Page 1: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report

2011-12

PATIALA, PUNJAB

Regd. Office: PSEB Head Office, The Mall, Patiala-147001

Page 2: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

Annual Report

cum

Achievements of

State Load

Despatch Centre

during

FY 2011-12

Page 3: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

FOREWORD

From the Chief Engineer’s Desk

It gives me immense pleasure to

present the Annual Report of SLDC,

Punjab for the financial year 2011-12.

SLDC role and responsibilities have

increased manifold in the recent past,

particularly in the sphere of

maintaining grid security and

operating the vast system in tandem

with national grid.

SLDC is primarily carrying out two types of operational activities- firstly grid

operation to ensure safe, reliable and economic despatch of electricity in the

State of Punjab and secondly commercial operation for providing Short Term

Open Access

Year 2010-11 has been a landmark year since a major step was taken

towards the ring fencing of SLDC, by making it an independent accounting

unit of PSTCL and taking various other organizational steps for its

strengthening. Intrastate Open Access procedures were simplified and web

based IT enabled services were introduced to make it transparent and

interactive. GIS mapping project covering complete transmission network in

PSTCL , scale wise first of its kind in India for any state or Central

Transmission utility, as a first major IT initiative in PSTCL.

I, on behalf of SLDC organisation, convey my earnest thanks to Sh Anurag

Agarwal, IAS , CMD, PSTCL, Er Ravinder Singh Director/Technical, PSTCL

and Sh. U K Panda, Director/Finance & Commercial, PSTCL for providing an

excellent support & guidance and taking profound interest in working and

boosting up morale of each individual working at SLDC.

Lastly, I also thank each and every one of my officers and staff for their active

involvement and cooperation in preparing this maiden report.

Patiala, 22nd January,2013

(R K Sharma)

Chief Engineer/SLDC

Page 4: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

MESSAGE

I am glad to note that the SLDC wing of PSTCL is bringing out

its first Annual Report for the financial year 2011-12.

I appreciate the efforts made in compiling the data and

extend my best wishes to all concerned at SLDC.

30th January, 2013 ( Anurag Agarwal, IAS) Chairman cum Managing Director,

Punjab State Transmission Corpn. Ltd.

Page 5: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

MESSAGE

It gives me immense pleasure to pen a few words on the

occasion of first Annual Report of SLDC for FY 2011-12.

Appreciating the achievements of FY 2011-12, I convey and

offer my best wishes to Punjab SLDC to achieve enhanced

results for financial year 2012-13.

30th January, 2013 (Er. Ravinder Singh) Director/Technical,

Punjab State Transmission Corpn. Ltd.

Page 6: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

MESSAGE

I am privileged to offer my best wishes to Punjab SLDC on the

occasion of the release of its Annual Report for FY 2011-12.

The Report clearly demonstrates their dedication and

commitment in accomplishing the PSTCL's Vision and Mission.

I extend my best wishes to the SLDC team.

30th January, 2013 (Sh. Umakant Panda) Director/Finance & Commercial,

Punjab State Transmission Corpn. Ltd.

Page 7: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

Table of Contents

1. Introduction…………………………………….………………………….1

2. Ring Fencing of SLDC ……………………….……………….…………2

3. Grid Operation Achievements…………………………………2-11

• System Operation Performance Indices………………….….3

• Month wise Demand……………………………..…………….....4-6

• Installed Capacity………………………………….……………….....7

• Max-Min Demand handled by SLDC………….………………..8

• Sector wise Availability of Demand......……….………………9

• Frequency Trends……………………………….…………………..10

• Voltage Trends……………………………………….……………….11

4. Commercial Operation Achievements.……….……….….12-14

• Quarterly Growth of Open Access ………………….….……..13

• Annual Revenue Receipt through Open Access….……...14

5. Infrastructural Achievements at SLDC ………….….…..15-16

• SCADA/EMS System at SLDC………………………….….……..15

• Intrastate boundary metering cum Transmission Level

Energy audit scheme ……………………………………..………..15

• Open Access Information System…………………….……….16

• Up-gradation of Communication System…………………..16

• GIS Mapping of PSTCL Transmission Network………….16

6. Financial Facts & Figures………………………….…………..16-18

7. Capex Plan for SLDC………………………………….…………..19-20

8. Way Forward for 2012-13 ………………………...……………..21

APPENDIX – I & II

• PSTCL Transmission System Map ……………………………….22

• Transmission Elements added during 2011-12……....23-24

Page 8: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

1

Introduction

The State Load Dispatch Centre (SLDC) is a state of the art computerised

Control Centre established under Sec 31 of the Indian Electricity Act, 2003.

