antwerp gateway is ready to handle your +20.000 teu vessels€¦ · antwerp gateway is ready to...

34
Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the Scheldt, DP World Antwerp Gateway has excellent nautical access for the largest container vessels afloat. By the end of 2017, our crane park will be able to handle vessels up to 25 rows, welcoming ULCS up to +20.000 TEU. Creating the Future, Now.

Upload: others

Post on 18-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Antwerp Gateway is ready to handle your +20.000 TEU vessels

Located at the upper end of the tidal estuary of the Scheldt, DP WorldAntwerp Gateway has excellent nautical access for the largest containervessels afloat.

By the end of 2017, our crane park will be able to handle vessels up to 25rows, welcoming ULCS up to +20.000 TEU.

Creating the Future, Now.

Page 2: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

2

Contents

Located at the upper end of the tidal estuary of the Scheldt, DP World Antwerp Gateway has excellent nautical access for the largest container vessels afloat.

1.1. Situation of Antwerp Gateway……………………………………………………..3 1.2. Nautical accessibility in the Port of Antwerp…………………………………..4

ULCS are licensed to access the Antwerp container terminals through the River Scheldt by the Common Nautical Management, the joint Belgian/Netherlands committee for the management of River Scheldt Region.

DP World Antwerp Gateway is fully equipped to handle the largest

container vessels afloat. By the end of 2017, our crane park will be able

to handle vessels up to 25 rows, welcoming ULCS up to +20.000 TEU.

4.1. Tidal windows Deurganckdok (December 2017)………………………………………………….11 4.2. Admission and departure regulation from/to Antwerp for marginal ships ………………21 4.3. Original equipment manufacturer specifications Antwerp Gateway cranes……………..30

Page 3: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

3

1. Excellent nautical accessibility

DP World Antwerp Gateway is located in the port of Antwerp at the upper end of the tidal estuary of the Scheldt, having excellent nautical access for the largest container vessels afloat. The port enjoys the benefits of excellent multi-modal connections to all major mainland European centres of consumption and production. The inland location means that the port of Antwerp enjoys a more central location in Europe than any other North Sea port. As a result, Antwerp has become one of Europe’s largest sea ports. It is also connected to the 1.500 km Belgian network of inland waterways and the European network of rivers and canals, where DP World manages 5 inland facilities via its division DP World Logistics. Antwerp is one of the biggest European rail ports and part of the three main rail corridors in Europe.

Page 4: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

4

Antwerp accommodates the largest container ships

Ultra Large Container Ships (ULCS) safely call the Port of Antwerp utilising full cargo capacity. Antwerp can be served by container vessels with a draught up to 16.0 meters* travelling up-river and 15.5 metres* down-river. (* tidal windows apply)

Page 5: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

5

Tidal windows on the River Scheldt

Large container vessels cannot always sail 24 hours a day the River Scheldt. The period in which

these vessels may proceed inward or outward bound is called the tidal window, depending on the

ship's depth and the height of tide.

The Common Nautical Authority calculates the tidal windows and give permission for the vessels

to proceed in- or outbound. As the tides varies every day, there are also different tidal windows.

This procedure will be clarified in the tidal window animation, which you also find on this site.

The tidal windows are calculated for predicted water levels for a waterway to target specific

depths and speeds on the sections. As there are circumstances in which increases and reductions

of the predicted water levels and of the sill depths may occur, or other hazards such as water

speeds, deviations from these calculations are possible.

More information:

http://www.vts-scheldt.net > Tidal Window > 2017-12 > Deurganckdok

A free translation of the tidal windows for the Deurganckdok can be found in the appendix (p. 11).

Page 6: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

6

2. Regulations for ULCS in Antwerp

The Common Nautical Management, the joint Belgian/Netherlands committee for the

management of River Scheldt Region, devised rules and regulations for marginal ships to access

the Antwerp container terminals through the River Scheldt. The Common Nautical Authority

calculates the tidal windows and give permission for the vessels to proceed in- or outbound

More information:

The document “Admission and departure regulation from/to Antwerp for marginal ships” can be found in the appendix p. 21.

Page 7: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

7

3. Advanced equipment to handle your vessels DP World Antwerp Gateway is fully equipped to handle the largest container vessels afloat. DP World Antwerp currently has 9 quay cranes, 5 of which were heightened by 6 to 7 metres during the past few years to be able to service the newest generation of container ships. Two new cranes with an outreach of 25 width will join the crane park by the end 2017. Together with 3 quay cranes able to handle vessels 23 rows across, we will have sufficient equipment to operate +20.000 TEU container vessels.

More information:

An overview of the specifications of the Antwerp Gateway cranes can be found below.

The OEM (original equipment manufacturer) specifications can be found in the appendix p. 30.

Technical drawing Quay Crane:

Page 8: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Speci

fica

tions

Quay

Cra

nes

Antw

erp G

ate

way

:

A

B

C

D

E

F

G

H

Ga

ntr

y

Nu

mb

er/

Nam

e

Lo

ad

ing

p

os

ibil

ity

(Tw

in, d

ou

ble

, 2

0/4

0?

)

Ma

nu

fac

ture r

Ye

ar

Bu

ilt

Ma

x

Sp

rea

de

r H

eig

ht

Ab

ove

Ra

il

(m)

Ou

tre

ac

h

Ma

x

(m)

Heig

ht

Ra

ils

A

bo

ve

Se

a

Le

ve

l a

t m

ea

n

tid

e

(m)

Dis

tan

ce

Rail

-

Fe

nd

er

(m)

Heig

ht

rail

s a

bo

ve

s

ea

bed

(m

Dis

tan

ce

be

twee

n

cra

ne

leg

s -

s

ide

(m

)

Dis

tan

ce

be

twee

n

cra

ne

leg

s -

fr

on

t (m

)

Dis

tan

ce

of

ba

ck

reac

h (

m)

Ma

x

lift

(t

on

s)

Co

nta

ine

r ro

ws

o

n

Ve

ss

el

Re

ma

rk

QC

01

51T

sin

gle

/

65T

tw

in

KA

LM

AR

20

05

37

55

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

74

(under

hook)

20 r

ow

s

QC

02

51T

sin

gle

/

65T

tw

in

KA

LM

AR

20

05

37

55

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

74

(under

hook)

20 r

ow

s

QC

03

51T

sin

gle

/

65T

tw

in

KA

LM

AR

20

05

37

55

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

74

(under

hook)

20 r

ow

s

QC

04

51T

sin

gle

/

65T

tw

in

KA

LM

AR

20

05

43

55

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

74

(under

hook)

20 r

ow

s

Ap

pen

d

ix

p. 31

QC

05

51T

sin

gle

/

65T

tw

in

KA

LM

AR

20

05

43

55

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

74

(under

hook)

20 r

ow

s

QC

06

51T

sin

gle

/

65T

tw

in

KA

LM

AR

20

05

43

55

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

74

(under

hook)

20 r

ow

s

Page 9: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

9

A

B

C

D

E

F

G

H

Ga

ntr

y

Nu

mb

er/

Nam

e

Lo

ad

ing

p

os

ibil

ity

(Tw

in, d

ou

ble

, 2

0/4

0?

