annual report 2017 air navigation … visibility of taxiway w, the main apron and the north apron,...
TRANSCRIPT
4
4730
FIGURES
FOREWORD
COMPANY PROFILE
SUPERVISORY BOARD
ORGANISATIONAL STRUCTURE
PERFORMANCE INDICATORS
SAFETY & INTEGRATED MANAGEMENT SYSTEM
OPERATIONS
DEVELOPMENT & INVESTMENT
HUMAN RESOURCES
SIGNIFICANT EVENTS AND SOCIAL COMMITMENT
FINANCIAL STATEMENT
INDIPENDENT AUDITOR’S REPORT
GLOSSARY
9
13
19
31
37
43
63
77
97
103
113
117
127
134
5
Company name:ALBCONTROL SH.A
Address:P.O Box 8172Rinas, Tirana,Albania
Telephone:+355 44 542 101
Fax:+355 42 375 805
Email:[email protected]
Website:www.albcontrol.al
10
Total Number ofFlights 191,533 Size (km2) of Controlled Airspace 36.000
Percentage ofOverflights
Percentage of InternationalDepartures and Arrivals
Peak of the DayAugust 2017
8713
989
11
Other
Middle East - Europe
Europe - Middle East Asia
Africa - Europe
Europe - Africa
Europe - Europe
3%
3%
5%
6%
11%
72%
Flights perRegion Pair 2017
14
The Annual Report 2017 presents ALBCONTROL’s achievements in increasing safety and quality of air navigation services in Albania during this successful and dynamic year.We have completed a four year investment to upgrade Tirana Tower, by installing cutting edge technological equipment in new consoles to facilitate the work process for air traffic controllers, in order to operate safely and to provide high quality services.The activation of the Remote Surface Manage-ment System (RSMS), has significantly Improved the visibility of taxiway W, the main apron and
the north apron, it has eliminated several blind spots and it has enhanced visibility of take-offs and landings during darkness and other low visibility conditions.The improvements done to the Skyline System over the last few years have brought, among other improvements, the automation of the Control Tower’s functions, the improvement of coordination and exchange of information, a speed up in terms of data processing, and an increased safety during landings and take offs. As part of this 4-year investment, the CRS (Centralized Rostering System) and PRS (Personal Rostering System) have enabled online communication with all users, reviewing every request through the use of the online Personal Rostering System (PRS). Additionally PRS can also be downloaded as a mobile application, and is available for
15
smartphones (Android and iPhone). Since December 2017, Free Route Operations in Albanian Airspace (FRALB) have been applied 24/7. The FRALB implementation offers significant opportunities to airspace users, increasing the efficiency of air traffic in our airspace, and significantly contributing towards the reduction of harmful environmental impacts caused by aviation through the reduction of CO2 emissions. With the implementation of the FRALB, traffic increase is expected, and thus the airspace will become more complex. In order to support ATCO in safely handling traffic, ALBCONTROL has implemented significant improve-ments in the Skyline system by creating a Stripless environment in Tirana ACC, assuring silent automatic coordination between ATC sectors, and by employing additional ATC tools for conflict detection. During 2017, ALBCONTROL provided zero delay services, fulfilling one of the main required EU standards to operate safely and to provide quality services.Our operations remained at a high level, as confirmed by the customer satisfaction surveys that we perform regularly. Furthermore, we also continued our dynamic and proactive development as part of the growing industry that is the aviation field. In this Annual Report of the year 2017, we have the pleasure to present some pictures of the early stages of the aviation in Albania, collected from archives of the time, representing images of the first flights and airports in Albania.
Belinda BallukuDG ALBCONTROL
16Entrance of Tirana Airport XVII The construction of Tirana Airport (Lapraka) began in 1934 and finished towards the end of 1935. Officially named Tirana Airport, the new facility was built in compliance to the optimal technological parameters of the time, with an asphalt-concrete runway (1200X400 m), advance technical equipment and appropriate buildings.
20The first aviation field of Tirana, 1921. Built on the area of “Shallvare”, approx. 400X200m. Domestic flights to Vlora and Shkodra.
HISTORY
VISION
ALBCONTROL manages and controls the airspace of Albania (FIR) in accordance with the national and international standards of air navigation services. Our company is a 100% state owned joint stock Company, property of the Ministry of Economic Development Trade, Tourism and Entrepreneurship, established as state-owned enterprise since 1992. Since 2003, ALBCONTROL has been a member of EUROCONTROL. In 2009 ALBCONTROL joined CANSO and since January 2016 it has become a full member of CANSO Region Europe.
Being responsive to the dynamics of the requirements of customers’ need, we are determined - based on safety and investment, to be an important growing factor in the international level of Air Navigation Service Providers.
21“Korca Airport, 1929”
MISSIONThe mission of ALBCONTROL is to provide air navigation services in the Albanian FIR, in compliance with international standards regarding safety, quality, and environmental care, as well as being customer oriented.ALBCONTROL uses its human resources, as well as operational, technical and financial as-sets to successfully execute its mission and reduce delays in operations in an effort to increase air traffic capacity.Cooperation with neighbours and partners in the field of air navigation is an important tool to successfully achieve our mission.
22
Main ActivitiesOf Albcontrol
+ AIR TRAFFIC MANAGEMENT + AERONAUTICAL INFORMATION SERVICE + COMMUNICATION+ NAVIGATION+ SURVEILLANCE + METEOROLOGICAL SERVICES
24
MajorCustomers
MAJOR TERMINAL CUSTOMERS 2017
MAJOR EN-ROUTE CUSTOMERS 2017+ TURKISH AIRLINES + AEGEAN AIRLINES + EASYJET AIRLINES+ BRITISH AIRWAYS+ EGYPTAIR+ AIR FRANCE+ LUFTHANSA+ SAUDIA+ ETHIOPIAN AIRLINES+ RYANAIR
+ BLUE PANORAMA+ ERNEST SPA+ ALBAWINGS+ ALITALIA SAI SPA AS+ TURKISH AIRLINES+ AUSTRIAN AIRLINES+ ADRIA AIRWAYS+ ALITALIA S.A.I. SPA+ MISTRAL AIR ROMA+ AEGEAN AIRLINES
25
+ A. E. DISTRIBUTION + 4 A - M + TRAINING MANAGEMENT CONSULTING – TMC + C & M ALBANIA + AIR COMMUNICATION + INFOSOFT SYSTEMS + R & T+ LEIDOS INNOVATIONS GLOBAL+ FREQUENTIS AG
Partners andSuppliers
26
In order to ensure the optimal delivery of provisions of the air navigations services, ALBCONTROL obtains, every year, a large quantity of quality feedback, through a detailed Customer Satisfaction Questionnaire from various airlines. This process enables ALBCONTROL to continuously improve services and adequately meet customer expectations. Always focusing on the safety, efficiency and cost effectiveness of the services of air navigation, ALBCONTROL uses the Customer Satisfaction data to react proactively, to refine investments plans, and to improve operations & quality of service. This is done in order to be responsive to the customer needs as they may change or develop.
