Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month : From APRIL 2012 To MARCH 2013 ) Works Awarded : APRIL 2012 S. N. Tender No. Date of opening Description of Item/ Work LOA No. and date Contractor’s Name and address Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works) Rate (for supply contract)/ Tendered Cost (For Engg./Elect./S&T/ Mech. etc Works) Value of Contract Scheduled completion date (1 ) (2 ) (3 ) (4 ) (5 ) (6 ) (7 ) (8 ) (9 ) (10 ) 1 IRCON/ 9038/ SLR.S&T/ TELE. WORKS. PKG-I/18 Dated 11.01.2012 23.02.2012 System design, supply, installation, testing & commissioning of STM-4, STM-1, ADMs systems, GPS clock, Public Address System, VHF system and trenching, laying, splicing/jointing, back filling, terminating, testing and commissioning of 24 fiber underground armoured OFC with 6 Quad/PIJF cable, provision of Emergency Socket, Headquarter/ Wayside Control Equipment and communication at L-Xing and important locations over section of Anuradhapura to Kankasanthurei and Medawachchiya to Talaimannar Pier of Sri Lanka Railway IRCON/9038/SLR.S& T/TELE.WORKS.PKG -1/18/LOA/251 dated 04.04.2012 M/s Kiran Infra Engineers Ltd., B- 141, Road No. 9D, Vishwakarma Industrial Area, Jaipur-302 013 Fax: 0141-2331808, 2260073 USD 2,381,349 6.5% below the estimated cost. USD 2,226,561.32 18 - months from the date of issue of LOA Contd.../-

Upload: doanliem

Post on 24-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Annexure: ADETAILS OF CONTRACTS PLACED BY OPEN TENDER

(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)(Status for the Month : From APRIL 2012 To MARCH 2013)

Works Awarded : APRIL 2012

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/

Estimated Cost (For Engg./Elect. /S&T/ Mech. etc

Works)

Rate (for supply contract)/

Tendered Cost (For

Engg./Elect./S&T/Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

9038/ SLR.S&T/TELE. WORKS.PKG-I/18 Dated 11.01.2012

23.02.2012 System design, supply, installation, testing & commissioning of STM-4, STM-1, ADMs systems, GPS clock, Public Address System, VHF system and trenching, laying, splicing/jointing, back filling, terminating, testing and commissioning of 24 fiber underground armoured OFC with 6 Quad/PIJF cable, provision of Emergency Socket, Headquarter/ Wayside Control Equipment and communication at L-Xing and important locations over section of Anuradhapura to Kankasanthurei and Medawachchiya to Talaimannar Pier of Sri Lanka Railway

IRCON/9038/SLR.S&T/TELE.WORKS.PKG

-1/18/LOA/251 dated 04.04.2012

M/s Kiran Infra Engineers Ltd., B-141, Road No. 9D,

Vishwakarma Industrial Area, Jaipur-302 013

Fax: 0141-2331808, 2260073

USD 2,381,349 6.5% below the estimated cost.

USD 2,226,561.32

18 - months from the date of issue of LOA

Contd.../-

Page 2: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

2 IRCON/1014/J&K-CELL/T-80 Circulating Area/ Date: 02.01.2012

14.02.2012 Construction of Infrastructure Facilities consisting of Duty Hut, Morchas, Parking Space, Access road and helipad, water tank for fire fighting and all other ancillary works at tunnel T-80 Portals in Zone-V of D-Q section in connection with Udhampur - Srinagar - Baramulla Rail Link Project in the state of J&K. (Package-T-80 Circulating Area)

IRCON/1014/J&K-DQ/ T-80 Circulating

Area/1908 dated 16.04.2012

M/s Dineshchandra R. Agrawal

Infracon Pvt. Ltd., Engineers &

Contractors, 401, The Grand Mall,

S.M. Road, Ambawadi, Ahmedabad

380015

`1276.00 Lacs `13,72,52,693.26 06 - months from the date of issue of LOA

3 IRCON/J&K

Cell/JAT/14/1014/D-Q/Sangald

an Qtrs-Office/SQ-

4 Date 05.03.12

27.03.2012 Construction of Type-III & Type-IV Quarters cum temporary offices and other related works at Sangaldan Camp near proposed Sangaldan Railway Station on Dharma-Katra section of USBRL project (J&K) (Package: SQ-4)

IRCON/J&K Cell/JAT/14/1014/D-Q/Sangaldan Qtrs-Office/SQ-4/1909 dated 17.04.2012

M/s Zeal Construction Co.,

J&K Bank Building, Pantha Chowk,

Srinagar, Kashmir - 191 101Mob.09419003883 : 09419060731Fax: 01933-224060

`402.00 Lacs ` 4,79,87,193.89 09 - months from the date of issue of LOA

4 IRCON/ MECH/1029/RCF. RBL-II/ Spot Welding/ 41Dtd. 08.09.11

11.10.2011 Supply, Erection, Testing & Commissioning of 01 No. CNC Spot Welding Machine at Rail Coach Factory, Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/RCF.RBL-II/Spot Welding/41 Dtd. 18.04.2012

M/s BISIACH & CARRU s.PA

Capital Sociale Interamente

Versato-I-10078, Venarai (Torino),

Italy-C SO Piemonte 36.

Email: [email protected]

01 no.`30001.00 Lacs

`25,16,47,363.56 `25,16,47,363.56 240 days from the date of LC

Contd.../-

Page 3: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

5 IRCON/ 2036/TSTPP/TENDER/LC/06/12

Date 16.03.12

09.04.2012 Re-gradation of NH-200 in connection with the construction of 3.5 Km Railway track connecting the existing MGR of NTPC Kaniha to Kaniha Mines of MCL

IRCON/2036/TSTPS/L-XING/NIC/25338/ 56 dated 20.04.2012

M/s Nanda Infra Construction (P)

Ltd., College Road, South

Balanda, Talcher, Distt.-Angul

(Orissa)PIN: 759 116

`699.00 Lacs ` 8,01,41,113.50 90 - Days from the date of issue of LOI dated 19.04.2012

6 IRCON/J&K-CELL/JAT/14/7004/03 Date 12.03.12

10.04.2012 Construction of Multi Functional Complex (MFC) comprising of Rail Yatri Niwas and Passenger Amenities Center at Jammu Tawi Railway Station, J&K

IRCON/J&K-CELL/JAT/14/7004/

03/1951 dated 25.04.2012

M/s Kapahi Construction Co.,

A-2 Central Mezzanine Floor, South Block, Bahu

Plaza, Jammu (J&K)

Ph.:0911-2470051

`750.00 Lacs ` 7,95,49,378.13 11 - months from the date of issue of LOA

Works Awarded : MAY 2012

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/

Estimated Cost (For Engg./Elect. /S&T/ Mech. etc

Works)

Rate (for supply contract)/

Tendered Cost (For

Engg./Elect./S&T/Mech. etc Works)

Value of Contract

Scheduled complet ion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

9038/SLR.S&T/SIG.Works PKG-I (R) /08 dated 30.03.12

20.04.2012 Design, Supply, Installation, Testing & Commissioning of Relay Based Panel Interlocking System at 6 stations (Anuradhapura, Mihintale, Parasangahawewa, Medawachchiya, Vavunia & Omanthai of Sri Lanka Railways

IRCON/9038/SLR. S&T/SIG.Works PKG-I (R) /08 dated 02.05.2012

M/s Angelique International Ltd., 104-107, Hemkunt Tower, 1st Floor, 98, Nehru Place,

New Delhi-19 Ph.: 011-26413873Fax:011-26413876

$1,516,112.00 1.11% below the estimated cost

$14,99,283.16 06 - months from the date of issue of LOA

Contd.../-

Page 4: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

2 IRCON/ 9038/ SLR. S&T/SIG. IPS.PKG-

XIV/36 Dated

28.02.12

12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004 (Amd-5) or latest for 27 Stations of Sri Lanka Railways

IRCON/9038/SLR. S&T/SIG.IPS.PKG-

XIV/36Dated 04.05.2012

M/s Statcon Power Controls Ltd., A-34,

Sec-59, Gautam Budh Nagar, Noida-

201 301Ph.: 0120-4640200-

210FAX: 0120-4640240

$ 5,60,976.00 `3,38,40,005/- 15 - months from the date of issue of LOA

3 IRCON/ 3015/ TN/ROB-RAJ/CLS-B/12/027 Date 11.04.12

25.01.2012 Construction of Road Over Bridge (ROB's) & its approaches as per Specifications, Drawing & Design, Maintaining all Quality Control Standards etc. complete under ROB Cluster Package "B" in Lieu of various LCs at Jaipur: Dadi Ka Phatak (LC-89), Khirni Ka Phatak (LC-228), Bindayaka (LC-233) & Bassi (LC-200) and at Reengus (LC-108), in Rajasthan state.

