SHEET 1 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date:243332.0003
J. Hotstream 11/15/2017 T. Martin 12/13/2017
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐002_2017 INSPECTION.DOCX 12/22/17
INSPECTION REPORT
Landfill Annual Inspection Report
Purpose:
This inspection checklist has been developed to meet the requirements for inspections by a
qualified professional engineer for a coal combustion residual (CCR) landfill. This checklist
exceeds the requirements for 40 Code of Federal Regulations 257.84(b). This inspection of the
Alma Off‐Site Disposal Facility Phase IV Landfill was performed by TRC Environmental
Corporation on behalf of Dairyland Power Cooperative (DPC).
The goal of the inspection is to ensure that the design, construction, operation, and maintenance
is consistent with recognized good engineering practices. In addition, the inspection looked for
conditions of structural weakness or conditions that may affect the safe operation of the CCR
unit.
The following were performed for the inspection of the CCR unit.
Review of Available Information:
The following documents were reviewed in preparation of the site visit.
Health and Safety Plan
Fugitive Dust Control Plan (12/19/2016)
Groundwater Monitoring Program (10/2017)
Dust Control Report (12/5/2016)
Post‐Closure Plan (10/2016)
Closure Plan (10/2016)
Run‐on and Run‐off Control System Plan (10/2016)
Annual Landfill Inspection Report (12/16/2016)
Weekly inspections performed by qualified personnel (11/2/2016 through 11/10/2017)
Comments on the Operating Record: Electronic system, well organized, accessible from the
office at the landfill
Summary of the Site Conditions (based on document review):
DPC operates a CCR landfill (Alma Off‐Site Disposal Facility, Phase IV Landfill) located in the
NE 1/4 of the NE 1/4 of Section 19 and portions of Sections 18 and 20, T21N, R12W, Town of
Belvidere, Buffalo County, Wisconsin. The location of the Phase IV landfill is in a valley
SHEET 2 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date:243332.0003
J. Hotstream 11/15/2017 T. Martin 12/13/2017
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐002_2017 INSPECTION.DOCX 12/22/17
INSPECTION REPORT
including 3 phases of non‐contiguous closed landfills. This inspection addresses only the Phase
IV landfill, because the Phase 1, II, and III landfills were closed prior to the promulgation of the
federal CCR rule (40 Code of Federal Regulations 257.50 through 107).
The Phase IV landfill is permitted through the state of Wisconsin. To date the liner system of
Cells 1, 2A, 2B, 3A, and 3B have been constructed with final cover installed over a portion of
Cells 1, 2A, and 2B. Cell 3B of the Phase IV landfill was constructed during May through
August 2015. The landfill construction includes a composite liner system, composite cover
system, leachate collection system, leachate storage tank, and storm water controls (diversion
berms, sedimentation basin, ditching, and downslope flumes).
Changes to the unit since the previous report:
Since the inspection in 2016, there has been continued placement of CCR into Cell 3A and 3B.
Approximate volume of CCR in the unit at the time of the inspection: Approximately 1,044,100
cubic yards based on the November 14, 2017, topographic survey
Visual Inspection:
A site visit and visual inspection were performed by Jonathan Hotstream, P.E., P.G. (TRC
Environmental Corporation) on November 15, 2017
Time arrived on site: 10:14 AM ________________________
Time departed from site: 12:10 PM _____________________
DPC Personnel Present: Leif Tolokken _________________
Weather Conditions: Cool, overcast, lower to upper 40s °F
Summary of Items Visually Inspected: Electronic operating record, weekly inspection forms,
sedimentation basin, perimeter berm/access road, perimeter run‐on controls including
stormwater channels, outlets, culverts; final cover areas including diversion berms and
vegetation; working area conditions; Cell 3A and 3B/Future Cell 4 delineation berm; and surface
conditions at the leachate collection tank controls. _______________________________________
___________________________________________________________________________________
Site Operations during Inspection: No site operations were occurring during inspection due to
a safety training. _____________________________________________________________________
___________________________________________________________________________________
SHEET 3 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date:243332.0003
J. Hotstream 11/15/2017 T. Martin 12/13/2017
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐002_2017 INSPECTION.DOCX 12/22/17
INSPECTION REPORT
Appearance of structural conditions:
Final Cover Conditions (Cell 1 and 2A areas):
Vegetation Condition: Well established, dense vegetation
Evidence of Erosion: Yes: None: X
Evidence of slumping, sloughing, or slope distress: Yes: None: X
Evidence of seepage: Yes: None: X
Comments: Good establishment of native grasses emerging on newer final cover, older phases
of final cover have a mature dense stand of state approved tall grass prairie vegetation. ______
Perimeter Berm:
Vegetation Condition: Well established, dense vegetation _________________________________
Evidence of Erosion: Yes: None: X
Cracking along crest: Access road along crest Yes: None: X
Evidence of slumping, sloughing, or slope distress: Yes: None: X
Evidence of seepage: Yes: None: X
Cell Delineation Berms: Exposed geomembrane covering berm ____________________________
Comments: Separation with waste filling for adequate run‐off control. No observed
irregularities in the slope or geomembrane cover. ________________________________________
Stormwater Controls:
Run‐on Controls: Diversion berms provide adequate drainage and slope away from open areas.
Perimeter Drainage Ditches: Cleared of sediment and obstructive vegetation, well‐
maintained rip‐rap, grouted rip‐rap clear of obstructions, and good conveyance present.
