CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Parvavas Bhawan, Sector - 19, Nava Raipur (C.G.) 492002

Email add - [email protected]

No.2e>F:_.? /TS/CECB/2017 Raipur, dated: 2_0+,. /2017 To,

•,/,/l/s Khetan Sponge and Infrastructure Private Limited, Village — Sarora, P.O. - Tilda, District — Raipur (C.G.)

Sub: Permission to establish for expansion in existing plant for Sponge Iron - 30,000 Metric Tonnes/Year, Induction furnace unit - 150000 Metric Tonnes/Year, Rolling Mill-150000 Metric Tonnes/Year, Ferro Alloys [2x9 MVA] -30000 Metric Tonnes/Year, Power through WHRB Route - 06 Megawatt, Power through FBC route - 12 Megawatt and Coal Washery - 1440000 Metric Tonnes/Year.

Ref.: Your online letter no. 415251 dated: 04/04/2017 and subsequent correspondence ending dated: 03/08/2017.

oo

Without prejudice to the powers of this Board under the Water (Prevention and Control of Pollution) Act, 1974, and the Air (Prevention and Control of Pollution) Act, 1981 and without reducing your responsibilities under the said Acts and after going through your proposal for achieving the effluent and gaseous emission standards, it is to inform you that this Board grants you permission to establish for expansion in existing plant for Sponge Iron - 30,000 Metric Tonnes/Year, Induction furnace unit - 150000 Metric Tonnes/Year, Rolling Mill-150000 Metric Tonnes/Year, Ferro Alloys [2x9 MVA] -30000 Metric Tonnes/Year, Power through WHRB Route - 06 Megawatt, Power through FBC route - 12 Megawatt and Coal Washery - 1440000 Metric Tonnes/Year at Khasra No.- 728/4. 729/5. 729/7. 731/1. 731/3. etc., Total area- 24.009 Hec. Village — Sarora, P.O. - Tilda, District - Raipur (C.G.), subject to fulfillment of following terms and conditions. Terms & Conditions: -

1. Industry shall provide adequate facility for proper treatment of industrial and domestic effluent and shall ensure that the treated effluent quality meet the standards prescribed by Board published in Gazette Notification dated 25.03.88. Treated effluent shall be utilized either in process or for plantation within premises. Industry shall make arrangement of suitable drains/pipe networks to ensure adequate flow for full utilization of treated effluent inside the premises. No effluent shall be discharged out of premises under any circumstances. The parameters of treated effluent shall not exceed the following limits : -

Page 1 of 6 qt . u.si SIICCONSEN F Loners C Fault Lb

Mn

Nagarjuna
Typewriter
Annexure-3

S. No. Parameters Limits

1. pH 5.5 - 9.0

2. Suspended Solids 100 Milligram per Liter

3. BOD 30 Milligram per Liter

4. COD 250 Milligram per Liter

5. Oil and Grease 10 Milligram per Liter

Chhattisgarh Environment Conservation Board may further stipulate stringent limit depending upon environmental conditions.

2. Any liquid effluent what so ever generated from industrial activities shall not be discharged into the any river or any surface water bodies under any circumstances, and it shall be reused wholly in the process/operation/plantation. All the industrial effluent generated shall be re-circulated/reused after proper treatment, The un-treated/treated domestic effluent shall not be discharge into the river or any surface water bodies. Industry shall make proper arrangements of suitable drains/pipe networks to ensure adequate flow for utilization of treated effluent inside the premises. No effluent shall be discharged outside of factory premises in any circumstances. The concept of zero discharge shall be strictly maintained all the time.

3. Industry shall provide adequate measuring arrangement for the measurement of water utilized in different categories and effluent generated before commissioning of the plant.

4. Construction of effluent treatment plant for industrial and domestic effluent (as per proposal submitted along with application) shall be taken up simultaneously with other construction activity.

5. Industry shall provide adequate and efficient air pollution control equipments at all point of emission and ensure that emission of particulate matter shall not exceed 30 mg/Nm3 from FBC based power plant and from any other point source. 50 mg/Nm3 under any circumstances. Industry shall install Electro precipitator (ESP) with sponge iron and FBC based power plant unit. Bag filter with fume extraction system shall be installed with induction furnace and submerged electric arc furnace. Bag filter shall be installed with coal washery unit. Industry shall install appropriate air pollution control equipments of adequate capacity and high efficiency to control the dust emission from various emission sources. Chhattisgarh Environment Conservation Board may further stipulate stringent particulate matter emission limit depending upon environmental conditions.

