  • 8/8/2019 Annual Rep 2008-09 Water Supply

    1/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc\D

    Karnataka Urban Water Supply & Drainage Board

    Annual Report 2008-09

    The Karnataka Urban Water Supply and Drainage Board was constituted by an Act of

    legislature in 1974 and is functioning from August 1975.

    The Board is an implementing body for Water Supply and UGD facilities in 213 Urban

    local bodies of the State except Bruhat Bangalore Mahanagara Palike.

    The Board aims to provide adequate water supply from assured and safe source of

    supply and also proper sanitation to all the urban areas. There are 213 urban local bodies

    coming under the jurisdiction of the Board, under the following categories:

    CATEGORY Nos.Population as per

    2001 census

    Corporations 7 34.45

    City Municipal Councils 44 42.54

    Town Municipal Councils 94 29.36

    Town Panchayaths 68 10.10

    Total 213 116.45

    The present population of 213 urban local bodies is 142.64 Lakhs

    Sl.No.

    Name of the BasinNo. of Town

    covered underdifferent Bains

    1. Godavari 5

    2. Krishna 101

    3. Cauvery 44

    4. North Pennar 5

    5. South Pennar --

    6. Palar 2

    7. West flowing 22

    Total 179

    Population covered with SurfaceSources (179 towns)

    130.75 lakhs

    Population covered with Sub-Surface Sources (34 towns)

    11.89 lakhs

    KrishnaBasin

    CauveryBasin

    Wes

    tFlowing

    Godavari

    North

    South

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    2/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc\D

    Moving towards adequate and assured sources of water supply

    Schemes commissioned since inception upto March 2009

    Water Supply - 466 Nos.

    U.G.D - 47 Nos.

    Total Estimate cost of these schemes - Rs.1931.46 Crores

    Population covered with drinking water - 79%

    Population covered with U.G.D facilities - 28%

    135

    75

    34

    12

    Towns with sub-surface source (Nos.)

    Towns with Surface source (Nos.)

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    3/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc\D

    The Board is executing water supply and sewerage schemes under the followingcategories.

    I PLAN SCHEMES:

    A. WATER SUPPLY SCHEMES:

    1 a) PIPED WATER SUPPLY SCHEMES:

    Piped water supply schemes are taken up for the towns having population less than

    20,000 as per 1991 census, for which the entire cost is borne by the Government as Grant in

    aid.

    b) ACCELARATED URBAN WATER SUPPLY PROGRAMMES:

    Under this programme water supply works are takenup in towns having population

    less than 20,000.

    For these schemes 50% of the estimated cost is provided by the Government of

    India as Grant and the remaining is borne by the State Government. The scheme is closed

    from 2006-07. All remaining sanctioned schemes will be completed by March 2010.

    2. URBAN WATER SUPPLY SCHEMES:

    Under this scheme water supply is provided for the cities/towns having population of

    20,000 and above as per 1991 census. The funding pattern of this scheme is as follows.

    Funding PatternSlNo

    CategoryLoan fromFinancial

    InstitutionGovt. Grant

    Local BodyContribution

    1 Population upto 20,000 NIL 100% NIL

    2 Population above 20,000upto 75,000

    50% 50% NIL

    3 Population above 75,000including Corporations

    66 2/3% 23 1/3% 10%

    B. SEWERAGE SCHEMES:

    1. UNDER GROUND DRAINAGE SCHEME:

    All urban areas irrespective of their population comes under this category. Under this

    category priority is given to the cities/towns having population of more than 1 lakhs and

    situated on the bank of rivers/seas. The funding pattern for UGD schemes is as follows:

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    4/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc\D

    Funding PatternSlNo

    CategoryLoan FromFinancial

    InstitutionGovt Loan

    Local BodyContribution

    1 Corporations 50% 20% 30%

    2 City Municipal Council 50% 25% 25%

    3 Town Municipal Council 50% 30% 20%

    II. MAINTENANCE OF THE WATER SUPPLY SCHEMES:

    As per the Government Order the Board is maintaining the following water supply

    schemes.

    Upto Consumer Point:

    1. Kushalnagar2. Bethamangala (KGF)3. Hubli-Dharwad4. Mandya

    5. Ramanagaram6. Channapatna7. Belgaum

    2. Upto to Bulk Supply

    1. Karwar - Ankola2. Bellary3. Gulbarga

    As per the G.O.No. UDD 204 UMS 95 dated 15.11.96, the Board has to hand over the

    completed schemes to the concerned Local Bodies, for maintenance. As some of the Local

    Bodies have not taken-over the schemes, the Board itself is forcibly maintaining the

    following water supply schemes upto Bulk point.

    1. Gadag-Betageri2.

    Mundargi

    3. Tumkur4. Bhalki

    5. Bijapur6.

    Ilkal-Hungund

    7. Hukkeri-Sankeshwar8 Bidar

    III. Other Schemes:

    1. Under National River Conservation Plan (N.R.C.P), 8 towns coming under the catchmentareas of Cauvery and Krishna, (Thunga Badra) rivers have been selected. It is proposed

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    5/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc 5

    to prevent river pollution by diverting and treating the sewage under core works, in

    these towns, for this, works costing Rs.19.62 crores are approved by the Government of

    India, and are under implementation. Out of 8 STPs 6 STPs are completed and

    remaining are in progress.