IRCON/3015/TN/ ROB-RAJ/CLS-B/12/27/1080

Date: 16.05.2012

M/s C&C Constructions Ltd.,

Plot No.: 70,Sector – 32,

GurgaonPIN- 122 001

Ph.: 0124-4536666FAX:0124-4536799

`15022.34 Lacs

LC200 - Bassi

LC89-Dadi Ka Phatak

LC228-Khirni Ka Phatak

LC233-Bindayaka

LC108-Reengus

`15022.34 Lacs `167,78,59,000/-

`3,373.46 Lacs

`3,200.35 Lacs

`3,040.69 Lacs

`4,323.99 Lacs

`2,840.10 Lacs

16 - months from the date of issue of LOA

4 IRCON/Elect/3014/Jhalawar/ OHE Erection/ 01 dated 15.12.11

10.01.2012 Supply, Installation, testing, commissioning, handover and maintenance of Overhead Equipment (OHE) Railway Electrification work of 33 TKM at RRVUNL Siding at Kalisindh Thermal Power Station, Jhalawar on Ramganj Mandi - Jhalawar (New BG) section.

IRCON/3014/ Jhalawar/OHE

Erection/01 dated 21.05.2012

M/s KEC International

Limited, Building No. 9-A, 1st Floor, DLF Cyber City, DLF Phase-III,

Gurgaon-122002

`10,47,19,030/- `8,90,11,176/- `8,90,11,176/- 20.11.2012

Contd.../-

Page 5: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

5 IRCON/Elect/3014/Jhalawar/ Copper Conductor/ 03 dated 30.12.11

23.01.2012 Supply of copper conductors for Design, Engineering, Manufacturing, Supply to site, construction, installation, Commissioning of Railway siding (within Railway premises) and upto RVUN Power Plant boundary and also within RVUN's premises of Kalisindh TPS for 2 x 600 MW unit # 1 & 2, Kalisindh thermal Power Project stage-1 Jhalawar

IRCON/ELECT./3014/ Jhalawar/ Copper Conductor/03/ 2863 dated 21.05.12

M/s Chandra Metals Limited, 1&2

MNNIT, Industrial Estate Teliarganj, Allahabad-211004

`4,93,50,000/- `3,70,80,422/- `3,70,80,422/- 07.09.2012

6 IRCON/ MECH/ 1029/ RCF.

RBL-II/3 D CMM/ 56 dtd

17.12.11

06.02.2012 01 No. 3D Co-ordinate Measuring Machine

IRCON/MECH/ 1029/ RCF.RBL-II/3D CMM/56

dtd.21.05.12

M/s Carl Zeiss Industrielle

Messtechnik GmbH Postfach 1369/1380,

D-73446, Oberkochen,

Germany Tel:+49 7364 202790,Fax:+49 7364 202424

(01 no.)`451 Lacs

`393.63 Lacs `393.63 Lacs Delivery within 255 days from the date of LOA i.e. 31.01.2013

7 IRCON/ ELECT/

1029/RCF-RBL/

INTERNAL ELECT GREEN

BUILDINGS/ 42

03.05.2012 Supply, Installation, Testing & Commissioning of Internal Lighting and Power Distribution Network system inside Administrative Building, Technical Training Centre, Technical Training Hostel and Shopping Complex at New Rail Coach Factory, Rae Bareli (UP)

IRCON/ ELECT/ 1029/RCF-RBL/

INTERNAL ELECT GREEN BUILDINGS/ 42 Date: 28.05.2012

M/s Aaryan Infratech, 44A Laxmi Plaza, Cantt Road, Lucknow

(UP)

`632.00 Lacs `5,51,99,168/- 08 - months from the date of issue of LOA

Page 6: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : JUNE 2012

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

3015/TN/ROB-RAJ/ JDPR-C-Open/12/

29 Dt. 05.05.12

29.05.2012 Construction of Road Over Bridge (ROB's)/RUB & its approaches as per specifications, drawings & design, maintaining all quality control standards etc. complete under ROB/RUB cluster Package "C" at Jodhpur, Makrana & Suratgarh in Lieu of various LCs in Rajasthan State.

IRCON/ 3015/ROB-RAJ/JDPR-C-Open/12/29

dated 05.06.12

M/s Rajdeep Buildcon Pvt Ltd, “Rajdeep House”,

Savedi, Ahmednagar PIN– 414 003,Maharashtra

Ph.: 0241-2424072, 2423631, 2424101Fax: 0241-2425812

`12285.87

LC-160 Nr. Banar at Jodhpur: `2872.28 Lacs

LC-165 at Jodhpur: `4201.37 Lacs

LC-C2 Pavta B-Road at Jodhpur:`1275.42 Lacs

LC-34 E2 at Makrana :`2127.14 Lacs

LC-95 at Suratgarh: `1809.66 Lacs

9.55% above tender amount i.e. at `13485.70 Lacs

3.81% above

12.68% above

18.97% above

8.46% above

6.01% above

`134,58,70,000/-

`2981.71 Lacs

`4734.10 Lacs

`1517.37 Lacs

`2307.10 Lacs

`1918.42 Lacs

13-17 months from the date of

issue of LOA15-months

17-months

13-months

13-months

13-months

2 IRCON/ CC/TN/ RSVY-BIHAR/12/653

11.05.2012 Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1A(i) & 1A(ii) in Vaishali & Samastipur District under RSVY Project Bihar (Package- 1A- Link Road)

IRCON/ CC/TN/ Bihar-SH/12/653/23 Dated 20.06.2012

M/s Siemens Construction, B-9, Abhiyanta Nagar,

Near Ashiyana Post Office,

Patna - 800 025 (Bihar)

`448.03 Lacs 15.00% below the estimated cost

`3,80,82,949.94 06-months from the date of issue

of LOA

3 IRCON/ CC/TN/ RSVY-

BIHAR/12/654

11.05.2012 Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1B(ii-i), 1B(iii) & 1B(iv) in Samastipur District under RSVY Project Bihar (Package- 1B- Link Road)

IRCON/ CC/TN/ Bihar-SH/12/654/22 Dated 20.06.2012

M/s Siemens Construction, B-9, Abhiyanta Nagar,

Near Ashiyana Post Office,

Patna - 800 025 (Bihar)

`681.40 Lacs 15.00% below the estimated cost

`5,79,19,264.19 06-months from the date of issue

of LOA

Contd.../-

Page 7: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/ CC/TN/ RSVY-BIHAR/12/655

11.05.2012 Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1B(i), 1C(i) & 1C(ii) in Darbhanga District under RSVY Project Bihar (Package- 1C- Link Road)

IRCON/ CC/TN/ Bihar-SH/12/655/21 Dated 20.06.2012

M/s Adarsh Construction, Lal

Koyhi, Main Road, Mairwa, Siwan

(Bihar)

`736.61 Lacs 12.50% below the estimated cost

`6,44,53,662.49 06-months from the date of issue

of LOA

5 IRCON/ 3015/TN/

ROB-RAJ/CLS

TR-A/12/031

Dt. 15.05.12

07.06.2012 Construction of Road Over Bridge (ROB's) & its approaches as per specifications, drawing & design, maintaining all quality control standards etc. complete under ROB cluster Package "A" in Lieu of various LCs at ALWAR YARD, NEEM KA THANA, KISHANGARH, ALWAR & AJMER, in Rajasthan State.