)

Ma

nu

fac

ture r

Ye

ar

Bu

ilt

Ma

x

Sp

rea

de

r H

eig

ht

Ab

ove

Ra

il

(m)

Ou

tre

ac

h

Ma

x

(m)

Heig

ht

Ra

ils

A

bo

ve

Se

a

Le

ve

l a

t m

ea

n

tid

e

(m)

Dis

tan

ce

Rail

-

Fe

nd

er

(m)

Heig

ht

rail

s a

bo

ve

s

ea

bed

(m

Dis

tan

ce

be

twee

n

cra

ne

leg

s -

s

ide

(m

)

Dis

tan

ce

be

twee

n

cra

ne

leg

s -

fr

on

t (m

)

Dis

tan

ce

of

ba

ck

reac

h (

m)

Ma

x lif

t (t

on

s)

Co

nta

ine

r ro

ws

o

n

Ve

ss

el

Re

ma

rk

QC

07

58T

sin

gle

/

71T

tw

in /

85T

tandem

Z

PM

C

20

09

50

63

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

95

(under

hook)

22 +

1

row

s

23 r

ow

s

in

tand

em

QC

08

58T

sin

gle

/

71T

tw

in /

85T

tandem

Z

PM

C

20

09

43

63

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

95

(under

hook)

22 +

1

row

s

Ap

pen

d

ix

p. 32

23 r

ow

s in

tand

em

QC

09

58T

sin

gle

/

71T

tw

in /

85T

tandem

Z

PM

C

20

09

50

63

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

18

20

95

(under

hook)

22 +

1

row

s

23 r

ow

s

in

tand

em

QC

10

50T

sin

gle

/

65T

tw

in/

85T

ta

nd

em

Lie

bherr

20

17

52

68

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

100

(under

hook)

25 r

ow

s

Ap

pen

d

ix

p. 33

QC

11

50T

sin

gle

/

65T

tw

in/

85T

ta

nd

em

Lie

bherr

20

17

52

68

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

30,4

8

100

(under

hook)

25 r

ow

s

MH

C4

max. 50T

sin

gle

/ 5

0T

tw

in

Gott

wald

20

02

40

50

3m

LW

/8,5

M

HW

5,5

26m

(m

ax)

N/A

N

/A

N/A

100

(under

hook)

N/A

mobile

harb

our

cra

ne

Page 10: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

10

4. Appendices

4.1. Tidal windows Deurganckdok (December 2017)………………………………………………….11 4.2. Admission and departure regulation from/to Antwerp for marginal ships ………………21 4.3. Original equipment manufacturer specifications Antwerp Gateway cranes……………..30

Page 11: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

11

Appendix 1.

Tidal windows Deurganckdok (December 2017)

The documents concerning the tidal windows at Deurganckdok are a free translation

from the Dutch source files at http://www.vts-scheldt.net. The displayed results of the

calculations cannot bind.

In this appendix, the departure tidal windows from depth 145 m to 152 m can be

found. The windows for depths 120 m to 144, as well as all arrival tidal windows, can

be found in Dutch at http://www.vts-scheldt.net, organised by either depth or date.

Translation

Tidal windows departure/arrival Deurganckdok – depth

• Diepgang: depth

• Voormiddag: AM

• Namiddag: PM

• Van: from

• Tot: to

• Geen tijpoort: no tidal window

• Onmogelijk: impossible

Tidal windows departure/arrival Deurganckdok – date (not included in this file)

• Vrijdag: Friday

• Zaterdag: Saturday

• Zondag: Sunday

• Maandag: Monday

• Dinsdag: Tuesday

• Woensdag: Wednesday

• Donderdag: Thursday

• Diepgang: depth

• Voormiddag: AM

• Namiddag: PM

• Van: from

• Tot: to

• Geen tijpoort: no tidal window

• Onmogelijk: impossible

Page 12: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Tidal windows departure Deurganckdok - depth

Diepgang 145

diepgang van tot van tot

1-12-2017 1-12-17 8:33 1-12-17 11:312-12-2017 1-12-17 21:19 2-12-17 0:09 2-12-17 9:32 2-12-17 12:153-12-2017 2-12-17 22:11 3-12-17 0:50 3-12-17 10:26 3-12-17 13:024-12-2017 3-12-17 22:57 4-12-17 1:33 4-12-17 11:16 4-12-17 13:525-12-2017 4-12-17 23:42 5-12-17 2:18 5-12-17 12:07 5-12-17 14:446-12-2017 6-12-17 0:26 6-12-17 3:05 6-12-17 12:58 6-12-17 15:377-12-2017 7-12-17 1:10 7-12-17 3:52 7-12-17 13:49 7-12-17 16:338-12-2017 8-12-17 1:54 8-12-17 4:42 8-12-17 14:40 8-12-17 17:359-12-2017 9-12-17 2:38 9-12-17 5:37 9-12-17 15:32 9-12-17 18:41

10-12-2017 10-12-17 3:25 10-12-17 6:41 10-12-17 16:27 10-12-17 19:5011-12-2017 11-12-17 4:17 11-12-17 7:52 11-12-17 17:26 11-12-17 21:0212-12-2017 12-12-17 5:17 12-12-17 9:03 12-12-17 18:34 12-12-17 22:1013-12-2017 13-12-17 6:33 13-12-17 10:0714-12-2017 13-12-17 19:44 13-12-17 23:08 14-12-17 7:51 14-12-17 11:0515-12-2017 14-12-17 20:43 14-12-17 23:59 15-12-17 8:54 15-12-17 11:5716-12-2017 15-12-17 21:32 16-12-17 0:38 16-12-17 9:46 16-12-17 12:4417-12-2017 16-12-17 22:12 17-12-17 1:12 17-12-17 10:31 17-12-17 13:2718-12-2017 17-12-17 22:46 18-12-17 1:45 18-12-17 11:11 18-12-17 14:0619-12-2017 18-12-17 23:19 19-12-17 2:16 19-12-17 11:50 19-12-17 14:4220-12-2017 19-12-17 23:52 20-12-17 2:47 20-12-17 12:29 20-12-17 15:1621-12-2017 21-12-17 0:26 21-12-17 3:19 21-12-17 13:06 21-12-17 15:5022-12-2017 22-12-17 0:57 22-12-17 3:51 22-12-17 13:40 22-12-17 16:2523-12-2017 23-12-17 1:26 23-12-17 4:25 23-12-17 14:11 23-12-17 17:0224-12-2017 24-12-17 1:55 24-12-17 5:05 24-12-17 14:43 24-12-17 17:4525-12-2017 25-12-17 2:29 25-12-17 5:51 25-12-17 15:21 25-12-17 18:3926-12-2017 26-12-17 3:11 26-12-17 6:48 26-12-17 16:10 26-12-17 19:4927-12-2017 27-12-17 4:03 27-12-17 7:59 27-12-17 17:12 27-12-17 21:0328-12-2017 28-12-17 5:10 28-12-17 9:12 28-12-17 18:24 28-12-17 22:1029-12-2017 29-12-17 6:34 29-12-17 10:1730-12-2017 29-12-17 19:37 29-12-17 23:09 30-12-17 7:55 30-12-17 11:11

VOORMIDDAG NAMIDDAG

Dutch source file http://www.vts-scheldt.net.

The list below indicates the approximate tidal windows for a departure from the Deurganckdok to Wandelaar Pilot (via Vaargeul). The tidal windows are calculated for predicted water levels for a waterway to target specific depths and speeds on the sections of 15 (sea), 13 (river), 9 (port) knots for depths < 140 dm and 14 (sea), 12 (river), 6 (port) knots for depths > 140 dm.The result of the calculation can not be seen as a personal, professional or judicial advise or any equivalent of these. This list does not relieve the shipping management / agency from the obligation to request a permit to proceed in- or outbound from the Common Nautical Authority. To request a specific or personal advice, please consult the Common Nautical Authority. This disclaimer applies to this list.* *free translation from the Dutch source file at http://www.vts-scheldt.net.

