“Process Stabilization Through A3 and the Daily Management Process”
Angelo EspositoManager of Quality & Operational
ExcellenceODG (Ontario Drive and Gear)
![Page 2: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/2.jpg)
Welcome
![Page 3: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/3.jpg)
Who is ODG?• Started in 1962 • Two divisions – Gear and Vehicle• Brand names – ODG Gear and ARGO• Sales 2013 of nearly $60M• Total employees 230
![Page 4: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/4.jpg)
1967The first Argo amphibious all terrain vehicle was developed
![Page 5: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/5.jpg)
![Page 6: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/6.jpg)
Gears• High mix, low volume, high quality gear
manufacturer– Over 1000 skews– Target 1 to 50,000 pieces– Manufacture up to 500 mm, AGMA 12
• Industries supplied– Industrial, off-highway, agricultural,
construction, automotive, military, aerospace, natural resources and ATV
![Page 7: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/7.jpg)
Engineering Design
![Page 8: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/8.jpg)
Gear Technology
![Page 9: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/9.jpg)
Transmission Assembly
![Page 10: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/10.jpg)
Test
![Page 11: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/11.jpg)
11
CHALLENGE !
GROWTH !
![Page 12: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/12.jpg)
60%
65%
70%
75%
80%
85%
90%
95%
100%
On Time Delivery
On Time + Partials + Late Sales Orders
GOOD
CHALLENGE !
STABLE
![Page 13: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/13.jpg)
0.0%
0.2%
0.4%
0.6%
0.8%
1.0%
1.2%
1.4%
1.6%
1.8%
Q12012
Q22012
Q32012
Q42012
Q12013
Q22013
Q32013
Q42013
Q12014
Quality - % Cost of Sales
Cost of Quality Defect as % of Sales
50% Improvement
![Page 14: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/14.jpg)
Stabilize Operations ProcessUsing A3 and The Daily Management Process
What was needed…
![Page 15: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/15.jpg)
Consistency in:• Machines• Manpower• Materials• Methods
Focus on Foundational Elements…
![Page 16: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/16.jpg)
16
2.VISION / FUTURE STATE
OBJECTIVES
METRICS
STRATEGY
3. PLAN
4. MONITORING,FREQUENT REVIEW,FEEDBACK
Requires
Determines
Necessitates
Requires
What ?How ?Who ?When ?
Facilitates
1.CURRENT STATERequires Creation of
Where are we?
Where do we want to be?
How will we get there? Is it working?
Planning & Deployment…MASTER PLAN
![Page 17: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/17.jpg)
![Page 18: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/18.jpg)
Where are we ? Where do we want to be..?
Current
State
Condition
Future
State
Condition
![Page 19: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/19.jpg)
• On Time Delivery 75% > 100%
• Cost of Quality 1.6% > 0.8%
Two main areas of focus..
![Page 20: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/20.jpg)
Team agreed on the strategies, timing and duration of activities, champions of the activities, milestones and review timing, and the target measurables.
A roadmap toward the vision.
![Page 21: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/21.jpg)
Managing Scoreboard
Safety Environment Quality Delivery Cost Learning
& MoraleGrowth
& TechnologyQA
…Protection
![Page 22: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/22.jpg)
So…WHERE DO WE BEGIN?
![Page 23: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/23.jpg)
Operating SystemDaily Management Process
Operating SystemDaily Management Process
Measurables StandardizedWork
ErrorProofing
QuickChangeover
Maintenance Excellence
TPM
5S/ Visual
Management
KanbanProblem Solving
LeanOverview
![Page 24: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/24.jpg)
What is Lean?
Measurables StandardizedWork
ErrorProofing
QuickChangeover
Maintenance Excellence
TPM
5S/ Visual
Management
KanbanProblem Solving
LeanOverview
![Page 25: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/25.jpg)
Training developed that defines principles and more importantly provides a clear
understanding of Lean and the standardized tools necessary to execute
Lean principles.
![Page 26: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/26.jpg)
– Formal Problem Solving process (A3)– Clear understanding of our Systems– Visual Management– Drive and dedication– Urgency and Accountability
![Page 27: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/27.jpg)
![Page 28: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/28.jpg)
![Page 29: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/29.jpg)
Specify Value
Understand and specify what adds value from the perspective of the customer
Integrate the Value Stream
Identify steps in the whole value stream to highlight waste
Make the Product Flow
Create a continuous flow of activities along the value stream
At the Pull of the Customer
Only carry out activities in response to pull from the customer
In Pursuit of Perfection
Strive for perfection by continually creating value and removing successive layers of waste
![Page 30: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/30.jpg)
Paradigms…
New Paradigm:
Must Provide all 3
Old Paradigm:
You Can Have 2 of 3
C
DQ
C
DQ
![Page 31: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/31.jpg)
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
• Operational Excellence• Maintenance Excellence
• 5S & Workplace Organization• Employee Training & Involvement
“Building Our Future”
“Cost”
“Speed” “Quality”
![Page 32: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/32.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention
• Operational Excellence• Maintenance Excellence
• 5S & Workplace Organization• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
Foundational Elements to our system and Lean Manufacturing emphasizing a
sequenced application of tools. Without these foundations the house is
unstable.