IRCON/ 3015/TN/ROB-

RAJ/Clstr-A-Open Tender/12/031/1313

dated 22.06.12

M/s C&C Constructions Ltd.,

Plot No.: 70,Sector - 32,

Gurgaon - 122 001Ph.: 0124-4536666FAX:0124-4536799

`13549.69

LC-116 Alwar Yard: `1932.00 Lacs

LC-76 Neem ka Thana: `2637.77 Lacs

LC-32 Kishangarh: `2900.30 Lacs

LC-113 Alwar: `3024.24 Lacs

LC-43 & 43/1 Ajmer: `3055.38 Lacs

11.5% above tender amount i.e.

at `151,07,90,000/-

13.89% above

10.02% above

15.13% above

10.46% above

8.85% above

`151,07,90,000/-

`2200.35 Lacs

`2902.07 Lacs

`3339.12 Lacs

`3340.58 Lacs

`3325.78 Lacs

13-15 months from the date of issue

of LOA

13-months

13-months

15-months

15-months

13-months

Page 8: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : JULY 2012

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

CC/TN/ RSVY-BIHAR/12/656

11.05.2012 Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1D(i), 1D(ii), 1D(iii) & 1D(Y) in Madhubani District under RSVY Project Bihar (Package- 1D- Link Road)

IRCON/ CC/TN/ Bihar-SH/12/656/71 Dated 09.07.2012

M/s Adarsh Construction, Lal

Koyhi, Main Road, Mairwa, Siwan

(Bihar)

`764.43 Lacs 12.50% below the estimated cost

`6,68,88,125.92 06-months from the date of issue

of LOA

2 IRCON/ 9038/SLR.S&T/SIG.WORKS.

PH-II/ PKG-XIII/31 Dtd.

31.05.12

11.07.2012 Design, Supply, Installation, Testing and Commissioning of Relay Based Panel Interlocking System at 21 stations of Sri Lanka Railways

IRCON/9038/SLR. S&T/SIG.WORKS. PH-II/PKG-XIII/31

Dtd. 18.07.12

M/s Kiran Infra Engineers Ltd.,

B-141, Road No. 9-D, Vishwakarma

Industrial Area, Jaipur, Rajasthan-

302013Ph.:+91-141-

2330305,Fax:+91-141-

2331808, 2260073

$51,98,695 9.90% below the estimated cost

USD46,84,024.20 18-months from the date of issue

of LOA

Page 9: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : AUGUST 2012(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

CC/TN/ RSVY-BIHAR/ 12/652(Re-tender)

11.05.2012 Road Connectivity between SH-52 and NH-57 at Kamla Balan Bund Near Mehat Dhala in Madhubani District Under Rashtriya Sam Vikas Yojana (RSVY) Project Bihar (Package – 1D (iii-a)

IRCON/CC/TN/Bihar-SH/12/652/121

Dated 04.08.2012

M/s Brajendra Kumar Builders Pvt.

Ltd., Barh, Patna

`1289.66 Lacs 9.07% below the estimated cost

`11,72,69,690.38 09-months from the date of issue

of LOA

2 IRCON/ 3015/TN/ROB-RAJ/ HINDAUN

/12/038 Dt:

07.07.12

27.07.2012 Construction of Road Over Bridge (ROB's) & its approaches as per Specifications, Drawing & Design, Maintaining all Quality Control Standards etc. complete in Lieu of LC No. 201-B at Railway KM 136/9-10 in Hindaun Town in Rajasthan State. (Package - HND 201/02)

LOA No. IRCON/3015/TN/

ROB-RAJ/HINDAUN/ 12/038/1612 Dated:

16.08.12

M/s Brahmaputra Infraprojects Ltd.,

Brahmaputra House,

A-7, Mahipalpur,(NH-8 -Mahipalpur

Crossing)New Delhi

PIN - 110 037

`3642.00 Lacs 7.86% above on abstract tender BOQ amount

`39,28,23,555.00 15-months from the date of issue

of LOA

Page 10: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : SEPTEMBER 2012

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

J&KCell/ JAT/14/

1014/T48/210 Dtd. 05.03.12

10.05.2012 Construction of Tunnel T-48 between Km. 100 and Km. 110.2 (approx) on Dharam-Qazigund Section of Udhampur-Srinagar-Baramulla New BG Railway Line Project. (Package–T48)

LOA No.: IRCON/J&K

CELL/JAT/1014/T-48/210/1395 dtd.

06.09.12

M/s Hindustan Construction Co.

Ltd, Hincon House,

Lal Bahadur Shastri Marg,

Vikhroli (West), Mumbai – 400083Tel: +91-22-25775959Fax: +91-22-25777568

`86300.00 Lacs `883,89,71,723/ 05.09.2017

2 IRCON/ 3015/TN/ROB-RAJ/ CHOMU-RUB-110/ RT1/12/ 036 Dtd.: 28.06.12

20.07.2012 Design and Construction of Two Lane Road Under Bridge (RUB) by Cut & Cover Technique comprising Two Boxes of internal dimensions 6.25 m (W) x 4.00 m (H) each including it’s approaches, Design, Casting & Placing box segments in traffic block, Drainage, Allied Road works & Junction Development etc. complete, as per Specifications & Drawings, Maintaining all Quality Control Standards complete near LC No. 110 on Jaipur-Sikar Railway Line of N.W. Railways at Chomu, Jaipur in Rajasthan State

LOA No. IRCON/3015/TN/

ROB-RAJ/C HOMU-RUB-110/RT1/12/ 036/ 1701 Dated:

06.09.2012

M/s M. M. Shawl 601, Plot No. 19,

Kirti Mahal,Rajendra Place,

New Delhi.PIN: 110 008Tele-fax: 011-

45702552

`1104.29 Lacs 21.786% above the scheduled

items rates mentioned in BOQ

`13,45,00,019/- 13 months from the date of issue

of LOA

Contd.../-

Page 11: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : SEPTEMBER 2012(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)3 IRCON/

J&K Cell/JAT/15

/1008/ Q-B/11KV

Feeder Line/144

dtd. 12.07.12

09.08.2012 Construction of 11 kV Feeder Line for illumination of major bridges, duty huts and L.C. Gates including construction of pole-mounted electrical substations/ isolation points along the Railway track on Qazigund – Baramulla section of USBRL project, J&K(Package-11kV Feeder)

LOA No.: IRCON/J&K

Cell/JAT/15/1008/Q-B/11KV Feeder

Line/144/2416 dtd. 07.09.12

M/s Absolute Projects (India)

Ltd., 4222/1, Laxmi Kunj (1st Floor),Ansari Road,Darya Ganj,

New Delhi 110002 Ph.: 011-23261775Fax: 011-43528498

`537.54 Lacs Schedule A-16% Below`10999059.75

Schedule B-19% Below`32934658.89

`4,39,33,719/- 06.06.2013

4 IRCON/ J&K Cell/ JAT/1014/D-Q/Balance Work of Electric Sub Station Building South Portal/Package OB-8R2 dtd. 27.08.12

03.09.2012 Construction of Balance Structural Work of Electrical Sub-station Building above Plinth Level at South Portal of Pir-Panjal Tunnel (T-80) by Pre-Engineered Building Solution i.e. made up of pre-fabricated steel structure in place of RCC structure & brick wall paneling including doors, windows, rolling shutters etc. in Zone V of Dharam-Qazigund section of Udhampur-Srinagar-Baramulla New BG Railway Line Project (Package : OB-8R2)

Counter Offer No.: IRCON/J&K

Cell/JAMMU/1014/D-Q/Balance Work of Electric Sub Station

Building South Portal/Package OB-

8R2/Date 18.09.2012

M/s Pro-Tech Enterprises,

73A, Hauzkhas Village,

New Delhi PIN- 110016Ph.:+91-11-26862048

`297.75 Lacs At PAR `297.75 Lacs Within 14 weeks from the date of issue of letter

5 IRCON/ MECH/ 1029/RCF-RBL-II/ Stretch Bend Forming/33 Dated 08.10.11

29.11.2011 Supply, Erection, Testing & Commissioning of 01 No. Stretch Bend Forming Machine at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

LOA No.: IRCON/MECH/1029

/RCF-RBL-II/ Stretch Bend

Forming/33 dtd. 26.09.12

M/s Cyril Bath 1610 Airport Road Monroe North

Caroline, 28110USA through M/s Empire Machine Tools, Empire House, 414,

Senapati Bapat Marg, Mumbai-

400013

01 No./`950.00 Lacs

$17,60,000/- + AMC at

$3,88,500/-

210 days from date of opening of

LC

Contd.../-

Page 12: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : SEPTEMBER 2012

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)6 IRCON/

MECH/ 1029/RCF.RBL-II/ Hyd Press /50 Dtd. 21.01.12

24.02.2012 Supply, Erection, Testing & Commissioning of 02 nos. (800 T) four column hydraulic press at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

LOA No.: IRCON/MECH/1029/

RCF-RBL-II/ Hyd Press/50/ 1587 dtd.

