annual report 2009-10 final - mizoram

38
1 POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10 POWER & ELECTRICITY DEPARTMENT GOVERNMENT OF MIZORAM ANNUAL REPORT 2009-10 CONTENT Pages 1. Organisation set up 3 - 12 2. Annual Plan & Budget 13 - 20 3. Report on Assets 21 - 28 4. Power Profile of Mizoram 29 - 38

Upload: others

Post on 28-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annual Report 2009-10 Final - Mizoram

1

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

POWER & ELECTRICITY DEPARTMENT

GOVERNMENT OF MIZORAM

ANNUAL REPORT 2009-10

CONTENT

Pages

1. Organisation set up 3 - 12

2. Annual Plan & Budget 13 - 20

3. Report on Assets 21 - 28

4. Power Profile of Mizoram 29 - 38

Page 2: Annual Report 2009-10 Final - Mizoram

2

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

ANNUAL REPORT FOR 2009-10

Prepared by

Planning Cell

Office of the Engineer-in-Chief

Power & Electricity Departrment

Government of Mizoram

Aizawl - 796001

(For official circulation only)

Contact Address :

Er. C.L.Thangliana, MES

Engineer-in-Chief

Power & Electricity Departrment

Government of Mizoram

Phone : 0389 2322848

Fax : 0389 2320862

EPEBX: 0389 2323308/2326084

Superintending Enginneer

Planning Cell

Office of the Engineer-in-Chief

Power & Electricity Departrment

Phone : 0389 2322038

Executive Enginneer

Planning Branch

Office of the Engineer-in-Chief

Power & Electricity Departrment

Phone : 0389 2320825

Page 3: Annual Report 2009-10 Final - Mizoram

3

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Organisation Set up

Page 4: Annual Report 2009-10 Final - Mizoram

4

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 5: Annual Report 2009-10 Final - Mizoram

5

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

ORGANIZATION SET UP

Power & Electricity Department was created in the year 1979 with the aim of

providing reliable and quality power to variuos category of consumers in the state. Initially,

the Department was headed by a Superintending Engineer under whom there were 4(four)

Divisions and 13 (thirteen) Sub- Divisions. The Department has since grown rapidly with

the passing of time. The present organization set up with detail of posts - Gazetted, Non-

Gazetted and Work Charged are as follows:-

Page 6: Annual Report 2009-10 Final - Mizoram

6

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 7: Annual Report 2009-10 Final - Mizoram

7

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 8: Annual Report 2009-10 Final - Mizoram

8

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 9: Annual Report 2009-10 Final - Mizoram

9

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 10: Annual Report 2009-10 Final - Mizoram

10

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

ORGANISATION CHART OF POWER & ELECTRICITY DEPARTMENT, MIZORAM

Serlui B Dam Sub-Division-I, Bilkhawthlir

Serlui B Dam Sub-Division-II, Bilkhawthlir

Serlui B Spilway Sub-Division, Bilkhawthlir

Serlui B Penstock Sub-Division, Bilkhawthlir

Serlui B Power Sub-Division, Bilkhawthlir

Revenue Sub-Division-I, Aizawl

Revenue Sub-Division-II, Aizawl

Revenue Sub-Division-III, Aizawl

Power Store Sub-Division, Aizawl

MRT Sub-Division, Aizawl

MRT Sub-Division, Lunglei

Distribution

Division,

Aizaw

l

Serlui B

Pow

er Div.

Bilkhawthlir

Civil

Project

Division

Aizaw

l

Generation

Division

Aizaw

l

SDO (TC)

Rural Sub-Division, Aizawl

Civil Project Sub-Division, Aizawl

Zuangtui S/S Sub-Division, Aizawl

Civil Project Sub-Division, Lunglei

Building Sub-Division, Bilkhawthlir

SDO (T

C)

Electrical

Inspectorat

e, Aizaw

l

SDO (TC)

Distribution Sub-Division-III, Aizawl Central

Distribution Sub-Division-II, Aizawl North

Distribution Sub-Division-I, Aizawl South

Luangmual S/S Sub-Division, Aizawl

Generation Sub-Division, Aizawl CentralMRT

Division

Aizaw

l

SDO (T

C)

Lungsen Power Sub-Division, Lungsen

Hnahthial Power Sub-Division, Hnahthial

Sub-Station Sub-Division, Lunglei

Rural Sub-Division, Lunglei

Distribution Sub-Division, Lunglei

Serlui B Dam

Div.