The SLDC in Punjab is located at 220 KV Grid Sub-station Complex at

Ablowal, Patiala. Consequent upon unbundling of erstwhile Punjab State

Electricity Board (PSEB) on 16th April, 2010 and formation of two successor

companies namely Punjab State Power Corporation Ltd. (PSPCL) and Punjab

state Transmission Corporation Ltd. (PSTCL), SLDC was placed under PSTCL.

The SLDC headed by Chief Engineer/SLDC is the apex body to ensure

integrated operation of Power System in the State of Punjab is responsible

for performing the following functions as specified under Sec 32 of the

Indian Electricity Act, 2003 ;-

• To ensure integrated Grid operations

• To monitor & control the system parameters to maintain healthiness

of system in the state

• Optimum Load dispatch & scheduling

• To keep accounts of energy transmitted through state Grid and to

prepare intrastate energy accounts

SLDC is mainly carrying out two types of operational activities; one is grid

system operation to ensure safe, reliable and economic despatch of

electricity in the State of Punjab and the other is commercial operation for

providing Short Term Open Access (STOA), accounting quantum of

scheduled energy, unscheduled interchange (UI) energy exchange and

reactive energy exchange. SLDC organisation also operate and maintains

state of art SCADA/EMS system established since August 2002 under

Unified Load Dispatch & Communication (ULDC) Scheme which provides

real time data at SLDC & NRLDC for monitoring and ensuring integrated

operation of the power system of Punjab in co-ordination with NRLDC,

BBMB & other constituents. SLDC has also undertaken various IT activities

such as web enabled GIS mapping of complete transmission network in

PSTCL ,implementation of Boundary Metering Scheme for intrastate energy

accounting , maintaining an independent SLDC web site with advanced

features like real time data like frequency, generation, power drawl and UI.

Page 9: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

2

A) Ring Fencing of SLDC

In line with Ministry of Power, Govt of India guidelines for ring

fencing of state SLDCS, Punjab SLDC has been made an independent

accounting unit of Punjab State Transmission Corporation Limited (PSTCL)

with effect from Ist April 2011

Status of Ring Fencing of SLDC

a) Punjab SLDC has started operating as a separate accounting unit of

PSTCL with effect from FY 2011-12 onwards.

b) Separate budget for SLDC from FY 2011-12 onwards

c) Separate ARRs are being filed for SLDC since FY 2011-12

B) Grid Operation Functions & Achievements:

• SLDC is responsible for Scheduling and Dispatch of Electricity in close

liaison with Punjab State Power Corporation Limited (PSPCL)

meeting its power demand through Thermal and Hydel Generating

Stations under PSPCL, as well as its allocated share from Central

Sector Generating stations, BBMB, internal & external power

purchases, etc

• SLDC is keeping accounts of quantity of electricity transmitted

through the State Grid, monitoring Grid Operations, supervising and

controlling the Intra-State Transmission System ensuring safety &

security in accordance with the Grid standards and State Grid Code.

• SLDC is fully complying with the directions of NRLDC and prescribed

Grid Operation procedures ensuring safety and security of the grid.

The grid parameters and drawls by Distribution licensee are

monitored at SLDC and over drawl beyond specified limits are

restricted by issuing directions to PSPCL .

• SLDC also issues directions to the 220/132 KV Sub-Stations located

all over Punjab for controlling the parameters & power flows to

ensure security of the grid. All such Sub-stations and generating

Stations as well as ALDCs are linked with the SLDC for data

Page 10: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

3

communication & speech through Microwave (now replaced with

fibre optic based OPGW links) PLCC, P&T Landline telephones and

Vodafone GSM Network.

• SLDC has also been pursuing strengthening of interstate and

intrastate Transmission System with the respective agencies for its

expansion to meet the increased demand for transfer of power and

up-gradation/augmentation of overloaded lines & sub stations.

• The up gradation of 400 KV Powergrid ICTs at Patiala & Malerkotla

was completed. Up gradation for 400 KV Powergrid ICTs at Amritsar,

Moga & Ludhiana and setting up of 400 kV Grid sub station near

Patran was approved by the Standing Committee (CEA) under Inter-

state system strengthening scheme for NR.