28.09.12

M/s Electropneumatics & Hydraulic (India)

Pvt. Ltd.A 302/303,

Universal Business Park Chandivali

Farm Road, Andheri (East),

MumbaiPh.: 022-40492525

02 nos.`2025.00 Lacs

`9,45,99,773/- `18,91,99,546/- 240 days from date of issue of

LOA

7 IRCON/ CC/TN/ JBNRL-2051/12/

650 Dated

31.01.12

30.04.2012 Construction of Embankment, Side Drains, Retaining Walls and Blanketing Works, Bridges (Minor & Major) and other ancillary items for “Construction of New Broad Gauge Railway Lines from Jogbani (India) to Biratnagar (Nepal) in Nepal portion from Km 5+445 to Km 18+601”

LOA No.: IRCON/CC/TN/JBN

RL-2051/EMBANK/12/6

50/ 1134 dtd. 28.09.12

M/s Tantia Construction Ltd.,DD-30, 7th Floor,

Sector-1, Salt Lake City, Kolkata PIN- 7000645

Ph.: 033-4019000FAX: 033-40190001

`4019.1 `3817.31 Lacs 27.12.2013

Page 13: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : OCTOBER 2012S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/ME

CH/1029 /RCF.RBL II/CVSMM/

46 dtd. 17.12.11

25.01.12 Supply, Erection, Testing & Commissioning of 01 No. CNC Vertical Spindle Moulder Machine.

LOA No.Ircon/MECH/10

29/RCF-RBL-II/ CVSMM/46/1600

dtd.03.10.12

M/s Po Chiao Industry Co. Ltd., No.279-1, Tung Chou Rd.,shen

kang Dist, Taichung

42942,Taiwan

1 No./238.00 Lacs

USD 2,88,610.00 + AMC at

`18,00,000/-

USD 2,88,610.00 + AMC at

`18,00,000/-

180 days from date of opening

of LC.

2 IRCON/MECH/1029/

RCF.RBLII/ Radial

Drill/RET II-13 &

17.02.12

12.03.12 Supply of 04 Nos. of Radial Drilling Machines.

LOA No.Ircon/MECH/10

29/RCF-RBL-II/Radial Drill/RET-

II-13/1666 dtd.03.10.12

M/s Geeta Machine Tools

Pvt. Ltd., Jamnagar-

361002 (Gujrat)

04 Nos./155.60 Lacs

`42,57,904/- `1,70,31,617/- 300 days from date of issue of

LOA

3 IRCON/ 2049/ROB-II-BIHAR/ TENDER/ LC -35B/I/ 2012/15

Date 25.06.2012

17.07.12 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC-35 B at Km 613/11-13 between section Phulwarisharif - Danapur Section on Patna Mughalsarai Route in Danapur Division of E C Railway, Bihar.

LOA No. IRCON/ 2049/ ROB-II-BIHAR/ LC-35B/ LOA/67 Dtd:

06.10.12

M/s BSC-C&C JV,Plot No.: 70,Sector-32,Gurgaon,Haryana

PIN: 122 001

`4038.86 Lacs 10.90% above `44,79,10,099/- 15-months from the date of issue

of LOA

4 IRCON/ 2049/ROB-II-BIHAR/ LC-23B/I/ TENDER/ 2012/16

Dtd: 26.06.2012

18.07.12 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining Earth wall in lieu of LC-23 B at Km 123/9-8 between section Khagaria and Mansi , Bihar

LOA No. IRCON/ 2049/ROB-II-BIHAR/ LC-23B/LOA/66 Dtd:

06.10.2012

M/s Brahmaputra InfraProject Ltd.,

Brahmaputra House,

A-7, Mahipalpur,(NH-8 -Mahipalpur X-ing)

New Delhi PIN - 110 037

`4339.5 Lacs 8.86% above `47,23,98,396/- 15-months from the date of issue

of LOA

Page 14: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

5 IRCON/ 2049/ ROB-II-BIHAR/ LC-53A/I/

TENDER/2012/17 Dtd:

03.07.12

25.07.12 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC-53A B at Km 613/19-21 between Kauriya Halt-Bihiya Section on Patna-Muglasarai Route in Danapur Division of E.C Railway, Bihar

LOA No. IRCON/ 2049/ ROB-II-BIHAR/ LC-53A/ LOA/68 Dtd:

06.10.12

M/s Bumi Geo Engineering Ltd., No.-85/1, NAC Tower, 2nd & 3rd

Floor, Dr. Radhakrishna

Salai, Myalpore, Chennai

PIN - 600 004

`1680.85 Lacs 10.25% above `18,53,14,118/- 15-months from the date of issue

of LOA

6 IRCON/ 2049/ROB-II-BIHAR/ TENDER/ LC-31/I/ 2012/19

Date: 25.07.2012

17.08.12 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No 31 at Km. 261/4-5 between Narkatiagunj – Harinagar section on Motihari-Gorakhpur Route in Samastipur Division of E.C Railway, Bihar

LOA No.IRCON/ 2049/ROB-II-BIHAR/

TENDER/ LC-31/ 2012/19/LOA/69 Date: 11.10.2012

M/s TRG Industries Pvt.

Ltd.,E-461, Greater

Kailash-II,New Delhi

PIN: 110 048Fax: 011-29210167

`2586.93 Lacs 8.0% above `27,93,88,662/- 15-months from the date of issue

of LOA

7 IRCON/ 2049/ROB-II-BIHAR/ TENDER/

LC-102/I/TEND

ER/ 2012/21

Date: 03.08.2012

27.08.12 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No 102 at Km. 403/11-12 on Mairwa-Jiradei Section on Siwan-Gorakhpur Route in Varanasi Division of North Eastern Railway

LOA No. IRCON/ 2049/ROB-II-BIHAR/

LC-102/I/LOA/ 70 Date: 15.10.2012

M/s TRG Industries Pvt.

Ltd.,E-461, Greater

Kailash-II,New Delhi

PIN: 110 048Fax: 011-29210167

`3360.22 Lacs 8.85% above `36,57,59,585/- 15-months from the date of issue

of LOA

Contd.../-

Page 15: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : OCTOBER 2012

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

8 IRCON/ CC/TN/

SANTRAGACHI/ 12/664 dated

22.08.12

17.09.12 Design Consultancy Services for Proposed Development at Santragachi Station, (S. E. Railway) West Bengal, including Architectural, Structural, Mechanical, Electrical & other design services; Detailed Site Survey; Geo-technical investigation and Quality Control.

LOI NO.IRCON/ 2052/

SANTRAGACHI/CONSUL/STUP/25345/ 724 dated

18.10.12 & LOA NO.

IRCON/ 2052/ SANTRAGACHI/CON

SUL/STUP/25345/ 767 dated 06.11.12

M/s Stup Consultants Pvt.

Ltd.,P-11, Darga Road, Park

Circus, Kolkata-700 017.

`4.96 Crore `5,98,10,000/- 36 Months from the date of issue

of LOI, which expires on 17.10.2015

9 IRCON/ 9038/SLR.S&T/SIG.CABLES.

PKG-XXI/71

Dtd. 06.07.12

30.07.2012 Supply of PVC Insulated, Armoured, Unscreened, Underground Railway. Signalling Cables of size 19x1.5 Sqmm (Copper Conductor) as per RDSO Specification No.: IRS: S-63/2007 (Amd-2) or latest for Sri Lanka Railway

IRCON/9038/SLR.S&T/SIG.CABLES.PKG-XXI/71/558

Dtd. 19.10.12

M/s CMI Limited,C-483,

Yojana ViharDelhi - 110 092

Ph.:011-49570000Fax: 011-22160411

$8,82,963

199 Kms $4,525.00

$9,00,475 3-months from the date of issue of

LOA

10 IRCON/MECH/1029/RCF.RBL-II/Cut To

Length/10 dtd.

11.08.11

08.11.11 Supply, Erection, Testing & Commissioning of 01 No. Slitter Cum Cut to Length Combination line

LOA No. Ircon/MECH/1029/RCF-RBL-II/Cut to

length/10/1679 dtd.23.10.12

Magadh Precision Equipment Limited 11, Industrial Area No. 2, A.B.Road, Dewas-455001,

M.P India.

