour Component (including contractor's profit) cum 133.40

18 cum 3644.30

Labour Component (including contractor's profit) cum 133.40

19 cum. 3210.70

Labour Component (including contractor's profit) cum. 133.40

20 cum. 4508.50

Labour Component (including contractor's profit) cum. 265.70

21 cum. 4823.00

Labour Component (including contractor's profit) cum. 265.70

22 cum. 4929.40

Labour Component (including contractor's profit) cum. 265.70

23 cum. 4004.40

Labour Component (including contractor's profit) cum. 959.80

24 cum. 3896.00

Labour Component (including contractor's profit) cum. 936.40

IRR-DAW-1-13

Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-1-14

Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm dia. hole drilled in bed rock and other end provided with L- bend for embedding in concrete / masonry for spillway and appurtenant works including drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod, cost of all materials, machinery, labour, steel wedge etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-2-1A

Providing, fabricating and placing in position reinforcement steel for RCC,below 36 dia rods overlaps and wastages wherever required, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-2-1B

Providing, fabricating and placing in position reinforcement steel for RCC above 36 dia with welding and wastage at 2.5%, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-2-2

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 250 kg /cum with use of super plasticiser equla to 0.4% of cement content, CA : 0.98 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.35 cum ))

IRR-DAW-2-2A (new

Item1 2010-11)

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 300 kg /cum with use of super plasticiser equla to 0.4% of cement content, CA : 0.90 cum, Blending Ratio of CA -- 40:30:20:10, FA : 0.4 cum ))

IRR-DAW-2-3

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 220 kg /cum with use of super plasticiser, CA: 0.98 cum, Blending Ratio of CA --40:30:20:10, FA: 0.37 cum )

IRR-DAW-2-4

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 310 kg / cum with use of super plasticiser, CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)

IRR-DAW-2-4A (new

Item2 2010-11)

Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 360 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum)

IRR-DAW-2-4B (new

Item3 2010-11)

Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--65:35, FA : 0.40 cum)

IRR-DAW-2-5

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum)

IRR-DAW-2-6

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type structures including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 1 km and all lifts. ( Cement content : 260 kg / cum of concrete with use of plums and super plasticiser,, CA : 0.77 cum, Blending Ratio of CA : 50:30:20,FA : 0.34 cum, plums of size 150 to 80 mm : 0.25 cum)

Check Box 134

Check Box 135

Check Box 137

Check Box 138

Check Box 139

Check Box 140

Check Box 141

Check Box 142

Check Box 143

Check Box 144

Check Box 145

Check Box 146

Abstract of work items

3

25 cum. 3673.20

Labour Component (including contractor's profit) cum. 869.30

26 cum. 3929.40

Labour Component (including contractor's profit) cum. 890.00

27 cum. 5518.80

Labour Component (including contractor's profit) cum. 1260.30

28 Rm 2133.80

Labour Component (including contractor's profit) Rm 432.50

29 Rm 2040.50

Labour Component (including contractor's profit) Rm 535.90

30 Rm 2081.60

Labour Component (including contractor's profit) Rm 568.60

31 cum 4576.00

Labour Component (including contractor's profit) cum 1078.30

32 cum 72.50

Labour Component (including contractor's profit) cum 10.30

33 Each 268.10

Labour Component (including contractor's profit) Each 219.50

34 Rm 379.10

Labour Component (including contractor's profit) Rm 50.80

35 Rm 1757.60

Labour Component (including contractor's profit) Rm 228.80

IRR_DAW-3 MASONRY & GUNITING WORKS :

36 cum 2444.20

Labour Component (including contractor's profit) cum 813.70

37

cum

2189.10

Labour Component (including contractor's profit) cum 813.70

IRR-DAW-2-7

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content 220 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA : 50:30:20, FA : 0.40 cum )

IRR-DAW-2-8

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 280 kg /cum with use of super plasticiser,CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum)

IRR-DAW-2-9

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of spillway bridge, blockouts and such other similar structures with conjested reinforcement with initial lead upto 1 km and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum).

IRR-DAW-2-10

Providing and forming porous concrete body drain of size 68.5 x 68.5 cm with 23 cm diameter central hole using cement and 20 mm down approved, clean, hard, graded coarse aggregates in 1 : 3.50 proportion by volume including cost of all materials, machinery, labour, formwork, curing etc., complete with initial lead upto 1 km and all lifts.(M15 Cement content : 400kg/cum, CA : 1cum, Blending Ratio of CA -- 65:35)

IRR-DAW-2-11(a)

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC solid parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.35 m c / c, 12.5 cm thick wall 80 cm height with 12.5 cm thick and 35 cm wide coping slab for wall and 12 .5 cm thick 40 cm x 40 cm coping for pillars with top edges of kerb and coping chamferred / rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content 350 kg / cum with use of super plasticiser( 0.4% by wt.of cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

IRR-DAW-2-12(b)

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 350 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

IRR-DAW-2-13

Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

IRR-DAW-2-14

Pre-cooling to control placement temperature of cement concrete in the range of 18 to 21 C at the concrete placement point by inundation of coarse aggregates and adding flaked ice as part of mixing water including cost of all materials, machinery, labour etc., complete with all leads and lifts.

IRR-DAW-2-15

Conveying and fixing elastomeric bearing for spillway bridge including cleaning and preparing surface, mixing and applying adhesive, fixing bearing in correct position etc., including cost of all materials except bearings, machinery, labour etc., complete with all leads and lifts.

IRR-DAW-2-16

Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.

IRR-DAW-2-17

Providing and forming expansion joint for spillway bridge consisting of 75 x 75 x 6 mm angles 2 numbers provided with 25 cm long 12 mm dia. anchors fixed to both flanges at 15 cm c /c and 140 x 6 mm plate welded on top of one of the angle including cost of all materials, machinery, labour, providing and fixing 38 mm thick joint filler board matching the thickness of wearing coat, painting etc., complete with lead upto 1 km and all lifts.

IRR_DAW-3-1

Providing and constructing un-coursed rubble stone masonry using approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto 1 km and all lifts.( Cement content : 190 kg/cum of masonry, rubble stones : 0.85 cum,stone chips : 0.15 cum/cum, FA : 0.4 cum)

IRR_DAW-3-2

Providing and constructing un-coursed rubble stone masonry using approved stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto 1 km and all lifts.( Cement content : 143 kg/cum of masonry, rubble stones : 0.85 cum, stone chips : 0.15 cum/cum, FA : 0.4 cum)

Check Box 147

Check Box 148

Check Box 149

Check Box 150

Check Box 151

Check Box 152

Check Box 153

Check Box 154

Check Box 155

Check Box 156

Check Box 157

Check Box 158

Check Box 159

Abstract of work items

4

38 cum 2571.60

Labour Component (including contractor's profit) cum 904.70

39 cum 2332.80

Labour Component (including contractor's profit) cum 904.70

40 cum 2707.00

Labour Component (including contractor's profit) cum 1105.80

41 cum 2479.00

Labour Component (including contractor's profit) cum 1105.80

42 sqm 93.20

Labour Component (including contractor's profit) sqm 64.40

43 sqm 86.00

Labour Component (including contractor's profit) sqm 64.40

IRR_DAW-4 CONTRACTION JOINT WORKS:

44 sqm 426.70

Labour Component (including contractor's profit) sqm 127.60

45 Rm 13637.70

Labour Component (including contractor's profit) Rm 130.90

46 Rm 2185.90

Labour Component (including contractor's profit) Rm 86.00

47 Rm 6355.90

Labour Component (including contractor's profit) Rm 99.90

48 Rm 191.20

Labour Component (including contractor's profit) Rm 79.20

IRR-DAW-5 EARTH / ROCKFILL EMBANKMENT WORKS :

49 cum 150.00

Labour Component (including contractor's profit) cum 15.50

50 cum 159.00

Labour Component (including contractor's profit) cum 16.90

51 cum 159.70

Labour Component (including contractor's profit) cum 16.80

IRR_DAW-3-3

Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto 1 km and all lifts.( Thickness of the CR face assumed: 0.75 m, Cement content : 178 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)

IRR_DAW-3-4

Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding,ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto 1 km and all lifts. ( Cement content : 134 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No)

IRR_DAW-3-5

Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km and all lifts.( Cement content : 167 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)

IRR-DAW-3-6

Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km and all lifts.( Cement content : 125 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No)

IRR-DAW-3-7

Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 2 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-3-8

Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 3 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-4-1

Providing 25 mm thick guniting to rock or masonry surface in cement mortar 1 : 3 proportion by weight including cost of all materials, machinery, labour, raking-out and cleaning joints, scaffolding wherever required and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-4-2

Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in two lines with 8 mm dia steel dowel rods on either side at one metre interval, forming 125 x 125 mm size groove in between copper strips for filling asphalt including fixing 15 mm dia two legged G.I pipe with U - bend at bottom for circulation of steam at intervals and forming 150 mm dia formed drain behind water seals including cost of all materials, machinery, labour, filling asphalt, circulation of steam through pipes etc., complete with all leads and lifts.

IRR-DAW-4-3

Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete with all leads and lifts.

IRR-DAW-4-4

Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in single line with 8 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour etc., complete with all leads and lifts.

IRR-DAW-4-5

Providing and constructing contraction joints by fixing 23 cm wide central bulb type PVC water stop in single line supported by 10 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, valcunising joints etc., complete with all leads and lifts.

IRR-DAW-5-1

Providing hearting embankment using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-5-2

Providing cut-off trench filling using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using sheep foot / pad foot roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-5-3

Providing casing embankment using semi-pervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as excavation, sorting out, transportation, spreading soil in layers of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using sheep foot / pad foot roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

Check Box 160

Check Box 161

Check Box 162

Check Box 163

Check Box 164

Check Box 165

Check Box 166

Check Box 167

Check Box 168

Check Box 169

Check Box 170

Check Box 171

Check Box 172

Check Box 173

Abstract of work items

5

52 cum 138.00

Labour Component (including contractor's profit) cum 14.30

53 cum 102.80

Labour Component (including contractor's profit) cum 14.30

54 cum 152.10

Labour Component (including contractor's profit) cum 15.80

55 cum 252.80

Labour Component (including contractor's profit) cum 87.30

56 cum 436.80

Labour Component (including contractor's profit) cum 79.30

57 cum 483.10

Labour Component (including contractor's profit) cum 150.70

58 cum 444.00

Labour Component (including contractor's profit) cum 104.90

59 Rm 671.10

Labour Component (including contractor's profit) Rm 23.60

IRR-DAW-6 FILTER & PITCHING WORKS :

60 Each 40789.40

Labour Component (including contractor's profit) Each 7909.80

61 cum 831.40

Labour Component (including contractor's profit) cum 111.70

62 cum 916.20

Labour Component (including contractor's profit) cum 111.70

63 cum 876.60

Labour Component (including contractor's profit) cum 100.30

64 cum 1020.50

Labour Component (including contractor's profit) cum 37.60

65 sqm 847.20

Labour Component (including contractor's profit) sqm 43.30

66 cum 537.80

Labour Component (including contractor's profit) cum 88.90

IRR-DAW-5-4

Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 95 percent using sheep foot / pad foot roller as stipulated etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-5-4-A (New

Item1 -2011-12)

Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 90 percent using 2Tonne Roller as stipulated etc., complete with initial lead upto 1 km and all lifts. (For Maintenance Works)

IRR-DAW-5-5

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-5-6

Providing embankment adjacent to masonry / concrete structures and filling trial pits using impervious soil from approved borrow areas in layers of 10 to 15 cm and compacting each layer to density control of not less than 95 percent using pneumatic tampers or by vibratory earth rammers including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-5-7

Providing and constructing rockfill embankment with 300 mm down graded stones and quarry spalls from approved source including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing the surface to required slopes etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-5-8

Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all lifts.