CONSULTATION WITH USERS
Fiat G50, Aviation field, Tirana 1940
27
PERFORMANCE TREND 2014 - 2017
CSI
AIS + ATS + MET Customer Satisfaction Indicator
20 1 4 20 1 5 20 1 6 20 1 7
Fiat G50, Arrow RA 24, Squadron 354, Aviation field, Tirana, January 1941
28
INTERNATIONAL PARTNERSHIP
ICAOThe ICAO (International Civil Aviation Organization), is a UN specialized agency, created in 1944 upon the signing of the Convention on International Civil Aviation (Chicago Convention). Albania has been a member of the agency since 1991.
ECACAlbania has been a member of the ECAC (European Civil Aviation Occupation Conference) since 1998. Its mission is the promotion of continued development of a safe, efficient and sustainable European air transport system.
EUROCONTROLEUROCONTROL (European Organisation for the Safety of Air Navigation) based in Brussels, is an intergovernmental Organization with 41 Member States, committed to building, together with its partners, a Single European Sky. Albania became member of the organisation in 2002.
29
ECCASigned in 2006 the ECAA (European Common Aviation Area), is an agreement with partners from South-Eastern and Northern Europe: Albania, Bosnia and Herzegovina, Croatia, the Former Yugoslav Republic of Macedonia, Montenegro, Serbia, Kosovo under UNSCR 1244, Norway and Iceland.
BLUE MEDThe BLUE MED FAB, is a cooperative project of several air navigation service providers (ANSPs) from Cyprus, Greece, Italy, and Malta. Albania became an Associated Partner of the BLUE MED FAB in 2008.
CANSOAlbania is full member of CANSO since 2009. The Mission of CANSO is to be the global voice of air traffic management (ATM) in the transformation of the aviation system, creating value for members and stakeholders. Starting from January 2016 Albania is full member of CANSO Europe Region.
33
MR. GENC GJONÇAJChairman of the Supervisory Board
MRS. MIRLINDA KARÇANAJVice Chairman of the Supervisory Board
MRS. BELINDA IKONOMIMember of the Supervisory Board
MRS. ALBANA KOÇIUMember of the Supervisory Board
MR. ADMIR ABRIJAMember of the Supervisory Board
MR. HALIL HYSENIMember of the Supervisory Board
“Tirana Airport, Lapraka, 1941”
38
DIRECTOR GENERAL
INTERNAL AUDIT
OPERATIONAL DIVISION
TECHNICAL DIVISION
ADMINISTRATIVE DIVISION
SAFETY & IMS DIVISION
EXTERNAL RELATIONS DIVISION
SupervisoryBoard
39
DG Cabinet
Aeronautical Information ServiceAir Traffic ServiceATM Development & Strategy
Systems DirectorateSystems Monitor & Control DirectorateMaintenance Site & Power SupplyMET SectorIT Directorate
Human Resources DirectorateLegal DirectorateProcurement DirectorateEconomic DirectorateSupporting Systems Directorate
Information Security OfficeSafety DirectorateQuality & Standards DirectorateSecurity Directorate
Foreign Relations OfficeInstitutional RelationsPublic Relations Office
44
Exempted Flights - 0.85%
Arrivals / Departures - 12.71%
Overflights - 86.44%
165,
56
1
24,3
36
1,6
36
TRAFFIC VALUES
45
0
5,000
10,000
15,000
20,000
25,000
20162017
JA N F E B M A R A P R M AY J U N J U L AU G S E P O C T N OV D EC
Due to the increased number of over-flights within Europe and the traffic from Europe to Africa, over-flights slightly increased compared to 2016 by 2.26%.
EN-ROUTE FLIGHTS 2016-2017
46
“EN-ROUTE” SERVICE UNIT 2017
Total Service Unit increasedby 2.6% compared to 2016
Total number ofservice unit for 2017453,737
Number of the chargeableService Unit for 2017450,639
Total Service Unit for 2017 showed the same trend as the number of movements, due to the increased number of civil flights by 3.2%.
47
TOTAL SERVICE UNIT 2012 - 20172012 -2013 -2014 -2015 -2016 -2017 -
4 4 2 , 9 2 14 5 5 , 5 9 54 6 8 , 7 9 94 8 4 , 4 2 64 4 2 , 2 8 04 5 3 , 7 3 7
48
T OP USERS OF “EN-ROUTE” FLIGHTS
+ TURKISH AIRLINES + AEGEAN AIRLINES + EASYJET AIRLINES+ BRITISH AIRWAYS+ EGYPTAIR+ AIR FRANCE+ LUFTHANSA+ SAUDIA+ ETHIOPIAN AIRLINES+ RYANAIR
“Tirana Airport, Lapraka, 1941”
49
TERMINAL FLIGHTS 2016 - 2017
0
500
1,000
1,500
2,000
2,500
3,000
JA N F E B M A R A P R M AY J U N J U L AU G S E P O C T N OV D EC
20162017
50
TOP TERMINAL USERS FOR THE “MOTHER TERESA” AIRPORT
+ BLUE PANORAMA+ ERNEST SPA+ ALBAWINGS+ ALITALIA SAI SPA AS+ TURKISH AIRLINES+ AUSTRIAN AIRLINES+ ADRIA AIRWAYS+ ALITALIA S.A.I. SPA+ MISTRAL AIR ROMA+ AEGEAN AIRLINES
Terminal Flights increased by 10 % during 2017 reaching a total amount of 24,336.New airline companies such as “Wizz Air” and “SmartWings” started operations in the “Mother Teresa” International Airport, flying to new destinations such as Budapest, Amsterdam, Prague and London.
51
CHARGES FOR AIR NAVIGATION SERVICES
In 2017, both charges for “en-route” and terminal navigation services at “Mother Teresa” Airport, were set in accordance to the International Civil Aviation Organization rules and the European Commission Regulation EC Regulation No. 1794/2006, applied by Albania since 2008, amended EC No.1191/2010.Pursuant to the Regulation of the European Commission No, 391/2013, during 2017 Albania continued to apply the principle of the full cost recovery method.
The 2017 “en-route” navigation charges were in compliance with “The principles for establishing the cost-base for route facility charges and the calculation of the unit rates”, issued by EUROCONTROL.
ALBCONTROL has been consistently applying a customer oriented policy in setting charges for air navigation services. Prior to final approval, the charges are consulted with air space users. The final consultation with IATA and EUROCONTROL on charges for “en-route” navigation service in 2017 took place in Brussels during the EUROCONTROL Enlarged Committee for the Route Charges in November Session. The Unit rate was approved by the enlarged commission.
52
CHARGES FOR “EN-ROUTE” NAVIGATION SERVICES
Since 2003 the “en-route” service charges are applied based on the rules established in the Multilateral Agreement Relating to Route Charges and EUROCONTROL principles. Consequently, the billing, collection, and recovery of charges for “en-route” navigation services are managed by the Central Route Charges Office (CRCO). The basis for calculation of the “en-route” navigation charges is the rate for Service Unit. The Service Unit is defined as the number of kilometers flown in airspace for the Albanian Republic divided by 100, multiplied by the square root of one fiftieth of the maximum take-off weights of the aircraft (MTOW) in tons.
The basic unit rate for en-route navigation services in 2017 was set at 6,787 ALL = 49.61 € per Service Unit. The cost base was calculated in Albanian ALL. Compared to the 2016 basic unit rate, the 2017 rate represented a year-on-year decrease of 0.3%.