01 No./ `3100.00 Lacs

`20,42,05,759/- + AMC at

`4,31,86,080/-

` 20,42,05,759/- +

AMC at ` 4,31,86,080/-

180 days from date of issue of

LOA.

11 IRCON/MECH/1029/RCF-RBL-II/ Pipelines/028A/028A

07.06.12 Pipelines for Compressed Air Supply System in Wheel, Transport, Machine, Development Shop and Headers.

LOA No.: IRCON/MECH/

1029/RCF-RBL-II/ Pipelines/028A/1682

dtd. 23.10.12

M/s Legris India Pvt. Ltd., (Parker Hannifin Group)

Plot No. 99, Place City-1, Sector-37,

Gurgaon

`300.00 Lacs `2,65,27,588/- 90 days from date of issue of

LOA.

Contd.../-

Page 16: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : OCTOBER 2012(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)12 IRCON/

2049/ ROB-II-BIHAR/

LC-47B/I/ TENDER/2012/18

dtd. 13.07.12

03.08.12 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No 47 B at Km. 163/6-7 between Begusarai - Tilrath Section of E C. Railway under Sonepur Division of E.C Railway, Bihar

LOA No. IRCON/2049/ROB-

II-BIHAR/LC-47B/LOA/73/2517 Date 26.10.2012

M/s SMC Infrastructure Pvt. Ltd., 101, Akriti, SMC, LBS Marg, Khopat, Thane

(West) PIN: 400 601Maharashtra

`2712.11 Lacs 7.86% above `29,25,29,158/- 15-months from the date of issue

of LOA

13 IRCON/MECH/1029

/RCF.RBL-II/1/CNC

TOOL ROOM MILLING

MACHINE/ 76 Dtd. 17.02.12

16.04.12 01 No. CNC Tool Room Milling Machine.

LOA No. Ircon/MECH/1029/RCF-RBL-II/CNC Tool Room Milling machine/76/1701

dtd.29.10.12

M/s Deckel Maho Pfronten GmbH

DECKEL MAHO- Strabe 1 87459

Pfronten, Germany

01 No./`546.00 Lacs

`1,54,07,300/- & EURO 553,090/- (excluding taxes)

+ AMC at `1,50,00,000/-

`1,54,07,300/- &

EURO 553,090/- +

AMC at `1,50,00,000/-

240 days from date of opening

of LC

14 IRCON/ CC/TN/

SALIMAR/12/665 dated

27.08.12

25.09.12 Design consultancy services for proposed development at Shalimar Station (S.E. Railway) West Bengal including Architecture, Structural, Track, Mechanical, Electrical and other Design Services, Detailed Site Survey, Geo-technical investigation and Quality Control.

LOI No. IRCON/2053/ SHALIMAR/CONSUL/CES/25347/739dated 29.10.12 & LOA No. IRCON/2053/ SHALIMAR/ CONSUL/CES/ 25347/760dated 05.11.12

M/s Consulting Engineering

Services (I) Pvt. Ltd.,

CES Centre, DM-3 & 4, Sector - V,Salt Lake,

Kolkata - 700091.

`4.81 Crore `4,62,00,000/- 36 months from the date of issue

of LOI, which expires on 28.10.2015

15 IRCON/ 2048/ISC-BEHALA/ TENDER/

FINISHING WORKS/

06/12 dated

25.04.12

01.06.12 Finishing works for Indoor Stadium under construction i.e. Interior including flooring and seating arrangement, lifting, acoustic, internal & external electrical, HVAC, water supply system, S.T.P., misc. works etc. as per BOQ for new Sports Complex of Eastern Railway at Gholsapur (Behala), Kolkata, W.B.

LOA No. IRCON/ 2048/ISC-

BEHALA/FIN WORKS/RIL/

25346/748 dated 31.10.2012

M/s RAMKY Infrastructure Ltd.,

Jindal Towers, Block-A, 4th floor, 21/1A/3, Darga Road, Kolkata –

700017.

`20.99 Crore `21.03 Crore `26,71,33,142.49 8 months from the date of issue

of LOA

Page 17: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : NOVEMBER 2012S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

MECH/1029/RCF.RBL-

II/Hyd. Press Brake/21

dtd.11.08.11

31.10.2011 Supply 07 nos. CNC Hydraulic Press Brake Machines at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/RCF.RBL-

II/Hyd. Press Brake/21/1741

Dated : 08.11.12

M/s BAYKAL MAKINE SANAYI VE TICARET

A.S., Organize Sanayi Bolgesi, 16140 Bursa/

TurkeyEmail:

[email protected]

`2797.50 Lacs Euro 2,478,792 + `2,11,17,980/- +

AMC at `3,25,50,000 + Custom duty as

per actual

270 days for 100T (02 nos), 160T (01 no.) & 350 T (02 nos) & 390 days for 650T (01 no) & 800T (01 no) from

date of opening of LC

2 IRCON/ MECH/

1029/RCF. RBL-II// Laser

Cutting/ RET/06 Dtd.

17.02.12

13.03.2012 Supply and Erection, Installation & Commissioning of 02 Nos. CNC Laser Cutting Machines at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/ RCF.RBL-

II//Laser Cutting/RET/06/

1737 Dated : 08.11.12

M/s SIS Corporation, 208-

6, Dalcheon-dong, Buk-Gu, Ulsan, Korea 683-470, Ph.: 052-245-5390

`2786.00 Lacs USD 12,04,800 for Machine A +

USD 13,20,352 for Machine B +

INR47,83,683.00 for Machine A +

INR49,14,664.00 for Machine B +

AMC at USD 1,21,440 for Machine A +

USD 1,21,440 for Machine B +

INR18,52,500 for Machine A + INR18,52,500 for Machine

B

USD 25,25,152.00+

INR 96,98,347.00+ AMC at USD 2,42,880.00 +

INR 37,05,000.00+

Custom duty as per actual

180 days from the date of

opening of LC

3 IRCON/MECH/1029

/ RCF.RBL-

II/EOT CRANES/

44 dtd. 21.01.12

21.02.2011 Supply and Erection, Installation & Commissioning of Electric Overhead Travelling Cranes (20T – 08 nos, 15T – 04 nos, 10T – 10 nos, 5T- 13 nos.) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/ RCF.RBL-

II/EOT CRANES/44 Dated : 14.11.12

M/s Alpha Services SPA 531, RIICO

Industrial Area, Bhiwadi,

Rajasthan – 301019e-mail:

[email protected]

`2210.48 Lacs `20,77,79,502/- + AMC at

`15,28,758/-

360 days from date of issue of

LOA

4 IRCON/ CC/TN/RSVY-

BIHAR/12/ 660 dtd. 22.07.12

13.08.2012 Overlay of 50 mm Bituminous Concrete, Extra Layer to Strengthen Hazipur - Tajpur Road of SH-49 in the District of Vaishali & Samastipur Under RSVY Project, Bihar. Package 1A(iii)

LOA No.: IRCON/CC/TN/RSVY-BIHAR/ 12/660

dtd. 14.11.12

M/s GHV(I) Pvt. Ltd., ALA Centre-I, 8, Mahal Industrial

Majkali Caves Road, Andheri (E), Mumbai-400 093

`2534.22 Lacs 16.90% below `21,05,93,941/- 6-Months including monsoon

5 IRCON/2049/ROB-II-

BIHAR/LC-17C/I/TENDER/2012/20

dtd. 24.08.12

24.08.2012 Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC No 17C at Km. 27/15-16 on Hathua-Thawe Stations in Varanasi Division of North Eastern Railway, Bihar.

IRCON/2049/ROB-II-BIHAR/LC-

17C/LOA/76/2688 dtd. 22.11.2012

M/s TRG Industries Pvt. Ltd.,

E-461, Greater Kailash-II,New Delhi

PIN: 110 048Fax: 011-29210167

`2391.97 Lacs 11.80% above `26,74,22,095/- 15 - months including the monsoon period from the date of issue of Letter of Acceptance

Page 18: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : DECEMBER 2012S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/C

C/TN/RSVY-BIHAR/

12/663 dtd.

17.08.12

10.09.2012 (i) Construction of 4x24m span H.L.RCC Bridge at Km. 26+900 (Sanauli) on Benipatti – Pupri Road at SH-52 in Madhubani district under RSVY project(ii) Construction of Multi-cell Culvert at CH.20+350 on Benipatti to Pupri Road at SH-52 in Madhubani district(iii) Widening of Concrete Road between gaps of PQC Road and drain from Pandasarai to Mabbi (CH0+000 to 10+491 Km) and Laheriasarai to Kathalbari (CH. 0+000 to 5.517 Km) by PQC material in Darbhanga town Pkg. 1D-I (Bridge)

LOA No.: IRCON/CC/TN/RS

VY-BIHAR/ 12/663/312 dtd.