IRR-DAW-5-9

Providing and constructing dry rubble rock-toe with rubble and stone chips from dump yard including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all lifts.

Note: Useful rubble and stone chips will be issued at dump yard at the issue rate for usefull rubble /stone chips. Sorting out and breaking charges included in rate analysis.

IRR-DAW-5-10

Providing and laying 30 cm diameter open jointed hume pipes with collars in rock-toe for drainage including cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.

IRR-DAW-6-1

Providing and constructing 1.20 m internal diameter and average 3 m height RCC manhole with 60 cm dia. top cover in M-15 grade cement concrete using 20 mm down graded, clean, hard coarse aggregate, 20 cm thick for bed / sides / top slab / 1.5 m long cut-off wall and 7.5 cm thick for cover including providing 12 mm dia reinforcement bars at 30 cm c / c bothways for bed / sides / cut-off wall / top slab / rungs and 8 mm dia bars at 15 cm c / c bothways for cover, excavation for foundation, providing 30 cm dia hume pipe outlet, cost of all materials, machinery, labour, formwork, scaffolding, batching, mixing, laying, vibrating, finishing, curing etc., complete with lead upto 1 km and all lifts.( Cement content : 300 kg/cum , CA : 0.80 cum, Blending Ratioof CA -- 65:35,FA : 0.44 cum, superplasticizer (0.4% by wt. of cement)

IRR-DAW-6-2

Providing and constructing longitudinal and cross graded filter drains using sand and 80-20 mm and 20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications including cost of all materials, machinery, labour, laying to required slopes, compaction etc. complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-3

Providing and constructing 1.40 m thick vertical or inclined graded filter media consisting of 20 cm thick sand layers, 25 cm thick 20 mm down coarse aggregate layers and 50 cm thick 80-20 mm coarse aggregate layer using approved materials satisfying specified filter creteria as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-4

Providing and constructing graded filter media below and behind rock-toe consisting of 20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 - 20 mm size graded coarse aggregates satisfying filter creteria as per specifications including cost of all materials, labour, machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-4-A (New

Item2 2011-12)

Providing and constructing graded filter media below and behind rock-toe consisting of 30 cm thick, 80 - 20 mm size graded coarse aggregates satisfying filter creteria as per specifications including cost of all materials, labour, machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-5

Providing and laying filter media consisting of 2 layers of 250 gsm poly-propeline non-woven filter fabric and 400 mm thick 20 mm down graded coarse aggregate for vertical / inclined and horizontal filter blanket for embankment including cost of all materials, machinery, labour etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.

IRR-DAW-6-6

Providing and constructing 45 cm thick chimney filter using clean approved sand satisfying filter creteria including cost of all materials, machinery, labour, compacting etc., complete with initial lead upto 50 m and all lifts.

Check Box 174

Check Box 175

Check Box 176

Check Box 177

Check Box 178

Check Box 179

Check Box 180

Check Box 181

Check Box 182

Check Box 183

Check Box 184

Check Box 185

Check Box 186

Check Box 187

Check Box 188

Abstract of work items

6

67 cum 896.70

Labour Component (including contractor's profit) cum 117.40

68 sqm 766.00

Labour Component (including contractor's profit) sqm 130.00

69 sqm 910.20

Labour Component (including contractor's profit) sqm 147.10

70 sqm 715.90

Labour Component (including contractor's profit) sqm 99.50

71 sqm 782.60

Labour Component (including contractor's profit) sqm 108.40

72 sqm 860.30

Labour Component (including contractor's profit) sqm 126.30

73 sqm 85.30

Labour Component (including contractor's profit) sqm 50.30

Chapter IIIRR-TAW TUNNEL AND ALLIED WORKS

IRR-TAW-1 EXCAVATION :

IRR-TAW-1-1 74 cum 1540.70

Labour Component (including contractor's profit) cum 453.90

IRR-TAW-1-2 75 cum 1960.20

Labour Component (including contractor's profit) cum 913.70

IRR-TAW-1-3 76 cum 1571.90

Labour Component (including contractor's profit) cum 448.00

IRR-TAW-1-4 77 cum 1619.50

Labour Component (including contractor's profit) cum 462.50

IRR-TAW-1-5 78 cum 1656.10

Labour Component (including contractor's profit) cum 496.50

IRR-TAW-1-6 79 cum 328.60

Labour Component (including contractor's profit) cum 69.70

IRR-TAW-2 DEWATERING & GUNITING WORKS :

IRR-TAW-2-1 80 Kwhr 20.40

Labour Component (including contractor's profit) Kwhr 6.50

IRR-TAW-2-2 81 sqm 530.10

Labour Component (including contractor's profit) sqm 144.30

IRR-DAW-6-7

Providing and constructing 90 cm thick transition cum filter media behind rockfill using approved sand and 80-20 mm and 20 mm down graded aggregates satisfying the filter creteria in layers of 30 cm thickness each as per specifications including cost of all materials, machinery, labour, laying each layer to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-8

Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75 cm long through stones at 1.50 m c / c over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-9

Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75 cm long through stones at 1.50 m c / c over a backing of 60 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-10

Providing and constructing 60 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-11

Providing and constructing 75 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips, etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-12

Providing and constructing 90 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto 50 m and all lifts.

IRR-DAW-6-13

Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen embankments over 20 mm thick sand backing including cost of all materials, machinery, labour including preparing surface, spreading sand, watering for 15 days etc., complete with initial lead upto 1 km and all lifts.

Excavation for adit by tunnelling methods in all types of rock including cost of all materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and hauling the excavated muck outside adit upto specified dump area and all other ancillary operations etc., complete with initial lead upto 50 m and all lifts.

Excavation for vertical / inclined shaft in all types of soft / hard rock including cost of all materials, machinery, labour, shoring, strutting, scaling excavated surface, ventilation, lighting, drainage, removing and hauling excavated muck outside shaft upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

Excavation for tunnel by tunnelling methods in rock not requiring supports including cost of all materials,machinery, labour, scaling excavated surface, removing under-cuts, ventilation, lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

Excavation for tunnel by tunnelling methods including excavation for supports in all types of soil / rock strata requiring supports ( excluding cost of providing supports ) including cost of all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

Excavation for tunnel by heading and benching tunnelling methods including excavation for supports in all types of soil / rock strata requiring supports ( excluding cost of providing supports ) for roof before benching including cost of all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage removing and hauling excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

NOTE: Where mucking is to be carried out through shaft using winch and mucking tub system increase the basic rates for items 3, 4 & 5 by 8 percent.

Removing and hauling muck overfallen due to natural causes such as geological faults etc., out of tunnel including breaking large fragments by blasting if necessary and disposing off the same in specified dump area or as directed including cost of all materials, machinery, labour, ventilation, drainage, lighting and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

Dewatering tunnel by pumping out water collected by natural drainage inside tunnel including providing sump wherever necessary, cost of all materials, machinery, labour, drainage, lighting, ventilation and all other ancillary operations etc., complete.

Providing 25 mm thick guniting to sides and arch of tunnel in cement mortar 1 : 3 proportion by weight including cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.

Check Box 189

Check Box 190

Check Box 191

Check Box 192

Check Box 193

Check Box 194

Check Box 195

Check Box 196

Check Box 197

Check Box 198

Check Box 199

Check Box 200

Check Box 201

Check Box 202

Check Box 203

Abstract of work items

7

82 sqm 1235.70

Labour Component (including contractor's profit) sqm 144.30

IRR-TAW-3 TEMPORARY & PERMANENT SUPPORTS :

IRR-TAW-3-1 83 Rm 1010.30

Labour Component (including contractor's profit) Rm 242.30

IRR-TAW-3-2 84 Rm 969.70

Labour Component (including contractor's profit) Rm 223.40

IRR-TAW-3-3 85 tonne 86772.70

Labour Component (including contractor's profit) tonne 13020.40

IRR-TAW-3-4 86 tonne 20136.60

Labour Component (including contractor's profit) tonne 6489.20

IRR-TAW-3-5 87 cum 28426.60

Labour Component (including contractor's profit) cum 1179.40

IRR-TAW-4 MASONRY WORKS :

IRR-TAW-4-1 88 cum 1886.70

Labour Component (including contractor's profit) cum 622.00

IRR-TAW-5 REINFORCEMENT & CONCRETE WORKS :

IRR-TAW-5-1 89 tonne 68441.20

Labour Component (including contractor's profit) tonne 7660.80

IRR-TAW-5-2 90 cum 4707.50

Labour Component (including contractor's profit) cum 614.70

IRR-TAW-5-3 91 cum 5774.00

Labour Component (including contractor's profit) cum 766.30

IRR-TAW-5-4 92 cum 5938.30

Labour Component (including contractor's profit) cum 593.10

IRR-TAW-6 DRILLING & GROUTING WORKS :

IRR-TAW-6-1 93 Rm 347.20

Labour Component (including contractor's profit) Rm 116.50

IRR-TAW-6-2 94 tonne 9383.10

Labour Component (including contractor's profit) tonne 1797.60

IRR-TAW-6-3 95 Rm 339.70

Labour Component (including contractor's profit) Rm 48.00

Chapter III

IRR-TAW-2-3 (new Item4 2010-11)

Shortcreting in two layers (each layer+38 mm thickness) for slabs duly fixing chain weld wire mesh 100 x 100x5 mm in between the two layers including cost and conveyance of all materials, labour charges, all heads, lifts, seigniorage, centering, scaffolding, machine mixing, laying concrete with shortcrete machine etc. complete as per specification and as directed by Engineer-in-Charge

Providing and fixing 25 mm diameter steel rock bolts with mechanical / wedge type anchorage including drilling 35 mm dia holes, providing 15 cm long 20 mm thick steel tapered wedge, 10 mm thick plate washers and nuts, tightening bolt by torque wrench, cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.

Providing and fixing 25 mm diameter steel rock bolts with resin bond cement capsule anchorage including drilling 35 mm dia holes, inserting grout capsule, driving bolt,fixing 10 mm thick plate washers and nuts and tightening the same by torque wrench after hardening of cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc., complete with lead upto 1 km and all lifts.

Providing, fabricating and fixing in position permanent structural steel supports as per details including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting, ventilation, drainage and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts.

Providing, fabricating and fixing in position temperary structural steel supports as per details and dismantling the same before concreting including cost of all materials, machinery, labour, cutting, bending, welding, grinding, ventilation, lighting, drainage and all other ancillary operations etc.,complete with initial lead upto 1 km and all lifts.

Providing and fixing hard variety cut jungle wood for lagging / blocking locations in tunnel wherever required including cost of all materials, machinery, labour, fixing in position, lighting, ventilation, drainage etc complete with all leads and lifts.