However, the basic rate converted to Euro, which is valid for a period of one year, is used for reference only, as the actual rates paid by users of services for a single calendar month depend on Euro/ALL exchange rate fluctuations during the year.
The chart below shows the developments of monthly charges for “en-route” navigation services against the basic reference rate announced in 2017, depending on the exchange rate movements.
53
DEVELOPMENT OF MONTHLY UNIT RATES
2017 / 9
2017 / 12
2017 / 8
2017 / 11
2017 / 7
2017 / 10
2017 / 6
2017 / 5
2017 / 4
2017 / 3
2017 / 2
2017 / 1
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
49.61 €
51.09 €
50.71 €
50.99 €
50.39 €
51.03 €
50.43 €
51.44 €
50.30 €
51.45 €
50.07 €
51.25 €
50.44 €
Basic Unit Rate (49.61 €)Monthly Unit Rate 2017
54
Eurocontrol member states unit rate 2017 in €
Turk
ey
Spai
n C
an.
Bo
snia
Her
zego
vina
Port
ugal
San
ta M
aria
Uni
ted
Kin
gdo
m
Mo
ldo
va
Slo
veni
a
Serb
ia /
Mo
nten
egro
/ K
FOR
Port
ugal
Lis
bo
a
Swit
zerl
and
FYRO
M
Slo
vaki
a
Arm
enia
Pola
nd
Swed
en
Cro
atia
Rom
ania
Alb
ania
Spai
n C
on.
120
100
80
49.616040
200
Overview of basic unit rates for “en-route” navigation charges of EUROCONTROL member states:
55
Ital
y
Ger
man
y
Net
herl
and
Cze
ch R
epub
lic
Irel
and
Fran
ce
Mal
ta
Cyp
rus
Cro
atia
Hun
gary
Finl
and
Lith
uani
a
Bul
gari
a
Gre
ece
No
rway
Den
mar
k
Latv
ia
Bel
g -
Luxe
mb
our
g
Aus
tria
56
2007 -2008 -2009 -2010 -2011 -2012 -2013 -2014 -2015 -2016 -2017 -
42,204 4,2345,904 4,2543,6543,294 4,8 445,0045,4949,7 74 9, 6 1
UNIT RATE 2007-2017
57
+ VFR flights
+ MTOW up to 2 tones
+ Flights of national importance
+ Military flights
+ Check and test ground navigation equipment’s
+ Customs and police bodies
*Unit Rate values during the last 10 years in Albania have been stable
EXEMPTED FLIGHTS 2017FOR “EN-ROUTE” CHARGES
58
CHARGES FOR TERMINAL NAVIGATION SERVICE
From 1 January 2016 EUROCONTROL is entrusted with the collection of terminal charges on the behalf of ALBCONTROL. The terminal charge is levied for each IFR flight departing from Tirana International Airport (LATI).The terminal charge R is calculated in accordance with the following formula:
R = t x N
Where “t” is the unit rate of charge and “N” is the number of service units corresponding to terminal air navigation services made available.The unit rate t is calculated by dividing the forecast number of total terminal service units for the relevant year into the corresponding cost-base for terminal services.For a given departing flight, the number of service units in respect of terminal charges, designated N, is obtained by dividing by fifty the Maximum Take-off Weight (MTOW), expressed in metric tons, which is used for calculating the EUROCONTROL route charge for the flight concerned, to the power of 0.7.The basic unit rate of charge applicable from 1 January 2017 was EUR 202.07.
59
The rate of interest on late payment of terminal charges applicable from 1 January 2017 was 9.88% per annum.The following flights are exempted from the payment of the terminal charges:+
+
+++
++
Flights performed by aircrafts for which the maximum take-off weight authorized is less than 2 (two) metric tons;Flights performed exclusively for the transport, on official mission, of the reigning Monarch and his/her immediate family, Heads of State, Heads of Government, and Government Ministers. In all cases, this must be substantiated by the appropriate status indicator or remark on the flight plan;Search and rescue flights authorized by the appropriate competent body;Military flights performed by military aircraft of any State;Flights performed exclusively for the purpose of checking or testing equipment used or intended to be used as ground aids to air navigation, excluding positioning flights by the aircraft concerned;Flights performed exclusively under VFR;Humanitarian flights authorized by the appropriate competent body.
60“Inauguration of the first flight with destinations Milano - Ankona - Bari – Tirana, March 1st, 1940”
64
SMS PERFORMANCE INDICATORS
Indicator Effectiveness of Safety Management
Measure Air Navigation Service Provider score ranked A (low) to D (high) against a questionnaire developed in accordance with the methodology defined from CANSO/EUROCONTROL
Target By 2019 Level C for the Safety Culture Management Objectives By 2019 Level D for all other Management Objectives
Achieved Level - 2017 Target Met: According the survey, Albcontrol classes as level D in all studied aspects and a level C in the aspect of Safety Culture. At this level, the ALBCONTROL SMS framework adequately meets the required regulatory standards and complies with the SMS requirements of ICAO Annex 19
IndicatorApplication of the Severity Classification Scheme
MeasureApplication of the severity classification based on the Risk Analysis Tool (RAT) methodology to the reporting of occurrences (Separation Minima Infringements, Runway Incursions and ATM-specific occurrences)
65
TargetBy 2017, 80% of SMIs, RIs and ATM-specific occurrences. By 2019 100% of SMIs, RIs and ATM-specific occurrences
Achieved Level - 2017Target Met: 100% of SMIs, RIs and ATM-specific occurrences
IndicatorJust Culture
MeasureThe ANSPs will ensure that a Just Culture training requirement (to include continuation training) is documented in staff training and induction programs.
TargetA minimum of 60% of staff will have completed the Just Culture training by the end of 2018 and all staff will be trained by 2019
Achieved Level - 2017In Progress: The Just Culture Policy has been signed by the Director General of Albcontrol. Additionally, Guidance on the Implementation of the Just Culture policy has been discussed, agreed upon and approved by Albcontrols Top Management and staff, consequently training of all safety related staff has been initiated. The objective is to complete training of all staff by end of 2018
66
MEASURE
SafetyTotal nr. ofOccurence
Reports
Measure inAnnual Basis 303
Measure inAnnual Basis
Measure inAnnual Basis
Measure inAnnual Basis
Measure inAnnual Basis
Availability ofsurveillance
Measure inAnnual Basis
AirspaceInfrigement Level
1
5
100%
99.99%
4
SeparationMinimal
Infrigement
RunwayIncursion
Availabilityof com voice
Air/Ground
Safety
Safety
Safety
Safety
Safety
PURPOSE FORMULA ACHIVEMENT 2017
Safety Monitoring & Safety Targets
ALBCONTROL has achieved 2016 Key Performance Indicators as determined in the Strategic Business Plan of the company
67
Reporting during 2017 and 5 Top Risks303 reports reviewed and evaluated by the Safety, Quality & Security Division.8 investigations were performed, 7 of which were ATM related occurrences and 1 Technical related occurrence. Appropriate recommendations have been issued for each event and their implementation has been monitored.
