Inspection Findings, Anomalies & Recommendations Summary Report
CLIENT's Scope of Work Name
Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good
Item
No. Unit
Component
InspectedAnomaly PHOTO / ANOMAL
Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E - Little or No Attention
Prioritynspection Findings/Anomalies Recommendationsating
Date Inspected:
-
8/12/2019 Anomaly Spreadsheet Sample by Michelle
2/7
Coating Structural Coating Structural Coating Structural Coating Structural
CLIENT
Inspection Findings, Anomalies & Recommendations Summ
CLIENT's Scope of Work Name
Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good
Item
No.Unit
Component
Inspected
Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months
Prioritynspection Findings/Anomalies Recommendationsating
7 GT 3 & 4 Manifold -GT4
Valve Approximately 75% coating failurenoted
There are a few areas of moderate
localized corrosion noted on thevalve body and some moderate to
heavy scaling observed on the top
2 3
Clean, de-scale,
inspect and
recoat affected
areas withPowergen
approved coating
system
De-scale andrecoat
D C
8GT 3 & 4 Manifold -
GT4
6"Flanged
Connection100% coating failure
Heavily corroded flanged
connection with severe metal loss
and missing bolts
1 1
Clean, de-scale,
inspect and
recoat affected
areas with
Powergen
approved coating
system
Before this
system goes into
service, these
flanges should
be replaced
A A
9 GT 3 4"Piping
Approximately 70% coating
failure overall with moderate to
heavy moss build up on the line
on the underside and
throughout in several areas
Slight corrosion in areas of
coating failure
3 4
Clean, de-scale,
inspect and
recoat affected
areas with
Powergenapproved coating
system
De-scale and
recoat
D E
-
8/12/2019 Anomaly Spreadsheet Sample by Michelle
3/7
Coating Structural Coating Structural Coating Structural Coating Structural
CLIENT
Inspection Findings, Anomalies & Recommendations Summa
CLIENT's Scope of Work Name
Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good
Item
No.Unit
Component
InspectedAn
Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E
Prioritynspection Findings/Anomalies Recommendationsating
10 GT 3 4" FlangesApproximately 75% coating failure
noted
Moderate to heavy scaling with
metal loss at underside edges of
the flanges, in between the flanged
connections and around the bolt
heads at one flange
3 2
Clean, de-scale,
inspect and
recoat affected
areas with
Powergen
approved coating
system
De-scale, re-
inspect, and
once acceptable,
recoat.
C D
11 GT 3 Instrument Support Approximately 25% coating failure
Moderate corrosion with flaking of
metal on the underside edges of the
clamp of the instrument support
3 3
Clean, de-scale,
inspect and
recoat affected
areas with
Powergen
approved coating
system
Remove clamp,
de-scale, recoat
and replace
support
D D
-
8/12/2019 Anomaly Spreadsheet Sample by Michelle
4/7
Coating Structural Coating Structural Coating Structural Coating Structural
CLIENT
Inspection Findings, Anomalies & Recommendations Summary R
CLIENT's Scope of Work Name
Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good
Item
No.Unit
Component
InspectedAnomaly
Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E - Lit
Prioritynspection Findings/Anomalies Recommendationsating
12 GT 4 4"Piping System
Generally, the entire system is with
approximately 85% coating failure
including isolated areas of flaking
and heavy moss growth underside
piping throughout
At areas of failed coating, there is a
presence of light corrosion3 3
Clean, de-scale,inspect and
recoat affected
areas with
Powergen
approved coating
system
Clean offunderside and
other areas free
of moss. Clean,
de-scale and
recoat
D C 12
-
8/12/2019 Anomaly Spreadsheet Sample by Michelle
5/7
Coating Structural Coating Structural Coating Structural Coating Structura
CLIENT
Inspection Findings, Anomalies & Recommendations Sum
CLIENT's Scope of Work Name
Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good
Item
No.Unit
Component
Inspected
Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months
Prioritynspection Findings/Anomalies Recommendationsating
13 GT 4 Piping Support
Piping supports are with
approximately 40% coating failure
overall
The most northern pipe support isheavily corroded at the area just
under the support plate. On the 2
most northern supports, there is
evidence of movement noted from
the failed coating on the piping
3 2
Clean, de-scale,
inspect andrecoat affected
areas with
Powergen
approved coating
system
De-scale pipe
support and
inspect the
heavily corrodedarea's integrity.
Renew the
section if need
be and recoat
with Powergen
approved coating
system
C B
14 GT 4 4" FlangedConnections
100% coating failure Heavy scaling observed aroundthe nuts
2 2
Clean, de-
scale, inspect
and recoataffected areas
with Powergen
approved
coating system
De-scale,inspect and
recoat
C C
15 GT 4 1 " ValveApproximately 85% coating failure
on the flanged connections of this
valve
Deteriorated valve packing noted 3 2
Clean, de-scale,
inspect and
recoat affected
areas (excluding
flange gasket
seating area)with Powergen
approved coating
system
Change out
packing at next
carded
turnaround, but
monitor valve
gasketmeanwhile
through annual
inspections
D D
-
8/12/2019 Anomaly Spreadsheet Sample by Michelle
6/7
Coating Structural Coating Structural Coating Structural Coating Structu
CLIENT
Inspection Findings, Anomalies & Recommendations Sum
CLIENT's Scope of Work Name
Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good
Item
No.Unit
Component
Inspected
Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months
Prioritynspection Findings/Anomalies Recommendationsating
16 GT 5 Entire Piping System
There are numerous areas ofcoating failure noted throughout the
system such as runs, sags, "fish
eyes", mechanical damage and
failure due to contaminated
surfaces. Newly coated areas
exhibit many symptoms of poor
preparation and application of
coating techniques. Underside of
almost all the piping has moss build-
up (with corrosion) due to
condensate presence.
Underside of piping exhibits slight
corrosion developing due to
poor/lack of coating coverage and
the presence of moisture.
3 3
Clean free of
moss and all
contaminants, de-
scale and recoat
to Powergen
approved coating
system
Clean free of
moss and all
contaminants, de-
scale, inspect
and recoat
D D
17 GT 5 Piping Support
Evidence shows that the pipe
supports were not removed to
recoat the piping
Crevice corrosion is noted at some
of the contact areas between the
piping and piping support as well as
at some of the areas where is
visible at the clamps
3 3
Remove clamp,
clean, de-scale
and recoat as
per Powergen
approved coating
system
Remove clamp,
clean, de-scale,
inspect and
recoat
D C
18 GT 5
-
8/12/2019 Anomaly Spreadsheet Sample by Michelle
7/7
Coating Structural Coating Structural Coating Structural Coating Structural
CLIENT
Inspection Findings, Anomalies & Recommendations Summary Report
CLIENT's Scope of Work Name
Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good
Item
No.Unit
Component
InspectedAnomaly PHOTO / ANOM
Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E - Little or No Attention
Prioritynspection Findings/Anomalies Recommendationsating
19 GT 5 19
20 GT 5 20
20 GT 5 21