• 400 kV Ring main Transmission System being developed by PSTCL is

in advance stage of implementation which shall cater mainly

evacuation of Power from upcoming IPPs in state namely 1980 MW

Talwandi Sabo TPS, 1400 MW Raj Pura TPS and 540 MW Goindwal

Sahib TPS and would also strengthen the system considerably.

• Replacement of Insulators with Anti- Fog insulators and Installation

of Capacitor banks carried out in order to ensure Grid Security and

Stability.

• In order to check the low voltage conditions in the system,

particularly during paddy season, MVARs capacitor bank additions in

the system made, as follows:-

Financial Year Capacity Installed (MVARs)

2010-11 272

2011-12 538 Further a target of 1092 MVARs has been fixed for FY 2012-13.

System Operation Performance Indices: By way of system strengthening and efficient grid operations, the

maximum demand met has increased from 8007 MW (during 2010-

11) to 8834 MW (during 2011-12) and SLDC has been able to cater

the energy demand, as per the statistical data cum graphical charts

given hereinafter:-

Page 11: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

4

Month wise Total Unrestricted Demand and Total

Restricted Demand Catered in MUs

Month

Restricted Demand/

Demand Catered (MUs)

Un-Restricted Demand

(Mus)

2009-10 2010-11 2011-12 2009-10 2010-11 2011-12

April 2672 2856 2891 2911 3551 2945

May 3633 3700 3956 3908 4043 4014

June 4095 4457 4470 4877 4712 4531

July 4576 4721 5652 5414 4988 5825

August 4646 5018 5207 5775 5350 5401

September 3785 4198 4292 4779 4312 4492

October 3147 3514 3657 3709 3636 3860

November 2465 2622 2721 2624 2679 2826

December 2722 2895 2886 3059 3019 3078

January 2570 2836 2856 3024 3004 2928

February 2546 2507 2973 2830 2647 3002

March 3121 3197 3262 3515 3313 3270

Total of

the year 39977 42520 44823 46426 45256 46173

Demand-Availability Status for 2011-12

Page 12: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

5

Monthwise Maximum Demand Catered in MW during FY

2009-10, 2010-11 & 2011-12

Month

Restricted Demand/ Demand

catered (MW)

2009-10 2010-11 2011-12

April 5489 5130 5925

May 6256 6166 6965

June 7087 7799 8466

July 7407 7880 8834

August 7166 7825 8470

September 6523 8007 7801

October 6096 6542 7171

November 4579 5084 5445

December 4829 5285 5534

January 4788 5090 5271

February 4941 4901 5762

March 5497 5723 5559

Maximum during

the year 7407 8007 8834

Page 13: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

6

Monthwise Maximum unrestricted demand in MW during

FY 2009-10, 2010-11 & 2011-12

Month Un-Restricted Demand (MW)

2009-10 2010-11 2011-12

April 6162 6755 5925

May 6657 6974 6965

June 9125 9358 9159

July 9762 9399 10406

August 9786 9376 10471

September 9311 9313 8632

October 8246 6977 7728

November 5296 5440 5645

December 6025 6061 5601

January 5874 5865 5393

February 6072 6637 5851

March 6355 6282 5732

Maximum during

the year 9786 9399 10471

Page 14: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

7

Installed Capacity:- Name of Project No. of

Units

MW Installed Capacity

(MW)

GNDTP, Bathinda 4 110 440

GGSSTP, Ropar 6 210 1260

GHTP, Lehra Mohabbat (Unit # 1 &

2) (Stage-I) 2 210 420

GHTP, Lehra Mohabbat (Unit # 3 &

4) (Stage-II) 2 250 500

TOTAL THERMAL 2620

Shanan 4 15 60

1 50 50

Total 110

UBDC-I 3 15 45

UBDC-II 3 15.45 46.35

UBDC TOTAL 91.35

**RSPP 4 150 600

Less 20% J&K and 4.6% HP share from RSD -147.6

Net RSD share of Punjab 452.4

ASHP 4 33.5 134

MHP-1&2 6 15 90

MHP-3&4 6 19.5 117

MHP Total 207

TOTAL HYDRO 994.75

TOTAL(HYDRO+THERMAL) 3614.75

PEDA & Others including Jalkheri 469

Micro Hydel 5.6

Total Installed Capacity within the State 4089.35

** J&K has 20% share at generation cost and HP has 4.6% free of cost share in RSD. So

far J&K has not availed the share.

