annual report 2009-10 final - mizoram
TRANSCRIPT
1
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
POWER & ELECTRICITY DEPARTMENT
GOVERNMENT OF MIZORAM
ANNUAL REPORT 2009-10
CONTENT
Pages
1. Organisation set up 3 - 12
2. Annual Plan & Budget 13 - 20
3. Report on Assets 21 - 28
4. Power Profile of Mizoram 29 - 38
2
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
ANNUAL REPORT FOR 2009-10
Prepared by
Planning Cell
Office of the Engineer-in-Chief
Power & Electricity Departrment
Government of Mizoram
Aizawl - 796001
(For official circulation only)
Contact Address :
Er. C.L.Thangliana, MES
Engineer-in-Chief
Power & Electricity Departrment
Government of Mizoram
Phone : 0389 2322848
Fax : 0389 2320862
EPEBX: 0389 2323308/2326084
Superintending Enginneer
Planning Cell
Office of the Engineer-in-Chief
Power & Electricity Departrment
Phone : 0389 2322038
Executive Enginneer
Planning Branch
Office of the Engineer-in-Chief
Power & Electricity Departrment
Phone : 0389 2320825
3
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
Organisation Set up
4
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
5
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
ORGANIZATION SET UP
Power & Electricity Department was created in the year 1979 with the aim of
providing reliable and quality power to variuos category of consumers in the state. Initially,
the Department was headed by a Superintending Engineer under whom there were 4(four)
Divisions and 13 (thirteen) Sub- Divisions. The Department has since grown rapidly with
the passing of time. The present organization set up with detail of posts - Gazetted, Non-
Gazetted and Work Charged are as follows:-
6
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
7
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
8
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
9
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
10
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
ORGANISATION CHART OF POWER & ELECTRICITY DEPARTMENT, MIZORAM
Serlui B Dam Sub-Division-I, Bilkhawthlir
Serlui B Dam Sub-Division-II, Bilkhawthlir
Serlui B Spilway Sub-Division, Bilkhawthlir
Serlui B Penstock Sub-Division, Bilkhawthlir
Serlui B Power Sub-Division, Bilkhawthlir
Revenue Sub-Division-I, Aizawl
Revenue Sub-Division-II, Aizawl
Revenue Sub-Division-III, Aizawl
Power Store Sub-Division, Aizawl
MRT Sub-Division, Aizawl
MRT Sub-Division, Lunglei
Distribution
Division,
Aizaw
l
Serlui B
Pow
er Div.
Bilkhawthlir
Civil
Project
Division
Aizaw
l
Generation
Division
Aizaw
l
SDO (TC)
Rural Sub-Division, Aizawl
Civil Project Sub-Division, Aizawl
Zuangtui S/S Sub-Division, Aizawl
Civil Project Sub-Division, Lunglei
Building Sub-Division, Bilkhawthlir
SDO (T
C)
Electrical
Inspectorat
e, Aizaw
l
SDO (TC)
Distribution Sub-Division-III, Aizawl Central
Distribution Sub-Division-II, Aizawl North
Distribution Sub-Division-I, Aizawl South
Luangmual S/S Sub-Division, Aizawl
Generation Sub-Division, Aizawl CentralMRT
Division
Aizaw
l
SDO (T
C)
Lungsen Power Sub-Division, Lungsen
Hnahthial Power Sub-Division, Hnahthial
Sub-Station Sub-Division, Lunglei
Rural Sub-Division, Lunglei
Distribution Sub-Division, Lunglei
Serlui B Dam
Div.
Bilkhawthlir
SDO(TC)
Thermal
Project Div.
Bilkhawthlir
SDO(TC)
Revenue
Division, Aizaw
l
Revenue Sub-Division, Lunglei
Pow
er
Maintenance
Division-I, Lunglei
SDO (T
C)
SDO (T
C)
Pow
er Maint.