Bilkhawthlir

SDO(TC)

Thermal

Project Div.

Bilkhawthlir

SDO(TC)

Revenue

Division, Aizaw

l

Revenue Sub-Division, Lunglei

Pow

er

Maintenance

Division-I, Lunglei

SDO (T

C)

SDO (T

C)

Pow

er Maint.

Division-II,

Lunglei

Power Sub-Division, Lawngtlai

Power Sub-Division, Saiha

SDO(TC)

Saiha

Pow

er

Division

Mualthuam Power Sub-Division, Mualthuam

Serchhip S/S Sub-Division, Serchhip

Serchhip Power Sub-Division, SerchhipSDO(TC)

Serchhip

Pow

er

Division

Darlawn Power Sub-Division, Saitual

Saitual Power Sub-Division, Saitual

Thingsulthliah Power Sub-Division, ThingsulthliahSDO(TC)

Construction

Division,

Aizaw

l

Maicham

Project

Division

Transmission & Switchyard Sub-Division, Bairabi

Kawnpui Power Sub-Division, Kawnpui

Kolasib Power Sub-Division, Kolasib

SDO (TC)

Kolasib Pow

er

Division

Maicham Hydel Project Sub-Division-II, N.Vanlaiphai

SDO(TC)

Chief

Electrical

Inspector

Aizaw

l

Chief E

ngineer (Distribution) P&E

SE(P)

EE(P)

AE

EO

SE(P)

EE(P)

Supdt.

FAO

AE

AE

Project Circle-II, Aizaw

l

EE(P)

AE

AE

Jt.Director

(Accoun

t)

SE (P

lanning)

Aizaw

l Pow

er Circle

Chief Engineer (S

ystem Operation) P&E

AE(P)

SE (C

ommercial)

Project Circle-I, Aizaw

l

EE(P)

EE(P)

AE

Lunglei Pow

er Circle

EE(P)

AE

Transm

ission Circle, Aizaw

l

EE(P)

AE

SLD

C Circle, Aizaw

l

Assistant Electrical Insapector

AE(Civil)-1no

Dy. Director (A

dmn.)

EE(P)

EE(D)

AE

Maicham Hydel Project Sub-Division-I, N.Vanlaiphai

E.Lungdar Power Sub-Division, E.Lungdar

AE-I (Civil)

AE-II (C

ivil)

Engineer - in - C

hief, Pow

er & Electricity Department, Mizoram

EE (C

ivil)

SE (C

ivil)

Chief Eng

ineer (Civil)

Chief E

ngineer (E

) RE

(RGGVY)

SE(E) R

E(RGGVY)

SE (D

esign) EE(M)

AE(M)

AE(D)

AE(T)

AE(O)

EE(E)

EE(E)

AE(E) - 3nos

SLD

C

Division

AE

AE

EE(P)

EO to E-in-

C

EE(Com

mercial)

AE(P)

Page 11: Annual Report 2009-10 Final - Mizoram

11

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Percentage of Organisation Structure of P&E Department

Percentage of Technical Posts (JE&above)

Page 12: Annual Report 2009-10 Final - Mizoram

12

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 13: Annual Report 2009-10 Final - Mizoram

13

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Annual Plan & Budget

Page 14: Annual Report 2009-10 Final - Mizoram

14

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 15: Annual Report 2009-10 Final - Mizoram

15

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

ANNUAL PLAN AT A GLANCE

The annual plan outlay for the last 10 years and for the year for 2009-10 under State Plan is

highlighted below:-

Salient features of Annual Plan 2009-10 is given below:

1. The total outlay during 2009-10 is 40.6% increase over 2008-09 only. However, the actual re-

quirement during 2009-10 for continuation of on-going developmental works is much higher than the

projected outlay.