Central Sector 2087

BBMB 1163

New Projects 6046

Total 13385.35

Page 15: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

8

Month wise Maximum catered, Minimum catered & Maximum

difference in a day handled by SLDC for FY 2011-12

Monthly Maximum Catered timings

Page 16: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

9

Break-up of Availability/ Demand Catered:

Availability from 2009-10 2010-11 2011-12

Own Hydro 3389.175 4567.553 4909.856

Own Thermal 20295.7 18326.14 19068.23

Other NRSE/Co-Gen Projects under PEDA

(Intra-State Long-term purchase by PSPCL) 248.8013 302.981 358.6821

Intra-State Short term purchase by PSPCL 86.56173 160.5 84.06554

Central Sector 11359.88 11694.99 11798.57

BBMB 3818.503 4570.88 4896.442

Long Term Purchase by PSPCL from IPPs

(Inter-State) 696.9756 738.9934 255.4938

Short Term Purchase by PSPCL (Inter-State) 1833.573 2492.706 2614.279

Sale by PSPCL -13.888 -309.476 -306.121

Banking From 1163.727 1266.942 2238.022

Banking To -1346.82 -2170.45 -1410.38

UI (Inter-State) 1051.222 940.7997 -581.898

Royalty & RSD Share to HP -99.8838 -128.474 -138.652

Power Purchased by Open Access Customers 131.162 2512.712 3260.688

Power Sold By Open Access Customers -347.033 -114.411 -19.482

Intra-State UI (Purchasers) 8.088262 91.2779 158.928

Open Access Injection (Consumer End) 333.5063 115.1059 51.20854

Open Access Schedule for Sale (Consumer End) -370.317 -122.051 -51.7633

Intra-State UI (Sellers) -36.811 -6.94523 -0.55476

Gen. Aux & T/F Losses -1760.44 -1597.39 -1664.84

Inter-State Transmission Losses -872.037 -941.068 -749.093

Net Availability/ Demand Catered 39976.78 42520.31 44824.01

Sector-wise Availability for FY 2011-12:

Page 17: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

10

Frequency Trend in last two financial years

Frequency Status 2011-12

Page 18: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

11

Voltage Trend during 2011-12:-

(1) At 400 kV Moga (PGCIL)

Month Maximum Voltage Minimum Voltage %age Variation

during the month KV Date KV Date

Apr-11 426 18.04.2011 388 22.04.2011 -3% to 6.5%

May-11 424 22.05.2011 389 19.05.2011 -2.75% to 6%

Jun-11 427 02.06.2011 385 24.06.2011 -3.75% to 6.75%

Jul-11 431 07.07.2011 388 03.07.2011 -3% to 7.75%

Aug-11 425 13.08.2011 383 02.08.2011 -4.25% to 6.25%

Sep-11 428 17.09.2011 396 28.09.2011 -1% to 7%

Oct-11 427 31.10.2011 396 26.10.2011 -1% to 6.75%

Nov-11 425 09.11.2011 394 30.11.2011 -1.5% to 6.25%

Dec-11 426 09.12.2011 387 03.12.2011 -3.25% to 6.5%

Jan-12 432 07.01.2012 396 04.01.2012 -1% to 8%

Feb-12 431 12.02.2012 392 10.02.2012 -2% to 7.75%

Mar-12 432 29.03.2012 397 02.03.2012 -0.75% to 8%

2011-12 432 29.03.2012 383 02.08.2011 -4.25% to 8%

(2) At 220 kV Verpal* (PSTCL)

Month Maximum Voltage Minimum Voltage %age Variation

during the month KV Date KV Date

Apr-11 227 18.04.11 206 29.04.11 -6.36% to 3.18%

May-11 217 01.05.11 200 17.05.11 -9.09% to -1.36%

Jun-11 217 01.06.11 194 23.06.11 -11.82% to -1.36%

Jul-11 212 02.07.11 185 12.07.11 -15.91% to -3.64%

Aug-11 208 16.08.11 188 02.08.11 -14.55% to -5.45%

Sep-11 209 17.09.11 195 07.09.11 -11.36% to -5%

Oct-11 222 31.10.11 195 07.10.11 -11.36% to 0.91%

Nov-11 228 05.11.11 205 24.11.11 -6.82% to 3.64%

Dec-11 228 29.12.11 205 03.12.11 -6.82% to 3.64%

Jan-12 232 07.01.12 208 06.01.12 -5.45% to 5.45%

Feb-12 227 22.02.12 203 09.02.12 -7.73% to 3.18%

Mar-12 235 05.03.12 205 01.03.12 -6.82% to 6.82%

2011-12 235 05.03.12 185 12.07.11 -15.91% to 6.82%

*Farthest grid sub station in PSTCL transmission system at tail end.