Safety325 325 353 517
not morethan 2 1 1 0
10 6 13 14
99.99% 100% 100% 100%
99.95%
1
100%
2
100%
1
100%
1
Safety
Safety
Safety
Safety
Safety
TARGET 2017 YEAR 2016 YEAR 2015 YEAR 2014 PERFORMANCEAREAS
Safety
Safety
Safety
Safety
Safety
Safety
WHO MEASURE
68
0
100
200
300
400
500
600
20 1 4 20 1 5 20 1 6 20 1 7
Operational ReportsTechnical reportsTotal
SAFETY REPORTS 2014-2017
Total number of reports 2014– 2017
69
0
5
10
15
20
35
25
40
30
45
50
Aircraftdeviantions
from...
Aircraftdeviantionsfrom ATC...
Aircraftdeviantions
from...
InadequateSeparation
LevelBust
ProlongedLoss of...
RunwayIncursionwhere...
SeparationMinima...
Unauthorisedpenetration
of...
BirdStrike
LaserBeam
20162017
Based on the collected and evaluated safety reports, we assessed the achievement of the specific safety performance indicators taking in consideration the severity of the occurrences, KPIs approved by Albcontrol Safety Committee and published in the Albcontrol Safety Plan 2016.
ATS REPORTS 2016-2017
70
YEAR OCCURENCESEVERITY E
OCCURENCESEVERITY C
OCCURENCESEVERITY B
OCCURENCESEVERITY A
2013
2014
2015
2016
2017 / Targets
2017 / Results
1
0
0
0
0
0
1
4
0
1
1
2
6
16
8
16
10
4
N/A
158
141
144
155
134
ASSESSMENTS OF SAFETY REPORTS 2017
71
5 TOP RISKS IN 2017
+ SEPARATION MINIMA INFRINGEMENT AND INADEQUATE SEPARATION+ LASER BEAMS+ TECHNICAL PROBLEMS ON BOARD OF THE AIRCRAFT NOT DETECTED FROM ATCO+ ATIS, LOSS OF SYNCHRONIZATION OF AWOS, PROBLEMS WITH SENSORS METEO MOR18PRW18, RVR18+ SKYLINE REPORTS
Based on the process of collecting and evaluating safety reports, we have identified 5 top risk areas. Several action plans have been put in motion in an effort to avoid a maximum of these safety risks.
Hawaker Hurricane MK. Tirana Airport, April 1941
72
ATM SECURITY
The activity of 2017’s ATM Security in ALBCONTROL focused on the fulfillment of the national legislation requirements regarding the security aspects in civil aviation, and more specifically in the ATM field. As such the ATM Security Directory has been subject to several security inspections performed by Albanian CAA. In order to improve the quality of work, the security personnel performed and completed successfully the 2017 ALBCONTROL training plan concerning ATM Security, in compliance with the National Program of Security Control. The security systems have been checked periodically by performing foreseen drills. Several security awareness sessions have been held during 2017, providing relevant information on the ATM Security.During 2017 ALBCONTROL implemented an internal information security system that classifies the information collected according to different levels of access. Procedures and manuals were updated defining specific requirements to be followed from the staff, in order to assure the protection of information. The implementation of the requirements is strictly monitored through periodical audits.
73
QUALITY MANAGEMENT SYSTEM
During 2017, in regard to Integrated Management System and Time of Services and Costs Efficiency, ALBCONTROL was dedicated to maintain and constantly enhance the quality of services to the costumer. Periodical audits were conducted in collaboration with Quality Austria along the year, in order to verify the compliance of Standards (ISO 9001, ISO 14001, OHSAS 18001, ISO27001, and ISO20000) and Single European Sky Requirements (SES-CR). New versions of standards ISO 9001/2015 and ISO 14001/2015 were initiated in order to prepare their certification process.
74
ENVIRONMENT
Aiming for the improvement of suitability, adequacy and effectiveness of the environmental management system, we updated our environmental policies during 2017 and refreshed our environmental risk evaluations accordingly.
In accordance with CEM (Collaboration Environmental Management), ALBCONTROL has improved and updated its Letter of Agreement with the TIA airport Authorities. Our people have been constantly trained, in accord with ISO14001/2015, in order to reach the new certification process forecasted to be finalized in 2018. The implementation of “FRALB” in the Albanian Airspace, led to shorter flight routes and thus generated savings for airspace users in terms of flight efficiency, demonstrating a much lower negative impact on the environment. Since May 2017 (only for ATS route AKIKA-TRN-DIMIS from time 22:00 till 06:00) 729 flights has flown 3645 km less, resulting in reduced operating costs of 126.900 Euro, approximately 16.785 kg less fuel was consumed, and CO2 emission levels were reduced by 52.874 kg.
75
ATS ROUTE AKIKA-TRN-DIMIS
Flight number
Less km
appr. Reduced operating costs €
appr. Reduced CO2 emmission (kg)
appr. Less fuel burn (kg)
729
3645
126,900
16,785
52,874
78
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
0
200
400
600
800
1000
1200 1.0
20 1 3 20 1 4 20 1 5 20 1 6 20 1 7 20 1 8 20 1 9 2020 202 1 2022
IFR
FLI
GH
TS (D
AIL
Y A
VER
AG
E)
ENR
OU
TE D
ELAY
(MIN
/FLI
GH
T)
Operations in ALBCONTROL reached the KPI set for 2017, and maintained an average of 0 minutes of delay for ‘en-route’ and terminal flights.
AIR TRAFFIC MANAGEMENT
79
Peak Day Traffic 964
704
550
0.00
0.00
959
692
543
0.00
0.00
1020
705
553
0.00
0.00
1014 994
670
510
0.00
0.00
691
562
0.00
0.00
693
704
680
709
743
681
728
766
690
756
825
694
776
858
700
Summer Traffic
Yearly Traffic
Summer TrafficForecast
*From 01/01/2017 to 31/10/2017
High TrafficForecast - Summer
Low TrafficForecast - Summer
Summer EnrouteDelay (all causes)
Yearly EnrouteDelay (all causes)*
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022YEAR
80
PERFORMANCE
Air Traffic in Albania has increased by 3.1% when compared to the summer of 2016.The ACC capacity baseline per hour was estimated at 65 flights, same to 2016. During the measured period, the average peak per hour demand was 54 flights, while the average peak per 3-hour demand was 47 flights.
TRAFFICEVOLUTION
CAPACITY PLAN +5%
SUMMER 2017 PERFORMANCE ASSESSMENT
ACHIEVED COMMENTS
CAPACITYGAPACTUALREF VALUE
EN-ROUTE DELAY (MIN/FLIGHT) - SUMMER2016CAPACITY BASELINE
+5.1 %
The average en-route delay per flight remained at zero minutes per flight in Summer 2017.