Page 13: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Diepgang 146

diepgang van tot van tot

1-12-2017 1-12-17 8:39 1-12-17 11:212-12-2017 1-12-17 21:25 1-12-17 23:59 2-12-17 9:38 2-12-17 12:063-12-2017 2-12-17 22:16 3-12-17 0:40 3-12-17 10:31 3-12-17 12:544-12-2017 3-12-17 23:02 4-12-17 1:24 4-12-17 11:21 4-12-17 13:445-12-2017 4-12-17 23:47 5-12-17 2:10 5-12-17 12:12 5-12-17 14:356-12-2017 6-12-17 0:31 6-12-17 2:56 6-12-17 13:03 6-12-17 15:297-12-2017 7-12-17 1:15 7-12-17 3:43 7-12-17 13:55 7-12-17 16:238-12-2017 8-12-17 1:59 8-12-17 4:32 8-12-17 14:46 8-12-17 17:239-12-2017 9-12-17 2:45 9-12-17 5:27 9-12-17 15:39 9-12-17 18:31

10-12-2017 10-12-17 3:33 10-12-17 6:29 10-12-17 16:34 10-12-17 19:3911-12-2017 11-12-17 4:26 11-12-17 7:39 11-12-17 17:34 11-12-17 20:5012-12-2017 12-12-17 5:29 12-12-17 8:50 12-12-17 18:43 12-12-17 21:5813-12-2017 13-12-17 6:45 13-12-17 9:5514-12-2017 13-12-17 19:51 13-12-17 22:57 14-12-17 8:00 14-12-17 10:5415-12-2017 14-12-17 20:50 14-12-17 23:46 15-12-17 9:02 15-12-17 11:4616-12-2017 15-12-17 21:39 16-12-17 0:25 16-12-17 9:53 16-12-17 12:3417-12-2017 16-12-17 22:19 17-12-17 1:01 17-12-17 10:37 17-12-17 13:1618-12-2017 17-12-17 22:53 18-12-17 1:34 18-12-17 11:18 18-12-17 13:5519-12-2017 18-12-17 23:25 19-12-17 2:06 19-12-17 11:57 19-12-17 14:3020-12-2017 19-12-17 23:58 20-12-17 2:37 20-12-17 12:36 20-12-17 15:0421-12-2017 21-12-17 0:32 21-12-17 3:09 21-12-17 13:13 21-12-17 15:3722-12-2017 22-12-17 1:04 22-12-17 3:40 22-12-17 13:47 22-12-17 16:1223-12-2017 23-12-17 1:33 23-12-17 4:14 23-12-17 14:19 23-12-17 16:5024-12-2017 24-12-17 2:02 24-12-17 4:52 24-12-17 14:51 24-12-17 17:3425-12-2017 25-12-17 2:36 25-12-17 5:40 25-12-17 15:30 25-12-17 18:2826-12-2017 26-12-17 3:19 26-12-17 6:37 26-12-17 16:19 26-12-17 19:3527-12-2017 27-12-17 4:12 27-12-17 7:47 27-12-17 17:21 27-12-17 20:5028-12-2017 28-12-17 5:22 28-12-17 9:01 28-12-17 18:32 28-12-17 21:5929-12-2017 29-12-17 6:44 29-12-17 10:0530-12-2017 29-12-17 19:44 29-12-17 22:59 30-12-17 8:02 30-12-17 11:00

VOORMIDDAG NAMIDDAG

Tidal windows departure Deurganckdok - depth

Dutch source file http://www.vts-scheldt.net.

Page 14: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Diepgang 147

diepgang van tot van tot

1-12-2017 1-12-17 8:46 1-12-17 11:122-12-2017 1-12-17 21:31 1-12-17 23:50 2-12-17 9:43 2-12-17 11:583-12-2017 2-12-17 22:21 3-12-17 0:32 3-12-17 10:36 3-12-17 12:444-12-2017 3-12-17 23:07 4-12-17 1:16 4-12-17 11:26 4-12-17 13:335-12-2017 4-12-17 23:52 5-12-17 2:01 5-12-17 12:17 5-12-17 14:276-12-2017 6-12-17 0:36 6-12-17 2:47 6-12-17 13:08 6-12-17 15:207-12-2017 7-12-17 1:20 7-12-17 3:35 7-12-17 14:00 7-12-17 16:158-12-2017 8-12-17 2:05 8-12-17 4:24 8-12-17 14:52 8-12-17 17:129-12-2017 9-12-17 2:51 9-12-17 5:17 9-12-17 15:45 9-12-17 18:18

10-12-2017 10-12-17 3:40 10-12-17 6:19 10-12-17 16:41 10-12-17 19:2811-12-2017 11-12-17 4:35 11-12-17 7:28 11-12-17 17:42 11-12-17 20:3912-12-2017 12-12-17 5:39 12-12-17 8:39 12-12-17 18:51 12-12-17 21:4713-12-2017 13-12-17 6:55 13-12-17 9:4514-12-2017 13-12-17 19:59 13-12-17 22:47 14-12-17 8:08 14-12-17 10:4415-12-2017 14-12-17 20:57 14-12-17 23:33 15-12-17 9:09 15-12-17 11:3716-12-2017 15-12-17 21:46 16-12-17 0:14 16-12-17 10:00 16-12-17 12:2517-12-2017 16-12-17 22:26 17-12-17 0:51 17-12-17 10:44 17-12-17 13:0718-12-2017 17-12-17 22:59 18-12-17 1:25 18-12-17 11:25 18-12-17 13:4519-12-2017 18-12-17 23:32 19-12-17 1:57 19-12-17 12:04 19-12-17 14:2120-12-2017 20-12-17 0:04 20-12-17 2:28 20-12-17 12:42 20-12-17 14:5421-12-2017 21-12-17 0:38 21-12-17 3:00 21-12-17 13:20 21-12-17 15:2622-12-2017 22-12-17 1:10 22-12-17 3:31 22-12-17 13:55 22-12-17 16:0023-12-2017 23-12-17 1:40 23-12-17 4:04 23-12-17 14:27 23-12-17 16:3824-12-2017 24-12-17 2:09 24-12-17 4:41 24-12-17 14:59 24-12-17 17:2325-12-2017 25-12-17 2:44 25-12-17 5:27 25-12-17 15:38 25-12-17 18:1626-12-2017 26-12-17 3:27 26-12-17 6:26 26-12-17 16:28 26-12-17 19:2327-12-2017 27-12-17 4:21 27-12-17 7:35 27-12-17 17:30 27-12-17 20:3828-12-2017 28-12-17 5:32 28-12-17 8:50 28-12-17 18:39 28-12-17 21:4829-12-2017 29-12-17 6:52 29-12-17 9:5330-12-2017 29-12-17 19:51 29-12-17 22:45 30-12-17 8:08 30-12-17 10:51

VOORMIDDAG NAMIDDAG

Tidal windows departure Deurganckdok - depth

Dutch source file http://www.vts-scheldt.net.