Providing and constructing un-coursed rubble stone masonry with approved stones from tunnel excavated muck in cement mortar 1 : 6 proportion for backfilling over cuts / slips on tunnel sides due to geological faults etc., including cost of all materials, machinery, labour, cleaning,scaffolding, packing mortar, wedging stone chips, curing, ventilation, lighting, drainage complete with lead upto 1 km and all lifts.(cement content : 95 kg/cum of masonry, Rubble stones : 0.83 cum, Stone chips : 0.13 cum,FA : 0.40 cum)

Providing, fabricating and placing in position reinforcement steel for tunnel RCC works including cleaning, straightening, cutting, bending, hooking, lapping / welding joints wherever required, tying with 1.25 mm dia.soft annealed steel wire, including cost of all materials, labour, machinery, ventilation, lighting, drainage etc.,complete with initial lead upto 1 km and all lifts.

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates crushed from tunnel excavated muck for filling and levelling over-cuts in bed due to geological faults etc., including cost of all materials, machinery, labour, cleaning bed, batching, mixing, conveying and laying, levelling, compacting, finishing, curing, lighting, ventilation, drainage etc., complete with initial lead upto 1 km and all lifts. ( Cement content : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum, Superplasticizer 0.4% by wt. of cement)

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard, graded aggregates crushed from tunnel muck for kerb and bed lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard, graded aggregates crushed from tunnel muck for sides and arch lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer or stooper drills as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage and all other ancillary operations etc., complete.

Grouting cement slurry in grout holes under specified pressure for consolidation / contact grouting including cost of all materials, machinery, labour, redrilling wherever necessary, ventilation,lighting, drainage and other ancillary operations etc., complete with lead upto 1 km and all lifts.

Drilling 75 mm diameter drainage holes vertical or inclined in rock / concrete in tunnel by percussion drilling using waggon drill or other suitable drilling equipment including cost of all materials, machinery, labour, ventilation, lighting, drainage etc., complete.

Check Box 204

Check Box 205

Check Box 206

Check Box 207

Check Box 208

Check Box 209

Check Box 210

Check Box 211

Check Box 212

Check Box 213

Check Box 214

Check Box 215

Check Box 216

Check Box 217

Abstract of work items

8

IRR-CAW CANAL AND ALLIED WORKS

IRR-CAW-1 EXCAVATION WORKS :

96 cum 83.70

Labour Component (including contractor's profit) cum 18.60

97 cum 44.40

Labour Component (including contractor's profit) cum 15.30

98 cum 113.00

Labour Component (including contractor's profit) cum 27.60

99 cum 73.40

Labour Component (including contractor's profit) cum 25.00

100 cum 170.80

Labour Component (including contractor's profit) cum 50.00

101 cum 419.70

Labour Component (including contractor's profit) cum 106.70

102 cum 528.40

Labour Component (including contractor's profit) cum 105.60

103 cum 903.80

Labour Component (including contractor's profit) cum 281.20

104 cum 269.90

Labour Component (including contractor's profit) cum 33.40

105 cum 406.10

Labour Component (including contractor's profit) cum 38.30

IRR-CAW-1-1

Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-1-2

Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m.

(Machinery excavation and manual conveyance)

IRR-CAW-1-3

Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing of bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soft rock neatly in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts.

IRR-CAW-1-4

Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road as directed etc.,complete with lead upto 10 m and lift upto 3 m.

(Machinery excavation and manual conveyance)

IRR-CAW-1-5

Excavation in hard rock (including F&F rock) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated rock in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts.

IRR-CAW-1-6 (a)

Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc., complete with initial lead upto 1 km and all lifts.

i ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth excavation in hard rock is less than 3 m.ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever required.

IRR-CAW-1-7 (b)

Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench of embankment, filter / catch-water drains etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations, costof all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

i) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth excavation in hard rock is less than 3 m.ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations is required.

IRR-CAW-1-8( c)

Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing canal sides neatly on either side to required profile by line drilling and smooth blasting including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in dump area or other place as directed, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.i) For excavation of canal below free board level combination of normal controlled blasting and line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose of payment 1 m width of excavation on either side shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be.ii ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m.iii ) The rate includes controlling fly-rock wherever required.iv ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval.v ) In case, where the above criteria is not fulfilled payment shall be restricted to the rate provided for excavation by normal blasting or controlled blasting as the case may be.

IRR-CAW-1-9(a)

Excavation in hard rock by blasting including boulders above 1.2 m dia. for canals, seating embankment etc., including levelling bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc.,complete with initial lead upto 1 km and all lifts.

i ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.ii ) The rate includes levelling canal bed by hammering /chiselling all rock projections wherever required.

IRR-CAW-1-10(b)

Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench of embankment etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations, cost of all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

i ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m. ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations is required.

Check Box 218

Check Box 219

Check Box 220

Check Box 221

Check Box 222

Check Box 223

Check Box 224

Check Box 225

Check Box 226

Check Box 227

Abstract of work items

9

106 cum 679.00

Labour Component (including contractor's profit) cum 86.40

IRR-CAW-2 EMBANKMENT WORKS USING BORROW AREA SOIL :

107 cum 202.50

Labour Component (including contractor's profit) cum 25.10

108 cum 196.40

Labour Component (including contractor's profit) cum 24.60

109 cum 202.20

Labour Component (including contractor's profit) cum 25.10

110 cum 198.10

Labour Component (including contractor's profit) cum 26.30

111 cum 186.80

Labour Component (including contractor's profit) cum 22.80

112 cum 178.40

Labour Component (including contractor's profit) cum 20.60

113 cum 173.10

Labour Component (including contractor's profit) cum 20.20

114 cum 164.40

Labour Component (including contractor's profit) cum 18.70

IRR-CAW-3 EMBANKMENT WORKS USING DUMP AREA SOIL :

115 cum 159.30

Labour Component (including contractor's profit) cum 19.20

116 cum 154.50

Labour Component (including contractor's profit) cum 18.90

117 cum 155.50

Labour Component (including contractor's profit) cum 18.60

IRR-CAW-1-11(c)

Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing canal sides neatly on either side to required profile by line drilling and smooth blasting including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in dump area or other place as directed, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts.i ) For excavation of canal below free board level combination of normal controlled blasting and line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose of payment 1 m width of excavation on either side shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be.ii ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m.iii ) The rate includes controlling fly-rock wherever required.iv ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval. v ) In case, where the above criteria is not fulfilled payment shall be restricted to the rate provided for excavation by normal blasting or controlled blasting as the case may be.

IRR-CAW-2-1

Providing impervious hearting embankment with selected soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-2-2

Providing impervious hearting embankment with selected soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-2-3

Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent or as stipulated by sheep's / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-2-4

Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated by sheep's / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-2-5

Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-2-6

Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-2-7

Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-2-8

Providing casing embankment using homogeneous soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-3-1

Providing impervious hearting embankment with soil from approved dump areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to achieve density control of not less than 98 percent or as stipulated by sheep's / pad foot roller etc.,complete with initial lead upto 1 km and all lifts.

IRR-CAW-3-2

Providing impervious hearting embankment with soil from approved dump areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to achieve density control of not less than 95 percent or as stipulated by sheep's / pad foot roller etc.,complete with initial lead upto 1 km and all lifts.

IRR-CAW-3-3

Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

Check Box 228

Check Box 229

Check Box 230

Check Box 231

Check Box 232

Check Box 233

Check Box 234

Check Box 235

Check Box 236

Check Box 237

Check Box 238

Check Box 239

Abstract of work items

10

118 cum 150.60

Labour Component (including contractor's profit) cum 18.20

119 cum 143.00

Labour Component (including contractor's profit) cum 16.80

IRR-CAW-4 EMBANKMENT WORKS USING EXCAVATED SOIL :

120 cum 85.30

Labour Component (including contractor's profit) cum 7.80

121 cum 80.50

Labour Component (including contractor's profit) cum 7.90

122 cum 85.30

Labour Component (including contractor's profit) cum 7.80

123 cum 80.50

Labour Component (including contractor's profit) cum 7.90

124 cum 71.60

Labour Component (including contractor's profit) cum 5.80

125 cum 249.00

Labour Component (including contractor's profit) cum 220.50

IRR-CAW-5 FOUNDATION FILLING WORKS :

126 cum 579.30

Labour Component (including contractor's profit) cum 114.00

127 cum 498.20

Labour Component (including contractor's profit) cum 114.00

128 sqm 96.30

Labour Component (including contractor's profit) sqm 14.30

129 cum 385.30

Labour Component (including contractor's profit) cum 57.00

130 cum 472.80

Labour Component (including contractor's profit) cum 80.40

131 cum 699.90

Labour Component (including contractor's profit) cum 106.00

132 Rm 347.00

133 Rm 20.20

133 one plug 287.50

Labour Component (including contractor's profit) one plug 85.50

IRR-CAW-3-4

Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-3-5

Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-4-1

Providing impervious hearting embankment with soil collected in embankment area in heaps as part of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with lead upto 1 km for water.

IRR-CAW-4-2

Providing impervious hearting embankment with soil collected in embankment area in heaps as part of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each layer to density control of not less than 95 percent or as stipulated by sheep's foot/ pad foot roller etc., complete with lead upto 1 km for water.

IRR-CAW-4-3

Providing semi-pervious / pervious casing hearting embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with lead upto 1 km for water.

IRR-CAW-4-4

Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with lead upto 1 km for water.

IRR-CAW-4-5

Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning and compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete.

IRR-CAW-4-6

Providing compacted embankment for field irrigation channels with gravely soil from approved borrow area including sorting out, spreading in layers of 15 cm thickness, breaking clods, watering, compacting, dressing sides to required slopes etc.,complete with lead upto 50 m and all lifts.

( manual work with water pump)

IRR-CAW-5-1

Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-2

Providing rubble and Murum filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-3

Providing and laying 25 cm thick sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-3-A (New

Item 3 -2011-12)

Providing and laying sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-4

Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-5

Providing and constructing longitudinal and cross graded filter drains using sand and 20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications including cost of all materials, machinery, labour, laying to required slopes, compaction etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-6

Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including excavation of drains and Cost of procuring of all materials

IRR-CAW-5-7

Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including excavation of drains and Cost of procuring of all materials

Check Box 240

Check Box 241

Check Box 242

Check Box 243

Check Box 244

Check Box 245

Check Box 246

Check Box 247

Check Box 248

Check Box 249

Check Box 250

Check Box 251

Check Box 252

Check Box 253

Check Box 254

Check Box 255

Abstract of work items

11

134 cum 820.30

Labour Component (including contractor's profit) cum 618.70

135 cum 1015.20

Labour Component (including contractor's profit) cum 99.10

136 sqm 527.60

Labour Component (including contractor's profit) sqm 23.40

137 sqm 582.70

Labour Component (including contractor's profit) sqm 23.40

IRR-CAW-6 ROCK FILL WORKS :

138 cum 433.90

Labour Component (including contractor's profit) cum 42.30

139 cum 290.80

Labour Component (including contractor's profit) cum 54.50

IRR-CAW-7 CANAL LINING WORKS :

140 cum 210.10

Labour Component (including contractor's profit) cum 50.40

141 cum 206.10

Labour Component (including contractor's profit) cum 49.80

142 cum 113.10

Labour Component (including contractor's profit) cum 38.40

143 Each 74.90

Labour Component (including contractor's profit) Each 51.00

144 kg 60.00

Labour Component (including contractor's profit) kg 5.40

145 sqm 371.10

Labour Component (including contractor's profit) sqm 22.70

146 sqm 387.10

Labour Component (including contractor's profit) sqm 22.70

IRR-CAW-5-8

Providing and constructing 0.50 m thick vertical or inclined graded filter media consisting of 15 cm thick sand layers and 20 cm thick 20 mm down coarse aggregate layer using approved materials satisfying specified filter creteria as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-9

Providing and constructing graded filter media below and behind rock-toe consisting of 20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm down size graded coarse aggregates satisfying filter creteria behind rock-toe and 15 cm thick sand, 20 cm thick 20 mm down coarse aggregate and 65 cm thick 40 mm down size coarse aggregate satisfying filter creiteria below rock-toe as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-5-10(a)

Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.