05.12.12

M/s Naraindas Construction Pvt.

Ltd., 14/441, Binodpur, Power

House Road, Katihar

PIN: 854 105 (Bihar)

Tel: 06452 – 243327,

FAX: 06452 - 246082

`1890.57 Lacs 6.5% above `20,13,46,060/- 11-Months including monsoon

2 IRCON/2049& 2034/ ROB-II & I – BIHAR/ TENDER/ 2012/28

Dtd 25.10.201

2

16.11.2012 (a)Supply, fabrication, assembly, erection and painting of Bowstring girder in Railway portion, steel stair case in connection to Construction of ROB at LC-47 at Begusarai and at LC No.23B (Khagaria) in state of Bihar.

and(b)Supply, fabrication, assembly, erection and painting of Foot over Bridge in connection to Construction of ROB at LC-45 at Bihta, at LC No.46 (Jamui), at LC-72 (Patna City) and at LC-74 (Kumrahar) in state of Bihar.

LOA No.: IRCON/2034 - 2049/

ROB-I & II – BIHAR/LOA/80/2838

Dtd 07.12.2012

M/s S.S.G. Techno Services

Pvt. Ltd., 29, Ashutosh Pally,

P.O.: Garia, Kolkata - 700084

`1134.51 Lacs 6.5% below `10,60,76,749/- 15-months including the

monsoon period from the date of issue of Letter of

acceptance

Contd.../-

Page 19: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : DECEMBER 2012S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)3 IRCON/M

ECH/1029/RCF.RBL

-II/Box Pallets/78

dated 17.04.12

16.05.2012 Supply and Erection, Installation & Commissioning of 5000 Nos. Box Type Pallets at Rail Coach Factory, Lalganj, Raebareli, UP (INDIA).

LOA No.: IRCON/MECH/1029/

RCF.RBL-II/Box Pallets/78/1960

dated 19.12.2012

M/s Modern Prefab Systems Pvt. Ltd., Plot No. 273, 274Sector-7, IMT

Manesar, Gurgaon-122050

600.00 Lacs `11,169.70 `5,58,48,500/- 1000 within 2-months from LOA,

2000 within 6 months from LOA and 2000 within 9 months from LOA

4 IRCON/ MECH/

1029/RCF.RBL-

II/Bogie Painting line/75

Dtd. 17.02.12

30.04.2012 Supply and Erection, Installation & Commissioning of Bogie Frame and Bogie Bolster Shot Blasting and Painting System at Rail Coach Factory, Lalganj, Raebareli, UP (INDIA).

LOA No.: IRCON/MECH/1029/RCF.RBL-II/Bogie

Painting line/75/1966 Dtd.

21.12.12

M/s Global Engineers Ltd.,

GEL Tower, Plot No.: 16, Sector-

20, Dwarka,New Delhi-75

`1150.00 Lacs `9,73,41,229/- + AMC @

`1,94,00,000/-

`9,73,41,229/- + AMC @

`1,94,00,000/-

240 days from the date of issue of

LOA

5 IRCON/2049/ROB-II-BIHAR/TENDER/II/2

012/29 Dtd.

31.10.12

22.11.2012 Supply, Fabrication, Assembly , Erection and Painting of Bowstring girder in Railway portion , steel stair case in connection to Construction of ROB at LC-31 in Harinagar, at LC No.53A in Bihia and at L.C no.102 in Jiradei in the state of Bihar

LOA No.: IRCON/2049/ROB-II-BIHAR/LOA/83/3005

Dtd. 27.12.2012

M/s S.S.G. Techno Services

Pvt. Ltd., 29, Ashutosh Pally,

P.O.: Garia, Kolkata - 700084

`989.25 Lacs 2.0% below `9,69,46,740/- 15-months including the

monsoon period from the date of issue of Letter of

acceptance

Page 20: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : JANUARY 2013S. N.

Tender No.

Date of opening

Descript ion of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled complet ion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/CC/

TN/3013/ NUC.VERSOVA/PH-III/12/670

dtd. 12.11.2012

10.12.2012 Construction of Gymnasium under Phase-III works at CIFE New University Complex, Pnch Marg, Versova, Mumbai

IRCON/3013/NUC.VERSOVA/PH-

III/729 dtd. 04.01.2013

M/s Canon Engineering

Construction, 50-51, Canon House, 5,

Matharpakhadi Road, Mazgaon, Mumbai-400 010

S.N.

Description Amount (`)

32.52% ABOVE(+)11984841.83

7.86% BELOW (-)725809.82

TOTAL

`48838598.99

`8508411.75

`57347010.74

06-months inclusive of

monsoon period from the date of

issue of LOA

A DSR Item 25340065.31B Mumbai SSR 8160561.85C NS Items 1748190.00

D Electrical Items

1604940.00

TOTAL (A+B+C+D)

36853757.16

E Extra Items 9234221.57

2 IRCON/ MECH/

1029/RCF.RBL-II/ BOGIE LINE/82

dated 17.04.2012

15.06.2012 Supply and Erection, Installation & Commissioning of Bogie Fabrication Line with Mechanized Material Handling System for Bogie Shop having Robotic Welding Centre for Side Frame, Brake Beam, Bolster and Complete Bogie Frame for Bogie Shop at Rail Coach Factory at Lalganj, Raebareli, UP

IRCON/MECH/ 1029/RCF.RBL-II/

BOGIE LINE/ 82/2075 dated

10.01.2013

M/s KUKA Systems (I) Pvt.

Ltd., H Block, Plot No-A_6/7/8,

Pimpri-MIDC, Pune-4110818

`2850.00 Lacs `19,84,71,840/- + AMC for 5 years

@ INR 1,75,28,160/-

+ Optional Accessories

@`75,64,075.+ Cost of Spares

EURO 1,22,562.82

`19,84,71,840/- + AMC for 5 years @ INR 1,75,28,160/-

+ Optional Accessories

@`75,64,075.+ Cost of Spares

EURO 1,22,562.82

240 days from the date of

opening of LC

3 IRCON/ CC/TN/ JBRLP/ 2050/12/

667 Date :28.09.12

22.10.2012 Construction of Staff Quarters, Passenger & Goods Platforms, Over Head Water Tank and Pump House of India side of alignment portion at Jaynagar in connection with Gauge Conversion & construction of new Broad Gauge Railway Line from JAYNAGAR (INDIA) to BARDIBAS (NEPAL) Package No.- Quarters & Platforms - 03 (INDIA)

LOA No.: IRCON/2050/

BGL.JBB/Tender/Pkg-03 (India)/165 dtd. 12.01.2013

M/s Ram Chhabila Rai,

P.P. Road, Rambagh, Buxar

(Bihar)PIN: 802 101Tel.: 06183-

222039

Schedule Estimated Cost (`)

%age Rate Amount (`) 18-months including the

monsoon period from the date of

issue of LOA

AI 3,03,60,810.37 36% above 41290702.10

AII 2,09,49,406.93 36% above 28491193.43

AIII 37,26,316.47 20% above 4471579.76

AIV 1,52,861.83 30% above 198720.38

B 50,00,000.00 30% above 6500000.00

TOTAL: 6,01,89,395.60 8,09,52,195.67Say, `: 6,01,89,396.00 `8,09,52,196/-

Contd.../-

Page 21: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : JANUARY 2013(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)4 IRCON/

MECH/ 1029/RCF.