![Page 33: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/33.jpg)
5S/Visual Management…
LeanOverview
Measurables
Problem Solving
Kanban
StandardizedWork
Lean Culture
QuickChangeover
Maintenance Excellence
TPM
5S / Visual
Management
![Page 34: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/34.jpg)
5S Activities 5S Activities
![Page 35: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/35.jpg)
5S Activities 5S Activities
![Page 36: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/36.jpg)
![Page 37: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/37.jpg)
Total Productive Maintenance and Maintenance Excellence…
Measurables StandardizedWork
Lean Culture
QuickChangeover
5S / Visual
Factory
KanbanProblem Solving
Lean Mfg.Overview
MaintenanceExcellence
TPM
![Page 38: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/38.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention• Operational Excellence
• Maintenance Excellence• 5S & Workplace Organization
• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
![Page 39: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/39.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention• Operational Excellence
• Maintenance Excellence• 5S & Workplace Organization
• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
Maintenance Excellence - another foundational element to our System and Lean Manufacturing emphasizing a Zero
Tolerance, Zero Mileage condition.
![Page 40: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/40.jpg)
TPM Objectives…The concept of “Zero Mileage Equipment”
![Page 41: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/41.jpg)
How Do We Measure Maintenance & TPM?
• OEE (Overall Equipment Effectiveness)
• % Planned vs. Unplanned maintenance• Repeat failures• MTBF (Mean Time Between Failure)
• MTTR (Mean Time To Repair)
![Page 42: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/42.jpg)
Visual OEE
![Page 43: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/43.jpg)
![Page 44: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/44.jpg)
STANDARDIZATION
Lean Manufacturing
Overview
Measurables
Problem Solving
Kanban
Lean Culture
QuickChangeover
Maintenance Excellence
TPM
5S/ Visual
Management
StandardizedWork
![Page 45: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/45.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention• Operational Excellence
• Maintenance Excellence• 5S & Workplace Organization
• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
![Page 46: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/46.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention• Operational Excellence
• Maintenance Excellence• 5S & Workplace Organization
• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
Standardization - another foundational element of our Lean Manufacturing System emphasizing a consistent
result, making the abnormal stand out from the normal
![Page 47: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/47.jpg)
What Does It Look Like?Traditional Work:
• Manage symptoms• React to fires• Search for things• Engineers design
processes• Use a variety of individual
methods• Inconsistent results
Standardized Work:
• Eliminate root cause• Prevent problems• Find things easily• Processes designed by
operator consensus• Follow and improve the
standard tool• Consistent results
![Page 48: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/48.jpg)
PLAN DO
CHECKACT
Standardize Continuous Improvement
![Page 49: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/49.jpg)
Benefits of Standardization…
• Quicker identification of problems
• Provides baseline from which to improve
![Page 50: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/50.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention
• Operational Excellence• Maintenance Excellence
• 5S & Workplace Organization• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
Foundational Elements to our system and Lean Manufacturing emphasizing a
sequenced application of tools. Without these foundations the house is
unstable.
![Page 51: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/51.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention
• Operational Excellence• Maintenance Excellence
• 5S & Workplace Organization• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
The tools…The tools…
Training• Lean Camp, Basic Training• Specific Training
“Building Our Future”
![Page 52: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/52.jpg)
Measurables StandardizedWork
Lean Culture
QuickChangeover
Maintenance Excellence
TPM
5S/ Visual
Management
KanbanProblem Solving
LeanOverview
PROBLEM SOLVING
![Page 53: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/53.jpg)
The key to elimination of firefighting!
Problem Solving…
![Page 54: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/54.jpg)
Defining a Problem…Problems:
– Are abnormalities that vary from the desired or expected condition
– Are OPPORTUNITIES
We must utilize a structured method to determine the quickest, most cost effective way to ensure the root cause of a problem is:
– Identified– Addressed– Permanently eliminated
![Page 55: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/55.jpg)
A3 PROBLEM SOLVING
![Page 56: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/56.jpg)
– Formal Problem Solving process – Drive and dedication– Urgency and Accountability– The classification of problems / opportunities– The 8 steps of problem solving
![Page 57: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/57.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention• Operational Excellence
• Maintenance Excellence• 5S & Workplace Organization
• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
![Page 58: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/58.jpg)
Continuous Improvement• PDCA• Kaizen and Quick
Change Over• Elimination of Waste• Measurables KPIs
The House…
HUMAN CENTERED
WORK
STANDARDIZATION
PROBLEM SOLVING
JUSTIN
TIME
CONTINUOUS IMPROVEMENT
BUILTIN
QUALITY
Fastest Processes
Standardization• ETQ• Standardized Work• 5S & Workplace
Organization • Visual Controls & Visual
Management – 50 ft 15 secs.