Page 19: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

12

C) Commercial Operation Achievements

Open Access is the major Commercial Activity being handled by SLDC.

SLDC being the nodal agency for Short Term open Access (STOA) in the

State, is responsible to operationalise the STOA and carry out energy

accounting, maintain and manage UI Account and Reactive Energy Account

and handle the Open Access revenue in line with open Access Regulations.

SLDC has further streamlined and strengthened the Open Access process by

developing procedures and formats for application, introducing IT in various

activities such as UI data processing and web based application handling

cum information system, to make the process transparent and consumer

friendly.

The salient commercial functions/achievements in respect of open access

are;

• Collection of Open Access Charges as levied by Hon’ble State

Commission (PSERC) for Open Access Customers in its Tariff Order and

Open Access Regulations 2011. The transmission & wheeling charges as

realized by SLDC through Energy exchange (IEX/PXIL)or RLDCs are

being remitted regularly to PSTCL & PSPCL respectively within

prescribed time frame.

• The applications for grant of Open Access are received, processed and

open access is granted within regulatory framework and policy/

guidelines of PSTCL/ PSPCL, within the prescribed time limits for each

activity.

• The UI energy accounts are also being prepared and forwarded to the

office of CE/ PP&R for finalization and onward submission to concerned

CBC of PSPCL.

• SLDC holds regular meetings of Commercial & metering Committee

formulated in line with State Grid Code to decide and sort out metering

and billing related issues arising from time to time.

• SLDC also responds to various Petitions filed with PSERC /CERC and

represent cases before the Commission both at state & central level.

• Open Access applications are being handled through e-mail and

application fee through NEFT/RTGS, based on which the monthly

Standing Clearance/ NOC for purchase/ sale of power under Open

Access is issued via. e-mail on the same day.

• As a major step towards automation, Software for online filing of NOC

taken up by Energy Exchange (IEX) in consultation with Punjab SLDC,

Page 20: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

13

which shall be used for receiving Standing Clearance/ NOC applications

and issuing of NOC online .

• The UI energy accounts being prepared by introducing the Automatic

Billing Software Module developed in association with Energy exchanges

(IEX/PXIL) resulted in to quick processing of UI energy account within

the stipulated time frame and eliminating chances of human error The

energy accounts prepared by SLDC are also uploaded on the website for

ensuring transparency in billing.

Commercial (Open Access ) Performance Indices: 109 no. Open Access Customers have been registered for purchase of

370 MW of power under Short Term Open Access during the year 2011-

12, increasing the total no. of Open Access Customers during the year

from 227 no. to 336 no. thereby registering an increase of OA consumer

base by about 48 %. The growth of Open Access in Punjab and other

highlights are summarized as under:-

Page 21: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

14

Quarterly growth of Open Access Consumers alongwith Power Allowed

Quarter Consumers Power (MW)

17th Apr 2010- 30th Jun 2010 54 440.44

July 2010- Sept 2010 81 543.38

Oct 2010- Dec 2010 214 1035.58

Jan 2011- March 2011 227 1046.81

Apr 2011-Jun 2011 278 1216.56

July 2011- Sept 2011 310 1337.24

Oct 2011- Dec 2011 316 1361.12

Jan 2012- March 2012 336 1416.99

Yearly Revenue Receipts through Open Access (In Rs)

Year Transmission

Charges

Wheeling

Charges

SLDC

Operating

Charges

Misc Charges

(Application &

NOC Fee)

Total

17th April

2010- 31st

March 2011

5,66,66,892 36,27,76,287 8,10,00,000 2,41,00,000 52,45,43,179

April 2011-

March 2012 27,80,69,000 73,58,63,000 15,66,48,765 3,50,00,986 1,20,55,81,751

Page 22: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

15

D) Infrastructural Achievements at SLDC

1. SCADA/EMS System at SLDC

• A computerized SCADA/EMS system at SLDC provides on line

data of power system on real time basis. The project was

commissioned in 2002 by Power Grid under Unified Load

dispatch & Communication (ULDC) Scheme in whole of NR

grid constituents.