RBL-II/ FOLDING/RET-II/08

Dtd. 30.10.12

21.11.2012 Supply and Erection, Installation & Commissioning of (02 nos) CNC Folding Machines at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/ 1029/RCF.RBL-II/ FOLDING/RET-II/08 /2094 Dtd:

14.01.2013

M/s Shrodder-Fasti Technology

GmbH, Elbringhausen,1D

-42929 Wermelskirchen,

Deutchland. Email:

[email protected]

`594.00 Lacs Euro 2,45,030/- + INR 24,87,240/-

Euro 4,90,060/- + INR

49,74,480/-

180 days from date of opening

of LC

5 IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT/27 Dt.16.10.13

09.11.2012 Construction of Workshop Office Complex, Laboratory Complex, Office Cum Locker Blocks, Toilet Cum Parking Blocks, Scrap Yard in RCC Framed/ Load Bearing Structures and Product Development Centre, TTC Workshops in PEB Structures & other Miscellaneous works for Factory & Township area of RCF Rae Bareli at Lalganj (UP)

No. IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT/27/2715 Dated: 15.01.2013

M/s. Gangotri Enterprises Ltd.,B-158, Sector A,

Mahanagar,Lucknow-226006

Ph-0522-2321103, 2331280

FAX: 0522-2321104, 2324539

`20.26 Cr (i) Sch-A (DSR-12 Items):5.00% (Five Percent) Below i.e. at total cost of `16,21,16,066/- and (ii) Sch-B (NS Items): 5.00% (Five Percent) above i.e. at total cost of `3,35,41,479/-

`19.57 Cr 15 Months i.e. 14.04.2014

6 IRCON/ ELECT/

1029/RCF-RBL/

HOSP & MISC/45

09.11.2012 Supply, Installation, testing & commissioning of internal lighting and power distribution network system in various buildings such as 75 bedded hospital, schools, officer’s club, guest houses, Maintenance offices etc. at New Rail Coach Factory, Rae Bareli (U.P.)

IRCON/ELECT/ 1029/RCF-RBL/

HOSP & MISC/45 dated 16.01.2013

M/s Aaryan Infratech, 44A Laxmi Plaza, Cantt Road, Lucknow, UP

`817.00 Lacs `7.47 Crores `8.94 Crores 10 months from the date of LOA

Contd.../-

Page 22: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : JANUARY 2013S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)7 IRCON/ME

CH/1029/RCF.RBL-II/

Turning Centre/

RET-II/ 18A dated

17.04.12

15.06.2012 Supply and Erection, Installation & Commissioning of (01 No.) CNC TURNING CENTRE at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/RCF.RBL-II/Turning Centre/RET-II/18A dated 18.01.2013

M/s DMG Mori Seiki India Machines

and Services Pvt. Ltd.,

Bangalore-560058

`275.00 Lacs Euro 492,130 + INR 46,75,000

Euro 492,130 + INR 46,75,000

240 days from the date of

opening of LC

8 IRCON/MECH/1029/RCF.RBL-

II/CNC Bed Milling/92

dated 17.04.12

25.06.2012 Supply and Erection, Installation & Commissioning of (01 No.) CNC BED MILLING MACHINE at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/RCF.RBL-II/CNC

Bed Milling/92 dated 22.01.13

M/s TOS Kurim, Alta Group, Stefanikova

4160200 Brno Czech Republic

email: marketing@tos-

kurim.cz

`1100.00 Lacs Euro 1,190,000/- + INR 64,20,800 + COST of AMC

FOR 5 YEARS @ INR 75,00,000

Euro 1,190,000/- + INR 64,20,800 + COST of AMC FOR 5 YEARS

@ INR 75,00,000

180 days from the date of opening of

LC

9 IRCON/ MECH/1029/RCF. RBL-II/ Dummy Bogie/139

dtd.22.06.12

31.08.2012 Supply and Erection, Installation & Commissioning of (160 Nos.) Dummy Bogies (Diplory) at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/RCF.RBL-II/Dummy

Bogie/139/2142 dated 23.01.2013

M/s J.S. Industries,16/2, Mathura Road

(Karkhana Bagh) Faridabad-

121002

`233.28 Lacs `85,970/- `1,37,55,200/- 40 nos. within 3-4 months from the date of issue of LOA & 120 nos. will be supplied by 30.03.2013

10 IRCON/ 2049/

ROB-II/ BIHAR/

TENDER/ II/2012/30

Dtd. 09.11.12

29.11.2012 Supply, fabrication, assembly, erection and painting of Bowstring girder in Railway portion, steel stair case in connection to Construction of ROB at LC-35B at Phulwarisarif and Danapur section on Patna Mughalsarai route in Danapur Division of E.C. Railway, Bihar

IRCON/ 2049/ ROB-II/ BIHAR/LC-

35/LOA/86/205 Dated. 24.01.13

M/s JCL Infra Ltd.,Industrial Area,

Delhi Road,Partap pur,

Meerut – 250 103

`817.17 Lacs 12.5% above `9,19,32,059/- 15-months including the

monsoon period from the date of

issue of LOA

Contd.../-

Page 23: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : JANUARY 2013S. N.

Tender No.

Date of opening

Descript ion of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled complet ion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)11 IRCON/

2049/ ROB-II/ BIHAR/

TENDER/LC-3

SPL/II/ 2012/34

Dtd. 17.11.12

10.12.2012 Supply, Fabrication, Assembly, Erection and Painting of Bowstring girder in Railway portion , steel stair case in connection to Construction of Road Over Bridge at LC No 3 SPL at Km. 51/09-10 between Hajipur - Muzaffarpur section on Barauni – Gorakhpur Route in Sonpur Division of East Central Railway, Bihar

IRCON/ 2049/ ROB-II/ BIHAR/LC-35 - 3SPL/LOA/85/203 Dated. 24.01.13

M/s JCL Infra Ltd.,Industrial Area,

Delhi Road,Partap pur,

Meerut – 250 103

`512.28 Lacs 10.00% above `5,63,50,342/- 15-months including the

monsoon period from the date of

issue of LOA

12 IRCON/MECH/1029/RCF.RBL

-II/CNC Wire Cut EDM/93 dated

17.04.12

19.07.2012 Supply and Erection, Installation & Commissioning of (01 No.) CNC WIRE CUT EDM MACHINE at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/ 1029/RCF.RBL-II/

CNC Wire Cut EDM/93/2149 dated 28.01.13

M/s Fanuc Corporation 3580 Shibokusa Aza-

Komanba Oshino-Mura,

Minamistsuru-Gun Yamanashi

Prefecture, 401-0597 Japan

`162.00 Lacs Yen 17,522,320 + USD 4000 +INR 3,82,249 + AMC

for 5 years @ INR 8,25,000/-

Yen 17,522,320 + USD 4000

+INR 3,82,249 + AMC for 5 years @ INR

8,25,000/-

180 days from the date of opening of

LC

13 IRCON/ ELECT/

1029/RCF-RBL/ Solar Plant/ 44B

29.11.2012 Design, Supply, Installation, testing & commissioning of Grid connected Solar power plant of 2MW capacity with all the electrical and associated equipments including civil works at New Rail Coach Factory, Rae Bareli (U.P.)

IRCON/ELECT/1029/RCF-RBL/2MW

SOLAR PLANT/44B dated 30.01.2013

M/s Tata Power Solar Systems Ltd., 78, Electronics City,

Phase I, Hosur Road, Bangalore -

560 100 India

`2242.00 Lacs - `1560.00 Lacs 08 months from the date of LOA

Page 24: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : FEBRUARY 2013S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRSDC/C

T-2 of 2012/

Chandigarh

27.11.2012 Architect and Technical Consultant for preparation of Technical Feasibility study and Master plan for development/ redevelopment of Chandigarh Railway Station on the Indian Railway Network

IRSDC/CT-2 of 2012/Chandigarh/81

Dtd. 01.02.2013

M/s GMP International

GmbH – Germany (lead Partner) + Intercontinental Consultants and

Technocrates Pvt. Ltd- New Delhi

( India)

NA NA `4,35,83,765/- (including

Service Tax and Additional

Costs)

140 Days

2 IRSDC/ CT-3 of 2012/

Habibganj-Bhopal

29.11.2012 Architect and Technical Consultant for preparation of Technical Feasibility study and Master plan for development/ redevelopment of Habibganj-Bhopal Railway Station on the Indian Railway Network

IRSDC/CT-3 of 2012/ Habibganj-

Bhopal/ 82 Dtd.01.02.2013

M/s GMP International

GmbH – Germany (lead Partner) + Intercontinental Consultants and

Technocrates Pvt. Ltd- New Delhi

( India)

NA NA `4,23,67,115/- (including

Service Tax and Additional

Costs)

140 Days

3 IRCON/ MECH/1029/ RCF.RBL-II/

Flat Pallets/78A

Dtd. 30.10.12

29.11.2012 Supply of 1000 Nos. Flat Pallets for Bogie Shop at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/RCF.RBL-II/Flat Pallets/78A/2177 dated 04.02.2013