2. The projected outlay can be divided as follows:-

(Rupees in lakhs)

3. Direction & Administration : There are 178 nos of Plan posts which had not yet been con-

verted into non-plan posts. The establishment cost of these 178 posts continues to be met from plan

fund. In addition to the above, there are many infrastructural assets created since 7th Five Year Plan.

The maintenance of many of these assets is still met from plan fund as the same are not yet committed

to non-plan. At the same time, the Department underwent expansion last year, during which 35 nos of

posts, mainly those in the top structure, were created. Hence, the fund requirement for maintenance of

Direction & Administration, including wages of MR and W/C staff, Office contingency, Motor vehicle

.. etc is worked out to be Rs 2,806.00 lakhs. For wages of 2123nos of MR and 625 nos of W/C staff

in the Department, the amounts of Rs 1038.84 lakh and Rs 781.16 lakh respectively are provided

Page 16: Annual Report 2009-10 Final - Mizoram

16

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

initially in this Plan. However, due to revision of M.R wages vide No.B.11015/1/2009-L&E dt.3.11.09

additional fund was required for which proposal was submitted to Government for additional alloca-

tion. Accordingly, additional allocation amounting to Rs 317 lakhs was made vide No.G.20015/1/

2010-FBT dt.1.3.2010.

4. Works: The works component may be grouped as follows:

Un-earmarked:

(1) Generation: Mizoram is not having its own power generation except from few mini hydel

projects which are seasonal, and operational during rainy season. Though a number of me-

dium and major projects of hydel generation are in the pipeline, harnessing of the hydel

potential can not be taken up in a big way due to fund constraint. Recently, Maicham-II Mini

Hydel Project of 3MW capacity and Lamsial Mini Hydel Project of 500kW were com-

pleted and commissioned. Serlui 'B' Small Hydel Project of 12MW capacity is also at comple-

tion stage under the State sector. In addition to this, Renovation & Modernisation of the old

mini hydel projects of Tuipui, Serlui 'A' and Khawiva are completed which now supplements

the power availability to some extent during rainy season. In spite of the fund constraints, it

is important that we should strive towards harnessing of the immense hydel potential, with

which Mizoram is endowed. So, in this year's Annual Plan, an amount of Rs 10.0 lakh is

provided under Hydel generation for investigation purpose.

Again, under Hydel Generation (R&M), a fund of Rs 9.40 lakh is provided for

repair of Penstock at Serlui 'A' Micro Hydel Station, to complete the R&M work financially.

(2) Transmission: The transmission network within Mizoram is so far at 132kV and at 33kV

levels. The overall sizes of the network are as follows:

(i) Transmission lines at 132kV level - 638.37 Km

(a) Charged at 132kV - 203.98 Km

(b) Charged at 33kV - 434.39 Km

(c) 66kV charged at 33kV - 117.00 Km

(ii) Sub-Transmission lines at 33kV level - 828.03 Km

There is a plan now under active consideration to bring into the State 400kV level

transmission system, to strengthen the power network, keeping in view future plan of gen-

eration and power transaction in the State. At the same time, the collapsing 132kV Sub-

Station at Zuangtui due to massive hill slide, necessitate re-drawing of 132kV power net-

work in the central part of the State, which involves re-alignments or new construction of

132kV lines and Sub-Stations. In spite of these huge tasks ahead, an amount of Rs 34.95

lakh only can be provided innitially in this Annual Plan due to inadequacy of available fund.

The Plan targeted re-alignments / improvements of existing 132kV and 33kV lines including

some new constructions, to remove network constraints and to complete on-going projects.

In addition to above, Government of Mizoram had made additional allocation ot the

tune of Rs 200 lakhs and Rs 1050 lakhs for Construction of 33kV D/C Serlui B to Bawktlang

line and Equity share of 400kV Palatana to Bongaigoan line vide No.G.20015/1/2010-FBT

dt.1.3.2010.