Using 200 gsm filter fabric.

IRR-CAW-5-11(b)

Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts.

Using 250 gsm filter fabric.

IRR-CAW-6-1

Providing and constructing rockfill casing to canal embankment with graded stones and spalls from approved quarry including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-6-2

Providing and constructing rockfill casing to canal embankment with graded stones and spalls available in dump yard including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc., complete with initial lead upto 50 m and all lifts.

Stones and spalls available in dump yard will be issued at specified issue rate.

IRR-CAW-7-1

Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 98 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-7-2

Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-7-3

Providing cohesive non-swelling ( CNS ) soil lining to canal using soil collected in heaps along the edge of canal requiring CNS soil lining as part of the disposal of excavated soil from canal excavation in CNS soil reach including spreading in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with lead upto upto 50 m and all lifts.

IRR-CAW-7-4

Providing and fixing 20 x 20 x 75 cm size top surface neatly dressed canal bed level stones including cost of all materials, labour, excavation, fixing in position to correct level etc., complete with lead upto 50 m and all lifts.

IRR-CAW-7-5

Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding wherever required including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.(1.05 tonne/tonne of steel)

IRR-CAW-7-6

Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts. ( 43 Gr Cement content: (300kg /cum) 22.5 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:79.2 cum including the extra quantity of concrete for curvatures and bends etc.,)

IRR-CAW-7-7

Providing and laying 80 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts. ( 43 Gr Cement content: (300kg /cum) 24 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:84.48 cum including the extra quantity of concrete for curvatures and bends etc.,)

Check Box 256

Check Box 257

Check Box 258

Check Box 259

Check Box 260

Check Box 261

Check Box 262

Check Box 263

Check Box 264

Check Box 265

Check Box 266

Check Box 267

Check Box 268

Abstract of work items

12

147 sqm 469.20

Labour Component (including contractor's profit) sqm 26.30

148 shifting 7396.20

Labour Component (including contractor's profit) shifting 5010.50

149 cum 3925.00

Labour Component (including contractor's profit) cum 886.50

150 cum 4056.10

Labour Component (including contractor's profit) cum 926.50

151 sqm 447.10

Labour Component (including contractor's profit) sqm 26.30

152 cum 3962.00

Labour Component (including contractor's profit) cum 926.50

153 cum 4270.80

Labour Component (including contractor's profit) cum 980.10

154 cum 4390.60

Labour Component (including contractor's profit) cum 1034.90

155 sqm 626.40

Labour Component (including contractor's profit) sqm 26.30

156 Rm 932.10

Labour Component (including contractor's profit) Rm 200.40

157 Each 118.60

Labour Component (including contractor's profit) Each 34.20

IRR-CAW-7-8

Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts. ( 43 Gr Cement content: (300kg /cum) 30 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:88 cum including the extra quantity of concrete for curvatures and bends etc.,)

IRR-CAW-7-9

Dismantling, shifting and re-erecting mechanical concrete paver and DG set with all accessories across canal CD work or other locations wherever shifting and re-erecting is necessary including aligning paver correctly for continuing canal lining work, cost of all materials, machinery, labour etc., complete with all leads and lifts.

Note: Local shifting and re-erection of paver for LH and RH side lining included in concrete lining rates under items IRR-CAW-7-7 and IRR-CAW-7-8 and saperate rate for shifting shall not be allowed.

IRR-CAW-7-10

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal(150mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

(Only forManually operated)

IRR-CAW-7-11

Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than 10 N/sqm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregade for bed and side lining of canal(100 mm thick) including, finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts ( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

IRR-CAW-7-12

Providing and laying 100mm thick insitu vibrated M-10 (28 days cube compressive strength-not less than 10.00 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver including cost of all materials mechinery labour batching mixing placing in position forming contraction joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with all leads & lifts. (Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

IRR-CAW-7-13

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

IRR-CAW-7-14

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining(150 mm thick) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 290 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

IRR-CAW-7-15

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining(of thickness 100 mm) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

IRR-CAW-7-16

Providing and laying 150mm thick insitu vibrated M-15 (28 days cube compressive strength-not less than 15.00 N / sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver including cost of all materials mechinery labour batching mixing placing in position forming contractiom joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with all leads & lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

(Paver)

IRR-CAW-7-17

Providing and fixing pre-cast RCC template walls consisting of 0.05 cum M-15 grade concrete using 20 mm down size coarse aggregates and 10 kg reinforcement steel moulded as per specifications and drawing in CM 1:4 proportion including cost of all materials, machinery, labour, formwork, fabricating and placing reinforcement steel, mixing, laying, conveying and fixing in position including necessary excavation for seating, finishing joints in CM 1:4, curing etc., complete with initial lead upto 1 km and all lifts.

IRR-CAW-7-18

Providing and fixing 50 mm dia perforated GI pressure relief pipes 12.50 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

Check Box 269

Check Box 270

Check Box 271

Check Box 272

Check Box 273

Check Box 274

Check Box 275

Check Box 276

Check Box 277

Check Box 278

Check Box 279

Abstract of work items

13

158 Each 170.10

Labour Component (including contractor's profit) Each 34.20

159 Each 203.10

Labour Component (including contractor's profit) Each 34.20

160 Each 265.10

Labour Component (including contractor's profit) Each 34.20

161 Each 384.80

Labour Component (including contractor's profit) Each 34.20

162 Each 196.10

Labour Component (including contractor's profit) Each 17.10

163 Each 223.90

Labour Component (including contractor's profit) Each 70.50

164 Each 34.50

Labour Component (including contractor's profit) Each 6.20

165 sqm 306.80

Labour Component (including contractor's profit) sqm 52.70

166 sqm 66.50

Labour Component (including contractor's profit) sqm 49.00

167 Rm 37.40

Labour Component (including contractor's profit) Rm 32.70

168 Each 136.00

Labour Component (including contractor's profit) Each 136.00

169 sqm 108.50

Labour Component (including contractor's profit) sqm 10.00

sqm 31.50

Labour Component (including contractor's profit) sqm 6.80

170 sqm 156.40

Labour Component (including contractor's profit) sqm 14.00

171 sqm 220.70

Labour Component (including contractor's profit) sqm 19.40

172 Rm 169.50

Labour Component (including contractor's profit) Rm 15.70

173 Rm 71.10

Labour Component (including contractor's profit) Rm 6.20

174 Rm 105.50

Labour Component (including contractor's profit) Rm 6.20

175 Rm 19.50

Labour Component (including contractor's profit) Rm 4.40

176 Each 84.60

Labour Component (including contractor's profit) Each 19.20

IRR-CAW-7-19

Providing and fixing 50 mm dia perforated GI pressure relief pipes 22.50 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

IRR-CAW-7-20

Providing and fixing 50 mm dia perforated GI pressure relief pipes 30 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

IRR-CAW-7-21

Providing and fixing 50 mm dia perforated GI pressure relief pipes 45 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

IRR-CAW-7-22

Providing and fixing 50 mm dia perforated GI pressure relief pipes 75 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts.

IRR-CAW-7-23

Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts.

IRR-CAW-7-24

Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and side lining of canal laid on rock including cost of all materials, machinery, labour etc., complete with all leads and lifts.

IRR-CAW-7-25

Providing and forming 35 x 35 x 40 cm deep filter drain consisting of 75 mm thick 10 mm down coarse aggregate around pressure relief pipe and 75 mm thick sand around coarse aggregate filter including cost of all materials, labour, excavation of pit etc., complete with lead upto 50 m and all lifts.

IRR-CAW-7-26

Providing and fixing 25 to 40 mm thick Shahabad / Talikota / other similar stone slabs with pointing and finishing joints neatly in CM 1:3 proportion for canal / field channel lining including cutting slabs to required size, mixing mortar, finishing joints neatly, curing etc., complete with lead upto 50 m and all lifts.

IRR-CAW-7-27

Fixing PCC slabs of various sizes in CM 1 : 3 proportion to the side slopes of canal including preparing bed, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding PCC slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-7-28

Fixing PCC lug slabs of various sizes in CM 1 : 3 proportion for supporting PCC slab lining including necessary excavation, refilling, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding PCC lug slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CAW-7-29

Fixing 30 cm height pre-cast drops for field channels as directed including excavation, etc., complete with all leads and lifts.

IRR-CAW-7-30

Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts.

Using 500 micron thick LDPE sheet.

If the surface on which the LDPE sheet is to be laid is too rough and undulating provide 75 mm thick sand backing to LDPE sheet. For providing 75 mm thick Sand for backing add

IRR-CAW-7-31

Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts.

Using 750 micron thick LDPE sheet.

IRR-CAW-7-32

Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts.

Using 1000 micron thick LDPE sheet.

IRR-CAW-7-33

Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler boards for stone masonry lining of canal including cost of all materials, labour etc., complete with all leads and lifts.

IRR-CAW-7-34

Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.

IRR-CAW-7-35

Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.

IRR-CAW-7-36

Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts.