6. Industry shall provide appropriate dust suppression/dust extraction system at all fugitive dust emission sources such as raw materials handling, product and wastes handling section, conveying system,

Page 2 of 6 ReRILSI SIR,CONSEN'tMonk to F20174elletan Sponge nod Infrestruo

transfer points/junction points, stock house etc. All conveyor belt, all transfer points, all junction points etc. shall be covered to avoid fugitive emission.

7 Height of stacks attached to various emission sources shall not be less than as per notification/ guidelines of Ministry of Environment, Forest and Climate Change, Government of India/Central Pollution Control Board or 30 meter (whichever is more). Adequate arrangement for stack emission monitoring shall be provided with the stack.

8. Ambient air quality within the factory premises shall not exceed the standards prescribed by Board.

9. Adequate number of permanent ambient air quality monitoring stations (at-least four) shall be set-up in the down wind direction as well as where maximum ground level concentrations of Suspended Particulate Matter, Sulphur Dioxide and Oxides of Nitrogen are anticipated in consultation with the Board. Monitoring network shall be designed taking into account the land use pattern, location of the stacks, meteorological conditions and topographic features including existing ambient air quality data. Data on ambient air quality and stack emission shall be submitted to the Board every month.

10. Reduction in fugitive emissions due to transportation (which contribute the air pollutants such as suspended particulate matter in ambient air in the nearby residential, rural and other areas) of raw material and finished products shall be done in the existing transport system by adopting appropriate measures and infrastructure development.

11. Industry shall install separate electric metering arrangements with time totalizer for the running of pollution control devices. These arrangements shall be made in such a fashion that any non-functioning of pollution control devices shall immediately stop the electric/raw material supply to the production unit and shall remain tripped till the pollution control device/devices are made functional again.

12. Industry shall provide proper arrangement to control the noise pollution. Industry shall install appropriate noise barriers/control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation to control the noise. The ambient noise level shall not exceed 75 dB (A) during daytime and 70 dB (A) during nighttime within factory premises.

13. Industry shall install fly ash brick plant of at least 20,000 bricks per day capacity within one year from date of issue of this letter.

14. Industry shall ensure transportation of raw material like coal, iron ore etc. in mechanically covered vehicles within one year either from date of issue of this letter or from date of commissioning of the unit which ever is latter.

Page 3 of 6 klitS1 SIIMONSENT 1 Aimee to E.201Tlattan tipmge and Ininnirmdure Prey. 1.anneditil I F R M• FR +CW vdmenoon dn.:

15. Industry shall comply the provisions stipulated) in Notification no. S.O. 3305 (E) Dated 07/12/2015 issued by Ministry of Environment, Forest and Climate Change.

16. Industry shall install on line emission monitoring system in sponge iron, FBC based power plant and Rolling mill stacks.

17. All internal roads shall be black topped. Good house keeping practices shall be adopted by the industry.

18. All raw materials shall be stored above ground level with pucca platform in covered area. Industry shall provide safe and scientific arrangement for handling, storage and disposal of all solid wastes such as; ETP Sludge, etc. The slag generated shall be utilized for road making and low-lying areas filling within premises etc. The dust collected in air pollution control system and sludge in settling tank shall be utilized for filling in low-lying area inside premises, road development etc. Adequate arrangements shall be provided for proper storage, handling etc. of all solid wastes generated to avoid any fugitive emission. The low-lying area within premises/outside premises filled by solid wastes shall be reclaimed by proper leveling, covering with soil and plantation without delay. All the other solid/hazardous waste generated shall be properly utilized or disposed off in environment friendly manner. A time bound action plan shall be submitted to reduce solid waste, its proper utilization and disposal.

19. Extensive tree plantation with local broad leaf plant species at all around the factory premises and in the open areas available within the factory premises shall be carried out. Industry shall abide by the decisions taken by Ministry of Environment, Forest and Climate Change, Government of India / Central Pollution Control Board / State Government / Chhattisgarh Environment Conservation Board from time to time in this regard.

20. Industry shall submit characterization report of all the waste generated. As per characterization report, if any waste comes under the purview of Hazardous and Other Wastes (Management and Trans Boundary Movement) Rules, 2016. Industry shall obtain letter of authorization under Hazardous and Other Wastes (Management and Trans Boundary Movement) Rules, 2016 from the Board.