Division-II,
Lunglei
Power Sub-Division, Lawngtlai
Power Sub-Division, Saiha
SDO(TC)
Saiha
Pow
er
Division
Mualthuam Power Sub-Division, Mualthuam
Serchhip S/S Sub-Division, Serchhip
Serchhip Power Sub-Division, SerchhipSDO(TC)
Serchhip
Pow
er
Division
Darlawn Power Sub-Division, Saitual
Saitual Power Sub-Division, Saitual
Thingsulthliah Power Sub-Division, ThingsulthliahSDO(TC)
Construction
Division,
Aizaw
l
Maicham
Project
Division
Transmission & Switchyard Sub-Division, Bairabi
Kawnpui Power Sub-Division, Kawnpui
Kolasib Power Sub-Division, Kolasib
SDO (TC)
Kolasib Pow
er
Division
Maicham Hydel Project Sub-Division-II, N.Vanlaiphai
SDO(TC)
Chief
Electrical
Inspector
Aizaw
l
Chief E
ngineer (Distribution) P&E
SE(P)
EE(P)
AE
EO
SE(P)
EE(P)
Supdt.
FAO
AE
AE
Project Circle-II, Aizaw
l
EE(P)
AE
AE
Jt.Director
(Accoun
t)
SE (P
lanning)
Aizaw
l Pow
er Circle
Chief Engineer (S
ystem Operation) P&E
AE(P)
SE (C
ommercial)
Project Circle-I, Aizaw
l
EE(P)
EE(P)
AE
Lunglei Pow
er Circle
EE(P)
AE
Transm
ission Circle, Aizaw
l
EE(P)
AE
SLD
C Circle, Aizaw
l
Assistant Electrical Insapector
AE(Civil)-1no
Dy. Director (A
dmn.)
EE(P)
EE(D)
AE
Maicham Hydel Project Sub-Division-I, N.Vanlaiphai
E.Lungdar Power Sub-Division, E.Lungdar
AE-I (Civil)
AE-II (C
ivil)
Engineer - in - C
hief, Pow
er & Electricity Department, Mizoram
EE (C
ivil)
SE (C
ivil)
Chief Eng
ineer (Civil)
Chief E
ngineer (E
) RE
(RGGVY)
SE(E) R
E(RGGVY)
SE (D
esign) EE(M)
AE(M)
AE(D)
AE(T)
AE(O)
EE(E)
EE(E)
AE(E) - 3nos
SLD
C
Division
AE
AE
EE(P)
EO to E-in-
C
EE(Com
mercial)
AE(P)
11
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
Percentage of Organisation Structure of P&E Department
Percentage of Technical Posts (JE&above)
12
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
13
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
Annual Plan & Budget
14
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
15
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
ANNUAL PLAN AT A GLANCE
The annual plan outlay for the last 10 years and for the year for 2009-10 under State Plan is
highlighted below:-
Salient features of Annual Plan 2009-10 is given below:
1. The total outlay during 2009-10 is 40.6% increase over 2008-09 only. However, the actual re-
quirement during 2009-10 for continuation of on-going developmental works is much higher than the
projected outlay.
2. The projected outlay can be divided as follows:-
(Rupees in lakhs)
3. Direction & Administration : There are 178 nos of Plan posts which had not yet been con-
verted into non-plan posts. The establishment cost of these 178 posts continues to be met from plan
fund. In addition to the above, there are many infrastructural assets created since 7th Five Year Plan.
The maintenance of many of these assets is still met from plan fund as the same are not yet committed
to non-plan. At the same time, the Department underwent expansion last year, during which 35 nos of
posts, mainly those in the top structure, were created. Hence, the fund requirement for maintenance of
Direction & Administration, including wages of MR and W/C staff, Office contingency, Motor vehicle
.. etc is worked out to be Rs 2,806.00 lakhs. For wages of 2123nos of MR and 625 nos of W/C staff
in the Department, the amounts of Rs 1038.84 lakh and Rs 781.16 lakh respectively are provided
16
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
initially in this Plan. However, due to revision of M.R wages vide No.B.11015/1/2009-L&E dt.3.11.09
additional fund was required for which proposal was submitted to Government for additional alloca-
tion. Accordingly, additional allocation amounting to Rs 317 lakhs was made vide No.G.20015/1/
2010-FBT dt.1.3.2010.
4. Works: The works component may be grouped as follows:
Un-earmarked:
(1) Generation: Mizoram is not having its own power generation except from few mini hydel
projects which are seasonal, and operational during rainy season. Though a number of me-
dium and major projects of hydel generation are in the pipeline, harnessing of the hydel
potential can not be taken up in a big way due to fund constraint. Recently, Maicham-II Mini
Hydel Project of 3MW capacity and Lamsial Mini Hydel Project of 500kW were com-
pleted and commissioned. Serlui 'B' Small Hydel Project of 12MW capacity is also at comple-
tion stage under the State sector. In addition to this, Renovation & Modernisation of the old
mini hydel projects of Tuipui, Serlui 'A' and Khawiva are completed which now supplements
the power availability to some extent during rainy season. In spite of the fund constraints, it
is important that we should strive towards harnessing of the immense hydel potential, with
which Mizoram is endowed. So, in this year's Annual Plan, an amount of Rs 10.0 lakh is
provided under Hydel generation for investigation purpose.
