annual general meeting · 2017-07-28 · annual general meeting 27 july 2017. disclaimer ... 8...

15
ANNUAL GENERAL MEETING 27 July 2017

Upload: others

Post on 20-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

ANNUAL GENERAL MEETING

27 July 2017

Page 2: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Disclaimer

This document contains information that is commercially sensitive, subject to professional privilege and is proprietary and

confidential in nature. Any professional privilege is not waived or lost by reason of mistaken delivery or transmission. If you

receive a copy of this document but are not an authorized recipient, you must not use, distribute, copy, disclose or take any

action in reliance on this document or its contents.

The information contained in this document has not been independently verified. No representation or warranty express or

implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of such

information or opinions contained herein. The information contained in this document should be considered in the context

of the circumstances prevailing at the time and has not been, and will not be, updated to reflect material developments

which may occur after the date of the presentation. Neither SingHaiyi Group Ltd. (the “Company”) nor any of its respective

affiliates, advisers or representatives shall have any liability whatsoever (in negligence or otherwise) for any loss howsoever

arising from any use of this document or its contents or otherwise arising in connection with this document.

The document contains statements that reflect the Company’s beliefs and expectations about the future. These forward-

looking statements are based on a number of assumptions about the Company’s operations and factors beyond the

Company’s control, and accordingly, actual results may differ materially from these forward-looking statements. The

Company does not undertake to revise forward-looking statements to reflect future events or circumstances.

2

Page 3: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

FY2017 snapshot

3

9 Penang Road

• 99-year lease extension from

8 December 2016 - 7 December 2115

December 2016

Page 4: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

FY2017 snapshot

4

Page 5: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

FY2017 snapshot

5

5 Thomas Mellon Circle

• Project entitlement approval obtained

9 Penang Road

• 99-year lease extension from

8 December 2016 - 7 December 2115

December 2016

Page 6: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

FY2017 snapshot

6

Page 7: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

FY2017 snapshot

7

9 Penang Road

• 99-year lease extension from

8 December 2016 - 7 December 2115

5 Thomas Mellon Circle

• Project entitlement approval obtained

December 2016

S$100.0m notes under the

Multi-currency Debt Issuance Programme• Fully redeemed

January 2017

TripleOne Somerset • Divestment of 20% stake for a sum of S$100.0m

March 2017

Transfer from Catalist to Mainboard of SGX-STThe Vales

• TOP obtained; 100% sold to date • Successfully completed

May 2017

Page 8: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

FY2017 snapshot

8

9 Penang Road

• 99-year lease extension from

8 December 2016 - 7 December 2115

5 Thomas Mellon Circle

• Project entitlement approval obtained

December 2016

S$100.0m notes under the

Multi-currency Debt Issuance Programme• Fully redeemed

January 2017

TripleOne Somerset • Divestment of 20% stake for a sum of S$100.0m.

March 2017

Transfer from Catalist to Mainboard of SGX-STThe Vales

• TOP obtained; 100% sold to date • Successfully completed

May 2017

Page 9: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Income Statement FY2015 FY2016 FY2017

Revenue 20.9 269.1 44.2

Gross Profit 12.4 41.6 21.7

Profit before Tax 23.2 41.5 26.4

Net Profit Attributable to Owners 21.2 29.3 31.1

Basic Earnings per Share (SGD cents) 0.740 1.024 1.084

Dividends to be paid/payable - 11.5 8.6

Financial highlights

9

Balance Sheet FY2015 FY2016 FY2017

Total Assets 1,154.3 991.2 975.6

Total Liabilities 711.0 523.3 482.0

Net Asset Value (“NAV”) 443.4 467.9 493.6

NAV per Share (SGD cents) 15.50 16.15 17.07

Net Debt 387.6 384.1 215.3

Net Gearing (%) 87.3 82.1 43.6

(S$M) Financial Year Ended 31 March

Page 10: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Revenue breakdown

10

By Business Segment FY2016 FY2017

Development property

income253.3 31.7

Rental income 14.6 10.0

Management income 1.2 2.5

By Geographical Segment FY2016 FY2017

Singapore 251.0 9.6

US 18.1 34.6

94%71%

5%

23%

1%

6%

FY2016 FY2017

Management Income

Rental Income

Development Property

Income

93%

22%

7%

78%

FY2016 FY2017

US

Singapore

(S$M)

Page 11: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Income Statement FY2015 FY2016 FY2017

Revenue 20.9 269.1 44.2

Gross Profit 12.4 41.6 21.7

Profit before Tax 23.2 41.5 26.4

Net Profit Attributable to Owners 21.2 29.3 31.1

Basic Earnings per Share (SGD cents) 0.740 1.024 1.084

Dividends to be paid/payable - 11.5 8.6

Financial highlights

11

Balance Sheet FY2015 FY2016 FY2017

Total Assets 1,154.3 991.2 975.6

Total Liabilities 711.0 523.3 482.0

Net Asset Value (“NAV”) 443.4 467.9 493.6

NAV per Share (SGD cents) 15.50 16.15 17.07

Net Debt 387.6 384.1 215.3

Net Gearing (%) 87.3 82.1 43.6

(S$M) Financial Year Ended 31 March

Page 12: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Dividend details

12

PERIOD FY2017

Dividend per share 0.3 Singapore cents

TIMELINE

Book Closure Date 10 August 2017

Dividend Payment Date 17 August 2017

Final dividend represents dividend payout ratio of 27.7% of net attributable profit

Page 13: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Income Statement FY2015 FY2016 FY2017

Revenue 20.9 269.1 44.2

Gross Profit 12.4 41.6 21.7

Profit before Tax 23.2 41.5 26.4

Net Profit Attributable to Owners 21.2 29.3 31.1

Basic Earnings per Share (SGD cents) 0.740 1.024 1.084

Dividends to be paid/payable - 11.5 8.6

Financial highlights

13

Balance Sheet FY2015 FY2016 FY2017

Total Assets 1,154.3 991.2 975.6

Total Liabilities 711.0 523.3 482.0

Net Asset Value (“NAV”) 443.4 467.9 493.6

NAV per Share (SGD cents) 15.50 16.15 17.07

Net Debt 387.6 384.1 215.3

Net Gearing (%) 87.3 82.1 43.6

(S$M) Financial Year Ended 31 March

Page 14: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Unique footprint in Singapore, US and Malaysia

Quality property development pipeline in US and Singapore up till 2019

14

CityLife@TampinesPasir Ris One

Vietnam Town 5 Thomas Mellon Circle

The Vales

Sin

gap

ore

US

9 Penang Road

1H2015 2H2015 1H2016 2H2016 1H2017 2H2017 1H2018 2H2018 1H2019 2H2019

Est. GDV

US$106 millionEst. GDV

US$420 million

GDV

S$528 million

GDV

S$430 million

GDV

S$270 million

Est. GDV

S$935 million

ARA Harmony Fund III

City Suites

Mala

ysia

Est. GDV

S$41 million

Page 15: ANNUAL GENERAL MEETING · 2017-07-28 · ANNUAL GENERAL MEETING 27 July 2017. Disclaimer ... 8 December 2016 - 7 December 2115 December 2016. FY2017 snapshot 4. FY2017 snapshot 5

Thank You