Free route
The ACC capacity baseline was estimated at 65, the same level as last year. During the measured period, the average peak 1 hour demand was 54 and the average peak 3 hour demand was 47
ATS route network improvements
Reduction of longitudinal seperation
Stripless system
Maximum configuration. 3/4 ENR + 1 APP sectors
65 (0%) 0.13 0.00
YES
NO
NO
YES
YES
NO
As of AIRAC of May night FRALB
As of 1st of June 2017
3 ENR + 1 APP
81
ATM KEY PERFORMANCE INDICATORS (KPI)
The maximum number of managed flights per hour (70 flights), was reached on the 12th of August 2017, 16:00 – 17:00 h. The average minutes of delay per flight during 2017 was 0.LoA with ANSPs ALBCONTROL- SMATSA Beograd, Amended 07/12/2017ALBCONTROL- M-Nav Skopje, Amended 07/12/2017ALBCONTROL- ENAV Brindisi, Amended 07/12/2017ALBCONTROL- Macedonia ACC, Amended 04/01/2018ALBCONTROL- Athens and Kerkyra ACC, 04/01/2018 Institutional LoA SLA for the coordination of operations between Albcontrol – VIVA Air – AAF, on 01/02/2017LoA between Albcontrol and Tirana International Airport, on 01/03/2017Internal LoA: OLA between MET Services and ATS, on 27/02/2017
+
++
+
+
82
TechnologyUpgrades
FREE ROUTE AIRSPACE (FRALB)
Since December 2017 Free Route Operations are applied 24/7 in Tirana FIR, from FL195 to FL660. The application of the FRALB concept encompasses the horizontal boundaries of Tirana FIR fully, as published in AIP Albania, ENR 2.1.
Free Route Airspace offers significant opportunities to airspace users. They will be able to freely plan a route between a defined entry and exit point, reducing flying distances and fuel consumption. A FRA environment will improve the predictability due to more stable trajectories while enhancing the role of conflict detention tools. In addition, aircraft conflicts will be better managed.
By increasing the efficiency of air traffic, the FRA will contribute towards the reduction of the environmental impact caused by aviation through the reduction of co2 emissions.
83
VISUAL APPROACH CHART
STRIPLESS ENVIRONMENT
The goal of this project was the publication of a visual map representing the CTR in accordance with ICAO Annex 14. In December 2017, the map was included in the AIP as a ‘Visual Approach Chart’. Pilots are now able to identify obstacles in the CTR.
With the implementation of the FRA in the Albanian Airspace, traffic has increased, and thus the airspace has become more complex. In order to support ATCO in safely handling traffic (by reducing their workload, while increasing situational awareness) ALBCONTROL has implemented a Stripless environment in Tirana ACC. Our working methods, tools and procedures have been adjusted adequately. Furthermore, the Skyline system has also been improved, as has the silent automatic coordination between ATC sectors.
84
IMPLEMENTATION OF LOW VISIBILITY PROCEDURES
Low visibility procedures (LVP) are established to support departure operations in RVR conditions less than a value of 550m, or when part of the manoeuvring area cannot be monitored.
Advantages of LVP:
To reduce conflicts and incursions between aircraft, vehicles and pedestrian traffic.To enable the availability of various support equipment and facilities.To support efficient flow of air traffic. To facilitate coordinated actions by various agencies.
++++
Tirana Airport, Lapraka, 1941
85
NEW PROCEDURES AND UPDATES
LoA between Albcontrol, VIVA Air and the Albanian Air Force.Amendment of LoA between Albcontrol and TIA.Amendment of ATM Manual – Tirana Approach Control Surveillance (part II), edition 05/amd 3, dt. 25.05.2017.Amendment of ATM Manual – Tirana Area Control Surveillance (part II), edition 6/amd 1, dt. 25.05.2017. Amendment of ATM Manual – Tirana Area Control Surveillance (part II), edition 6/amd 2, dt. 07.12.2017LSSIP document 2017
+++
+
+
+
86
AIS PUBLICATIONS 2017
INTERNATIONAL NOTAM OFFICE - INO
+ 2 AIRAC AIP AMDT + AIRAC AIP SUP+ AIP AMDT
INO 2017140 NOTAMs
Aeronautical Information Service – AIS
-Preparation of the new ILS 35 package-Revision of ATC Surveillance Minimum Altitude Chart – ICAO
ATS / CNS /Aerodrome Operator / CAA
INO has issued more than 140 NOTAMs in 2017 following the requests made from the ATS, CNS, Aerodrome Operator and CAA. The quality of NOTAM preparation has been improved and all errors discovered were immediately rectified and discussed at the refresher INO staff briefings. ATS units have been notified without delay of NOTAMs and aeronautical data issued by other countries affecting flights in Tirana FIR. In addition, monitoring of FPL has been one of the INO priorities in order to prevent the entry of aircraft in our airspace without permission.
87
ATS REPORTING OFFICE -ARO
TRAFFIC
Particular attention was paid in 2017 by ARO towards the preparation of VFR flight plans, ensuring relevant information for the pilots before the take-off. The number of VFR flights have been increased, reaching their peak in May, up until September.
Compared landings, departures and overflights over the Albanian airspace 2016 to 2017
JAN 834
751
840
841
856
861
1,051
1,175
1,071
1,010
903
957
906
783
877
889
919
1,032
1,254
1,329
1,228
1,033
933
1,096
8.6%
4.3%
4.4%
5.7%
7.4%
19.9%
19.3%
13.1%
14.7%
2.3%
3.3%
14.5%
832 903
754
836
839
852
859
1,052
1,175
1,076
1,011
903
959
787
873
890
912
1,030
1,252
1,330
1,227
1,030
938
1,093
6.1%
4.4%
4.4%
8.5%
7.7%
19.9%
19.0%
13.2%
14.0%
1.9%
3.9%
14.0%
10,896
8,853
7,779
8,696
15,638
18,297
22,586
22,238
18,230
14,377
8,171
8,738
12,160
8,957
7,572
8,214
15,239
18,143
22,121
22,815
19,405
15,774
9,516
9,402
11.6%
1.2%
-2.7%
-5.5%
-2.6%
-0.8%
-2.1%
2.6%
6.4%
9.7%
16.5%
7.6%
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
TOTAL
2016
11,150
2017
LANDINGS
12,279
% +/-
10.1%
2016
11,148
2017
DEPARTURES OVERFLIGHTS
12,271
% +/-
10.1%
2016
164,499
2017
169,318
% +/-
2.9%
88
0 : 0 0
J u l 20 1 6C O N F 3
J u l 20 1 7C O N F 3
1 20 : 0 6
1 75 : 3 3
1 : 2 5
02 : 0 0
622 : 29
5 6 6 : 27
J u l 20 1 5C O N F 4
J u l 20 1 6C O N F 4
J u l 20 1 6C O N F 2
J u l 20 1 7C O N F 2
72 : 0 0 1 4 4 : 0 0 2 1 6 : 0 0 28 8 : 0 0 3 6 0 : 0 0 4 3 2 : 0 0 5 0 4 : 0 0 5 76 : 0 0 6 4 8 : 0 0 720 : 0 0
JULY 2016 - 2017
Comparison of activated sectors during July,August, September 2016/2017
89
0 : 0 0
A u g 20 1 6C O N F 3
A u g 20 1 7C O N F 3
1 29. 38
1 4 6 : 5 8
1 : 1 0
0 : 0 0
61 7 : 02
597 : 02
A u g 20 1 5C O N F 4
A u g 20 1 6C O N F 4
A u g 20 1 6C O N F 2
A u g 20 1 7C O N F 2
72 : 0 0 1 4 4 : 0 0 2 1 6 : 0 0 28 8 : 0 0 3 6 0 : 0 0 4 3 2 : 0 0 5 0 4 : 0 0 5 76 : 0 0 6 4 8 : 0 0 720 : 0 0
AUGUST 2016 - 2017
Comparison of activated sectors during July,August, September 2016/2017
90
0 : 0 0
S e p 20 1 6C O N F 3
S e p 20 1 7C O N F 3
87 : 02
8 5 : 4 5
0 : 0 0
1 : 0 3
6 32 : 5 8
6 35 : 2 5
S e p 20 1 5C O N F 4
S e p 20 1 6C O N F 4
S e p 20 1 6C O N F 2
S e p 20 1 7C O N F 2
72 : 0 0 1 4 4 : 0 0 2 1 6 : 0 0 28 8 : 0 0 3 6 0 : 0 0 4 3 2 : 0 0 5 0 4 : 0 0 5 76 : 0 0 6 4 8 : 0 0 720 : 0 0
JULY 2016 - 2017
91
MONTHLY VARIATIONS OF TRAFFIC GROWTH IN PERCENTAGE FOR 2017
-40.0%
-30.0%
-20.0%
-10.0%
0.0%
30.0%
10.0%
40.0%
20.0%
50.0%
60.0%
AVRGMINMAX
JA N F E B M A R A P R M AY J U N J U L AU G S E P O C T N OV D EC
* The Graphic shows the average growth or decrease, minimal and maximal traffic for each month
15.1% 17.