• Under the scheme, all the Generating Station of PSPCL,

Interstate tie lines, important 220kV & 132 kV grid substations

of PSTCL have been covered for remote data acquisition and

control. Presently 49 nos. RTUs have been installed at the

above said locations for acquisition of online power system

data through PLCC/Microwave communication media.

• Up gradation of existing EMS/SCADA system under ULDC

Phase-II and establishment of Backup Control Centre is under

implementation by PGCIL on unified basis. (Likely to be

commissioned in 2014-15)

2. Intrastate boundary metering cum Transmission Level Energy

audit scheme using ABT type & conventional energy meters

(CEM) including comprehensive O&M for 7 years on turnkey

basis for all 440Kv, 220 KV , 132 KV substations of PSTCL

• This project includes 700 No. ABT (Availability Based Tariff)

meters, 400 No. CEM (Conventional Energy Meters) and

integration of existing 200 No. CEMs, located at 220 No. Sub

stations along with associated modems, CMRIs, cables, etc.

• This project also includes setting up of a Centralized Energy

Centre (CEC) as a base computer station for the complete

Boundary Metering cum Energy Audit System, at SLDC,

Ablowal, Patiala and Comprehensive O&M (including

warranty) of the scheme including CEC initially for seven (7)

years and further extendable at mutually agreed terms.

• The tendering process initiated in 2011-12. The project is

likely to be commissioned during 2012-13.

Page 23: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

16

3. Open Access Information System

For creation of translucent environment, SLDC website was

made user friendly with additional features like information on

UI account, etc. All up to date operational data, information and

formats regarding Open Access are now easily accessible to all

users. The website is updated on regular basis.

4. Up-gradation of Communication System:

The job for replacing the Microwave communication links with

OPGW links, in line with Central govt. directive, was completed

by Powergrid in Punjab during 2011-12.

5. GIS Mapping of PSTCL Transmission Network:

The project for GIS mapping of PSTCL transmission network

which was initiated in 2010-11 was completed. The field

survey was completed by the GIS vendor, M/S CCE-PEC,

Chandigarh covering 22000 towers and about 150 no grid sub

stations.

E) Financial Facts & Figures

1. Aggregate Revenue Requirement for the FY 2011-12 First Aggregate Revenue Requirement (ARR) for SLDC for the FY

2011-12 was filed. A glimpse of the ARR for the FY 2011-12 is given

below :

(Figures in Cr. Rs.)

Particulars Projection

by SLDC

Approved by the

Commission

Employee Cost 4.54 3.32

R&M Expenses 4.86 0.17

A&G Expenses 5.43 0.03

Depreciation 0.67 0.37

Interest Charges 1.26 0.55

Return on Equity - -

ULDC Charges 10.00 18.91

Total Revenue Requirement 26.76 23.35

Less: Non-Tariff Income - -

Net Revenue Requirement 26.76 23.35

Gap/(Surplus) for - -

FY 2010-11

Cumulative Revenue Requirement 26.76 23.35

Page 24: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

17

The transmission system capacity projected by PSTCL for FY 2011-12

is 7990.18 MW, which is the sum of installed capacity in MW of all

generating stations connected to the transmission system of PSTCL

and the contracted capacities in MW of other long-term transactions

to be handled by the transmission system of PSTCL. There being single Distribution cum generation licensee in the State

of Punjab, thus as per the order of Hon'ble PSERC, whole of the SLDC

charges are borne by PSPCL, which works out to Rs. 1.95 crore per

month. Thus the Commission approved SLDC charges @ RS. 1.95

Cr. per month for PSPCL and for long term open access

customers at the rate of Rs. 2435.28 /MW/Month of the

contracted capacity.

2. Short Term Open Access (STOA) Charges for FY 2011-12

As per PSERC Open Access Regulations, SLDC is the nodal agency for

Short Term Open Access and is responsible for collection of

transmission & wheeling charges in respect of STOA Customers of

Punjab and its disbursement to the respective utilities (PSTCL &

PSPCL respectively). Hon'ble PSERC vide its Tariff Order for FY 2011-

12 notified following charges to be recovered from STOA Customers:

Sr.No. Particulars Details

1. Transmission Charges 11 Paise per kWh

2. Wheeling Charges 23.2 Paise per kWh The Wheeling Charges were revised w.e.f. 06.07.2011 after

notification of PSERC (terms & conditions for intra state open access)

regulations, 2011. As per these regulations, the revised Wheelng

Charges were as under:-

For STOA Customers connected at

Voltage level Wheeling Charges

220 kV & 132 kV 0

66 kV & 33 kV 17.4 Paise/Unit

11 kV 34.8 Paise/Unit

Besides above, following charges (contributing to SLDC's income) are

also charged by SLDC in line with prevailing Open Access Regulations

and Procedures:

• SLDC Scheduling & Operating Charges @ Rs. 2,000/- per day

for each STOA transaction.