Page 15: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Diepgang 148

diepgang van tot van tot

1-12-2017 1-12-17 8:52 1-12-17 11:042-12-2017 1-12-17 21:37 1-12-17 23:41 2-12-17 9:49 2-12-17 11:483-12-2017 2-12-17 22:26 3-12-17 0:24 3-12-17 10:41 3-12-17 12:334-12-2017 3-12-17 23:12 4-12-17 1:06 4-12-17 11:31 4-12-17 13:235-12-2017 4-12-17 23:57 5-12-17 1:50 5-12-17 12:22 5-12-17 14:166-12-2017 6-12-17 0:41 6-12-17 2:37 6-12-17 13:14 6-12-17 15:127-12-2017 7-12-17 1:26 7-12-17 3:25 7-12-17 14:06 7-12-17 16:068-12-2017 8-12-17 2:11 8-12-17 4:16 8-12-17 14:59 8-12-17 17:039-12-2017 9-12-17 2:57 9-12-17 5:09 9-12-17 15:52 9-12-17 18:06

10-12-2017 10-12-17 3:47 10-12-17 6:09 10-12-17 16:48 10-12-17 19:1811-12-2017 11-12-17 4:43 11-12-17 7:18 11-12-17 17:50 11-12-17 20:2912-12-2017 12-12-17 5:50 12-12-17 8:29 12-12-17 18:59 12-12-17 21:3713-12-2017 13-12-17 7:05 13-12-17 9:3514-12-2017 13-12-17 20:06 13-12-17 22:35 14-12-17 8:16 14-12-17 10:3515-12-2017 14-12-17 21:04 14-12-17 23:23 15-12-17 9:16 15-12-17 11:2916-12-2017 15-12-17 21:53 16-12-17 0:04 16-12-17 10:07 16-12-17 12:1617-12-2017 16-12-17 22:33 17-12-17 0:42 17-12-17 10:51 17-12-17 12:5918-12-2017 17-12-17 23:06 18-12-17 1:16 18-12-17 11:31 18-12-17 13:3619-12-2017 18-12-17 23:38 19-12-17 1:49 19-12-17 12:10 19-12-17 14:1120-12-2017 20-12-17 0:10 20-12-17 2:20 20-12-17 12:49 20-12-17 14:4421-12-2017 21-12-17 0:44 21-12-17 2:51 21-12-17 13:27 21-12-17 15:1722-12-2017 22-12-17 1:16 22-12-17 3:23 22-12-17 14:02 22-12-17 15:5023-12-2017 23-12-17 1:46 23-12-17 3:54 23-12-17 14:34 23-12-17 16:2724-12-2017 24-12-17 2:16 24-12-17 4:31 24-12-17 15:07 24-12-17 17:1125-12-2017 25-12-17 2:51 25-12-17 5:16 25-12-17 15:46 25-12-17 18:0626-12-2017 26-12-17 3:34 26-12-17 6:15 26-12-17 16:36 26-12-17 19:1227-12-2017 27-12-17 4:30 27-12-17 7:24 27-12-17 17:38 27-12-17 20:2728-12-2017 28-12-17 5:42 28-12-17 8:38 28-12-17 18:47 28-12-17 21:3829-12-2017 29-12-17 7:00 29-12-17 9:4330-12-2017 29-12-17 19:57 29-12-17 22:34 30-12-17 8:15 30-12-17 10:41

VOORMIDDAG NAMIDDAG

Tidal windows departure Deurganckdok - depth

Dutch source file http://www.vts-scheldt.net.

Page 16: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Diepgang 149

diepgang van tot van tot

1-12-2017 1-12-17 8:58 1-12-17 10:552-12-2017 1-12-17 21:43 1-12-17 23:32 2-12-17 9:54 2-12-17 11:373-12-2017 2-12-17 22:32 3-12-17 0:14 3-12-17 10:46 3-12-17 12:244-12-2017 3-12-17 23:17 4-12-17 0:55 4-12-17 11:36 4-12-17 13:145-12-2017 5-12-17 0:02 5-12-17 1:40 5-12-17 12:27 5-12-17 14:066-12-2017 6-12-17 0:46 6-12-17 2:26 6-12-17 13:19 6-12-17 15:017-12-2017 7-12-17 1:31 7-12-17 3:14 7-12-17 14:12 7-12-17 15:588-12-2017 8-12-17 2:17 8-12-17 4:05 8-12-17 15:05 8-12-17 16:549-12-2017 9-12-17 3:04 9-12-17 5:01 9-12-17 15:58 9-12-17 17:55

10-12-2017 10-12-17 3:55 10-12-17 6:01 10-12-17 16:55 10-12-17 19:0511-12-2017 11-12-17 4:52 11-12-17 7:08 11-12-17 17:58 11-12-17 20:1812-12-2017 12-12-17 6:00 12-12-17 8:18 12-12-17 19:07 12-12-17 21:2513-12-2017 13-12-17 7:14 13-12-17 9:2614-12-2017 13-12-17 20:13 13-12-17 22:23 14-12-17 8:24 14-12-17 10:2615-12-2017 14-12-17 21:12 14-12-17 23:12 15-12-17 9:24 15-12-17 11:2016-12-2017 15-12-17 22:00 15-12-17 23:55 16-12-17 10:14 16-12-17 12:0817-12-2017 16-12-17 22:40 17-12-17 0:34 17-12-17 10:58 17-12-17 12:5018-12-2017 17-12-17 23:13 18-12-17 1:08 18-12-17 11:38 18-12-17 13:2819-12-2017 18-12-17 23:45 19-12-17 1:41 19-12-17 12:17 19-12-17 14:0320-12-2017 20-12-17 0:17 20-12-17 2:12 20-12-17 12:56 20-12-17 14:3621-12-2017 21-12-17 0:50 21-12-17 2:43 21-12-17 13:34 21-12-17 15:0822-12-2017 22-12-17 1:23 22-12-17 3:14 22-12-17 14:09 22-12-17 15:4123-12-2017 23-12-17 1:53 23-12-17 3:46 23-12-17 14:42 23-12-17 16:1624-12-2017 24-12-17 2:23 24-12-17 4:21 24-12-17 15:15 24-12-17 16:5925-12-2017 25-12-17 2:58 25-12-17 5:06 25-12-17 15:55 25-12-17 17:5526-12-2017 26-12-17 3:42 26-12-17 6:03 26-12-17 16:44 26-12-17 19:0127-12-2017 27-12-17 4:39 27-12-17 7:13 27-12-17 17:45 27-12-17 20:1628-12-2017 28-12-17 5:51 28-12-17 8:26 28-12-17 18:54 28-12-17 21:2629-12-2017 29-12-17 7:07 29-12-17 9:3230-12-2017 29-12-17 20:04 29-12-17 22:23 30-12-17 8:21 30-12-17 10:32

VOORMIDDAG NAMIDDAG

Tidal windows departure Deurganckdok - depth

Dutch source file http://www.vts-scheldt.net.