21. Garland drains with appropriate check dams shall be provided all along the other raw materials, solid wastes such as; metal scrap, air pollution control system returns in air pollution control devices storage areas etc. to avoid any possibility of erosion (wash-off) during rain. Garland drain (size, gradient & length) and sump capacity shall be designed keeping 50% safety margin over and above the peak sudden rainfall and maximum discharge in the area adjoining the site. Sump capacity shall also provide adequate retention period to allow proper settling of silt material. Sedimentation pits shall be constructed at the corners of the garland drains. The surface run-off shall be de-silted through a series of check dams and drains before re-use.

Page 4 of 6 1),11 , 1.51 SIIIC1)NSENTlaratt2 to Et2 lalletan Sponge and larrattoonure Privatelamited (SI t IF • nit FRA , W11R1311,11(2.-CW capon/A.04o,

22. Industry shall adopt rainwater-harvesting technique in the project area and residential area (if any) for recharge of ground water. The rain harvesting technique shall be incorporated right from the design stage of all structures. Industry shall develop rainwater-harvesting structures to harvest the rainwater for utilization in the lean season as well as to recharge the ground water table.

23. Industry shall use fly ash brick, fly ash block and fly ash based products in the construction/repairing activities. Industry shall also use fly ash for filling low-lying areas within plant premises.

24. Industry shall establish an environmental management cell to carryout function relating to environmental management under the supervision of senior executive who is directly reporting to the head of organization. Industry shall setup laboratory facility for collection and analysis of environmental samples under the supervision of competent technical personnel.

25. Necessary fund shall be provided for implementation of the above conditions and the conditions to be incorporated in the 'consent to operate' of the Board and for environmental safeguards. The funds earmarked for environmental protection measures shall be kept in separate account and not diverted for any other purpose.

26. Industry shall obtain statutory clearances/licenses from concerned Central Government/State Government Departments, Boards, Bodies and Corporations etc. before establishment of plant. Industry shall follow direction issued by Central Government/ State Government, Central Pollution Control Board/Chhattisgarh Environment Conservation Board from time to time regarding control of water & air pollution and for environmental conservation.

27. The issuance of this 'permission to establish' of Board does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Central, State or Local laws or regulations.

28. Industry shall follow any other conditions given at the time of grant of consent under the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981.

29. Any change in product, production capacity, process, raw materials used, project profile etc. shall be intimated to the Board and prior permission of the Board shall be obtained for the same.

30. This permission to establish shall be valid for the period of five years effective from the date of issue of this letter. This permission to establish shall be treated as cancelled in case; no construction activity has been started on the site regarding establishment of the industry during this period. Chhattisgarh Environment Conservation Board reserves the right to extend the validity period / not to extend the validity period/ cancel /withdraw the permission to establish of the industry,

Page 5 oflfgz.„ SI SIRuCONSENF L411ers C 01F 2017 Ahem Sponge and Intras1003ore Povalc 1 mud (11 , 11 101 FR N1101100 FIN C.

- based on the construction activities carried out on the site regarding establishment of the industry.

31. Board reserves the right to amend/cancel any of the above conditions, stringent the emission/effluent limits stipulated above and add new conditions as and when deemed necessary in the interest of environmental protection, change in the project profile or non- satisfactory implementation of the stipulated conditions etc.

The consent (for operation) as required under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 shall be granted to your industry after fulfillment of all the conditions mentioned above. For this purpose you shall have tip make an application to this Board in the prescribed Proforma at least two months before the expected date of commissioning of the plant. The applicant shall not without valid consent (for operation) of the Board bring into use any out let for the discharge of effluent and particulate matter/gaseous emission.

For & on behalf of Chhattisgarh Environment Conservation Board

Member Secretary Chhattisgarh Environment Conservation Board

_Naya Raipur (C.G.)

Endt. No. /TS/CECB/2017 Naya Raipur, dated: / /2017 Copy to: -

1. Chief Engineer, M/s Chhattisgarh State Power Generation Company Ltd. (Formerly known as Chhattisgarh State Electricity Board), Raipur for information and necessary action please. The power supply to the unit shall be released only after submission of the copy of "Consent to Operate" issued by Chhattisgarh Environment Conservation Board, Raipur.

2. Regional Officer, Regional Office, Chhattisgarh Environment Conservation Board, Raipur (C.G.). Please ensure compliance and report, if any condition/conditions are violated by the industry.

Member Secretary Chhattisgarh Environment Conservation Board

Naya Raipur (C.G.)