• STOA Application and NOC fee @ Rs. 10,000/- per application.

Page 25: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

18

3. Financial Statement for SLDC (FY 2011-12) Pending Statutory Audit of SLDC for the FY 2010-11, the financial

statement (unaudited) for FY 2011-12 is as below: (Figures in Cr. Rs.)

Particulars Amount

Income :

SLDC Charges from PSPCL 23.35

Scheduling & Operating Charges 15.66

STOA Application & NOC fee 3.50

Miscellaneous Income 0.28

Total 42.79

Major Expenses :

ULDC Charges & NRLDC fee 10.79

Employee Cost 7.67

Repairs & Maintenance 1.93

Administration & General Exp. 0.55

Depreciation 0.33

Total 21.27

Page 26: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

19

F) Capex Plan for SLDC

(Requirement for SLDC business for the year 2012-13 & 2013-14) 1.0 ULDC Scheme:

1.1 The initial expenditure made by PGCIL for implementation of

ULDC scheme is being recovered by it, from SLDC/ PSTCL as ULDC

Charges (for erstwhile PSEB portion, Central sector portion

proportional to Punjab’s allocation in ISGS plants & BBMB portion

proportional to Punjab’s share in its generation) through monthly

installments, as per CERC orders, amounting to Rs. 9.5 cr for year

2012-13 & Rs. 10 cr. for the year 2013-14. This recovery is to

continue tentatively till 2017.

1.2 The existing SCADA/ EMS control centres are being upgraded by

PGCIL under unified scheme called ULDC Phase-II, which also

envisages a backup control centre for disaster recovery purpose

alongwith better/ upgraded user interface tools/ reports, PMU

(Phase Measurement Units) integration, etc. The project has been

awarded by PGCIL to M/s Siemens and likely to be commissioned

during 2013-14. The expenditure amounting to Rs. 5 Cr shall be

required to be made to PGCIL during 2013-14.

1.3 RTUs addition/ replacement:

A) To further augment the ULDC scheme, 47 No. more RTUs are

already ordered for covering 41 Nos. left out/ upgraded/ new

220kV level substations in PTSCL and 6 Nos. RTUs for

cannibalizing the existing RTUs (of different makes) for spares.

Out of 47 Nos RTUs, 25 Nos RTU are likely to be commissioned by

during 2012-13 and remaining 22 will e commissioned by June

2013. (Date of Order: 05.10.2011, Completion Time: 8 Months for

25 Nos. RTUs and 22 Nos. RTUs were deferred due to non

readiness of communication connectivity and/ or Substations).

With commissioning of these 41 RTUs at left out/ upgraded/ new

220kV substations there shall be a total of 90 substations ( 49 No.

previous plus 41 No. under present order) which shall be covered.

Out of Rs. 6.0 Crore, expenditure amounting to Rs 2.5 Cr is

expected during 2012-13, Rs 3.5 Cr is expected during 2013-14

Page 27: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

20

and thereafter around Rs 10 lacs every year shall be payable for

extended warranty cum Maintenance support for 10 years and for

this purpose during 2013-14 an amount of Rs 4.5 lac shall be

required.

B) SLDC/ PSTCL has also plan to take up addition of more RTUs to

cover left out 132kV & new 220kV (if any) substations in PSTCL as

well as replacement of old technology and/ or non-performing/

un-maintainable/ aged RTUs. This work is expected to be taken

up during 2012-13 and accordingly an amount of Rs. 9.00 cr shall

be required during 2013-14 along with O&M Charges in

subsequent years.

2.0 Intrastate Boundary Metering cum Transmission Level Energy

Audit Scheme:

2.1To meet with the SGC stipulations, SLDC/ PSTCL has also ordered

Intrastate Boundary Metering cum Transmission Level Energy

Audit Scheme and major work in this respect is expected to be

completed by March 2013. Remaining works under this scheme

shall be completed during 2013-14. (Date of order: 26.10.2012,

Completion Time: 9 Months). With the commissioning of this

scheme PSTCL Grid losses, line wise, bus bar wise and

transformer wise losses and other required grid parameters from

revenue class energy meters(ABT as well as conventional energy

meters) alongwith numerous types of reports, and complete

energy audit at transmission level shall be possible.