3%
22.9
%
10.5
%
18.2
%
19.8
%
11.0%
3.4%
20.2
%
5.8%
25.1%
14.3
%2.
9%
0.4%
39.8
%
48.9
%
43.0
%
16.9
%
7.6%
13.8
%-10.
4%
-10.
7%
-1.6
%
-1.5
%
-1.9
%-1
9.4%
-20.
6% -16.
0%
58.6
%
-33.
5%-4
.5% -0
.3%
0.3%
-15.
6%
-15.
5%
-7.5
%
92
FREQUENT AIR OPERATORS OVER THE ALBANIAN AIRSPACE JANUARY - DECEMBER 2017
0
1,000
3,000
5,000
7 ,000
11,000
9,000
13,000
15,000
T H Y A E E E Z Y BAW RY R M S R D L H A F R A D R S W R
94Mass Ceremony in Tirana Airport XVII, with the presence of Brigadier General Ferruccio Ranza, the commander of the Albanian Air Force and of Colonel Umberto Nannini, the commander of Tirana Airport, March 28, 1941
98
SYSTEMS
SKYLINE
AWOS / ATIS
During 2017 our engineers successfully implemented major changes in ATM System, in order to support the implementations of the FRA and a stripless environment in ATC Operations. These complex changes in our operations have been made possible by an excellent level of coordination between the technical and operational staff, with full support of the ATM system supplier. Thanks to continuous monitoring of the systems, we recorded excellent performance levels of the ATM system supporting the FRA and the stripless environment.
During 2017, the AWOS/ATIS System has been reliable and the Service Level Agreement with integrator has been in place to ensure maintenance. Additionally, the sensors were continuously calibrated in accordance with maintenance manual.
99
COMMUNICATION
Our communication system is composed by two VCS and VHF/UHF radios. All of our systems have displayed a high level of performance and have been well maintained by Albcontrols engineers, as well as its suppliers through Level 3 maintenance. Two sites (only receivers) have been made functional in July of 2017 dramatically improving VHF coverage in northeast, southeast and low level flights for traffic departing from the Ionian island. The implementation of the BSS (Best Signal Selection) allowed our systems to automatically select the appropriate radios needed quickly. On October 2017, Albcontrol has begun a new project to support IP operations for VHF radios. It is projected to be implemented by 2019 and has been separated into two phases.
NAVIGATION
Navigation systems worked within standards, confirmed by routine flight checks conducted on May and November 2017. Reports indicate that these systems have been available 100% of the time, with great reliability and integrity.Problems reported on DVOR monitoring have been managed through the creation of a workaround plan. The technical Division has planned to upgrade its monitoring kit for the DVOR in order to comply with all safety requirement listed in Albcontrol USC (Unit Safety Case). Coordination with TIA regarding their civil works in airside has been excellent, with a minimum impact on operation. New procedure has been agreed to and implemented.
100
SURVEILLANCE
The Surveillance System is composed of two MSSR radars owned, maintained and operated by Albcontrol, as well as, two other MSSR radars from neighboring ANSP, base of Radar Data Sharing Agreement. From the beginning of 2017 MSSR Porto Romano has been used by SMATSA (Serbian ANSP) to improve radar coverage in their area of interest. Both, Porto Romano and Rinas MSSR are performing very well in terms of availability,
“First flight Milano-Tirana, operated by Avioline Airline. Tirana Airport, March 1st , 1940”
101
reliability and integrity as confirmed by continuous monitoring of the Radar Sensor Performance using approved tools (SASS - C), as required by EC 1207/2011. In order to improve its surveillance system, ALBCONTROL has started a new project for the implementation of MLAT/WAM. During 2017 the installation sites have been selected and the evaluation process has been initiated by our engineers.
MET
Following the gap analyses done with the support of EUROCONTROL, we have begun the implementation of core infrastructure within our MET services. The use of the new Numerical Weather Prediction Charts has significantly improved the quality of MET data. We started the process of satellite data receiving through EUMETSAT.
104
ALL YEAR LONG EXTERNAL AND IN-HOUSE TRAININGS
English Training and testing by EPC for 64 participants (62 ATCO + 2 AIS) New functionalities of Build 9.0, 6 ATCOsEmergency Training 78 ATCOOJTI-Ref Course, 1 ATCOOJT Approach for 7 ATCOs , final phaseTRM Stress & Fatigue for 12 ATCOBasic Training AIS for 2 specialistsEAD Training for 2 AIS specialistsIANS Courses for 23 ATCOs Advance Training for Data Processing ATSEP, in US at Leidos factory for 5 participantsNew functionalities of Build 9.0 for 2 ATSEPs, and Advanced Maintenance for 4 ATSEPsShared Qualification Training, completed at Entry point North Academy for two ATSEPsAdvance Training for GAREX and Richochet System completed at the factory, for 4 COM ATSEPRAD’s Network Training for 19 participantsALCOWIKI Software by Q-Plan & TMC (Training Management Consulting), for 15 participants ISO 9001 and Statistics Methods for Decision makers, by Q-Plan, TMC and foreign lectors for 10 participantsAeronautical Awareness Training, modules on awareness of safety and quality, for 5 participants
Our people are our precious assets. We care and we invest in them.
++++++++++
+
+
+
++
+
+
105
Awareness Training for the Integrated Management System by TMC Training, for 20 participants OHSAS 18001, for 11 participants ISO 20000-1 by TMC, for 11 participants ISO 14001, for 13 participantsISO 27001, Information Security Training by the TMC, for 11 participantsManaging EU Financial Assistance Funds by ASPA, for 2 participantsScanner and General Security Operator Course, training package of seven modules, for 25 participantsSafety Management and Just Culture (SES), by Quality Austria, for 24 participants MTBP Management and Public Investment, by ASPA in 5 modules – participation of the Internal Audit Department employeeAwareness on Security, Quality and Safety in ALBCONTROL, for 20 participants Time Management, for 8 participantsSelf-Esteem & Motivation, for 8 participants Receiving, evidencing, administering, technical-scientific processing, expertise of the value of document preservation and delivery, by the Inspection and Training Directorate at the General Directorate of Archives in Tirana. Training for the archives and protocols specialistInformation on Security Information - ISO 27001-2013 Standards Procedures, for 1 participant
++++++++
+
+
+
+++
+
109
STAFF SATISFACTION THROUGH YEARS
0
0.5
1
1.5
2
2.5
3
20 1 4
2 .7 72 .8 4 2 .8 2 .8 4
20 1 5 20 1 6 20 1 7
In 2017, 191 employees answered to the Staff Satisfaction Questionnaire discreetly and anonymously.
