anthony independent school district al flores jr., director maintenance and operations department...
TRANSCRIPT
ANTHONY INDEPENDENT SCHOOL DISTRICTAl Flores Jr., Director
Maintenance and Operations Department620 Sixth Street, Anthony Texas, 79821-1279
Phone: (915) 886-6516 Fax: (915) 886-2420
Web-based Maintenance Work Order Program
“Schooldude.com”
Functions of the Maintenance Department
• Building remodeling• Chemical maintenance program• Electrical repairs• General building repairs• HVAC/ Heating repairs• Lighting issues (2007-2008 includes bulb replacement)• Major painting projects• New construction• Pest control• Plumbing repairs• Preventative maintenance• Roof repairs• Vandalism damage (non-paint related)
Functions of the Grounds Department
• The Grounds Department reports directly to the Maintenance Director
• The Department is responsible for the following areas of the district.– All athletic fields– All playgrounds– All Irrigation Systems– Maintenance and scheduling of watering of the following areas:
• Grass areas• Trees• Shrubs• Xeriscaped areas
– Weed control district wide– Outdoor pest control– Recovery of all ecological trash (Leaves, branches, etc)
Functions which are NOT the responsibility of the Maintenance
Department• Cleaning Responsibilities• Distributing supplies/equipment• Floor maintenance (Cleaning, polishing, etc.)• Furniture Repair• Minor nuts & bolts repairs• Moving or assembling furniture• Ordering or distributing custodial supplies• Touch-up painting• Trash pickup and cleaning (in campus areas and
parking lot)
Implementation of the Web-based Work Order System
• Traditional paper based system obsolete
• Provides instant feedback to the requestor
• Allows for better planning by the Maintenance Department
• Allows access to the system on any computer with internet access
• Administrators are given the opportunity to “See” what is occurring on their campus
• An integral tool for the Administration Department for future budget planning
• An essential tool for the Maintenance Department for future equipment replacement planning and preventative maintenance procedures
STEP 1
SITE ADMINISTRATORAPPROVES OR
DISAPPOVESTHE REQUEST
MAINTENACEWORK ORDERCOMPLETED
BY THE REQUESTOR
REQUESTORAND SITE
ADMINISTRATORIS NOTIFED OF THE
COMPLETION OF WORK
ONCE APPROVEDTHE WORK ORDERIS PROCESSED BYTHE MAINTENANCE
DEPARTMENT
MAINTENACEDEPARTMENTCOMPLETESTHE WORK REQUESTED
WORK ISINSPECTED
FOR COMPLETIONAND
WORKMANSHIP
All AISD Employees will be assigned a SchoolDude login name
Welcome, to our request submittal service called "MySchoolBuilding.com". This service allows you to submit work requests directly to our maintenance department via the internet.
Your password to submit work requests is "wildcats".
1) Click this URL: http://www.myschoolbuilding.com. (To make theprocess faster, you may want to bookmark this URL.)2) Type in this account number 761687452 3) Click "Submit Organization" button and the request submittal pagewill appear.4) Type in your request information along with the other requiredinformation such as your name and submittal password and click thesubmit button. (Your password is indicated above in this message.)5) Your new request will then appear in a list on the left. You canedit new requests until they have been assigned.
For more questions or concerns please feel free to contact me at mailto:[email protected] or .
We look forward to serving you,Al Flores
Once you are signed in as a user, the following email will be sent to you:
As a user, you will be able to enter a work order from your classroom computer.
Procedure for logging into the Maintenance Work Order System
• Open the Anthony ISD website: www.anthonyisd.net
• Click on the Maintenance Department Page
• Click on the SchoolDude.com Icon• Under the Email Address box, Type in
your A.I.S.D. email address ex: [email protected]
• The Maintenance Work Order Request will show up on your screen
Creating a new Maintenance Work Order
(ALL FIELDS WITH A RED CHECKMARK BOX IS A REQUIRED FIELD)• Step 1:
– Please be yourself, click here if you are not Al Flores• Your information should come up in the text boxes under this heading
• Step 2: – Location
• The pulldown menu will show all the applicable locations around the campus.– Area
• The pulldown menu will show all the applicable areas around the campus.– Area/Room Number
• Add your room number here or the description of a specific area – Yes, remember my area entries for my next new request entry.
• Click on this box if you wish for your room to be your default location for future use
• Step 3– Select Problem Type:
• There are icons which define the task requested (If this is an emergency, click on the check box)
• Step 4 – Please describe your problem or request.
• Type in a detailed description of the work or problem to help the Maintenance department further isolate the problem
• Step 5– Submittal Password
• The password that you receive in your initial email will be used in this field- The request will not be filled otherwise
• Step 6– “SUBMIT”
What happens to My Maintenance Work Order (MWO) once I submit it?
• Your work order is assigned a number and submitted to your site administrator: (Principals, Food Service Director, Transportation Supervisor, etc.)
• Your site administrator will determine the validity of the request. At this point they will either approve or reject it.
• If your request is denied, you will be notified via e-mail• If your request is approved, the MWO will be forwarded
to the Operations Manager for assignment and completion
• This system is designed to maintain a direct line of communication with you as the requestor and with the Maintenance Department via e-mail
Managing your Maintenance Work Order Account
• In your Request Page, you can click on the “My Requests” tab– This page will show all requests you have submitted.– You can check on the status of your request by clicking on it.
• This will tell you if your request has been approved or disapproved• If approved, the status of the work completion will be shown:
– If an inspection was conducted, the results of the inspection are shown.– If parts are required, the order status is shown– If problems arise, the feed back is shown
• Once completed, this status will be reflected on the website
• In addition to the website access, emails as to the status of the MWO will be sent to your email box
QUESTIONS?