Problem Solving• A3 Problem Solving• Six Sigma• Reoccurrence Prevention• Operational Excellence
• Maintenance Excellence• 5S & Workplace Organization
• Employee Training & Involvement
Just In Time• Takt Time• Level Production• Pull System, Kanban• Flow• Multi-skilled Operators
Built In Quality• Quality Standards• Error Proofing• Andon• MSA
Lowest Cost• Total Cost• Price – Cost = Profit
Human Centered Work• Lean Culture• Communication• Support for the Value-Adder
Training• Lean Camp, Basic
Training• Specific Training
Problem Solving - another foundational element to our System and Lean
Manufacturing emphasizing a systematic elimination of problems and
abnormalities
![Page 59: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/59.jpg)
The 8 Steps for A3- PDCAProblem Solving
![Page 60: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/60.jpg)
5 WHY – ROOT CAUSE ANALYSIS“By repeatedly asking ”Why” (five is a good rule of thumb), you can peel away the layers of symptoms which can lead to the root cause of a problem.”
Effect on Problem
Measurement
pManpower Method
MaterialsMother Nature
Machines
1st Why Clear statement of the reason for thedefect or failure to occur, understood even by people that are not familiar with the operation where the problem occurred. Must be a short, concise sentence. It is Okay to write it down even if it seemstoo obvious for you. (It may not seem thatobvious to others that will read thedocument).
2nd Why‐ A more concise explanation to support the first statement. Get into the technical arena, theexplanation can branch out to severaldifferent root causes here. It is OK tofollow each of them continuing with their own set of remaining 3 why’s and so forth.
3rd Why‐ Do not jump to conclusions, follow theregular thought process even though someunderlying root causes may start surfacingalready.- This 3rd why is critical for a successfultransition between the obvious and thenot so obvious. The first two why’s haveprepared you to focus on the area wherethe problem could have been originated.- The last three why’s will take you to adeeper comprehension of the problem.
CAUSE AND EFFECT DIAGRAM(Also known as fishbone diagram)
4th Why- Clear your mind of preconceivedexplanations and start the fourth why with a candid approach.‐ You may have two or more differentavenues to explore now, explore them all.
5th Why- When you finally get to the fifth why, it is likely that you have found a systemic cause. Most of the problems in the process can be traced to them.- Even a malfunctioning machine can sometimes be caused by an incorrectly followed Preventive Maintenance or Incorrect machine parameters setup.Root Cause is Identified
![Page 61: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/61.jpg)
– To bring ownership to the team /team member
– To bring an emphasis on finding the “right “ problem, with the “right” data
– To emphasize the “right” countermeasure
– To eliminate, not “manage”, the problem
![Page 62: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/62.jpg)
1. The critical thinking behind problem solving
2. Formal resolution
3. Making problem solving stick
![Page 63: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/63.jpg)
For many successful companies, drive and dedication underscore the way they do business. Their business practices and problem solving methods are the concrete actions and processes that make their business successful.
BusinessPractices and
Problem Solving
Successful Business Foundation
Concrete action& processes
Drive and Dedication
![Page 64: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/64.jpg)
• The goals of problem solving:– To emphasize the “right” countermeasure
• Once you’ve found the “right” problem, you need to find the correct countermeasure.
• With practice, this will be easy!
![Page 65: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/65.jpg)
MRPWork to do list
![Page 66: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/66.jpg)
MRP ‐ Live
![Page 67: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/67.jpg)
![Page 68: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/68.jpg)
![Page 69: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/69.jpg)
![Page 70: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/70.jpg)
Control Points – Measures…
Current Situation
(WAH)
What’s
Actually
Happening
![Page 71: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/71.jpg)
Standards…
A specific, known expectation of –
Standard (WSBH)
What
Should
Be
Happening
![Page 72: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/72.jpg)
Problem Identification Tools…
• Standards• Visual controls• Reports• Variation in measurables• Flow diagrams• Check sheets• SPC• Pareto diagram
![Page 73: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/73.jpg)
LEAN SIGMA…Harvesting the fruit - Lean,A3,& Six Sigma
Degreeof
Difficulty
Sweet FruitSix Sigma / Lean ToolsProduct Development for Six Sigma
Process Entitlement
Bulk of FruitLean Tools / A3 Problem Solving / Six SigmaProcess Characterizationand Organization
Low Hanging FruitLean Tools / A3 Problem SolvingContinuous Improvement Tools
Ground FruitLogic and Intuition
![Page 74: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/74.jpg)
LEAN CULTURE
Lean Manufacturing
Overview
Measurables
Problem Solving
Kanban
StandardizedWork
Lean Culture MaintenanceExcellence
TPM
5S/ Visual
Management
QuickChangeover
![Page 75: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/75.jpg)
Consistency in:• Machines• Manpower• Materials• Methods
STABILITY
Focus on Foundational Elements…
![Page 76: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/76.jpg)
![Page 77: “Process Stabilization Through A3 and Daily Management ... · • 5S & Workplace Organization • Visual Controls & Visual Management – 50 ft 15 secs. Problem Solving • A3 Problem](https://reader030.vdocuments.us/reader030/viewer/2022040918/5e946fa92da3b24b3b585a49/html5/thumbnails/77.jpg)
Thank You!Please complete the session survey at:
AMESurvey.org
Session Code: “Process Stabilization Through A3 and the Daily
Management Process”Angelo Esposito
ODG (Ontario Drive and Gear)[email protected]