IRR-CAW-7-37

Manufacturing 550 x 550 x 55 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N /sqmm ) cement concrete using 20 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum)

Check Box 280

Check Box 281

Check Box 282

Check Box 283

Check Box 284

Check Box 285

Check Box 286

Check Box 287

Check Box 288

Check Box 289

Check Box 290

Check Box 291

Check Box 292

Check Box 293

Check Box 294

Check Box 295

Check Box 296

Check Box 297

Check Box 298

Check Box 299

Abstract of work items

14

177 Each 57.80

Labour Component (including contractor's profit) Each 19.20

178 Each 29.50

Labour Component (including contractor's profit) Each 12.30

179 Each 21.70

Labour Component (including contractor's profit) Each 12.30

180 Each 71.70

Labour Component (including contractor's profit) Each 12.30

181 Each 31.50

Labour Component (including contractor's profit) Each 12.30

182 Each 21.20

Labour Component (including contractor's profit) Each 12.30

183 cum 1810.10

Labour Component (including contractor's profit) cum 472.40

184 cum 2697.10

Labour Component (including contractor's profit) cum 1561.70

185 cum 1716.60

Labour Component (including contractor's profit) cum 533.40

186 cum 2553.30

Labour Component (including contractor's profit) cum 1561.70

IRR-CAW-8 ROCK PITCHING

187 sqm 175.90

Labour Component (including contractor's profit) sqm 36.80sqm 34.00

Labour Component (including contractor's profit) sqm 11.40

188 sqm 166.80

Labour Component (including contractor's profit) sqm 36.80

189 sqm 180.30

Labour Component (including contractor's profit) sqm 88.50

190 sqm 139.70

Labour Component (including contractor's profit) sqm 79.60

191 sqm 193.80

Labour Component (including contractor's profit) sqm 36.80

IRR-CAW-7-38

Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 20 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum)

IRR-CAW-7-39

Manufacturing 450 x 300 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

IRR-CAW-7-40

Manucturing 450 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),CA : 0.68 cum, FA : 0.43cum)

IRR-CAW-7-41

Manufacturing 600 x 300 x 100mm size PCC lining slabs in M-15 grade (28 days cube compressive strength not less than 15 N/Sqmm) cement concrete using 20 mm down grades coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, FA : 0.45cum, Blending Ratio of CA--65:35)

IRR-CAW-7-42

Manucturing 400 x 400 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm )cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

IRR-CAW-7-43

Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N /sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum)

IRR-CAW-7-44

Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side lining using stones and chips from approved quarry including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Thickness of the masonry assumed: 0.3 m, rubble stones : 0.96 cum, Stone Chips : 0.15cum,Through Stones 20 x 20 x 30cm : 1/sqm)

IRR-CAW-7-45

Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining using stones from approved quarry including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(with no pin headers)(Thickness of the Masonry assumed:0.3 m, rubble stones : 1.1 cum)

IRR-CAW-7-46

Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side lining using stones and chips from canal excavation including cost of all materials, machinery, labour, forming weep holes at specified interval, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.96 cum, Stone Chips : 0.15cum, Through Stones 20 x 20 x 30cm : 1/sqm)

IRR-CAW-7-47

Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining using stones from canal excavation including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(with no pin headers)( rubble stones : 1.1cum, cement : 98kg, sand 0.34 cum)

IRR-CAW-8-1

Providing and constructing 25 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm)

If 15 cm thick murum bed is to be provided below pitching add

IRR-CAW-8-1-A (New

Item4 - 2011-12)

Providing and constructing 22.5 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.207 cum/sqm, Stone Chips : 0.3375cum/sqm, Pin Headers 30cm : 2/sqm) (For Maintenance Works)

IRR-CAW-8-2

Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.33 cum/sqm)

IRR-CAW-8-2 - A (New

Item5 - 2011-12)

Providing and constructing 225 mmm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.2475 cum/sqm) (For Maintenance Works)

IRR-CAW-8-3

Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

Check Box 300

Check Box 301

Check Box 302

Check Box 303

Check Box 304

Check Box 305

Check Box 306

Check Box 307

Check Box 308

Check Box 309

Check Box 310

Check Box 311

Check Box 312

Check Box 313

Check Box 314

Abstract of work items

15

192 sqm 216.30

Labour Component (including contractor's profit) sqm 106.10

193 sqm 291.20

Labour Component (including contractor's profit) sqm 51.90

194 sqm 324.50

Labour Component (including contractor's profit) sqm 159.10

195 sqm 443.40

Labour Component (including contractor's profit) sqm 63.20

196 sqm 362.40

Labour Component (including contractor's profit) sqm 14.00

197 sqm 266.10

Labour Component (including contractor's profit) sqm 36.80

198 sqm 274.10

Labour Component (including contractor's profit) sqm 51.90

199 sqm 502.90

Labour Component (including contractor's profit) sqm 60.30

200 sqm 606.50

Labour Component (including contractor's profit) sqm 82.90

201 sqm 82.80

Labour Component (including contractor's profit) sqm 47.80

202 sqm 56.00

Labour Component (including contractor's profit) sqm 27.50

Chapter IVIRR-CCDW CANAL CROSS DRAINAGE WORKS

IRR-CCDW-1 EXCAVATION & FOUNDATION TREATMENT WORKS :

203 cum 179.60

Labour Component (including contractor's profit) cum 179.60

204 cum 14603.40

Labour Component (including contractor's profit) cum 8.00

205 cum 260.80

Labour Component (including contractor's profit) cum 260.80

206 cum 0.00

Labour Component (including contractor's profit) cum 6.00

207 cum 275.60

Labour Component (including contractor's profit) cum 202.80

IRR-CAW-8-4

Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.33 cum/sqm)

IRR-CAW-8-5

Providing and constructing 45 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

IRR-CAW-8-6

Providing and constructing 45 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.495 cum/sqm)

IRR-CAW-8-7

Providing and constructing 30 cm thick rubble stone pitching set in CM 1: 5 proportion with pin headers at 2 per sqm in including cost of all materials, labour, packing chips and mortar, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

IRR-CAW-8-8

Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion including cost of all materials,labour, packing chips and mortar ,finishing etc.,complete( rubble stones : 0.33 cum/sqm )

IRR-CAW-8-9

Providing and constructing 30 cm thick dry khandki stone pitching using 20 to 25 cm size khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

IRR-CAW-8-10

Providing and constructing 45 cm thick dry khandki stone pitching using 25 to 30 cm size khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 1200 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

IRR-CAW-8-11

Providing and constructing 30 cm thick khandki stone pitching using 20 to 25 cm size khandki stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1:3 proportion including cost of all materials, labour, packing chips and mortar, finishing, curing etc.complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

IRR-CAW-8-12

Providing and constructing 45 cm thick khandki stone pitching using 25 to 30 cm stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1 : 3 proportion including cost of all materials, labour, packing chips and mortar, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 730 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm)

IRR-CAW-8-13

Providing 10 cm thick approved type grass turfing to the side slopes of canal icluding cost of all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.(FA : 2 cum/sqm)

IRR-CAW-8-14

Providing 10 cm thick approved type grass turfing to the side slopes of canal icluding cost of all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.

with no sand

IRR-CCDW-1-1

(manual means of excavation and conveyance)

Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

IRR-CCDW-1-2

Excavation for Structures- Mechanical Means ( Data adopted from MORTH)

Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ( depth upto 3 meters)

IRR-CCDW-1-3

(manual means of excavation and conveyance)

Excavation in ordnary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

IRR-CCDW-1-4

( Data adopted from MORTH) (manual means of excavation and conveyance)

Excavation in ordnary rock (including HDR) without blasting for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

IRR-CCDW-1-5

(manual means of excavation after blasting and conveyance)

Excavation in hard rock requiring blasting including boulders above 0.6 m upto 1.2 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

Check Box 315

Check Box 316

Check Box 317

Check Box 318

Check Box 319

Check Box 320

Check Box 321

Check Box 322

Check Box 323

Check Box 324

Check Box 325

Check Box 326

Check Box 327

Check Box 328

Check Box 329

Check Box 330

Abstract of work items

16

208 cum 435.30

Labour Component (including contractor's profit) cum 251.40

209 cum 0.00

Labour Component (including contractor's profit) cum 0.20

210 Each 831.00

Labour Component (including contractor's profit) Each 151.10

IRR-CCDW-2 STEEL AND CEMENT CONCRETE WORKS :

211 kg 60.00

Labour Component (including contractor's profit) kg 5.70

212 kg 70.90

Labour Component (including contractor's profit) kg 7.10

213 cum 4037.20

Labour Component (including contractor's profit) cum 932.50

214 cum 4005.30

Labour Component (including contractor's profit) cum 971.20

215 cum 3758.30

Labour Component (including contractor's profit) cum 891.30

216 cum 3824.50

Labour Component (including contractor's profit) cum 965.00

217 cum 4383.20

Labour Component (including contractor's profit) cum 980.20

218 cum 4787.90

Labour Component (including contractor's profit) cum 976.80

219 cum 4792.30

Labour Component (including contractor's profit) cum 1037.70

220 cum 4507.30

Labour Component (including contractor's profit) cum 1039.60

IRR-CCDW-1-6

(manual means of excavation after blasting and conveyance)

Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in specified dump area or stack yard as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.

IRR-CCDW-1-7

(manual means of excavation after controlled blasting and conveyance)Hard Rock ( blasting prohibited ) ( Data adopted from MORTH)

Excavation in hard rock with blasting ( blasting prohibited )prohibited for foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in or stack yard as directed etc., complete with specified dump area initial lead upto 50 m and initial lift upto 3 m.

IRR-CCDW-1-8

Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-2-1

Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.

IRR-CCDW-2-2

Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x 100 x 10 mm angle and 250 x 12 mm plate for sinking 4.50 m outer diameter foundation wells foundation wells including cost of all materials, machinery, labour, bending, welding, providing anchors etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-2-3

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

IRR-CCDW-2-4

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

IRR-CCDW-2-5

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

IRR-CCDW-2-6

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

IRR-CCDW-2-7

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 310 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

IRR-CCDW-2-8

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

IRR-CCDW-2-9

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

IRR-CCDW-2-10

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

Check Box 331

Check Box 332

Check Box 333

Check Box 334

Check Box 335

Check Box 336

Check Box 337

Check Box 338

Check Box 339

Check Box 340

Check Box 341

Check Box 342

Check Box 343

Abstract of work items

17

221 cum 4073.10

Labour Component (including contractor's profit) cum 966.40

222 cum 5935.90

Labour Component (including contractor's profit) cum 1254.80

223 cum 5364.20

Labour Component (including contractor's profit) cum 1146.80

224 cum 4121.50

Labour Component (including contractor's profit) cum 905.70

225 cum 3774.50

Labour Component (including contractor's profit) cum 887.40

226 cum 4238.40

Labour Component (including contractor's profit) cum 903.20

227 cum 4850.70

Labour Component (including contractor's profit) cum 1199.50

228 cum 4669.90

Labour Component (including contractor's profit) cum 1192.80

229 cum 4593.80

Labour Component (including contractor's profit) cum 1103.40

230 cum 5285.40

Labour Component (including contractor's profit) cum 1142.30

IRR-CCDW-2-11

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

IRR-CCDW-2-12

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well kerb including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-13

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for well steining including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-14

Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well bottom plug by tremie or skip box method including cost of all materials, complete with initial lead upto 50 m and all lifts.(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

IRR-CCDW-2-15

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for well top plug including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltrs / cum

IRR-CCDW-2-16

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well cap including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-17

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-18

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-19

Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-20

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for cantiliver / counterfort retaining walls including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

Check Box 344

Check Box 345

Check Box 346

Check Box 347

Check Box 348

Check Box 349

Check Box 350

Check Box 351

Check Box 352

Check Box 353

Abstract of work items

18

231 cum 4653.90

Labour Component (including contractor's profit) cum 1070.00

232 cum 4404.30

Labour Component (including contractor's profit) cum 1010.30

233 cum 4367.10

Labour Component (including contractor's profit) cum 1048.30

234 cum 7242.40

Labour Component (including contractor's profit) cum 1502.00

235 cum 6321.70

Labour Component (including contractor's profit) cum 1371.10

236 cum 4148.90

Labour Component (including contractor's profit) cum 926.10

237 cum 5756.00

Labour Component (including contractor's profit) cum 1272.20

IRR-CCDW-3 FOUNDATION WELL SINKING WORKS :

238 *Rm 3186.20

Labour Component (including contractor's profit) *Rm 1169.80for 3 to 10 meters for each running meter *Rm 4537.20Labour Component (including contractor's profit) *Rm 1512.60

239 cum 426.40

Labour Component (including contractor's profit) cum 81.70

IRR-CCDW-4 MASONRY WORKS :

240 cum 1999.80

Labour Component (including contractor's profit) cum 580.40

IRR-CCDW-2-21

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type retaining walls / piers / abutments etc., including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum, plums of size 150 to 80 mm : 0.25cum )

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-22

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,graded aggregates for cast in-situ pipes including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-23

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for cast in-situ pipes including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-24

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-25

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for columns and beams including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-26

Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-2-27

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for troughs including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

If water is to be brought from other place add only lead charges @ 500 ltr / cum.