114
REGIONAL COOPERATION MEETING IN TIRANA
ALBCONTROL AND ENTRY POINT NORTH, A FRUITFUL AND LONG-TERM COLLABORATION
On May 17th and 18th 2017, ALBCONTROL hosted a Regional Cooperation Meeting that took place in Tirana, facilitated by CANSO. Gathered together at a technical and operational level, experts from the south-eastern European area discussed about future possibilities of regional cooperation in the light of several international and European Union developments.Places of sunny Tirana full of history and typical Albanian cuisine were part of the program within this Regional Cooperation activity.
An Agreement on Supplying Consultants has been signed between ALBCONTROL and Entry Point North to provide qualified Consultants for short term assignments. Under this agreement, several projects have been successfully completed within the first semester 2017, where ALBCONTROL instructors delivered training for Entry Point North students on APS/RAD training courses.
115
BLOOD DONATION IN ALBCONTROL
ALBANIA’S SECOND PRESIDENCY TO THE ENLARGED COMMITTEE FOR ROUTE CHARGES IN EUROCONTROL
As it is custom for ALBCONTROL, every year we contribute and are fully engaged in the Red Cross campaign of blood donation for children with Thalassemia, and fundraising for orphan children in the community.On May 31, numerous employees donated blood for children with Thalassemia, following ALBCONTROL’s social policy and responsibility of helping people in need, especially children.
Albania took the presidency of the EUROCONTROL enlarged Committee for Route Charges, represented by Mr. John Perry. He has been a member of the Enlarged Committee since 1986, its first Vice-President, and was elected President of this Committee in 1987, 1999 and 2015. With the proposal of Albania, he was re-elected President on November 2017.
119
NO. DESCRIPTION NOTES CURRENT YEAR 2017 CURRENT YEAR 2016
01
02
03
04
05
06
07
01
02
03
01
02
01
01
Incomes
Other incomes
Raw materials and consumables used
Power purchase
Personnel expenses
Depreciation and amortization expenses
Other expenses
Operating Profit
Financial income
Financial expenses
Net financial expense
Profit before tax
Profit tax credit
Profit tax expense
Net profit for the period from continuing operations
Discontinued operations
Net profit for the period from discontinued operations
Net profit for the period
Incomes from
Total inclusive incomes
3,301,851,390
5,127,727
(47,519,991)
(28,052,141)
(1,311,902,310)
(741,025,472)
(969,580,169)
208,899,033
29,127,013
(59,171,205)
(30,044,192)
178,854,842
(4,080,087)
(54,057,005)
120,717,750
120,717,750
120,717,750
120,717,750
3,456,821,806
1,749,357
(47,181,630)
(26,934,646)
(1,395,632,187)
(952,927,895)
(958,560,568)
77 334 236
12,744,889
(36,834,598)
(24,089,709)
53,244,528
15,800,049
(20,837,738)
48,206,839
48,206,839
48,206,839
48,206,839
19
20
21
21
22
5
23
24
14
25
STATEMENT OF INCLUSIVE INCOMES OR LOSSES FOR THE YEAR ENDED ON 31 DECEMBER 2017
120
NO. VOICES NOTES 31 DECEMBER 2017 31 DECEMBER 2016
01
02
01
02
03
04
05
ACTIVES
I. LONG TERM ASSETS
Property, plant and equipment
Other long-term financial assets
Total long-term assets
II. SHORT TERM ACTIVITIES/ASSETS
Inventory
Trade receivables
Other short-term assets
Prepayments and deferred expenses
Cash in cash register and banc
Total short-term assets
TOTAL OF ASSETS (I & II)
5,667,616,522
4,404,745
5,672,021,267
18,399,673
370,162,942
267,017,850
403,308,487
767,893,482
1,826,782,435
7,498,803,702
5,668,328,610
5,029,945
5,673,358,555
18,023,648
614,603,775
441,644,417
1,099,034,771
2,173,306,611
7,846,665,166
5
6
7
8
9
10
11
STATEMENT OF FINANCIALPOSITION AT 31 DECEMBER 2017
121
NO. VOICES NOTES 31 DECEMBER 2017 31 DECEMBER 2016
01
02
03
04
05
06
01
02
03
01
02
03
04
05
CAPITAL AND LIABILITIES
I. CAPITAL
Fundamental capital
Revaluation reserve
Other reserves
Legal reserves
Carried gains
Acquisition of exercise
Total Capital
II. LONG TERM OBLIGATIONS
Long-term loans
Deferred tax
Deferred income grants and other liabilities
Total long-term liabilities
III. SHORT TERM OBLIGATIONS
Trade payables and other payables
Short-term loans
Profit tax
Short-term provisions
Other short-term liabilities
Total short-term liabilities
Total liabilities (II & III)
TTOTAL CAPITAL AND OBLIGATIONS
5,679,172,000
123,958,777
102,610,087
171,686,359
0
48,206,838
6,125,634,062
537,733,253
42,074,147
2,740,074
582,547,474
263,727,249
358,458,030
20,837,738
-
147,599,150
790,622,167
1,373,169,641
7,498,803,702
5,018,346,000
123,958,777
908,028,673
-81,552,202
120,717,750
6,089,498,998
1,271,847,447
57,874,196
3,435,797
1,333,157,440
152,212,388 -
85,773,061
79,870,316
106,152,963
424,008,728
1,757,166,167
7,846,665,166
12.1
12.2
12.4
12.3
12.5
12
13
14
15
16
13
17
18
STATEMENT OF FINANCIALPOSITION AT 31 DECEMBER 2017
122
FOR THE YEAR ENDED
31 DECEMBER 2017
FOR THE YEAR ENDED
31 DECEMBER 2016
CASH FLOWS FROM OPERATING ACTIVITIES
Profit before tax
Adjustments to non-monetary items:
Amortization
Depreciation
Disposal of Fixed Assets, Net of Capital Profit
Inventory devaluation
Estimated interests
Interest expense
Profit tax
Change in working capital
Decrease / (increase) in inventory
Decrease / (increase) in receivable accounts
Decrease / (increase) in other receivableaccounts
Increase / (decrease) in payable accounts
Increase / (decrease) in other payables
Decrease / (increase) in prepayments and deferred expenses
Monetary assets generated by operating activities
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
53,244,529
952,927,894
(5,995,310)
(376,025)
(47,554,585)
(48,189,343)
111,514,861
(45,105,474)
38,335,924
1,008,802,471
178,854,842
741,025,472
79,870,316
2,269,922
(14,339,430)
294,308,149
45,631,619
3,434,477
(93,067,106)
1,237,988,261
REVIEW OF MONETARY MEANS OF FLOWS
123
FOR THE YEAR ENDED
31 DECEMBER 2017
FOR THE YEAR ENDED
31 DECEMBER 2016
Paid interests
Profit tax paid during the year
Investment activities
Purchases of intangible and intangible assets
Sale of tangible and intangible assets
Monetary assets generated by investing activities
Financing activities
(Repayment) / net income from long-term loans
(Repayment) / short-term loans
Additions / reductions in finance leases
Dividends paid
Monetary resources generated by the financing activity
Net change in cash
Money assets at the beginning of the period
Money assets at the end of the period
+
+
+
+
+
+
+
+
+
+
+
+
-
(952,215,820)
(952 ,215,820)
(375,656,165)
(12,071,775)
(387,727,940)
(331,141,289)
1,099,034,771
767,893,482
(16,540,750)
(16,540,750)
(994,401,168)
(994,401,168)
(385,052,233)
(385,052,233)
(158,005,890)
1 257,040,661
1,099,034,771
REVIEW OF MONETARY MEANS OF FLOWS
124
SHARE CAPITAL OTHER RESERVES
Financial Position on January 1, 2016
Profit for the period
Transfer to Deliverable Results
Transfer to retained earnings
Other inclusive income for the year
The financial position on December 31, 2016
Profit for the period
Transfer to overdue results and reservations
Other inclusive income for the year
Transactions with owners of the economic unit recognized directly in equity
Increased capital
Paid Dividends
Total transactions with owners of the unit
The financial position on December 31, 2017
5,018,346,000
5,018,346,000
660,826,000
5,679,172,000
908,028,673
908,028,673
(633,732,227)
274,296,446
STATEMENT OF CAPITAL CHANGES FOR THE EXERCISE YEAR OF 2017
125
REVALUATION RESERVE DELIVERABLE RESULTS UNDISTRIBUTED PROFITS TOTAL
123,958,777
123,958,777
123,958,777
-
(81,552,202)
(81,552,202)
120,717,750
(27,093,773)
(12,071,775)
-
(81,552,202)
120,717,750
81,552,202
120,717,750
48,206,840
(120,717,750)
48,206,840
5,968,781,248
120,717,750
-
6,089,498,998
48,206,840
-
-
-
-
(12,071,775)
6,125,634,063
128
To the Management and Shareholders of ALBCONTROL sh.a.