Page 17: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Diepgang 150

diepgang van tot van tot

1-12-2017 1-12-17 9:05 1-12-17 10:452-12-2017 1-12-17 21:49 1-12-17 23:24 2-12-17 10:00 2-12-17 11:283-12-2017 2-12-17 22:38 3-12-17 0:03 3-12-17 10:51 3-12-17 12:144-12-2017 3-12-17 23:23 4-12-17 0:45 4-12-17 11:41 4-12-17 13:045-12-2017 5-12-17 0:07 5-12-17 1:30 5-12-17 12:33 5-12-17 13:566-12-2017 6-12-17 0:52 6-12-17 2:17 6-12-17 13:25 6-12-17 14:507-12-2017 7-12-17 1:37 7-12-17 3:05 7-12-17 14:18 7-12-17 15:488-12-2017 8-12-17 2:23 8-12-17 3:55 8-12-17 15:11 8-12-17 16:449-12-2017 9-12-17 3:11 9-12-17 4:52 9-12-17 16:05 9-12-17 17:45

10-12-2017 10-12-17 4:02 10-12-17 5:52 10-12-17 17:02 10-12-17 18:5311-12-2017 11-12-17 5:01 11-12-17 6:58 11-12-17 18:06 11-12-17 20:0512-12-2017 12-12-17 6:09 12-12-17 8:09 12-12-17 19:15 12-12-17 21:1313-12-2017 13-12-17 7:23 13-12-17 9:1614-12-2017 13-12-17 20:21 13-12-17 22:12 14-12-17 8:32 14-12-17 10:1715-12-2017 14-12-17 21:19 14-12-17 23:02 15-12-17 9:31 15-12-17 11:1216-12-2017 15-12-17 22:08 15-12-17 23:46 16-12-17 10:22 16-12-17 11:5917-12-2017 16-12-17 22:47 17-12-17 0:24 17-12-17 11:05 17-12-17 12:4218-12-2017 17-12-17 23:20 18-12-17 1:00 18-12-17 11:46 18-12-17 13:1919-12-2017 18-12-17 23:51 19-12-17 1:31 19-12-17 12:24 19-12-17 13:5420-12-2017 20-12-17 0:23 20-12-17 2:02 20-12-17 13:03 20-12-17 14:2721-12-2017 21-12-17 0:56 21-12-17 2:33 21-12-17 13:41 21-12-17 14:5922-12-2017 22-12-17 1:29 22-12-17 3:05 22-12-17 14:17 22-12-17 15:3123-12-2017 23-12-17 2:00 23-12-17 3:37 23-12-17 14:50 23-12-17 16:0624-12-2017 24-12-17 2:30 24-12-17 4:12 24-12-17 15:24 24-12-17 16:4825-12-2017 25-12-17 3:05 25-12-17 4:55 25-12-17 16:03 25-12-17 17:4226-12-2017 26-12-17 3:50 26-12-17 5:51 26-12-17 16:52 26-12-17 18:5027-12-2017 27-12-17 4:48 27-12-17 7:02 27-12-17 17:53 27-12-17 20:0528-12-2017 28-12-17 5:59 28-12-17 8:15 28-12-17 19:01 28-12-17 21:1329-12-2017 29-12-17 7:14 29-12-17 9:2230-12-2017 29-12-17 20:10 29-12-17 22:12 30-12-17 8:27 30-12-17 10:23

VOORMIDDAG NAMIDDAG

Tidal windows departure Deurganckdok - depth

Dutch source file http://www.vts-scheldt.net.

Page 18: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Diepgang 151

diepgang van tot van tot

1-12-2017 1-12-17 9:11 1-12-17 10:342-12-2017 1-12-17 21:56 1-12-17 23:13 2-12-17 10:06 2-12-17 11:193-12-2017 2-12-17 22:44 2-12-17 23:54 3-12-17 10:57 3-12-17 12:064-12-2017 3-12-17 23:29 4-12-17 0:37 4-12-17 11:47 4-12-17 12:565-12-2017 5-12-17 0:13 5-12-17 1:22 5-12-17 12:39 5-12-17 13:486-12-2017 6-12-17 0:58 6-12-17 2:09 6-12-17 13:32 6-12-17 14:417-12-2017 7-12-17 1:43 7-12-17 2:55 7-12-17 14:25 7-12-17 15:378-12-2017 8-12-17 2:30 8-12-17 3:45 8-12-17 15:18 8-12-17 16:369-12-2017 9-12-17 3:18 9-12-17 4:41 9-12-17 16:12 9-12-17 17:36

10-12-2017 10-12-17 4:10 10-12-17 5:42 10-12-17 17:09 10-12-17 18:4211-12-2017 11-12-17 5:09 11-12-17 6:49 11-12-17 18:14 11-12-17 19:5312-12-2017 12-12-17 6:18 12-12-17 7:59 12-12-17 19:22 12-12-17 21:0113-12-2017 13-12-17 7:32 13-12-17 9:0714-12-2017 13-12-17 20:28 13-12-17 22:01 14-12-17 8:40 14-12-17 10:0815-12-2017 14-12-17 21:27 14-12-17 22:52 15-12-17 9:39 15-12-17 11:0116-12-2017 15-12-17 22:16 15-12-17 23:37 16-12-17 10:29 16-12-17 11:4817-12-2017 16-12-17 22:56 17-12-17 0:16 17-12-17 11:13 17-12-17 12:3118-12-2017 17-12-17 23:28 18-12-17 0:49 18-12-17 11:53 18-12-17 13:0919-12-2017 18-12-17 23:59 19-12-17 1:20 19-12-17 12:32 19-12-17 13:4620-12-2017 20-12-17 0:30 20-12-17 1:51 20-12-17 13:10 20-12-17 14:1921-12-2017 21-12-17 1:03 21-12-17 2:23 21-12-17 13:48 21-12-17 14:5022-12-2017 22-12-17 1:36 22-12-17 2:54 Onmogelijk Onmogelijk23-12-2017 23-12-17 2:07 23-12-17 3:27 Onmogelijk Onmogelijk24-12-2017 24-12-17 2:37 24-12-17 4:02 24-12-17 15:32 24-12-17 16:3725-12-2017 25-12-17 3:13 25-12-17 4:45 25-12-17 16:11 25-12-17 17:3126-12-2017 26-12-17 3:58 26-12-17 5:40 26-12-17 17:00 26-12-17 18:3827-12-2017 27-12-17 4:56 27-12-17 6:50 27-12-17 18:00 27-12-17 19:5328-12-2017 28-12-17 6:07 28-12-17 8:04 28-12-17 19:08 28-12-17 21:0229-12-2017 29-12-17 7:21 29-12-17 9:1230-12-2017 29-12-17 20:17 29-12-17 22:02 30-12-17 8:33 30-12-17 10:14

VOORMIDDAG NAMIDDAG

Tidal windows departure Deurganckdok - depth

Dutch source file http://www.vts-scheldt.net.