_____________________________________________________________________________
Comments: Well‐maintained. No concerns at this time. ____________________________
_____________________________________________________________________________
_____________________________________________________________________________
Run‐off Controls: Final Cover
Diversion Berms: Good condition. Well‐maintained with dense vegetative cover, no
erosion observed, and clear of obstructions. _______________________________________
SHEET 4 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date:243332.0003
J. Hotstream 11/15/2017 T. Martin 12/13/2017
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐002_2017 INSPECTION.DOCX 12/22/17
INSPECTION REPORT
Downslope Flumes: Inlets and outlets were cleared of vegetation and no erosion
observed at rock protection. ____________________________________________________
Ditching: No erosion observed; clear of obstructions, sloped for positive drainage, and
no standing water observed. ___________________________________________________
Comments: Stormwater controls are well‐maintained at the site. Good drainage and
conveyance to the sedimentation basin. No obstructions observed. __________________
_____________________________________________________________________________
_____________________________________________________________________________
Sedimentation Basin No. 1:
Outlets Operational: Yes, repaired and upgraded from previous inspection. (Added
stone at outlet.) _______________________________________________________________
Culverts Operational: Yes, box culverts cleared and grout added for protection. ______
Comments: Well‐maintained and vegetated. The basin has been cleared, stone added at
outlet, and side slopes are in good condition. _____________________________________
_____________________________________________________________________________
Operating Conditions:
Changes in Operation since the previous annual inspection: Continued filling of cells 3A and
3B _________________________________________________________________________________
Access Road Conditions: Well‐maintained, clear of tracked material, no rutting or cracking
observed. ___________________________________________________________________________
Landfill Operations:
Temporary Storm Water Controls: Adequate slopes to contain water within landfill and convey
water to leachate collection system. ____________________________________________________
___________________________________________________________________________________
Working Face Conditions: Placed material has been graded and rolled to minimize infiltration
into CCR. ___________________________________________________________________________
___________________________________________________________________________________
Access roads: Good access conditions into and out of site. ________________________________
Fugitive Dust Observed: Yes: No: X
SHEET 5 OF 5
708 Heartland Trail, Suite 3000 (53717) Madison, WI (608) 826‐3600 FAX: (608) 826‐3941
PROJECT/PROPOSAL NAME PREPARED CHECKED PROJECT/PROPOSAL NO.
Dairyland Power Cooperative; Phase IV
Alma Off‐site Disposal Facility
By: Date: By: Date:243332.0003
J. Hotstream 11/15/2017 T. Martin 12/13/2017
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐002_2017 INSPECTION.DOCX 12/22/17
INSPECTION REPORT
Comments: No site operations were occurring at time of inspection. Moist conditions
observed around site. Water truck is available as needed. DPC installed larger motors
for pin mixer and lowered operating temperature of silo, which resulted in less moisture
evaporating from ash and improved dust control. _________________________________
Leachate Management: No standing leachate observed. Exposed areas of leachate collection
system and drainage layer at perimeter and base of landfill to manage contact with water
effectively. __________________________________________________________________________
___________________________________________________________________________________
Ash Tracked Out on Access Road? Yes: None: X
Leachate Collection System: Pipes buried, but not visible; system recently jetted and video
inspected in October according to weekly reports; system working properly. ________________
Pipe Cleanouts: Clean & accessible, bollards protecting ____________________________
Tank: Controls are accessible and appeared operational. __________________________
Loadout Area: Accessible and operational ________________________________________
Comments: Appears to be a well‐maintained system used daily for operation of the site.
Conditions that may potentially impact safety: None observed. __________________________
___________________________________________________________________________________
___________________________________________________________________________________
Observed Deficiencies and Proposed Corrective Actions: Items identified in the previous
inspection have been addressed. No new deficiencies observed. ____________________________
___________________________________________________________________________________
Future Action:
– Continue monitoring and maintenance of stormwater controls. __________________________
– Continued implementation of dust control practices. ___________________________________
___________________________________________________________________________________
__________________________________________________________________________________
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐001.DOCX 1
Photographic Log
Client Name: Site Location: Project No.:
Dairyland Power Cooperative Phase IV Off‐Site Disposal 243332.0003
Photo No. Date
1 11/15/2017
Description:
Asphalt paved site entrance
road looking south. No material
tracked off site.
Photo No. Date
2 11/15/2017
Description:
Sedimentation Basin 1 outlet.
Sediment removed and
vegetation established in the
base. Gravel placed
surrounding base of outlet pipe.
Standing water present from
recent precipitation.
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐001.DOCX 2
Photographic Log
Client Name: Site Location: Project No.:
Dairyland Power Cooperative Phase IV Off‐Site Disposal 243332.0003
Photo No. Date
3 11/15/2017
Description:
Vegetation established on
Area 1 and Area 2 final cover.
Photo No. Date
4 11/15/2017
Description:
CCR filling area showing Cell 3
delineation berm. Sufficient
space and berm height provided
to control runoff within the
landfill.
\\NTAPB‐MADISON\MSN‐VOL6\‐\WPMSN\PJT2\243332\0003\Z2433320003‐001.DOCX 3
Photographic Log
Client Name: Site Location: Project No.:
Dairyland Power Cooperative Phase IV Off‐Site Disposal 243332.0003
Photo No. Date
11/15/2017 5
Description
Perimeter drainage ditch with
rock check dam.
Photo No. Date
6 11/15/2017
Description:
Grouted riprap perimeter ditch
conveying stormwater off site.