IRR-CCDW-3-1

Sinking RCC wells vertically for foundation of piers and abutments in all kinds of soil, sand and soft rock by approved well sinking method including cost of all materials, machinery, labour, kent - ledge arrangements, disposal of excavated material as disposal of excavated material as directed etc., complete with lead upto 50 m for disposal of excavated material.(diameter of well 6.00m) (Data adopted from MORTH)

IRR-CCDW-3-2

Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering, ramming as directed including cost of all materials, machinery, labour etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-4-1

Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion for sub-structure portions of return walls / abutments etc., including cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging stone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum)

Check Box 354

Check Box 355

Check Box 356

Check Box 357

Check Box 358

Check Box 359

Check Box 360

Check Box 361

Check Box 362

Check Box 363

Abstract of work items

19

241 cum 2047.80

Labour Component (including contractor's profit) cum 595.00

242 cum 2437.10

Labour Component (including contractor's profit) cum 665.60

243 cum 2537.00

Labour Component (including contractor's profit) cum 765.50

244 sqm 97.50

246 sqm 67.80

245 sqm 90.00

Labour Component (including contractor's profit) sqm 67.80

246 sqm 138.90

Labour Component (including contractor's profit) sqm 96.30

247 sqm 130.20

Labour Component (including contractor's profit) sqm 96.30

248 sqm 199.60

Labour Component (including contractor's profit) sqm 128.60

249 sqm 185.00

Labour Component (including contractor's profit) sqm 128.60

IRR-CCDW-5 COPING & RAILING WORKS :

250 sqm 499.40

Labour Component (including contractor's profit) sqm 139.10

251 sqm 610.50

Labour Component (including contractor's profit) sqm 250.20

252 sqm 754.20

Labour Component (including contractor's profit) sqm 393.90

253 cum 5532.50

Labour Component (including contractor's profit) cum 1207.00

254 Rm 1235.50

Labour Component (including contractor's profit) Rm 130.00

IRR-CCDW-6 HUME PIPE LAYING & JOINTING WORKS :

255 Joint 250.80

Labour Component (including contractor's profit) Joint 184.70

IRR-CCDW-4-2

Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion for super-structure portions of return walls / abutments etc., including cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging stone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum)

IRR-CCDW-4-3

Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion with stones from approved source including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos)

IRR-CCDW-4-4

Providing and constructing coursed rubble masonry first sort in CM 1:4 proportion with stones from approved source including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos)

IRR-CCDW-4-5

Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 2 proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-4-6

Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 3 proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-4-7

Providing 12 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-4-8

Providing 12 mm thick plastering in cement mortar 1:4 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-4-9

Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-4-10

Providing 20 mm thick plastering in cement mortar 1:4 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-5-1

Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

IRR-CCDW-5-2

Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

IRR-CCDW-5-3

Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm)

IRR-CCDW-5-4

Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete using 20 mm down size approved clean, hard, graded aggregates for coping slab including cost of all materials, machinery, labour, formwork, cleaning surface, batching, mixing, placing in position, levelling, compacting, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m. (Cement content: 300 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

IRR-CCDW-5-5

Providing and constructing protective railing consisting of in-situ railing posts of size 15 x 15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre to centre in M-20 grade concrete using 20 mm down size graded aggregates and with each post reinforced by 4 Nos. of 8 mm dia main bars embedded in kerb concrete for a depth of 40 cm and 5 Nos. of 6 mm dia. stirrups including fixing 3 rows of 40 mm dia. GI pipes with one coat of red oxide primer and two coats of synthetic enamel paint, cost of all materials, machinery, labour, formwork, finishing, curing etc., complete with lead upto 50 m and all lifts.

IRR-CCDW-6-1

Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)

Check Box 364

Check Box 365

Check Box 366

Check Box 367

Check Box 368

Check Box 369

Check Box 370

Check Box 371

Check Box 372

Check Box 373

Check Box 374

Check Box 375

Check Box 376

Check Box 377

Check Box 378

Abstract of work items

20

256 Joint 300.80

Labour Component (including contractor's profit) Joint 184.70

257 Joint 394.30

Labour Component (including contractor's profit) Joint 229.50

258 Joint 439.50

Labour Component (including contractor's profit) Joint 229.50

259 Joint 533.90

Labour Component (including contractor's profit) Joint 274.20

260 Joint 566.60

Labour Component (including contractor's profit) Joint 274.20

261 Joint 627.30

Labour Component (including contractor's profit) Joint 302.70

262 Joint 674.70

Labour Component (including contractor's profit) Joint 302.70

263 Joint 798.40

Labour Component (including contractor's profit) Joint 363.70

IRR-CCDW-7 BACK FILLING & OTHER WORKS :

264 cum 628.90

Labour Component (including contractor's profit) cum 163.60

265 cum 357.40

Labour Component (including contractor's profit) cum 206.90

266 cum 247.00

Labour Component (including contractor's profit) cum 81.60

267 Each 1163.10

Labour Component (including contractor's profit) Each 337.80

268 Each 843.80

Labour Component (including contractor's profit) Each 287.90

Chapter VIRR-GAW GATES / HOISTS AND ALLIED WORKS

269 tonne 94503.00

Labour Component (including contractor's profit) tonne 15366.90

IRR-CCDW-6-2

Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint)

IRR-CCDW-6-3

Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)

IRR-CCDW-6-4

Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 32.1 kg / joint, FA : 0.031cum/joint, Hemp Yarn : 0.25kg/joint)

IRR-CCDW-6-5

Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint)

IRR-CCDW-6-6

Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)

IRR-CCDW-6-7

Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)

IRR-CCDW-6-8

Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint)

IRR-CCDW-6-9

Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)

IRR-CCDW-7-1

Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m.

IRR-CCDW-7-2

Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with lead upto 50 m and all lifts.

IRR-CCDW-7-3

Providing and filling murum / gravely soil ( CNS soil ) for foundation or above pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power roller to achieve density control of not less than 98 percent etc., complete with lead upto 50 m and all lifts.

IRR-CCDW-7-4

Providing and fixing one line dressed 111x35x25 cm thick IRC standard kilometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 70x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-CCDW-7-5

Providing and fixing one line dressed 65x15x10 cm thick IRC standard hectometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 50x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

IRR-GAW-1-1

SPILLWAY RADIAL GATESE.M Parts and anchorages fabrication, supply, erection, testing and commissioning of embedded parts for radial gate consists of sill beam, wall plates, anchor girders , yoke girders, tie flats, trunnion supports etc., including cost of all materials, machinery, labour, welding, finishing, with leads and lifts &all accessories (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately)

Check Box 379

Check Box 380

Check Box 381

Check Box 382

Check Box 383

Check Box 384

Check Box 385

Check Box 386

Check Box 387

Check Box 388

Check Box 389

Check Box 390

Check Box 391

Check Box 392

Abstract of work items

21

270 tonne 118921.80

Labour Component (including contractor's profit) tonne 14305.40

271 37177.80

Labour Component (including contractor's profit) 1549.50

272 Rm 18998.80

Labour Component (including contractor's profit) Rm 1460.50

273 tonne 157621.90

Labour Component (including contractor's profit) tonne 28235.70

274 tonne 74559.60

Labour Component (including contractor's profit) tonne 6758.80

275 tonne 103964.20

Labour Component (including contractor's profit) tonne 11295.60

276 208842.10

Labour Component (including contractor's profit) 11374.40

277 Rm 6788.40

Labour Component (including contractor's profit) Rm 278.70

278 tonne 112592.50

Labour Component (including contractor's profit) tonne 6887.10

279 62885.00

Labour Component (including contractor's profit) 1475.20

IRR-GAW-1-2

RADIAL GATES fabrication, supply, erection, testing and commissioning of radial gate consisting of skin plate, stiffeners, horizontal girders, radial arms, trunnion assemblies, tie beam, pulley supports, bracings, rubber seals, clamps etc., with all accessories for spillway/canals including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately)

IRR-GAW-1-3

RADIAL GATES-ROPE DRUM HOISTS WITH HOIST BRIDGES fabrication, supply, erection, testing and commissioning of electrically operated rope drum hoist of adequate capacity consisting of base frames, rope drums,connecting shaft, gear system, brake system, electric motor, wire ropes, gate position indicator, manual operation arrangement etc., with all accessories for spillway radial gate including cost of all materials, machinery, labour,, greasing, providing hand railing and approach staircase with gate to hoist platform, , complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately)

tonne capacity

tonne capacity

IRR-GAW-1-4

RADIAL GATES Walk way(cat walk) Design, fabrication, supply, erection and commissioning of 1 metre wide walkway connecting spillway piers / abutments at trunnion platform level including cost of all materials, machinery, labour, cutting, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

IRR-GAW-2-1

VERTICAL LIFT GATES-EM PARTSDesign, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elements etc., with all accessories for spillway stop log gates and other vertical lift elements including cost of all materials, machinery, labour, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

IRR-GAW-2-2

vertical lift gates and stop log gate elements ( SLIDING GATES)

Design, fabrication, supply, erection, testing and commissioning of vertical lift gates and stoplog gate elements, consisting of skin plate, horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks/bearings, guide shoes, rubber seals, clamps etc., with all accessories including cost of all materials, machinery, labour, seal fixing etc.,complete as per specifications and approved drawings

(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)2

IRR-GAW-2-3

STOP LOGS-automatic lifting beam fabrication, supply, erection, testing and commissioning of automatic lifting beam with all accessories for handling, lowering and lifting of spillway stop log gate elements including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, etc., complete as per specifications and drawings with all leads and lifts.(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

IRR-GAW-2-4

MOVING GANTRY CRANE-CLASS II fabrication, supply, erection, testing and commissioning of adequate capacity Class- II type moving gantry crane consisting of rail mounted gantry frame, top platform with hand railing, long / cross travel arrangements, rope drums, gear systems, electric motors, electro-magnetic brake system, cabin, control panel, wire rope, ladder, motorised cable reeling drum etc., with all accessories for operating spillway stop log gate elements and river sluice / canal sluice emergency gates including cost of all materials, machinery, labour, etc., complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

tonne capacity

IRR-GAW-2-5

RAIL TRACK FOR GANTRY CRANEDesign, fabrication, supply, erection and commissioning of rail track using 45 kg / m standard rails on spillway bridge for movement of gantry crane for handling and operating spillway stoplog gate elements / river sluice / canal sluice emergency gate including cost of all materials, machinery, labour, complete as per specifications(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

IRR-GAW-2-6

VERTICAL LIFT GATES/STOP LOGS - ROLLER MOUNTEDDesign, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories for river sluice / canal sluice vent including cost of all materials, machinery, labour,welding ,aligning finishing seal fixing etc.with all leads and lifts, complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