    2. The Board is implementing the Comprehensive Water Supply Scheme to Karwar-Ankolatowns with Gangavalli River as source at an estimated cost of Rs.30.00 crores under

    KUDCEM Project withADB assistance.

    3. The Board is executing 17 water supply and 10 Under Ground Drainage schemes at anestimate cost of Rs.418.07 crores and 78.10 crores respectively under the Centrally

    sponsored UIDSSMT programme.

    4. The Board has takenup remodeling of existing distribution network, Automation andIntegrated Management System of Mysore city under the Jawaharalal Nehru National

    Urban Renewal Mission centrally sponsored scheme at an estimating cost of Rs.194.54

    Crores, and Augmentation of water supply scheme from Kabini river is taken up at an

    estimated cost of Rs.108.81 crores under JnnURM

    Activities of the Board for the year 2008-09

    Government has approved the Action Plan vide order No. UDD 22 UMS 2008 (P)

    Blore dt: 2-2-2009 for sanction of 13 Water Supply Scheme and 5 Under Ground Drainage

    scheme which are :-

    SlNo

    Program No. of SchemesEstimate cost(Rs.in crores)

    1 Water supply scheme 13 416.81

    2 Under Ground Drainage scheme 05 83.13

    TOTAL 18 499.94

    The Board has commissioned 19 water supply scheme during the year 2008-09 as

    against the target of 30 schemes ( 26 WSS & 4 UGD ). The list of scheme commissioned are

    as follows :-

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    6/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc 6

    Schemes commissioned during 2008-09

    (Rs. in Lakhs)

    Sl.No.

    Name of the SchemeEstimated

    CostRevised cost

    1 2 3 4

    I Piped Water Supply Scheme

    1 Kundagol 39.00 39.00

    2 Shiralakoppa 87.00 87.00

    3 Thirthahalli 202.00 202.00

    4 Chikknayakanahalli 150.00 256.50

    Total 478.00 584.50

    IIAccelerated Urban Water SupplyProgramme

    1 Holalkere 777.50 777.50

    2 Jagalur 1523.00 1523.00

    Total 2300.50 2300.50

    III Urban Water Supply Scheme

    1 Mandya 675.00 675.00

    2 Muddebihal 220.00 220.00

    3 Humnabad-Chitaguppa 1904.00 2100.00

    4 Jamakhandi 1184.93 1184.93

    5 Basavana Bagewadi 158.50 158.50

    6 Shahapur 213.00 213.00

    7 Jewargi 457.00 457.00

    8 Shimoga 2800.00 2800.00

    9 Sankeshwar 495.00 495.00

    10 Gundlupet 255.00 255.00

    11 Chitradurga 6370.83 6370.83

    12 Bhadravathi 600.00 660.00

    13 Ramanagar - I 504.80 504.80

    Total 15838.06 16979.13

    Grand Total 18616.56 19864.13

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    7/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc 7

    During the year 2008-09 Board has mobilised the funds from the following source.

    (Rs.in Crore)

    SlNo

    Source of fund BudgetRevisedBudget

    Releases

    1 Plan allocation state

    Government

    200.00 155.00 155.00

    2 RDPR 17.10 -- --

    3 SFC Grants (LBS) 34.73 22.49 22.49

    4 Opening balance 94.60 94.60 94.60

    5 Loan from Financial Institution(IEBR)

    150.00 150.00 ---

    TOTAL 496.43 422.09 270.09

    Government have sanctioned Rs.150.00 Crore under IEBR during March 2009. RDPR

    department share for enroute villages has not been released during the year.

    Financial achievement during the year 2008-09 is detailed below :-

    (Rs.in Crore)

    SlNo

    Programme Board Budget Expenditure %

    1 Piped Water Supply Scheme 38.09 23.31 61

    2 Augmentation Water Supply

    Programme

    31.55 10.74 34

    3 Urban Water Supply scheme 235.00 122.85 52

    4 Under Ground Drainage scheme 117.45 39.02 33

    TOTAL 422.09 195.92 46

    Programme for the year 2009-10

    The Board has prepared an action plan for the year 2009-10 & submitted to

    Government for approval. The action plan for 129 schemes comprise of schemes to be

    completed, which are commissioned in earlier years, targeted schemes to be commissioned

    during the year 2009-10, on-going schemes and New Schemes proposed during the year

    2009-10. The Board budget for the year 2009-10 is amounting to Rs. 550.00 crores

    ( including 2008-09 IEBR awaiting release of loan from Financial Institution).

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    8/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc 8

    The Plan allocation in the State Budget for the year 2009-10 is Rs.105.00 Crore. The

    Budget allocation for the schemes targeted is as follows.

    (Rs.in Crore)

    Sl

    No

    Program On-goingSchemesTarget to

    2009-10

    Budget forTargeted

    schemes1 Piped Water Supply

    Scheme12 04 3.75

    2 Augmentation WaterSupply Programme

    03 03 11.12

    3 Urban Water Supplyscheme

    29 10 37.55

    4 Under Ground Drainagescheme

    23 06 25.77

    TOTAL 67 23 78.19

    Mobilisation of funds for the year 2009-10.