(3) Transformation: In general, the present transformation capacity at 132/33kV and 33/11kV

levels requires strengthening to cope up with the increasing power demands. At the same

time, the capacity addition Plan in the Generation and Transmission fields also calls for the

corresponding strengthening of transformation capacity at various Sub-Stations and at vari-

ous on-going Projects. At present, it is proposed to construct 1x25.0MVA, 400/132kV

Page 17: Annual Report 2009-10 Final - Mizoram

17

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Sub-Station at Sihhmui to draw power at 400kV level when the 400kV Srikona (Silchar) -

Aizawl line is completed by PowerGrid. However, the transformation capacity in existence

at present are as below:-

(i) Sub-Station at 132/66kV, 132/33kV, 66/33kV

& 11/132kV level - 7 Nos (153.20 MVA)

(ii) Sub-Station at 33/11kV level - 43 Nos (187.90 MVA)

(Inclusive of 33/11kV system at 132 kV Sub-Stations)

(4) Distribution: At present, the size of Distribution network under the Department is as follows:

(a) 11kV lines - 4292.41 Km

(b) Distribution Sub-stations (DTs) - 1273 Nos. (179.35 MVA)

(c) LT (low tension) llines - 2251.97 Km.

In almost all the villages, towns / City of Mizoram, there is growth. Villages are growing

bigger and towns are expanding due to imigration. Inhabited areas are increasing with popu-

lation increase and new constructions. These growths call for massive strengthening of Dis-

tribution networks, involving the need for new 11kV lines, new distribution transformers

(DTs), and new LT lines. In many areas, the need is in the form of extensions or strengthen-

ing, or augmentation to bring the benefits of electricity to more people or to wider areas, or

to improve the quality of the electricity, as against the low voltage regulation due to voltage

drop. In many cases, the strengthening is required in the form of augmentation of the distri-

bution lines or transformers which have become undersized on account of increase in de-

mands from the areas they cater. The overall practical need of new infrastructures for distri-

bution network is also huge and immense this year. But due to the overall fund shortage, an

amount of Rs 295.91 lakh only can be provided for Distribution work. The provided fund

mainly targeted completion of on-going distribution works, such as Raising of DT Platforms,

renovation of 33kV and DT Sub-Stations, Repair of damaged DTs, Wireless, metering of

Circle inputs ..etc.

(5) Buildings: In spite of numerous Department's residential and non-residential buildings acutely

due for repair, and the necessity to continue construction of RCC buildings for 33kV Indoor

Sub-Station, for the Office of the E-in-C, P&E at P&E Office Complex, Electric veng,

Aizawl, including the need to improve the Complex, no fund more than Rs 46.74 lakh can be

provided due to shortage.

Earmarked:

(6) Additional Central Assistance (ACA):

(i) Replacement of existing LT bare Conductors at Aizawl and at Lunglei by Insulated

Aerial Bunched Cables - Rs 513.36 lakh

(ii) R&M of 22.92MW HFO based standby Diesel Generating sets- Rs 250.0 lakh

(iii) Construction of 2x3.50MVA, 33/11kV Sub-Station at P&E Complex, Lunglei,

with the 9.0km 33kV D/C line Khawiva - Lunglei - Rs 622.47 lakh

(iv) Renovation of 132KV Sub-Station at Khawiva, Lunglei - Rs 298.0 lakh

(v) Installation of Optical Ground Wire (OPGW) in 132kV Aizawl - Lunglei line

- Rs 719.0 lakh

(vi) Upgradation of 33kV Sub-Station, Bilkhawthlir - Rs 215.0 lakh

(vii) Construction of 33kV Sub-Station at S. Vanlaiphai, including the associated

33kV and 11kV line - Rs 300.0 lakh.

