TOOLIK GIS ANNUAL STEERING COMMITTEE MEETING: January 31 , 2019 Annual Toolik GIS Report

Upload: others

Post on 03-Sep-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

TOOLIK GIS – ANNUAL STEERING COMMITTEE MEETING: January 31, 2019

Annual Toolik GIS Report

Page 2: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Overview

• Highlights From 2018

• Website Usage & Metrics

• Summer Internship Program

• Archaeological Survey

• Repeat Aerial Photographs

• Unmanned Aerial System (UAS) Services

Page 3: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Requests Completed

2014: 253 Requests from 33 Institutions

2015: 213 Requests from 36 Institutions

2016: 203 Requests from 39 Institutions

2017: 224 Requests from 34 Institutions

2018: 207 Requests from 33 Institutions

Page 4: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Website Usage - Metrics

1. Homepage

2. General Maps

3. Data Download

4. Maps Homepage

5. Thematic Maps

10 Most Popular Pages

6. Plots/Permits

7. Photos/Imagery

8. Online Mapping – Research Sites

9. Service Request

10. Online Mapping

Downloads - Oct. 1, 2016 to Sep. 30 2017

Maps – 468 Unique Users, 191 Maps, 3892 Downloads

GIS Data – 226 Unique Users, 51 Files, 1651 Downloads

Page 5: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Requests

Site Selection• Provided Assistance to 9 Research Groups

• Vole Project

• Ameriflux

• Renier Geisler (INTERACT)

• Arctic LTER

• Maija Marushchak (INTERACT)

• Doak & Morris

• Ruud Riijkers

• Alireza Tabatabaeenejad

• Yonghong Yi

Page 6: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Upgrades to Common Use Boardwalk

• Continued Collaboration With CPS Staff and Toolik Researchers

• South of Toolik in Good Condition

• Imnavait Main Boardwalk Repaired

• Toolik Inlet / Lake I-8

Page 7: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Summer Internship Program

• Hands On Training and Experience

• Spatial Surveying Tools, Techniques, and Processing

• Contributed to GIS Program

Page 8: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Archaeology Survey Support & Coordination

• On-site Archaeology Survey - Summer 2018

• Planning Meetings, Data Sharing

• Toolik GIS Staff On-Site During Survey

Page 9: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Fire Management at TFS

• Meetings With BLM Fire Management Office

• No Retardant in Zone Around TFS

• Prioritize Saving Equipment in Field

Page 10: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Aerial Photo Collection 2018

Page 11: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

UAS Services

• 2017 Proof of Concept

• 2018 Offered Services to Research Community

• Services in High Demand

• Had to Defer Some Projects Until 2019

• Committed to Supporting 7 Research Projects

Page 12: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

UAS Services

34,000m2

Page 13: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

UAS Image Processing

• Desktop Computer: 3.5 Days Processing

• Desktop Cost - $6200

• Amazon’s “Ferrari” Instance: 6.5 Days Processing

• Processing Cost - $4415.26

Page 14: Annual Toolik GIS Report...•Amazon’s “Ferrari” Instance: 6.5 Days Processing •Processing Cost - $4415.26 Toolik GIS Title PowerPoint Presentation Author Administrator Created

Toolik GIS