Page 19: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Diepgang 152

diepgang van tot van tot

1-12-2017 1-12-17 9:18 1-12-17 10:252-12-2017 Onmogelijk Onmogelijk Onmogelijk Onmogelijk3-12-2017 Onmogelijk Onmogelijk Onmogelijk Onmogelijk4-12-2017 Onmogelijk Onmogelijk Onmogelijk Onmogelijk5-12-2017 Onmogelijk Onmogelijk Onmogelijk Onmogelijk6-12-2017 Onmogelijk Onmogelijk Onmogelijk Onmogelijk7-12-2017 Onmogelijk Onmogelijk Onmogelijk Onmogelijk8-12-2017 Onmogelijk Onmogelijk 8-12-17 15:25 8-12-17 16:279-12-2017 9-12-17 3:25 9-12-17 4:31 9-12-17 16:19 9-12-17 17:26

10-12-2017 10-12-17 4:18 10-12-17 5:33 10-12-17 17:17 10-12-17 18:3211-12-2017 11-12-17 5:18 11-12-17 6:40 11-12-17 18:22 11-12-17 19:4312-12-2017 12-12-17 6:27 12-12-17 7:50 12-12-17 19:30 12-12-17 20:5113-12-2017 13-12-17 7:40 13-12-17 8:5914-12-2017 13-12-17 20:36 13-12-17 21:51 14-12-17 8:48 14-12-17 9:5815-12-2017 14-12-17 21:35 14-12-17 22:44 15-12-17 9:47 15-12-17 10:5016-12-2017 15-12-17 22:25 15-12-17 23:29 16-12-17 10:37 16-12-17 11:3817-12-2017 16-12-17 23:04 17-12-17 0:05 Onmogelijk Onmogelijk18-12-2017 17-12-17 23:36 18-12-17 0:38 Onmogelijk Onmogelijk19-12-2017 19-12-17 0:06 19-12-17 1:10 Onmogelijk Onmogelijk20-12-2017 20-12-17 0:37 20-12-17 1:41 Onmogelijk Onmogelijk21-12-2017 21-12-17 1:10 21-12-17 2:13 Onmogelijk Onmogelijk22-12-2017 22-12-17 1:43 22-12-17 2:44 Onmogelijk Onmogelijk23-12-2017 23-12-17 2:14 23-12-17 3:18 Onmogelijk Onmogelijk24-12-2017 24-12-17 2:45 24-12-17 3:54 Onmogelijk Onmogelijk25-12-2017 25-12-17 3:20 25-12-17 4:35 25-12-17 16:19 25-12-17 17:2026-12-2017 26-12-17 4:06 26-12-17 5:30 26-12-17 17:08 26-12-17 18:2727-12-2017 27-12-17 5:05 27-12-17 6:39 27-12-17 18:08 27-12-17 19:4228-12-2017 28-12-17 6:15 28-12-17 7:54 28-12-17 19:15 28-12-17 20:5229-12-2017 29-12-17 7:28 29-12-17 9:0430-12-2017 29-12-17 20:24 29-12-17 21:53 30-12-17 8:40 30-12-17 10:04

VOORMIDDAG NAMIDDAG

Tidal windows departure Deurganckdok - depth

Dutch source file http://www.vts-scheldt.net.

Page 20: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

20

Appendix 2.

Admission and departure regulation from/to Antwerp for

marginal ships by the Common Nautical Management

Page 21: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Page 1

Joint Publication

No 03-2017

Admission and departure regulation from/to Antwerp

Admission and departure regulation for ships with a marginal draught or length to and from Antwerp

The Dutch State Harbour Master Westerschelde and de Flemish Administrator General of the Maritime Service and

Coast Agency announce:

That the evaluation of the test runs (each time ascending and descending to and from Antwerp) with the type of

container ships with a length of 400 metres and a width of 59 metres was carried out.

The fact that the nautical-technical representatives of the Joint Nautical Authority, the relevant Dutch and Flemish

government services, the two pilotage services, the Port Authority Antwerp and other actors in the nautical chain were

consulted and gave a positive opinion on this.

The fact that the Kieldrechtsluis was taken into use in the course of 2016.

In view of article 54 of the Dutch Westerschelde Shipping Code 1990, as well as article 47 of the Belgian Shipping Code

for the Beneden-Zeeschelde and article 34 of the Belgian Police and Shipping Regulations for the Belgian territorial sea,

the ports and beaches of the Belgian coast, the following regulations are laid down:

General remarks:

• The Joint Nautical Authority shall be abbreviated to GNA (Gemeenschappelijke Nautische Autoriteit).

• Port Authority Antwerp is abbreviated to HA (Havenbedrijf Antwerpen)

• Westerschelde Planner is abbreviated with WESP and is a tool for calculating tide frame

• Requested Time of Arrival is abbreviated with RTA, Antwerp Coordination Point is abbreviated with CP

(Coördinatiepunt Antwerpen).

• The sailing of the Scheldt Area by the named vessels is subject to an Admission to ascent or descent, issued by

the GNA. To do this, the form that can be downloaded from the website www.vts-scheldt.net must be

completed in full and forwarded to: [email protected] [email protected] in CC.

Free translation. Dutch source file: http://www.vts-scheldt.net.

Page 22: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

• All the draughts relate to the greatest/maximum draught and are expressed in decimetres. On the river section

the calculation is made with density of 1000 kg/m3 and on the sea section the calculation is made with a density

of 1020 kg/m3.

• All ship lengths and widths are expressed in metres and refer to length overall and breadth overall.

• The GNA may, for reasons of safety and/or depending on the capacity of the fairway and/or on the basis of the

information provided by HA with regard to problems with the available capacity of a lock and/or the availability

of the berth, impose conditions with regard to the number of simultaneously loading or unloading

marginal/above-size vessels per tide.

• The tide frame are calculated using the route Vaargeul 1, via WESP, both in ascent and descent. It may be

pointed out that these tide frames also take account of the possible restrictions due to the airdraught of the

vessel in relation to the lower passage height of the high-voltage cables on the route near Zandvliet.

• From the Zandvliet-Berendrech complex and the Kieldrecht lock, container ships can be used at a row of tide.

The vessel must be operated with a minimum keel clearance of 1 metre in the lock chamber. To this end, the

Berendrechtsluis, Zandvlietsluis and Kieldrechtsluis are gauged at least four times a year and the gauges are

made available digitally via ENC maps.

• In the Deurganck dock, all ships with a length greater than 260 metres have to moor “head-out”. Upon request,

the GNA may, in exceptional cases, grant permission to deviate from this in consultation with HA. Vessels are

preferably moored at the North Sea terminal and Europe terminal according to tide, taking into account a

possible next destination (shift to ET or BES/ZAS (NZT) and Deurganckdok (EI and NZT)).

• At the container terminals on the river, at the place where the ship moors on ascent and descent, no shore

cranes may be placed within 2 bollards in front of and behind the bow or fence of the ship.

• The Scheldt Navigator Marginal Vessels is abbreviated with SNMS (Schelde Navigator Marginale Schepen) and is

a navigation system accepted by the GNA - an extended version of this navigation system is the "FULL SNMS".

I. Ships with marginal draught

I.1. Vessels above 120 dm draught with destination locks Right Bank or from 125 dm draught with destination

Left Bank or the tide bound container terminals.

The general regulations and special regulations 1 to 7 inclusive apply.

Page 23: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

I.2. Ships from 120 dm draught departing from the locks Right Bank or from 125 dm draught departing from Left

Bank or tide bound container terminals

This is subject to the general rules and special rules 6 to 11 inclusive.

II. Ships with marginal dimensions in length and/or breadth

II.1. Ships of 300 metres and up to 340 metres in length and/or of a breadth equal to or greater than 45 metres:

The general regulations and special regulations 1 to 12 inclusive and 16 apply.

II. 2. Container ships from 340 metres up to 360 metres in length:

These ships are subject to the general regulations, and special regulations 1 to 16 inclusive.

II.3. Container ships 360 metres long and/or more than 51 metres in length and/or wider than 51 metres, of those

types whose test runs have been positively evaluated:

These ships are subject to the general regulations and special regulations 1 to 14, 16 and additional conditions C. 1 & C.

2.