Page 18: Annual Report 2009-10 Final - Mizoram

18

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

(viii)5.0 Km 33kV D/C Mualpui - Tlangnuam line - Rs 200.01 lakh

(ix) Augmentation of 132kV Sub-Station, Luangmual - Rs 74.16 lakh

(x) Improvement of 132kV Sub-Station, Bawktlang, Kolasib - Rs 395.0 lakh

Total :Rs 3587.0 lakh

5. Non-Conventional Source of Energy (NCSE): For Non-Conventional Source of Energy Rs

50.00 lakhs is provided during 2009-10 for taking up non-conventional system of energy sources. This

fund will be transferred to Zoram Energy Development Agency (ZEDA), an autonomous body and

nodal agency for non-conventional sources of energy in Mizoram as Grant-in-Aid.

6. Integrated Rural Electric Programme (IREP): Under this scheme Rs 11.00 lakhs is provided

during 2009-10 and similar to above, the fund will be transferred to ZEDA as Grant-in-Aid.

CONCLUSION: Approved Annual Plan 2009 - 10 Rs 6911 lakhs is framed based on the direc-

tion of State Planning Board, Government of Mizoram vide their letter No. G.28014/55/2009-10/

SPB/Pt-III dt. 22.07.2009 and No. G.28014/55/2008-10/SPB dt. 19.8.2009.

Page 19: Annual Report 2009-10 Final - Mizoram

19

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 20: Annual Report 2009-10 Final - Mizoram

20

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 21: Annual Report 2009-10 Final - Mizoram

21

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Reports on Assets

Page 22: Annual Report 2009-10 Final - Mizoram

22

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 23: Annual Report 2009-10 Final - Mizoram

23

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 24: Annual Report 2009-10 Final - Mizoram

24

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 25: Annual Report 2009-10 Final - Mizoram

25

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 26: Annual Report 2009-10 Final - Mizoram

26

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 27: Annual Report 2009-10 Final - Mizoram

27

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 28: Annual Report 2009-10 Final - Mizoram

28

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 29: Annual Report 2009-10 Final - Mizoram

29

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Power Profile

Page 30: Annual Report 2009-10 Final - Mizoram

30

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 31: Annual Report 2009-10 Final - Mizoram

31

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Highlights of power supply position in Mizoram during 2009-2010

1. Power Sources (as per installed capacity):

a) From Central Power Sector Unit (NEEPCO & NHPC) = 65.31 MW

b) From Other Power Projects (TSECL) = 5.25 MW

c) From Local Generation of hydel & thermal = 40.47 MW

Total = 111.11 MW

2. Energy available:

a) From CPSU Schedule = 268.50 MU

b) From TSECL = 41.08 MU

c) From Local generation = 17.34 MU

Total = 326.91 MU

3. Energy drawal (actual):

a) From CPSU & TSECL (at Mizoram periphery) = 308.53 MU

b) From Local generation = 17.33 MU

Total = 325.86 MU

4. UI charges:

a) Payable - Unit = 35.12 MU Amount = Rs 1185.92 lakhs

b) Receiveable - Unit = 36.16 MU Amount = Rs 1168.12 lakhs

5. Peak Demand met = 64 MW on 24.12.2009

6. Maximum Energy consumed in a month from CPSU = 29.87 MU in Dec ‘09

7. Maximum local generation in a month = 3.22MU in Sept ‘09

8. Circle wise Energy consumptions:

a) Aizawl Power Circle = 123.897 MU

b) Lunglei Power Circle = 28.866 MU

CE(System Operation) = 152.763 MU

c) Champhai Power Circle = 14.758 MU

d) Project Circle-I = 18.635 MU

e) Transmission Circle = 4.544 MU

CE(Distribution) = 37.937 MU

Department Total = 190.7 MU

Page 32: Annual Report 2009-10 Final - Mizoram

32

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 33: Annual Report 2009-10 Final - Mizoram

33

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 34: Annual Report 2009-10 Final - Mizoram

34

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 35: Annual Report 2009-10 Final - Mizoram

35

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 36: Annual Report 2009-10 Final - Mizoram

36

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 37: Annual Report 2009-10 Final - Mizoram

37

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10

Page 38: Annual Report 2009-10 Final - Mizoram

38

POWER & ELECTRICITY DEPARTMENT, MIZORAM : ANNUAL REPORT 2009-10