    The source of mobilisation of funds for the year 2009-10 is as follows.

    (Rs.in Crore)

    SL No Source Budget 2009-10

    1 State Government grants 115.07

    2 State Government loan 34.93

    3 SFC grants 50.00

    4 IEBR 105.00

    5 RDPR scheme 25.006 Opening balance 220.00

    TOTAL 550.00

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    9/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc 9

    Schemes targeted for commissioning during the year 2009-10 are.

    Rs.in lakhs

    SlNo

    ProgramEstimate

    CostRevisedEstimate

    Target date forcommissioning

    I Piped Water Supply scheme

    1 Srinivasapura 208.00 270.00 April 2009

    2 Honnalli 350.00 550.00 June 2009

    3 Kushtagi 675.00 750.00 September 2009

    4 Koppa 160.00 160.00 October 2009

    Sub-Total 1393.00 1730.00

    Accelerated Urban Water Supply Programme

    1 Somwarpet 610.00 910.00 September 2009

    2 Yelandur 747.00 970.00 June 2009

    3 Yellapura 1310.86 1600.00 February 2009

    Sub-Total 2667.86 3480.00

    1 D.B.Pura 2249.86 2249.86 Febraury 2009

    2 Mahalingapura 1144.76 1300.00 January 2010

    3 Mudhol 1299.36 1299.36 March 2010

    4 Kunigal 673.50 673.50 December 2009

    5 Byadgi 440.00 440.00 December 2009

    6 Shikaripura 1200.00 1200.00 September2009

    7 Chintamani 442.00 442.00 June 2009

    8 Bellary 499.00 499.00 February 2010

    9 Shikaripura Distribution 1880.00 1880.00 December 2009

    10 Tiptur 440.20 440.20 February 2010Sub-Total 10268.68 10423.92

    Underground Drainage Scheme

    1 Kolar II Stage 929.50 929.50 February 2010

    2 Gadag-Betageri 1114.66 1114.66 February 2010

    3 Jewargi 370.00 370.00 May 2009

    4 Gangavathi 1702.27 1702.27 December 2009

    5 C R Patna 916.00 1300.00 January 2010

    6 Nagamangala 547.00 547.00 February 2010

    Sub-Total 5579.43 5963.43

    Grand Total 19908.97 21597.35

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    10/11

    D:\shridhar\Web site\Annual_rep_2008-09_eng.doc 10

    Quality Policy:

    The Board is an ISO 9001-2000 certified institution and accordingly is committed tomaintain quality in all aspects.

    To provide quality potable water and good sanitation systems. Formulation & completion of the projects ensuring quality, economy and time schedules. Striving to meet the expectations of the Customer and exceed the same by continuous

    improvement.

    Quality Objectives:

    The quality of the Project shall be measured and the Board shall work towards achievingzero defects.

    Timely completion of all the projects. To formulate economic and viable projects. Actual expenditure for each project should not exceed more than 5% of the sanctioned

    estimate cost.

    Reforms undertaken in Board to increase efficiency

    Development and Implementation of Management Information System (MIS) throughWide Area Network and Local area Network by computerizing all the Offices in the State

    in collaboration with M/s Indian Institute of Science, Bangalore and M/s.Tata

    Consultants, Bangalore.

    Award of ISO 9001 2000 Certification for all the Offices of the Board across the Statesince 1st July 2002, the first Board to obtain such Certification in India.

    To have best quality in execution of works, third party inspections of schemes have beenintroduced.

    For speedy and timely completion of the projects, contracts have been awarded throughpackage tender to the pre-qualified firms.

    Abolition of the 3 circle offices in the Board to achieve speedy disposal and reduce thenon-plan expenditure. This is the 1st organisation to abolish the Divisional level posts not

    only in Karnataka but in the entire Country.

    Abolition of several vacant posts at all levels to make the Board compact and efficient. To have transparency and speedy finalisation of tenders, E-Tendering has been

    implemented in the Board.

  • 8/8/2019 Annual Rep 2008-09 Water Supply

    11/11

    D:\shridhar\Web site\Annual rep 2008-09 eng doc 11

    Bio Metric based Attendance and Tracking System is introduced in all the Offices of theBoard in the State, to monitor the punctuality of all the Officers/ Officials attending the

    Office.

    Formation of HRD Cell to take care of training needs of all category of employees. Planning, Design and Monitoring Cell in the Central Office has been created for speedy

    implementation of the projects.

    To have efficient disposal of LOCs, a customised software has been developed andimplemented for release of funds directly to the firms/contractors which again is not

    existing in any of the Government Departments or Boards/ Corporations of Karnataka.

    Development and installation of customised software for revenue billing & collection forHubli-Dharwad Maintenance division.

    Board is developing workflow solution for all its activities for making the organisation apaperless office. This is being developed by M/s.HCL Infosystems using FILENET.

    The Board is constructing the Water and Waste Water Learning Centre at Yelahanka,Bangalore to train the Board employees, local body authorities and public.