IRR-GAW-2-7

VERTICAL LIFT GATES-ROPE DRUM HOIST UPTO 30 TON CAP. POWER OPERATEDDesign, fabrication, supply, erection, testing and commissioning of adequate capacity rope drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electro-magnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc., with all accessories for operating river sluice / canal sluice service gate including cost of all materials, machinery, labour, , complete as per specifications and drawings with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

tonne capacity

Check Box 393

Check Box 394

Check Box 395

Check Box 396

Check Box 397

Check Box 398

Check Box 399

Check Box 400

Check Box 401

Check Box 402

Abstract of work items

22

280 tonne 78545.80

Labour Component (including contractor's profit) tonne 9714.40

281 31208.50

Labour Component (including contractor's profit) 624.50

282 28544.50

Labour Component (including contractor's profit) 2825.80

283 66626.60

Labour Component (including contractor's profit) 3785.60

IRR-GAW-3 SAND BLASTING AND PAINTING

284 sqm 400.10

Labour Component (including contractor's profit) sqm 70.70

285 sqm 268.80

Labour Component (including contractor's profit) sqm 88.40

286 sqm 156.90

Labour Component (including contractor's profit) sqm 65.60

287 sqm 236.60

Labour Component (including contractor's profit) sqm 108.30

288 sqm 212.70

Labour Component (including contractor's profit) sqm 118.00

IRR-GAW-4 PAINTING WITHOUT SAND BLASTING

289 sqm 412.90

Labour Component (including contractor's profit) sqm 161.70

290 sqm 371.90

Labour Component (including contractor's profit) sqm 137.80

291 sqm 284.20

Labour Component (including contractor's profit) sqm 161.70

292 sqm 254.20

Labour Component (including contractor's profit) sqm 80.00

IRR-GAW-2-8

HOIST BRIDGE/ WITH TRESSELSDesign, fabrication, supply, erection and commissioning of structural steel hoist bridge consisting of columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing, ladder etc., with all accessories for supporting rope drum hoist for operating barrage gates including cost of all materials, machinery, labour, welding, finishing, etc., complete complete as per specifications and drawings with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

IRR-GAW-2-9

ROPE DRUM HOIST WITHOUT HOIST BRIDGE FOR BARRAGE GATESDesign, fabrication, supply, erection, testing and commissioning of adequate capacity rope drum hoist consisting of rope drum, pulleys, gear system, electric motor, electro-magnetic brake system, manual operation assembly, position indicator, control panel, wire rope etc., with all accessories for operating vertical lift roller gates for barrage including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc., complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

tonne capacity

IRR-GAW-2-10

SCREW GEAR HOISTS INCLUDING PLATFORM ( UPTO 10 TON CAP)Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw gear type hoist consisting of supporting structure, platform, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,finishing etc.,complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

tonne capacity

IRR-GAW-2-11

MANUAL OPERATED ROPE DRUM HOISTSDesign, fabrication, supply, erection, testing and commissioning of adequate capacity manually operated rope drum hoist consisting of hoist platform, rope drum, gear system, brake system, wire rope, ladder etc., with all accessories for operating canal regulator radial gate including cost of all materials, machinery, labour, welding, finishing, cleaning, ., complete with all leads and lifts(without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

tonne capacity

tonne capacity

IRR-GAW-3-1

Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface for painting by sand blasting method as per specifications including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts.

IRR-GAW-3-2

painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted surfaces with one coat of inorganic zinc silicate (airless spray preferred)70 +/- 5 and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns) cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

IRR-GAW-3-3

painting of Lifting beams,cat walks and other similar structures-painting hoist machinery, on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coat and twocoats of alkyd based micaccous iro oxide paint , 65 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

IRR-GAW-3-4

HOISTS:STRUCTURAL COMPONENTSpainting structurals on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coat and one coat 65+/-5 of alkyd based micaccous iron oxide paint followed by two coats of synthetic enamel paint 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

IRR-GAW-3-5

HOISTS:MACHINERY COMPONENTSpainting hoist machinery, on sand blasted surfaces with one coats of zinc phosphate primer (airless spray preferred) 50microns/coat and three coats of aluminium paint or synthetic enamel , 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts

IRR-GAW-4-1

E.M PARTS OF ALL TYPES OF GATESSurface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 40 microns ,followed by finishing coats 4 coats with coal tar epoxy with material, labour,and all accessories with all leads and lifts

IRR-GAW-4-2

ALL TYPES OF GATESSurface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to athickness of 40 microns ,followed by finishing coats 3 coats with coal tar epoxy with material, labour,and all accessories with all leads and lifts

IRR-GAW-4-3

HOIST BRIDGES ,HOISTING EQUIPMENT AAND CRANES,Etc,Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer ,followed by finishing coats 3 coats with synthetic enamel paint with material, labour,and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preperation done manually by hand and power tool after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting, before applying primer painting.

IRR-GAW-4-4

WALK WAYS( CAT WALKS), LIFTING BEAMS,etc,Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 40 microns ,followed by finishing coats 2 coats with coal tar epoxy with material, labour,and all accessories with all leads and lifts

Check Box 403

Check Box 404

Check Box 405

Check Box 406

Check Box 407

Check Box 408

Check Box 409

Check Box 410

Check Box 411

Check Box 412

Check Box 413

Check Box 414

Check Box 415

Abstract of work items

23

Chapter VIIRR-PMW PRELIMINARY AND MAINTENANCE WORKS

IRR-PMW-1 JUNGLE CLEARANCE :

293 sqm 1.00

Labour Component (including contractor's profit) sqm 1.00

294 sqm 1.60

Labour Component (including contractor's profit) sqm 1.60

295 Each 36.40

Labour Component (including contractor's profit) Each 36.40

296 Each 81.90

Labour Component (including contractor's profit) Each 82.00

297 Each 262.20

Labour Component (including contractor's profit) Each 262.20

298 Each 46.40

Labour Component (including contractor's profit) Each 46.40

299 Each 10.60

Labour Component (including contractor's profit) Each 10.60

300 Each 10.30

Labour Component (including contractor's profit) Each 10.30

301 Each 20.50

Labour Component (including contractor's profit) Each 20.50

302 Each 69.80

Labour Component (including contractor's profit) Each 67.10

303 Each 244.40

Labour Component (including contractor's profit) Each 235.20

304 Each 488.80

Labour Component (including contractor's profit) Each 470.30

305 Each 977.60

Labour Component (including contractor's profit) Each 940.50

306 Each 1584.60

Labour Component (including contractor's profit) Each 1510.50

307 Each 555.20

Labour Component (including contractor's profit) Each 533.00

308 sqm 3.80

Labour Component (including contractor's profit) sqm 3.80

IRR-PMW-2 PRELIMINARY WORKS :

309 cum 188.10

Labour Component (including contractor's profit) cum 188.10

310 cum 263.30

Labour Component (including contractor's profit) cum 263.30

311 stage 246.40

Labour Component (including contractor's profit) stage 179.60

312 Rm 1024.80

Labour Component (including contractor's profit) Rm 325.60cost of hdpe/light black MS casing pipe Rm 200.00

IRR-PMW-1-1

Clearing thin jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.

IRR-PMW-1-2

Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.

IRR-PMW-1-3

Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girth including excavation, stacking the materials neatly and levelling the surface etc., complete with initial lead upto 50 m and all lifts.

IRR-PMW-1-4

Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 1.50 m and upto 3.0 m including excavation, stacking the materials neatly and levelling the area etc., complete with initial lead upto 50 m and all lifts.

IRR-PMW-1-5

Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 3.0 m and upto 5.0 m including excavation, stacking the materials neatly and levelling the area etc., complete with initial lead upto 50 m and all lifts.

IRR-PMW-1-6 Additional rate for every 0.5 m increase in girth of tree stump/stumps of bamboo cluster beyond 5 m

IRR-PMW-1-7

Cutting and stacking bamboos excluding removing stumps and roots etc., complete with initial lead upto 50 m and all lifts.

IRR-PMW-1-8

Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials as directed with initial lead upto 50 m and all lifts.

IRR-PMW-1-9

Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth excluding removal of stumps and including burning or disposing off the materials as directed with initial lead upto 50 m and all lifts.

IRR-PMW-1-10

Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

IRR-PMW-1-11

Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

IRR-PMW-1-12

Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

IRR-PMW-1-13

Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

IRR-PMW-1-14

Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts.

IRR-PMW-1-15

For every 0.5 m increase in girth of tree beyond 3 m add

Additional rate for cutting tree for every 0.5 m increase in girth of tree beyond 3 m.

IRR-PMW-1-16

Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with initial lead upto 50 m and all lifts.

IRR-PMW-2-1

Earthwork excavation for trial pits / borrow pits and other investigation works in all kinds of soil including boulders upto 30 cm dia and disposing off excavated soil as directed with lead upto 10 m and lift upto 3 m.

IRR-PMW-2-2

Earthwork excavation for trial pits / borrow pits and other investigation works in soft rock including disposing off the excavated rock as directed with lead upto 10 m and lift upto 3 m.

IRR-PMW-2-3

Conducting geophysical investigation studies by electrical resistivity method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete excluding cost of transportation arrangements.

IRR-PMW-2-4

Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or inclined upto 10 degrees to vertical as directed including cost of all materials, machinery, labour, water charges, reaming, collection of wash samples at suitable intervals, logging and lebelling, supplying honne wood core box, fixing casing pipes ( excluding cost of casing pipes ) etc., complete for depth upto 30 m from surface.

1. For driiling through over-burden beyond 30 m from surface increase the rate per Rm by 10 percent.2. For providing HDPE or light black MS casing pipe add the cost of pipe per Rm.

Check Box 416

Check Box 417

Check Box 418

Check Box 419

Check Box 420

Check Box 421

Check Box 422

Check Box 423

Check Box 424

Check Box 425

Check Box 426

Check Box 427

Check Box 428

Check Box 429

Check Box 430

Check Box 431

Check Box 432

Check Box 433

Check Box 434

Check Box 435

Abstract of work items

24

313 Rm 5232.80

Labour Component (including contractor's profit) Rm 1275.00

314 Rm 5080.80

Labour Component (including contractor's profit) Rm 1275.00

315 Each 117.40

Labour Component (including contractor's profit) Each 86.40

316 Each 396.50

Labour Component (including contractor's profit) Each 255.90NOTE: For providing 30 cm thick compacted murum bed in B.C soil area including additional

excavation for thickness of murum bedding add per Each 4.00

317 Each 5204.40

Labour Component (including contractor's profit) Each 2271.50

IRR-PMW-3 MAINTENANCE WORKS :

318 cum 152.10

Labour Component (including contractor's profit) cum 152.10

319 sqm 179.10

Labour Component (including contractor's profit) sqm 113.80

320 cum 204.90

Labour Component (including contractor's profit) cum 163.00

321 sqm 45.30

Labour Component (including contractor's profit) sqm 38.60

322 sqm 40.00

Labour Component (including contractor's profit) sqm 40.00

323 Each 50.70

Labour Component (including contractor's profit) Each 50.60

324 Each 114.00

Labour Component (including contractor's profit) Each 114.00

325 cum 191.70

Labour Component (including contractor's profit) cum 22.70

326 cum 215.70

Labour Component (including contractor's profit) cum 27.10

327 cum 175.80

Labour Component (including contractor's profit) cum 21.70

IRR-PMW-2-5

Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, collection of core samples, logging and lebelling, supplying honne wood core box including cement grouting ( excluding cost of cement for grouting ) and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.

1. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.2. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 40 percent.