Page 6 of 6 D,TuLsi SIIICONSENT Legerol: 1u E3l/17'10 Sgmge.M lntiunlruvlure Private Limited (SI kl,IIA•WIII(HYP-111(,(2W expansion)doe

Nagarjuna
Typewriter
Annexure - 4
Nagarjuna
Typewriter

Annexure - 5

Details of payment made to various equipment supplier and consultants

PLANT & MACHINERY CH NO CH DATE AMOUNT

1 ARK Engineering & Power Consultant P Ltd 970306 17.08.2017 483800

739218 23.11.2017 2300000

739231 12.12.2017 1500000

TOTAL 4283800 4283800

2 Marshal Geo Test Laboratory 739203 10.10.2017 49000

739208 31.10.2017 98000

TOTAL 147000 147000

3 Ashwini Engineering Industries 970317 28.09.2017 5000000

739206 19.10.2017 2000000

739210 31.10.2017 6000000

739213 09.11.2017 3275000

739219 27.11.2017 4000000

739230 12.12.2017 11000000

739236 18.12.2017 9950000

184251 21.12.2017 8000000

TOTAL 49225000 49225000

4 EICS Technology 970314 28.09.2017 200000 200000

5 Simens Limited 970321 16.10.2017 3325000 3325000

6 Enexio Power Cooling Solution Indis P Ltd 739212 08.11.2017 7280600 7280600

7 Elecon Engineering Co Ltd 739223 28.11.2017 212500 212500

8 Center for Ground Water Recharge Testing Laboratory739232 13.12.2017 55080 55080

9 Thermex Limited 739226 11.12.2017 1255000 1255000

10 Lighthouse Info Sysem P Ltd 739235 14.12.2017 620000 620000

11 Classic Technomec Pvt Ltd 739243 04.12.2017 5000000

739249 08.12.2017 5000000

TOTAL 10000000 10000000

12 Electrotherm (India) Ltd 900321 05.12.2017 4000000

900339 25.12.2017 6000000

TOTAL 10000000 10000000

13 Concast India Ltd 900324 08.12.2017 5000000 5000000

14 Shape Machine Tools Pvt Ltd 900323 08.12.2017 5000000 5000000

15 P P Rolling Mill Pvt Ltd 900326 08.12.2017 2500000

900329 12.12.2017 10000000

900334 18.12.2017 7500000

900336 20.12.2017 5000000

TOTAL 25000000 25000000

GRAND TOTAL 121603980

FACTORY SHED & BUILDING

1 Cherra Infratech Company 900322 06.12.2017 6000000

900330 13.12.2017 10000000

900335 19.12.2017 3200000

TOTAL 19200000 19200000

For, Amitabh Agrawal & Co. Chartered Accoun FRN - 006620C

Amitaoh Agrayval d

Partner M.No. 075315

AMITABH AGRAWAL & CO. CHARTERED ACCOUNTANTS

Head Office :- 109, Wallfort Ozone, Fafadih Chowk, Raipur - (C.G.) Ph.No.0771 - 4065350 (D) Ph.No.0771 - 4065301 to 320,

MOB. 098931 - 21111 Email : amitabhaolavahoo.com

CERTIFICATE

We have verified the Books of Accouints of M/s Khetan Sponge & Infrastructure Pvt. Ltd. having its Registered Office at 1 st Floor, Khetan Building , Moudhapara, Raipur (C.G.) and Factory at Village Sarora, P.O. Tilda, Distt - Raipur (C.G.) have made following investment towards their expansion project as on 15 th January' 2018.

Sr No Name of Assets Rs. In Lacs

1 Land Existing_ 45.12 2 Site Development

3 Civil Work including Advance to Contractor 192.00 4 Plant & Machinery including Advance to Plant

Supplier 1216.04

5 Misc. Fixed Assets 12.05 6 Preliminary & Pre-operative Expenses 38.07

TOTAL 1503.28

The above certificate has been issued on the basis of Books of Accounts produced by the Director of the Company and are true and correct to the best of our knowledge and belief.