2.2 Out of order value of 12.00 Cr. an amount of Rs 8.50 Cr. shall be

required for payments against supply/ commissioning of ordered

equipment during 2012-13, Rs. 3.50 Cr. during 2013-14 and an

amount of Rs. 40 lac shall be required for Comprehensive O&M

during 2013-14. Thereafter, an amount of Rs. 45 lakh per annum

shall be required for 7 years for Comprehensive O&M.

As such, PSTCL has estimated Capital expenditure of Rs. 11.38

Crore for its SLDC business for the FY 2012-13 and Rs. 18.4 Crore

for FY 2013-14.

Page 28: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

21

G) Way Forward for 2012-2013

A number of opportunities and challenges exist for Punjab

Grid. Key amongst the challenges are the increasing levels of

complexity in the operation of the power system coupled with

increased quantum of renewable energy sources, portfolio of high

capacity generator units, wide variation in demand, planning of

outages for generating units and transmission elements, real time

incorporation of voluminous revisions from generators and DISCOM,

data acquisition on faster rate, assessment of transfer capabilities,

flexibility to implement frequent changes in Regulations,

implementation of intrastate Boundary Metering system to calculate

transmission losses and sub-station level energy audit & work out

transmission availability, issuance of energy accounts and statements

to all users timely and accurately etc. SLDC is required to be

strengthen by way of skilled man power and set a road map to meet

these challenges.

Page 29: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

22

APPENDIX I

PSTCL Transmission System Map:-

Page 30: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

23

APPENDIX II

Transmission Elements added during 2011-12:-

Central Sector/ PGCIL

S.No. Name of the Element

1 400kV Kaithal- Patiala-II

2 400kV Nalagarh-Patiala-I

3 400kV Patiala-Kaithal -I

4 Patiala ICT-III 500MVA

5 400kV Patiala - Ludhiana -I

6 400kV Patiala - Ludhiana -II

7 500MVA ICT-III at Malerkotla

8 125MVAR Bus Reactor at Patiala

State Sector/PSTCL

A) Transmission Lines Added/ Augmented during 2011-12:-

S.No. Name of the Element

1 220 kV Mohali -Dera Bassi line (LILO at Lalru)

2 220 kV Sunam -Mansa line(LILO at Jhurur)

3 220 kV Patti -Algaon line

4 220 kV Laltokalan - Sahnewal line (LILO at Ludhiana -PG)

5 220 kV Laltokalan -Dhandarikalan(LILO at Ludhiana-PG)

6 220 kV Jamsher - Mahilpur line(LILO at Rehana Jatan)

Transmission Lines Ckt. KM added during 2011-12:-

Voltage

Level

Ckt. KM Total upto

31.03.2011

Total as on

31.03.2012

400 kV 150 (Erection Work) - 150 (Erection Work)

200 kV 345.220 4934 5279.22

132 kV 26.721 3105 3131.721

Page 31: Annual Report 2011-12 · Annual Report 2011-12 PATIALA, PUNJAB Reg d. Office : PSEB Head Office, The Mall, Patiala -147001 . Annual Report 2011-12 State Load Despatch Centre Punjab

Annual Report 2011-12

State Load Despatch Centre

Punjab State Transmission Corporation Limited

24

B) Sub-Stations Added/ Augmented during 2011-12:-

Particulars No. of Sub-

Stations

added during

the year

Capacity

added

(MVA)

Total upto

31.03.2011

Total as on

31.03.2012

220 kV Sub-Stations

New 8 800 13646 15346

Augmented 9 900

132 kV Sub-Stations

New 2 32.5 5499 5702.5

Augmented 14 171

Detail of New Sub-Stations:-

Sr.No. Name of Sub-Station Capacity

220 KV Sub-Stations

1. Mehal Kalan 1 x 100 MVA

2. Mastewal 1 x 100 MVA

3. Rehana Jattan 1 x 100 MVA

4. Doraha 1 x 100 MVA

5. Gobindgarh IV 1 x 100 MVA

6. Lalru 1 x 100 MVA

7. Kanjli 1 x 100 MVA

8. Chola Sahib 1 x 100 MVA

Total 800 MVA

132 KV Sub-Stations

1. F.P. Jalandhar 1 x 20 MVA

2. Kiratpur Sahib/ Nakkian 1 x 12.5 MVA

Total 32.5 MVA