IRR-PMW-2-6

Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges,collection of core samples,logging, lebelling, supplying honne wood core box including cement grouting ( excluding cost of cement for grouting ) and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface.

1. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent.2. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 40 percent.

IRR-PMW-2-7

Providing and fixing 20 x 20 x 75 cm size roughly dressed boundary / demarcation / chainage / arrow stones including cost of all materials, labour, engraving marks, fixing in position, murum filling etc., complete with lead upto 50 m and all lifts.

IRR-PMW-2-8

Providing and fixing 20 x 20 x 75 cm size temporary bench mark stone in CC 1 : 4 : 8 using 40 mm down size graded coarse aggregate including cost of all materials, labour, dressing top surface, engraving BM data etc.,complete with lead upto 50 m and all lifts.

IRR-PMW-2-9

Providing and fixing 20 x 20 x 75 cm size permanent bench mark stone in CC 1 :3 : 6 block of size 90 x 90 x 120 cm using 40 mm down size graded coarse aggregate and providing 35 cm thick 30 cm high UCR masonry in CM 1 : 5 proportion protective wall alround the BM stone, including cost of all materials, labour, dressing top surface of stone, engraving BM data

IRR-PMW-3-1

Removing dry stone rock-toe / rivetment and filter layers below rock-toe/ rivetment including stacking all materials separately as directed with initial lead upto 50 m and all lifts.

IRR-PMW-3-2

Re-constructing 60 cm thick hand packed rough stone revetment with through stones at 1.5 m c / c over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained from revetment removed for re-construction including cost of all machinery, labour, laying filter and stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

IRR-PMW-3-3

Re-constructing dry rubble rock-toe and filter media for rock-toe consisting of sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained from rock-toe removed for re-construction including cost of all machinery, labour, laying filter and stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts.

IRR-PMW-3-4

Removing and resetting disturbed Yarguntla / Shahabad / Talikot / PCC / Other types of slab lining set in CM 1 : 3 including flush cement mortar pointing in CM 1 : 3 with lead upto 50 m and all lifts.

IRR-PMW-3-5

Removing and resetting disturbed dry rubble / khandki stone pitching 25 to 45 cm thick including packing, wedging, finishing etc., complete with all leads and lifts.

IRR-PMW-3-6

Removing and refixing disturbed chainage / demarcation / hectometre / guard stones including excavation, back filling etc., complete with all leads and lifts.

IRR-PMW-3-7

Removing and refixing disturbed km stone / sign board / hecto-metre stone etc., including excavation, back filling with available stuff after refixing, forming base platform of size 90 x 90 x 7.5 cm including watering, ramming etc complete with all leads and lifts.

IRR-PMW-3-8

Providing impervious hearting for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

IRR-PMW-3-9

Providing pervious/semi-pervious casing for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

IRR-PMW-3-10

Providing impervious hearting for breached / damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil,sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

Check Box 436

Check Box 437

Check Box 438

Check Box 439

Check Box 440

Check Box 441

Check Box 442

Check Box 443

Check Box 444

Check Box 445

Check Box 446

Check Box 447

Check Box 448

Check Box 449

Check Box 450

Abstract of work items

25

328 cum 196.90

Labour Component (including contractor's profit) cum 25.70

329 sqm 2.60

Labour Component (including contractor's profit) sqm 2.60

330 Rm 31.00

Labour Component (including contractor's profit) Rm 23.60

331 Rm 28.30

Labour Component (including contractor's profit) Rm 17.10

332 sqm 52.60

Labour Component (including contractor's profit) sqm 45.60

333 sqm 354.60

Labour Component (including contractor's profit) sqm 70.70

334 sqm 82.60

Labour Component (including contractor's profit) sqm 48.50

335 sqm 143.10

Labour Component (including contractor's profit) sqm 61.60

336 sqm 95.40

Labour Component (including contractor's profit) sqm 48.50

337 cum 114.00

Labour Component (including contractor's profit) cum 114.00

338 cum 142.50

Labour Component (including contractor's profit) cum 142.50

339 cum 111.00

Labour Component (including contractor's profit) cum 10.70

340 41.10

Labour Component (including contractor's profit) 5.10

341 cum 5.90

Labour Component (including contractor's profit) cum 0.90

Weed Removal by Manual Means

342 Removal of Water Hyacinth up to 30 cm thick Sqm 4.60

343 Removal of Water Hyacinth beyond 30 cm thick Sqm 6.30

344 Clearing Alchi Tilla Sqm 4.20

345 Removal of Jammu Sqm 3.60

346 Removal of Imponea, Cornea Sqm 4.20

347 Removal of Natchu, goobi, thooti, etc. Sqm 1.30

COM-MWRK New extra items-- common item for all earth works using only manual labour for allother works

without involving contractors

348 cum 83.30

IRR-PMW-3-11

Providing pervious /semi-pervious casing for breached /damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

IRR-PMW-3-12

Repairing rain cuts / resectioning canal slopes to required lines and grades as directed using available soil including dressing, clod breaking, packing, tamping etc., complete with all leads and lifts.

IRR-PMW-3-13

Cleaning drainage gallery, adits, instrumentation galleries etc., by scrubbing / brushing including chiselling and removing leached lime deposit and disposing off all the waste material out side adits in specified location etc., complete with all leads and lifts.

IRR-PMW-3-14

Cleaning dam parapet inner face and top using oxalic acid and water by scrubbing / brushing and washing to remove all surface coatings etc., complete .

IRR-PMW-3-15

Cleaning gates / hoists / embedded parts for re-painting by removing rust, old paint, grease etc., by using wire brush, scrubber, rust remover and applying a coat of rust inhibitive compound etc., complete.

IRR-PMW-3-16

Cleaning gates / hoists / embedded parts to expose fresh metal surface for repainting by sand blasting method as per specifications including cost of all materials, labour, machinery, scaffolding, applying a coat of rust inhibitive etc., complete with initial lead for sand upto 1 km and all lifts.

IRR-PMW-3-17

Providing two coats of painting to hoist supporting structures / hoists / moving gantry cranes / railings etc., with zinc chromate alluminium primer paint of approved quality including removing rust, cleaning surface, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts.

IRR-PMW-3-18

Providing two coats of painting 100 micron dry film thickness each coat to embedded parts / gates with cold applied coal tar epoxy paint of approved quality including removing rust, cleaning surface, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts.

IRR-PMW-3-19

Providing two coats of painting to hoist supporting structures / hoists / moving gantry cranes / railings etc., with first quality synthetic enemel paint of approved colour including cleaning surface, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts.

IRR-PMW-3-20

Excavation and removal of silt and silt mixed with sand from canal bed in dry condition including disposing off the same in spoil bank or on the canal embankment in layers as directed etc., complete with initial lead upto 50 m and all lifts.

IRR-PMW-3-21

Excavation and removal of silt or silt mixed with sand in slussy condition from canal bed including disposing off the same in spoil bank or on the canal embankment in layers as directed etc., complete with initial lead upto 50 m and all lifts.

IRR-PMW-3-22 (new

Item5 2010-11)

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.

IRR-PMW-3-23 (new

Item6 2010-11)

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as watering, compactingto density control of not less than 95 percent or as stipulated using 8T roller etc., complete with initial lead upto 1 km and all lifts.

IRR-PMW-3-24 (new

Item7 2010-11)

Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as compactingto density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 km and all lifts.

IRR-PMW-3-25 (new Item 3 2012-13)

IRR-PMW-3-25(a)

IRR-PMW-3-25(b)

IRR-PMW-3-25(c)

IRR-PMW-3-25(d)

IRR-PMW-3-25(e)

IRR-PMW-3-25(f)

COM-MWRK-1

(Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 3 Cum per day output

Check Box 451

Check Box 452

Check Box 453

Check Box 454

Check Box 455

Check Box 456

Check Box 457

Check Box 458

Check Box 459

Check Box 460

Check Box 461

Check Box 462

Check Box 463

Check Box 464

Check Box 465

Check Box 466

Check Box 467

Check Box 468

Check Box 469

Check Box 470

Check Box 471

Abstract of work items

26

349 cum 100.00

350 cum 188.00

351 cum 373.10

COM-MWRK-2

(Manual)Excavation in all kinds of soil/HDR including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 2.5 Cum per day output

COM-MWRK-3

(Manual)Excavation in soft rock (including F&F rock) without blasting, including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) Soft rock 1.33 Cum/Day

COM-MWRK-4

(Manual)Excavation in hard rock, including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works )Hard rock 0.67Cum/ day

Check Box 472

Check Box 473

Check Box 474

ABSTRACT ESTIMATEName of the Work:- FDR works to the existing tank, vizianagaram

Item No: Qty unit Description of Item Per

1

2

3

Sl.No:

Rate(Rs.)

Amount(Rs.)

C5
rvkumar:- please enter/link the quantity for same item code/ description of item

Estimate Cost Value(Rs.) 0.00LS Provison towards VAT @ 5% 0.00LS Provison towards Insurance Premium @ 0.44% 0.00LS Provison towards Labour cess @ 1% 0.00

LS 0% 0.00LS 0% 0.00LS 0% 0.00LS 0% 0.00

Total Amount (Rs.) 0.00or say (Rs.) 0.00

#VALUE!

Executive Engineer Dy.Executive Engineer Assistant Executive EngineerDam Maintenance Division Dam Maintenance Sub Division-I Spillway Section

NSRS Srisailam Project NSRS Srisailam Project NSRS Srisailam ProjectKurnool Dist., Kurnool Dist., Kurnool Dist.,

DETAILED ESTIMATE

Name of the Work:- FDR works to the existing tank, vizianagaram

Description of Item Nos Quantity

1

2

3

Sl.No:

Length(m)

Breadth(m)

Height(m)

Executive Engineer Dy.Executive Engineer Assistant Executive EngineerDam Maintenance Division Dam Maintenance Sub Division-I Spillway Section

NSRS Srisailam Project NSRS Srisailam Project NSRS Srisailam ProjectKurnool Dist., Kurnool Dist., Kurnool Dist.,

327

(Common to all Departments)Index_code

COM_MWRK A. Manual Works New extra items-- common item for all earth works using only manual labour for all other works without involving contractors

foundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposing

per cum 83.30initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 3 Cum per day output

foundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposing

per cum 100.00initial lift upto 1.5 m. (WIthout involving the contractors for specified works )With 2.5 Cum per day output

foundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposing

per cum 188.00initial lift upto 1.5 m. (WIthout involving the contractors for specified works )Soft rock 1.33 Cum/Day

foundations of canal cross drainage and other appurtenant structuresand placing excavated stuff neatly in specified dump area or disposing

per cum 373.10initial lift upto 1.5 m. (WIthout involving the contractors for specified works )Hard rock 0.67Cum/ day

COM_MWRK-1 (Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for

off the same as directed etc., complete with initial lead upto 10 m and

COM_MWRK-2 (Manual)Excavation in all kinds of soil/ HDR including boulders upto 0.30 m dia. for

off the same as directed etc., complete with initial lead upto 10 m and

COM_MWRK-3 (Manual)Excavation in soft rock (including F&F) without blasting, including boulders upto 0.30 m dia. for

off the same as directed etc., complete with initial lead upto 10 m and

COM_MWRK-4 (Manual)Excavation in hard rock, including boulders upto 0.30 m dia. for

off the same as directed etc., complete with initial lead upto 10 m and