III. Regulations

A) General regulations for all marginal ships (I and II)

a) At the outset, visibility shall be at least l000m on the entire route concerned.

b) At least 6 hours prior to arrival at the Wandelaar or Steenbank pilot station or 6 hours prior to the departure of the

berth, a written permission from the GNA must be obtained for each voyage or departure by using the application form

mentioned above.

c) After mutual consultation with and agreement of the CNA, it is determined within which tide frame the ascent or

descent must take place, and the Antwerp Port Coordination Centre (ACC- Havencoördinatiecentrum Antwerpen) will

implement this.

d) Before the ship actually moored from its berth behind the lock, this shall be reported by the dock pilot to the Port

Authority, stating the draught. The draught must be checked for the GNA for correctness and deviations must be

reported to the GNA.

e) The pilot advice on the use of tugs shall be followed closely.

f) For bulk carriers, tankers and ships with similar manoeuvring characteristics, the issue of an authorisation to operate

is based on a manoeuvring speed as mentioned in points B 2 and B 9, for container ships the calculation is done with

speeds as mentioned in the Annex §4. For other shipping, the calculation is done with a speed of 12 knots through the

water. If a ship cannot comply with this condition, additional preconditions may be imposed on ascent or descent.

g) Depending on Hydro-meteo conditions, ship conditions, the expected traffic intensity and conditions of the

waterway, additional conditions can be set by the GNA in consultation with the head of the Nautical Service VBS. For

meteorological forecasts, the weather forecast OMS is used as a basis.

h) The GNA can, after consultation with the head of the Nautical Service VBS, set additional regulations for the

protection of concerned interests. These regulations must be followed immediately.

i) Planned departure, in relation to the tide frame, in two tides is not permitted.

j) The minimum tide frame allowed is 60 minutes.

Page 24: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

B) Special regulations

1. Maximum draught during ascent:

• to the locks Right Bank is 155,6 dm.

• to the Kieldrechtsluis is 154 dm for the ship types of bulk carriers, tankers and ships with similar manoeuvring

characteristics. For container shipping, larger draughts are possible;

2. For the ship types of bulk carriers, tankers and ships with similar manoeuvring characteristics, both the river and sea

sections are expected to operate at a speed of 12 knots and the next ascent schedule is maintained:

a) Draught less than 135 dm: these ships sail on, both at low tide and high tide, within their tide frame.

b) Draught from 135 dm to 145 dm: these ships sail on according to the tide frame, until arrival CP at the latest 1

hour after HW Prosperpolder.

c) Draught greater than 145 dm:

a. With destination locks Right Bank, these ships sail on entering CP on HW + 15 min. Prosperpolder.

b. With destination Kieldrechtsluis, these ships sail on their entering the estuary Deurganckdok 40

minutes after HW Prosperpolder. This will be evaluated after 6 voyages with these types of ships.

3. The order of arrival at CP, according to the port planning of the HA, is partly determined by the imposed RTA CP and is

translated and endorsed by the GNA as early as possible and preferably before pilotage in a sequence of ascents, taking

into account the overall traffic picture within the GNB area.

4. The ship shall be treated as a priority by the harbour service.

5. The ascending ship shall begin its voyage at the beginning of its tide frame. This means that the vessel has left at the

pilot station at least 60 minutes before the end of its tide frame.

6. After consultation with the head of the Nautical Service VBS and/or the operating pilot and the GNA, the final time of

arrival at Vlissingen's harbour shall be determined by the GNA.

7. The ship should preferably be at the front of the lock, but at a distance from the lock doors so that the lock tugs have

sufficient space to assist the ship adequately. For the right bank, ships with a width of 43 metres or more should

preferably be operated via the Berendrechtsluis.

8. The ship should preferably leave at the beginning of its tide frame and be battlegged on the river at least 60 minutes

before the end of its tide frame.

9. The maximum draught is 145 dm for the ascent from the Zandvliet/Berendrecht complex and the Kieldrechtsluis. For

ascents from the Kieldrechtsluis, larger draughts can be allowed provided that the ship indicates the current

manoeuvring speed on the river section and on the sea section for each individual permit.

For container shipping, larger draughts are permitted, provided that:

a) The draught of 152 dm shall not be exceeded.

b) Such a ship shall declare for each individual authorisation the current status of the ship manoeuver speed

through the water on the river section and on the sea section.

Contrary to the first paragraph of point 9, a maximum draught of 140 dm shall apply to the types of bulk carriers,

tankers and ships with similar manoeuvring characteristics. For these ships, a speed of 11 knots is calculated on the river

section and a speed of 2 knots on the sea section. The GNA may deviate from the 140 dm draught for an individual

admission, provided that the ship guarantees in writing that it will be able to meet the required speeds.

10. Ships with a draught between 120 dm and 135 dm will receive an indicative tide frame from the GNA as soon as possible after the application has been submitted.

Page 25: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

11. The GNA will decide on the tide frame of a descending ship with a draught from 135 dm, between 12:00 AM and

6:00 AM before departure from the berth.

However, the GNA will, at the ship's request, already give out indicative tide frames at an earlier stage.

12. A second river pilot is mandatory for ships with destination to and from the locks.

13. Two pilots are required on the river section, at least one of the highest category.

14. Instructions concerning shipping meetings:

a) On the sea section: for the ascent/descent there are no restrictions on the ascent/crossing.

b) On the river section: In view of the size of the vessel in relation to the dimensions of the fairway, avoid

encounters with the following vessels in the Pas of Borssele and the “Narrow” of Bath:

– Ships subject to the provisions of Joint Notice 02-2009 (large vessels, gas ships),

– Special and non-normal transports,

– Oversized ships.

15. With a wind force of more than 7 Bft. at the North Sea and Europe terminal, locks or Deurganckdok no permission

will be given for ascent and descent.

16. Trip planning for the ships referred to in paragraph II, destined for the North Sea terminal:

a) For the North Sea terminal berth S 903 (with possible overlap of 5905) ships larger than 300 metres may

mooring/unmooring only during the high tide, until 1 hour after high tide. It is not allowed to moor/unmoor

from 1 hour after HW to LW.

b) For the remaining berths, ships may moor and depart at any time according to their tide frame, if any.

C) Additional conditions for the ascent an descent of the ships referred to in 11.3

The following additional conditions are attached to the ascent and descent of the said vessels:

C. 1. Overview of the additional conditions

Maximum wind force (measured at the ZandvietlietlietlBerendrecht complex or Kieldrechtsluis):

Destination/departure Berendrechtsluis or Kieldrechtsluis:

Both on the ascent and descent to/from the locks: 5 Bft.

Destination/departure tide-bound container terminals:

Ascent: 6 Bft.

D: 7 Bft.

Maximum draught:

Destination/departure Berendrechtsluis

Ascent: 155.6 dm.

Descent: 145 dm.

a) if the Berendrecht lock is at target depth.

b) if the navigational route from the Berendrechtsluis to the pilot crossing point is at target depth.

c) if a large draught or other causes slow down the speeds referred to in §4 of the appendix, this element shall be taken

into account in the implementation of the conditions.

Destination/departure Deurganckdok and Northsea terminal:

Ascent: 155 dm.

Descent: 152dm.

Page 26: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

a) if the navigation rout from the berth to the pilot crossing post is at target depth.

b) If a large draught or other causes, slow down speeds referred to in §4 of the appendix, this element shall be taken

into account in the implementation of the conditions.

For ascending with a greater draught, the GNA may give its consent if the ship in question gives up a guaranteed speed

through the water that makes this possible and if the circumstances permit navigation at those speeds.