Place: Raipur, Chhattisgarh Date : 19-01-2018

Nagarjuna
Textbox
Annexure - 6

Annexure - 7 COMPARISION OF POLLUTION LOADS

Pollution Loads (Stack Emission details) as per the Environmental Clearance order issued

vide No. J-11011 / 387 / 2009 – IA II (I) dated 29th March 2011

S.No. Stack attached to Dia (m)

Height (m)

Temp. of flue gas

(ºC)

Velocity of flue gas (m/ sec)

SPM (g/s)

SO2

(g/s)

NOX

(g/s)

1. Pelletization plant 2.0 33 180 15.0 1.6 4.7 16.0

2. MBF 1.5 50 100 15.0 0.3 --- 3.0

3. Sinter Plant 1.0 40 170 15.0 0.5 --- 5.0

5. DRI kilns with WHRBs (2 x 100 TPD)

1.3 (per flue)

60 (combined

stack)

170 15.0

0.7 (per flue)

15.1 (per flue)

7.0 (per flue)

6. DRI kilns with WHRBs (1 x 100 TPD ) Existing

1.3 50 (1 no.) 170 15.0 0.7 15.1 7.0

7. Induction Furnaces – 4 x 10 MT (combined stacks each with twin flues)

0.6 (per flue)

30 (2 nos of combined

stacks)

100 15.0 0.2

(per flue) --

2.0 (per flue)

8. Induction Furnaces – 1 x 10 MT 0.6 30 100 15.0 0.2 -- 2.0

9. Rolling Mill 1.0 48 180 15.0 0.4 16.2 4.0

10. Submerged Arc furnace (2 x 9 MVA)

1.3

30 (2 nos.)

160 15.0 0.7 -- 7.0

11. FBC Boiler (12 MW)

1.8

65 170 15.0 1.4

44.5

14.0

12. Coal Washery 0.3 30 303 4.0 0.2 -- --

TOTAL EMISSION LOAD 7.3 110.7 74.2

STACK EMISSIONS

Pollution Loads after dropping Iron Ore Beneficiation & Pelletization, Blast Furnace, Sinter Plant, WHRB - from Blast Furnace & FBC based

power plant from 12 MW to 9 MW (decrease by 3 MW)

S.No. Stack attached to Dia

(m)

Height

(m)

Temp. of

flue gas

(ºC)

Velocity of

flue gas

(m/ sec)

SPM

(g/s)

SO2

(g/s)

NOX

(g/s)

1. Pelletization plant 2.0 33 180 15.0 Nil Nil Nil

2. MBF 1.5 50 100 15.0 Nil Nil Nil

3. Sinter Plant 1.0 40 170 15.0 Nil Nil Nil

5. DRI kilns with WHRBs (2 x 100 TPD)

1.3

(per flue)

60

(combined

stack)

170 15.0

0.7

(per flue)

15.1

(per flue)

7.0

(per flue)

6. DRI kilns with WHRBs (1 x 100 TPD )-

Existing 1.3 50 (1 no.)

170 15.0 0.7 15.1 7.0

7. Induction Furnaces – 4 x 10 MT

(combined stacks each with twin flues)

0.6

(per flue)

30

(2 nos of

combined

stacks)

100 15.0 0.2

(per flue) --

2.0

(per flue)

8. Induction Furnaces – 1 x 10 MT 0.6 30 100 15.0 0.2 -- 2.0

9. Rolling Mill 1.0 48 180 15.0 0.4 16.2 4.0

10. Submerged Arc furnace (2 x 9 MVA)

1.3

30

(2 nos.) 160 15.0 0.7 -- 7.0

11. FBC Boiler (9 MW)*

1.6

59 170 15.0

0.6

2.1

2.1

12. Coal Washery 0.3 30 303 4.0 0.2 -- --

TOTAL EMISSION LOAD 4.6 63.6 38.3

* Emission calculation are based on emission standards notified by MoEF&CC vide S.O. no. 3305 (E) dated 7th December 2015 for Thermal

Power Plants.

REDUCTION IN EMISSSIONS

Description PM

(g/s) SO2 (g/s)

NOx (g/s)

As per E.C. 7.3 110.7 74.2

After Dropping units 4.6 63.6 38.3

Total Reduction in emissions 37% 42.5 % 48.4%

Stack Height calculation (POWER PLANT- AFBC – 9 MW)

No. of Boilers : 1x 35 TPH

The fuels proposed to be used in the boiler will be dolochar, washery rejects and coal.

Entire dolochar generated from the DRI plant will be used as fuel in FBC boiler. However

in a situation when Sponge iron plant will be under maintenance and FBC based power

plant will be in operation the following will be the fuel requirement for both the boilers

put together which represents the worst environmental scenario.

Consumption of Middlings /Washery rejects : 280 TPD

Sulphur content in Middling / washery rejects : 0.5 % (by mass, Max.)