Again, under Hydel Generation (R&M), a fund of Rs 9.40 lakh is provided for
repair of Penstock at Serlui 'A' Micro Hydel Station, to complete the R&M work financially.
(2) Transmission: The transmission network within Mizoram is so far at 132kV and at 33kV
levels. The overall sizes of the network are as follows:
(i) Transmission lines at 132kV level - 638.37 Km
(a) Charged at 132kV - 203.98 Km
(b) Charged at 33kV - 434.39 Km
(c) 66kV charged at 33kV - 117.00 Km
(ii) Sub-Transmission lines at 33kV level - 828.03 Km
There is a plan now under active consideration to bring into the State 400kV level
transmission system, to strengthen the power network, keeping in view future plan of gen-
eration and power transaction in the State. At the same time, the collapsing 132kV Sub-
Station at Zuangtui due to massive hill slide, necessitate re-drawing of 132kV power net-
work in the central part of the State, which involves re-alignments or new construction of
132kV lines and Sub-Stations. In spite of these huge tasks ahead, an amount of Rs 34.95
lakh only can be provided innitially in this Annual Plan due to inadequacy of available fund.
The Plan targeted re-alignments / improvements of existing 132kV and 33kV lines including
some new constructions, to remove network constraints and to complete on-going projects.
In addition to above, Government of Mizoram had made additional allocation ot the
tune of Rs 200 lakhs and Rs 1050 lakhs for Construction of 33kV D/C Serlui B to Bawktlang
line and Equity share of 400kV Palatana to Bongaigoan line vide No.G.20015/1/2010-FBT
dt.1.3.2010.
(3) Transformation: In general, the present transformation capacity at 132/33kV and 33/11kV
levels requires strengthening to cope up with the increasing power demands. At the same
time, the capacity addition Plan in the Generation and Transmission fields also calls for the
corresponding strengthening of transformation capacity at various Sub-Stations and at vari-
ous on-going Projects. At present, it is proposed to construct 1x25.0MVA, 400/132kV
17
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
Sub-Station at Sihhmui to draw power at 400kV level when the 400kV Srikona (Silchar) -
Aizawl line is completed by PowerGrid. However, the transformation capacity in existence
at present are as below:-
(i) Sub-Station at 132/66kV, 132/33kV, 66/33kV
& 11/132kV level - 7 Nos (153.20 MVA)
(ii) Sub-Station at 33/11kV level - 43 Nos (187.90 MVA)
(Inclusive of 33/11kV system at 132 kV Sub-Stations)
(4) Distribution: At present, the size of Distribution network under the Department is as follows:
(a) 11kV lines - 4292.41 Km
(b) Distribution Sub-stations (DTs) - 1273 Nos. (179.35 MVA)
(c) LT (low tension) llines - 2251.97 Km.
In almost all the villages, towns / City of Mizoram, there is growth. Villages are growing
bigger and towns are expanding due to imigration. Inhabited areas are increasing with popu-
lation increase and new constructions. These growths call for massive strengthening of Dis-
tribution networks, involving the need for new 11kV lines, new distribution transformers
(DTs), and new LT lines. In many areas, the need is in the form of extensions or strengthen-
ing, or augmentation to bring the benefits of electricity to more people or to wider areas, or
to improve the quality of the electricity, as against the low voltage regulation due to voltage
drop. In many cases, the strengthening is required in the form of augmentation of the distri-
bution lines or transformers which have become undersized on account of increase in de-
mands from the areas they cater. The overall practical need of new infrastructures for distri-
bution network is also huge and immense this year. But due to the overall fund shortage, an
amount of Rs 295.91 lakh only can be provided for Distribution work. The provided fund
mainly targeted completion of on-going distribution works, such as Raising of DT Platforms,
renovation of 33kV and DT Sub-Stations, Repair of damaged DTs, Wireless, metering of
Circle inputs ..etc.