M/s. J.S. Industries,16/2, Mathura Road

(Karkhana Bagh)- Faridabad- 121002;jsindustries@sarna

group.com

`285.17 Lacs 250 nos @ `89,01,000/-, 250 nos @

`27,83,000/-, 500 nos @

`1,18.68,00/-

`2,35,52,000/- 500 nos. within 03 months from the date of issue of

LOA and 500 nos. within 06-months from the date of

issue of LOA4 IRSDC/C

T-5 of 2012/

Bijwasan – New Delhi

30.11.2012 Architect and Technical Consultant for preparation of Technical Feasibility study and Master plan for development/ redevelopment of Bijwasan – New Delhi Railway Station on the Indian Railway Network

IRSDC/CT-5 of 2012/Bijwasan - New Delhi/83

Dtd. 04.02.2013

M/s Sener Ingeniera Y

Sistemas S.A.(lead Member) + Balaji Railroad System Limited (BARSYL)-India

NA NA `5,10,80,945/- (including

Service Tax and Additional

Costs)

210 Days

Contd.../-

Page 25: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : FEBRUARY 2013S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)5 IRCON/

MECH/ 1029/ RCF.RBL-II/

3D CMM (BOGIE

SHOP)/71 Dtd. 17.02.12

18.05.2012 Supply of 01 No. 3-D Co-ordinate Measuring Machine for Bogie Shop at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/ RCF.RBL-II/3D CMM

(BOGIE SHOP)/71/2195 Dtd.07.02.2013

M/s Accurate Gauging &

Instruments Pvt Ltd Gauge House, 67, Hadapsar Industrial

Estate, Pune-411013

01 No.(`451.00 Lacs)

`3,40,42,157/- `3,40,42,157/- 120 days from the date of issue of PO

6 IRCON/ MECH/1029/ RCF.RBL-II/ Shuttle/114

Dtd. 30.10.12

26.11.2012 Supply of 05 Nos. Shuttle (i.e. Transfer Cars) for Bogie Shop at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

IRCON/MECH/1029/RCF.RBL-

II/Shuttle/114 dated 11.02.2013

M/s Unique Industrial Handlers Pvt. Ltd. 206-207, Nahar &

Seth Industrial Estate Chakala,

Andheri (E) Mumbai-400099.

Email:[email protected]

05 nos.(`736.00 Lacs)

2 Nos. @ `2,45,76,072/-,

1 Nos. @ `1,24,06,789/-,

1 No. @ `76,33,479/-,

1 no. @ `1,04,58,467/-

`5,50,74,807/- 150 days from the date of

issue of LOA

7 IRCON/ 9038/SLR

.S&T/ EXCHANGE.PKG-II/50 Dtd. 19.09.12

05.11.2012 System Design, Supply, Installation, Testing & Commissioning of IP based EPABX and other associated work at stations over Northern Province of Sri Lanka Railways

IRCON/ 9038/SLR.S&T/

EXCHANGE.PKG-II/50/V

Dtd.15.02.2013

M/s Silica Infotech Pvt. Ltd., 142,

Ground Floor, Sant Nagar, East of

Kailash, New Delhi – 110065

Tel.:011-41622583, 41622915; FAX: 011-

26468258

`226.00 Lacs 11.08% below the estimated cost

`2,01,60,317.64 6-months from the date of

issue of LOA

8 IRCON/ 2049/

ROB-II-BIHAR/

TENDER/STEEL

GIRDER/ II/2013/3

Date:15.01.2013

04.02.2013 Supply, Fabrication, Assembly, Erection and Painting of Bowstring girder in Railway portion, steel stair case in connection to Construction of Road over Bridge at LC – 17 C, (Thawe), LC – 45 AB (Chapra) and LC – 159 (Motihari) in state of Bihar

LOA No.: IRCON/2049/ROB-

II-BIHAR/Steel Girder/LOA/93/417

dtd.18.02.2013

M/s S.P. Developers & Decorators,

#3195, Paradise Enclave, Sector-50

D, Chandigarh Mob.:

09646031286, FAX: 0172-2673195

`787.81 Lacs 6.90% above tender cost

`8,42,16,500.95 15-months including

monsoon period from the date of

issue of LOA

Contd.../-

Page 26: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : FEBRUARY 2013S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)9 IRSDC/CT-

4 of 2012/ Shivaji Nagar - Pune

03.12.2012 Architect and Technical Consultant for preparation of Technical Feasibility study and Master plan for development/ redevelopment of Shivaji Nagar - Pune Railway Station on the Indian Railway Network

IRSDC/CT-4 of 2012/Shivaji Nagar-

Pune/124 Dtd. 20.02.2013

M/s Sener Ingeniera Y Sistemas S.A.(lead Member) + Balaji Railroad System Limited (BARSYL)-India

NA NA `3,70,90,495/- (including

Service Tax and Additional

Costs)

140 Days

Page 27: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : MARCH 2013S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)1 IRCON/

MECH/1029/RCF.

RBL-II/ Fire Hydrant & Fire Alarm System/ 142 Dtd. 30.10.12

02.01.2013 Supply of Fire Hydrants Supply Lines & Pumps etc. and Fire Alarm System at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)

LOA No.: IRCON/MECH/

1029/RCF.RBL-II/ Fire Hydrant & Fire Alarm

System/142/2318 dtd.01.03.13

M/s Thermosystems Pvt. Ltd.,

Plot No.:262,1st Floor, I.T.D.C.,

MB Road, Five Senses Road,

Saidulajab,New Delhi

PIN - 110 030

`764.45 Lacs `550.11 Lacs `550.11 Lacs 180 days from the date of issue

of LOA

2 IRCON/ K-RO/TN/

SRC&SHM/12/3 Dtd. 08.01.13

05.02.2013 RCC Bored Cast-in-situ Piling works for Construction of Substructure of Flyover/ Road over Bridge and adjacent approach spans in connection with Station Development at Santragachi and Shalimar Stations for South Eastern Railway in W.B.

LOA No.: IRCON/2052/

SANTRAGACHI/ PILING/REIPL/

1200 dtd. 01.03.2012

M/s Reacon Engineers (ind) Pvt.

Ltd,142, Lenin Sarai,

KolkataPIN:700 013

`1925.00 Lacs `15,79,52,773.34 08 months (excluding

monsoon period for 2 months

between July & September)

3 IRCON/ JK Cell/ JAT/14/

1014/D-Q/ Bal.works-Har.–Meg-Zone-I/M-5R/240 Date:

19.11.2012

11.12.2012 Construction of Balance works in Harog - Megdhar Access Road under Dharam-Qazigund Rail Link Works in Zone –I Section in connection with the Construction of USBRL Project(Jammu and Kashmir) (Package: M- 5R)

LOA No.: IRCON/J&K

Cell/JAT/14/1014/DQ/ Bal. Works-Har.-Meg-Zone-I/ M-5R/240/2975

dtd.08.03.13

M/s K.S. Constructions, 114, Housing

Colony, Phase-II, Udhamnpur, J&KTele Fax: 01992 -

272831

`6,53,11,126.00 8.00% below `6,00,86,235.92 10/03/13

Contd.../-

Page 28: Annexure: A DETAILS OF CONTRACTS PLACED BY .... Contracts placed by Open...12.03.2012 Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/ SPN/165/2004

Works Awarded : MARCH 2013

S. N.

Tender No.

Date of opening

Description of Item/ Work

LOA No. and date

Contractor’s Name and

address

Quantity (for supply contract)/ Estimated Cost (For

Engg./Elect. /S&T/ Mech. etc Works)

Rate (for supply contract)/ Tendered Cost (For

Engg./Elect./S&T/ Mech. etc Works)

Value of Contract

Scheduled completion

date

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/ELECT/1029/

RCF-RBL/HVAC-ADM/47A

Dtd. 11.02.13

06.03.2013 Design, Supply, Installation, Testing & Commissioning of “VRV/VRF” type HVAC system in Administrative Buildings (GF and FF) at New Rail Coach Factory, Rae Bareli (U.P.)

LOA No.: IRCON/ELECT/ 1029/RCF-RBL/ HVAC-ADM/47A dtd.18.03.2013

M/s LG Electronics India Pvt Ltd,

A-27, Mohan Co-op. Industrial Estate,Mathura Road, Delhi-110 044

`1043.00 Lacs Item Rate `8,68,60,003/- 06 months from the date of issue

of LOA