SO2 emission : 280 x1000x0.005 x2/24

: 116.67 Kg/hr

Stack Height, H : 14(Q)0.3

: 14 (116.67)0.3 = 58.4 m

Consumption of Coal : 140 TPD

Sulphur content in Middling / washery rejects : 0.5 % (by mass, Max.)

SO2 emission : 140 x1000x0.005 x2/24

: 58.33 Kg/hr

Stack Height, H : 14(Q)0.3

: 14 (58.33)0.3 = 47.41 m

However a stack of 59 m will be provided

Photographs showing progress of work pertaining to WHRB & FBC

Annexure - 8

Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

1 Induction Furnace 5 x 10 MT 1,50,000 TPA

2 Rolling Mill 1 x 500 TPD 1,50,000 TPA

3 Ferro Alloys 2 x 9 MVA 30,000 TPA

4 WHRB (Power)

5 FBC based (Power)

6 Coal Washery 200 TPH 14,40,000 TPA

3 x 2 MW

12 MW

20202018 2019S.No Unit (Product)

Production

Capacity

Plant

Configuration

Project Implementation Schedule - Khetan Sponge & Infrastructure Pvt. Ltd.

20212017

Nagarjuna
Typewriter
Annexure - 9
Nagarjuna
Typewriter

UPDATED Form – I for

Extension of Validity of Environment Clearance

& Amendment in Environment Clearance

[E.C. issued vide order No. J-11011 / 387 / 2009 – IA II (I)

dated 29th March 2011]

Submitted to MoEF&CC, New Delhi

for

Khetan Sponge & Infrastructure Pvt. Ltd. [Integrated Steel Plant]

at Sarora Village, Tilda Tehsil,

Raipur District, Chhattisgarh

Nagarjuna
Typewriter
Annexure - 10

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

1

APPENDIX I (See paragraph – 6)

FORM - I

(I) BASIC INFORMATION

1. Name of the project Khetan Sponge & Infrastructure Pvt. Ltd.

2. S. No. in the schedule 3 (a)

3. Proposed capacity / area / length / tonnage to be handled / command area / lease area / number of wells to be drilled

EC was issued for below configuration vide order No. J-11011 / 387 / 2009 – IA II (I) dated 29th March 2011

Environmental Clearance was issued for the following units

S.No. Details

Capacity

Existing CFE awarded Proposed Total

Implemented To be

commissioned

1. Sponge Iron 2 x 100 TPD 1 x 100 TPD --- 90,000 TPA

2. Only Pellet plant 100000 TPA --- --- 100000 TPA

3. Iron Ore Beneficiation & Pelletization

--- --- 3,00,000 TPA (1 x 1000 TPD)

3,00,000 TPA

4. Blast Furnace --- --- 1 x 250 M3 1,50,000 TPA

5. Sinter 1 x 24 M2 2,07,360 TPA

6. Induction Furnace with CCM/ PCM

--- --- 5 x 10 MT 1,50,000 TPA

7. Rolling Mill --- --- 1 x 500 TPD 1,50,000 TPA

8. Ferro Alloys Unit --- --- 2 x 9 MVA 30,000 TPA

9. POWER --- --- 20.5 MW

i. WHRB – from sponge iron

--- --- 3 x 2 MW 6.0 MW

ii. WHRB - from Blast Furnace

--- --- 2.5 MW 2.5 MW

iii. FBC Boiler --- --- 12 MW 12 MW

10. Coal Washery --- --- 200 TPH 1.44 MTPA

4. New / Expansion / Modernization Request for Extension of validity & amendment in the Environmental Clearance order issued vide order No. J-11011 / 387 / 2009 – IA II (I) dated 29th March 2011 to the implement the unimplemented units.

5. Existing capacity/Area etc. The following table showing Implementation status

S.No.

Details

Capacity

Existing CFE awarded

Proposed

Total

Implementation Schedule

Implemented

To be commissioned

1. Sponge Iron 2 x 100 1 x 100 --- 90,000 • Detailed Engineering has

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

2

TPD TPD TPA been done.

• Purchase order issued to M/S EICS TECHNOLOGY PVT. LTD., M/s CLASSIC TECHNOMEC PVT. LTD., M/s THERMAX LTD., M/s SHAPE MACHINE TOOLS PRIVATE LTD.