On route Vlissingen Harbour - Antwerp or v. v. strive for:

– A minimum distance of 3 miles between the vessels larger than 300 metres and the vessel referred to in this article

to be stowed above buoy 35 (sailing in the same direction). The aim should be to establish definitively the sequence

of ships sailing more than 300 metres before Vlissingen Harbour.

– The pilots of these ships are exchanged by the harbour service with a separate harbour boat and this as early as

possible in the harbour area.

– The location and mode of change of the pilot is determined by nautical elements such as wind direction, traffic

intensity, pass time Vlissingen harbour,.... which can vary from start up to start up. On simple request, this can be

changed by the operating pilot. This must be reported in good time through the appropriate channels.

– If a ship is not “head-out” in the Deurganck dock, the ship can only depart from the high tide to high water.

– Three hours before the ship actually departs from its berth, this is reported by the Zandvliet Traffic Centre to the

GNA.

C. 2. Concluding agreements to make with service providers and parties in the chain (see appendix 1)

IV. NEW SHIP TYPES TO SIGN IN WITH DIFFERENT CHARACTERISTICS, THAN THE SHIPS MENTIONED IN I AND II.

In the case of such ships, the concerned shipping company must, at least twee months before the ascent to Antwerp,

submit a written application accompanied by a ship's file to the Joint Nautical Authority (GNA).

The ship's file must contain the following documents:

– Ship's principal particulars

– Ship's harbour speed table

– Result of Crash Stop Astern Test

– Result of Turning Circle Test

– Result or Zig Zag Test

– Result of Lowest Revolution Test Main Engine

– Result of Bow Thruster Test

– General arrangement plan

– Mooring arrangement and anchor handling plan

– Table of Lateral wind-pressure forces

The written request, accompanied by the ship's file, must be sent to the following address:

Gemeenschappelijke Nautische Autoriteit, Commandoweg 50,4381 BV in Vlissingen.

tel. 0031- (0)118 424 760 or 0031- (0)118 424 758, fax. 0031- (0)118 467 700 or 0031 - (0)118 418 142

On the basis of the ship's file, the GNA will, in consultation with the two pilotage services and in coordination with the

Permanent Committee, assess within 8 weeks whether and under what conditions authorisation will be granted for the

ascent and descent of the type of ship concerned for which a written application has been submitted.

Page 27: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

V. EVALUATION

One year after the implementation, the provisions of this publication will be evaluated by the nautical technical

guidance committee.

VI. IMPLEMENTATION

This publication will be published in the Netherlands Government Gazette and the Belgian Official Gazette and will enter

into force on 26 June 2017.

The Joint Publication 03-2016 hereby expires.

Vlissingen, 22 June 2017

The State Harbour Master Westerschelde The Administrator General Maritime Services and Coast,

Ir. Th.F.J. van de Gazelle Capt. J. D’Havé

Page 28: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Appendix: Making close agreements with the service providers and parties in the chain

1. Port of Antwerp Authority (HA):

– When descending to the docks, the lock must be empty and available from Saeftinghe

– Tugboats HA: tugs available and useable on binding pilot advice

– For ships requiring exchange, the agent shall provide before the start of the voyage a "fallback position/moving

possibility" at the North Sea Terminal - Europe terminal - Deurganckdok which will be available at passage CP

which is linked back to the GNA. If this exchange is not possible during passage CP, because the requested berth

is not free at that time, the fallback position must be immediately available.

– The waterway must be at depths from the Berendrechtsluis to the Delwaides dock berth.

– At least four times a year, the Zandvliet- en Berendrechtsluis is gauged and the gauges are made available

digitally to SNMS via ENC maps.

– The water levelling of the locks in Antwerp shall be coordinated in function of the ascent/descent of the ships

referred to in this appendix.

2. Towing service on the river section:

– Before ascent:

– 3 tugs must be initially available and finally ready on binding pilot advice

– Before descent:

– Minimum 2 tugs in function of the weather, wind and current, on binding pilot advice

– By the river pilots/ACC pilot prior contact is made with Brabo about the possible need for additional towage

assistance.

3. Pilotage services

3.a. River:

– Seagoing pilots and river pilots shall be present in good time, respectively at the pilot crossing points, at the

descent location and in the harbour of Vlissingen.

– In any event, both on NL and FL side, on the river section a pilot is on board who has followed training for this

type of vessel on a simulator approved by the GNA.

– FULL SNMS navigation system "FULL SNMS" is used on the river section.

– In the case of ships of the above class, the aim is to deploy two pilots of the highest category on the river section

for ascent and descent.

– A joint instruction on the application and implementation of this Joint Publication will be carried out issued by

the GNA, in coordination with the pilotage services

3.b. Brabo pilot service:

– The ship is piloted by a "dedicated pilot", who has followed a training course for this type of ship on a simulator

approved by the GNA. This pilot shall be on board in good time.

4. Drawing up a balanced sailing schedule:

– The calculation of the sailing schedule and keel clearance is done by means of WESP, the data are secured.

– In ascent, the tide frames are calculated with 14 knots on the sea section and 12 knots on the river section.

– In descending voyages, the tide frames are calculated with 15 knots on the sea section and 11 knots on the river

section.

5. Far advanced traffic guidance:

– Shipping from the lock complex Zandvliet/Berendrecht, Terneuzen and Hansweert will be stopped for a moment

at passage time.

Page 29: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

Joint Nautical Jurisdiction Scheldt Area

Joint Nautical Authority

Commandoweg 50 NL-4381 BH Vlissingen

This publication and any annexes may be downloaded from www.vts-scheldt.net

Joint Nautical

Authority

BASS Publication to the Shipping Scheldt area

Waterway: GNB Jurisdictional Area

Description: Admission and departure regulation to/from Antwerp, change of drawing

Ref. Bass 058-2017 – Joint Publication 03-2017

The Joint Nautical Authority announces that the drawing on page 2 of the Joint Publication 03-2017

should be replaced by the following drawing.

The amendment has already been implemented in the publications in the Netherlands Government

Gazette and the Belgian Official Gazette.

Vlissingen, 26 June 2017

The State Harbour Master Westerschelde, The Administrator General of the Maritime

Service and Coast Agency, on his behalf, on his behalf, The GNA advisor The Nautical Chief of Service GNA

V.H.J. Baetens B. Meynen

Bass No 059 - 2017

Page 30: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

30

Appendix 3.

Original equipment manufacturer specifications Antwerp

Gateway cranes:

• Kalmar (3 x heightened up to 43 m, 3 x not heightened) – p. 31

• ZPMC (2 x heightened up to 50 m, 3rd will be heightened in 2018) – p. 32

• Liebherr (2 x 52 m, operational in 2018) – p. 33

Page 31: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the
Page 32: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the
Page 33: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the
Page 34: Antwerp Gateway is ready to handle your +20.000 TEU vessels€¦ · Antwerp Gateway is ready to handle your +20.000 TEU vessels Located at the upper end of the tidal estuary of the

©D

P W

orl

d A

ntw

erp

, Mo

len

we

g H

ave

n 1

950

, 913

0 D

oe

l - N

ove

mb

er

2017

CONTACT

DP World Antwerp Gateway Molenweg Haven 19509130 DoelBelgium

Steve Declercq, commercial director+32 3 730 40 05+32 478 39 39 [email protected]

www.dpworldantwerp.com Twitter: @DPWorldAntwerp LinkedIn: DP World Antwerp