Qualified Opinion
We have audited the financial statements of ALBCONTROL sh.a. (the Entity), which comprise the statement of financial position as at December 31, 2017, and the statement of comprehensive income, statement of changes in equity and statement of cash flows for the year then ended, and notes to the financial statements, including a summary of significant accounting policies.
In our opinion, except the issues described in basis for our qualified opinion, the accompanying financial statements present fairly, in all material respects, the financial position of the Entity as at December 31, 2017, and its financial performance and its cash flows for the year then ended in accordance with International Financial Reporting Standards (IFRSs).
Basis for Qualified Opinion
As it is presented in statement of financial position as at December 31, 2017, Property Plant and Equipment (PPE) are 4,886,346 thousand ALL. The entity has selected the revaluation method, to measure its PPE. IAS 16 “Property Plant and Equipment” requires that if an entity
129
Responsibilities of Management and Those Charged with Governance for the Financial Statements
Management is responsible for the preparation and fair presentation of the financial statements in accordance with IFRS and for such internal control as management determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error. In preparing the financial statements, management is responsible for assessing the Company’s ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless management either intends to liquidate the Company or to cease operations, or has no realistic alternative but to do so. Those charged with governance are responsible for overseeing the Company’s financial reporting process.
select the revaluation method for PPE, revaluations shall be made with sufficient regularity to ensure that the carrying amount does not differ materially from that which would be determined using fair value at the end of the reporting period. The last revaluation of the Entity’s assets had taken place in 2005, and no revaluation of PPE was done in the following periods to reflect their fair value. Consequently, we are not able to evaluate the fair value of PPE presented in these financial statements.In addition, in Entity’s Capital is presented the revaluation reserve in the amount 123,958 thousand ALL. This amount should have been reduced for the remaining balance of revaluation reserve related to assets sold or disposed of, by transferring this amount in “Retained earnings”. As a consequence, the revaluation reserve is overstated and the retaining earnings are understated with the same amount. We are not able to estimate the effects that such transactions would have on the amount of revaluation reserve and retained earnings presented in the Entity’s equity section.
130
Auditor’s Responsibilities for the Audit of the Financial Statements
The objectives of our audit are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these financial statements.
As part of an audit in accordance with ISAs, we exercise professional judgment and maintain professional scepticism throughout the planning and performance of the audit. We also:
Identify and assess the risks of material misstatement of the financial statements, whether due to fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control. Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control.Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related disclosures made by management. Conclude on the appropriateness of management’s use of the going concern basis of accounting and based on the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt on the Company’s
+
+
+
+
131
ability to continue as a going concern. If we conclude that a material uncertainty exists, we are required to draw attention in our auditor’s report to the related disclosures in the consolidated financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our auditor’s report. However, future events or conditions may cause the Company to cease to continue as a going concern.Evaluate the overall presentation, structure and content of the financial statements, including the disclosures, and whether financial statements represent the underlying transactions and events in a manner that achieves fair presentation.
We are required to communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during our audit.
18 JUNE 2018
+
134
ACCACAAAFTN
AMHSAIS
ANSANSP
ATC ATCO
ATMATSEP
APPAWOS
CANSOCEOCNS
CRCODMEDPCDPS
EASAECAC
EMSEUROCONTROL
FAB
Area Control CenterAlbanian Civil Aviation AuthorityAeronautical Fixed Telecommunication- BroadcastAeronautical Message Handling SystemAeronautical Information Services Air Navigation ServicesAir Navigation Service ProviderAir Traffic ControlAir Traffic ControllerAir Traffic ManagementAir Traffic Safety Electronics PersonnelApproachAutomated weather observing SystemCivil Air Navigation Services OrganizationChief Executive OfficerCommunication, Navigation and SurveillanceCentral Route Charges OfficeDistance Measuring EquipmentData Processing SystemData Processing ChainEuropean Aviation Safety AgencyEuropean Civil Aviation ConferenceEnvironmental Management SystemEuropean Agency for the Safety of Air NavigationFunctional Airspace Block
GLOSSARY
135FIR
HVACHUMICAO
IDSIFRILS
IMSISAL
ISOKPI
LSSIPMET
MEDTEMSAWMSSRMTDC
NAVOLDIOPSSARSES
SESARSMATSA
SMCSMS
STCASWAL
RATTWRVCSVRFVHF
WAM
Flight Information RegionHeating Ventilation and Air ConditioningHuman ResourcesInternational Civil Aviation OrganizationInformation Display SystemInstrumental Flight RulesInstrumental Landing SystemsIntegrated Management SystemInfrastructure & Safety ALBCONTROLInternational Organization for StandardizationKey Performance IndicatorsLocal Single Sky Implementation PlanMeteorologicalMinistry of Economic Development, Trade and Entrepreneurship Minimum Safe Altitude WarningMonopulse Secondary Surveillance RadarMedium –Term Conflict DetectionNavigationOn-Line Data InterchangeOperationalSearch & Rescue Single European SkySingle European Sky ATM ResearchSerbia & Montenegro Air Traffic Service Agency System Monitoring ControlSafety Management SystemShort Term Conflict AlertSoftware Assurance LevelRisk Analysis ToolTowerVoice Communication SystemVisual Flight RulesVery High Frequency Wide Area Multilateration