• Civil works under progress

• 1 x 100 TPD Yet to be Implemented and will be completed by April 2019

2. Only Pellet plant

100000 TPA

--- --- 100000 TPA

Not Applicable

3. Iron Ore Beneficiation & Pelletization

--- --- 3,00,000 TPA (1 x

1000 TPD)

3,00,000 TPA

• Dropping Now

4. Blast Furnace

--- --- 1 x 250 M3

1,50,000 TPA

• Dropping Now

5. Sinter 1 x 24 M2

2,07,360 TPA

• Dropping Now

6. Induction Furnace with CCM/ PCM

--- --- 5 x 10 MT

1,50,000 TPA

• Detailed Engineering has been done.

• Purchase order issued to M/S CONCAST INDIA LTD., M/s. ELECTROTHERM, M/S CENTURY TRANSFORMER PVT. LTD., M/S RAMASA CRANES PVT LTD.

• Yet to be implemented and will be completed by April 2019

7. Rolling Mill --- --- 1 x 500 TPD

1,50,000 TPA

• Detailed Engineering has been done.

• Purchase order issued to M/S PP ROLLING MILLS PVT. LTD., M/S RAMASA CRANES PVT LTD., M/S CENTURY TRANSFORMER PVT. LTD.

• Yet to be implemented and will be completed by June 2019.

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

3

8. Ferro Alloys Unit

--- --- 2 x 9 MVA

30,000 TPA

• Yet to be implemented and will be completed by December 2020

9. POWER --- --- 20.5 MW

i. WHRB – from sponge iron

--- --- 3 x 2 MW

6.0 MW • Detailed Engineering has been done.

• Purchase order issued to M/s. ARK ENGINEERING AND POWER CONSULTANTS (P) LIMITED, M/s THERMAX LTD., M/s ASHIWINI ENGINEERING INDUSTRIES.

• Civil works under progress.

• WHRB power plant will be operational by April 2019.

ii. WHRB - from Blast Furnace

--- --- 2.5 MW 2.5 MW • Dropping Now

iii. FBC Boiler --- --- 12 MW 12 MW • Now proposed to install 9 MW FBC Power Plant.

• Dropping 3 MW Power Plant

• Detailed Engineering has been done.

• Purchase order issued to M/s. M/s. ARK ENGINEERING AND POWER CONSULTANTS (P) LIMITED, M/s THERMAX LTD., M/s ENEXIO POWER COOLING SOLUTIONS INDIA PVT. LTD., M/s SIEMENSE LTD., M/s ASHIWINI ENGINEERING INDUSTRIES.

• Civil works under progress.

• FBC power plant will be operational by April 2019.

10. Coal --- --- 200 1.44 • Yet to be implemented

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

4

Washery TPH MTPA and will be completed by December 2020

6. Category of project i.e. ‘A’ or ‘B’. A

7. Does it attract the general condition? If yes, please specify.

No

8. Does it attract the specific condition? If yes, please specify.

No

9. Location

Plot/Survey/Khasra No. 726, 727/2, 727/3, 728/3, 729/4, 729/6, 739/2, 740/2, 741/5, 741/7, 741/9, 756, 757/2, 757/3, 757/5, 759/1, 759/2, 760, 762, 741/11, 741/12, 753/1, 753/2, 753/3, 753/4, 753/5, 754/1, 768/1, 768/3, 770/1, 771/1, 771/3, 771/5, 771/6, 771/7, 771/8, 771/9, 728/4, 729/5, 729/7, 731/1, 731/3, 734/1, 735, 737, 738/1, 738/2, 739/3, 740/3. 741/6, 741/8, 750/2, 741/10, 752/1, 752/2, 807/3, 807/6, 807/7, 813/2, 814, 815/1

Village Sarora

Tehsil Tilda

District Raipur

State Chhattisgarh

10. Nearest railway station/airport along with distance in kms.

Nearest Railway Station: Tilda – 6.2 Kms. Nearest Airport : Raipur Airport – 42.5 Kms.

11. Nearest Town, City, District Headquarters along with distance in kms.

Raipur Town : 30.0 Kms.

12. Village Panchayats, Zilla Parishad, Municipal corporation, Local body (complete postal addresses with telephone no.s to be given)

Sarora Village

13. Name of the applicant Khetan Sponge & Infrastructure Pvt. Ltd.

14. Registered Address 501 to 511, Fifth Floor, Harshith Corporate, Amanaka, Raipur, Chhattisgarh - 492010

15. Address for correspondence:

Name Shri Vikas Goyal

Designation(owner/partner/CEO) Director

Address 501 to 511, Fifth Floor, Harshith Corporate, Amanaka, Raipur, Chhattisgarh - 492010

Pin code 492010

E-Mail [email protected]

Telephone No. 0771-22233360

Fax No. ----

16.