(5) Buildings: In spite of numerous Department's residential and non-residential buildings acutely
due for repair, and the necessity to continue construction of RCC buildings for 33kV Indoor
Sub-Station, for the Office of the E-in-C, P&E at P&E Office Complex, Electric veng,
Aizawl, including the need to improve the Complex, no fund more than Rs 46.74 lakh can be
provided due to shortage.
Earmarked:
(6) Additional Central Assistance (ACA):
(i) Replacement of existing LT bare Conductors at Aizawl and at Lunglei by Insulated
Aerial Bunched Cables - Rs 513.36 lakh
(ii) R&M of 22.92MW HFO based standby Diesel Generating sets- Rs 250.0 lakh
(iii) Construction of 2x3.50MVA, 33/11kV Sub-Station at P&E Complex, Lunglei,
with the 9.0km 33kV D/C line Khawiva - Lunglei - Rs 622.47 lakh
(iv) Renovation of 132KV Sub-Station at Khawiva, Lunglei - Rs 298.0 lakh
(v) Installation of Optical Ground Wire (OPGW) in 132kV Aizawl - Lunglei line
- Rs 719.0 lakh
(vi) Upgradation of 33kV Sub-Station, Bilkhawthlir - Rs 215.0 lakh
(vii) Construction of 33kV Sub-Station at S. Vanlaiphai, including the associated
33kV and 11kV line - Rs 300.0 lakh.
18
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
(viii)5.0 Km 33kV D/C Mualpui - Tlangnuam line - Rs 200.01 lakh
(ix) Augmentation of 132kV Sub-Station, Luangmual - Rs 74.16 lakh
(x) Improvement of 132kV Sub-Station, Bawktlang, Kolasib - Rs 395.0 lakh
Total :Rs 3587.0 lakh
5. Non-Conventional Source of Energy (NCSE): For Non-Conventional Source of Energy Rs
50.00 lakhs is provided during 2009-10 for taking up non-conventional system of energy sources. This
fund will be transferred to Zoram Energy Development Agency (ZEDA), an autonomous body and
nodal agency for non-conventional sources of energy in Mizoram as Grant-in-Aid.
6. Integrated Rural Electric Programme (IREP): Under this scheme Rs 11.00 lakhs is provided
during 2009-10 and similar to above, the fund will be transferred to ZEDA as Grant-in-Aid.
CONCLUSION: Approved Annual Plan 2009 - 10 Rs 6911 lakhs is framed based on the direc-
tion of State Planning Board, Government of Mizoram vide their letter No. G.28014/55/2009-10/
SPB/Pt-III dt. 22.07.2009 and No. G.28014/55/2008-10/SPB dt. 19.8.2009.
19
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
20
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
21
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
Reports on Assets
22
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
23
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
24
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
25
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
26
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
27
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
28
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
29
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
Power Profile
30
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
31
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
Highlights of power supply position in Mizoram during 2009-2010
1. Power Sources (as per installed capacity):
a) From Central Power Sector Unit (NEEPCO & NHPC) = 65.31 MW
b) From Other Power Projects (TSECL) = 5.25 MW
c) From Local Generation of hydel & thermal = 40.47 MW
Total = 111.11 MW
2. Energy available:
a) From CPSU Schedule = 268.50 MU
b) From TSECL = 41.08 MU
c) From Local generation = 17.34 MU
Total = 326.91 MU
3. Energy drawal (actual):
a) From CPSU & TSECL (at Mizoram periphery) = 308.53 MU
b) From Local generation = 17.33 MU
Total = 325.86 MU
4. UI charges:
a) Payable - Unit = 35.12 MU Amount = Rs 1185.92 lakhs
b) Receiveable - Unit = 36.16 MU Amount = Rs 1168.12 lakhs
5. Peak Demand met = 64 MW on 24.12.2009
6. Maximum Energy consumed in a month from CPSU = 29.87 MU in Dec ‘09
7. Maximum local generation in a month = 3.22MU in Sept ‘09
8. Circle wise Energy consumptions:
a) Aizawl Power Circle = 123.897 MU
b) Lunglei Power Circle = 28.866 MU
CE(System Operation) = 152.763 MU
c) Champhai Power Circle = 14.758 MU
d) Project Circle-I = 18.635 MU
e) Transmission Circle = 4.544 MU
CE(Distribution) = 37.937 MU
Department Total = 190.7 MU
32
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
33
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
34
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
35
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
36
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
37
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10
38
POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10