Details of Alternative sites examined, if any. Location these sites should be shown on a topo sheet

Not applicable, as present proposal is for Validity extension & amendment in Environmental Clearance.

17. Interlinked Projects No

18. Whether separate application of No

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

5

interlinked project has been submitted?

19. If yes, date of submission Not applicable

20. If no, reason Not applicable

21. Whether the proposal involves approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation) Act,1980 (b) The Wildlife (protection) Act,1972 (c) The C.R.Z Notification, 1991?

Not applicable

22.

Whether there is any a government order/policy relevant/relating to the site?

No

23. Forest land involved(hectares) Not applicable

24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a)Name of the court (b)Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project.

Not applicable

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

6

(II) ACTIVITY

1. Construction, operation or decommissioning of the Project involving actions, which will cause

physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

Yes Present land is Industrial land. Some of the units are under implementation stage (civil work has started) and some units are yet to be started. The status of implementation has been specified in Page # 1. There are certainly some topographical changes in the site due to implementation of the units.

1.2 Clearance of existing land, vegetation and buildings?

Yes Existing land is more or less flat without many undulations. Not much of plantation in the area earmarked for the project. Hence no clearance of vegetation required during implementation of unimplemented units for which EC has been accorded. However, as a part of greenbelt development, vegetation is being developed in the Plant premises.

1.3 Creation of new land uses? No Present use of land is already converted for the industrial purpose. Moreover, extensive greenbelt will be developed within the plant premises.

1.4 Pre-construction investigations e.g. bore houses, soil testing?

Yes Pre-construction investigation e.g. borehouse, soil testing will be carried out during implementation of unimplemented units for which EC has been accorded.

1.5 Construction works? Yes Construction work has been initiated for some of the units for which E.C. already accorded by honourable Ministry and the construction for the remaining units will be taken up after obtaining the extension of validity & Amendment in Environmental clearance from MoEF&CC and NOC from SPCB.

1.6 Demolition works? No No demolition has been involved for units already implemented / under

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

7

implementation. Similarly, no demolition work will be involved for unimplemented units.

1.7 Temporary sites used for construction works or housing of construction workers?

No Construction workers will be taken from local areas only for implementation of unimplemented units. Hence no housing is proposed for construction workers.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes Most of the structures in the project which have been implemented/under implementation are above the ground. Structures in the project which are not implemented will also be above the ground. However excavations are involved for foundations pertaining to units. Excess cut will be used for landfill.

1.9 Underground works including mining or tunneling?

No No mining and tunneling are involved in the proposed project.

1.10 Reclamation works?

No No reclamation works are involved in the proposed project.

1.11 Dredging?

No No dredging works are involved in the proposed project.

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing processes? Yes Production of Sponge Iron through DRI route. The waste flue gases from the kilns will pass through WHRB and power will be generated. Later this Sponge Iron along with scrap & Ferro Alloys will be melted in Induction Furnaces to produce M.S. Billets/ Ingots/ Blooms. This Steel ingots/ billets/ blooms are heated in Re-heating furnace of rolling mill to produce Rolled products viz. TMT bars, channel, angles Joist, Bar, Rounds and other structural items. Manganese ore along with Coke and other additive is melted in Submerge Arc Furnaces to produce Ferro Alloys. The Dolochar generated from the sponge iron Plant will be used FBC

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

8

Boiler as fuel along with Coal to generate power.

1.14 Facilities for storage of goods or materials?

Yes Sheds have been constructed for storage of some of the raw materials. Other raw materials will be stored in storage yards and products.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes There will be no effluent generation from the process & cooling of DRI Kilns, Induction Furnace, Rolling Mill as close circuit cooling system will be installed. Sanitary waste water is being treated in Septic tank followed by soak pit and same practice will be continued after implementation of unimplemented unit. Dolochar generated during manufacturing of Sponge Iron will be utilized in the own FBC power plant. Slag generated during the manufacturing of the Ingots/Billets/ Blooms will be crushed and after recovery of iron the inert material will be used as landfill/given to brick manufacturers. Mill scales generated from the Rolling Mill will be reused in the Sinter Plant. Slag from Ferro Alloys will be given to Cast Iron foundries (FeSi slag) / will be used in Road Construction or given to Slag cement manufacturing (SiMn Slag) / will be reused in the manufacture of SiMn as it contains high SiO2 and Si (FeMn Slag). All the solid wastes generated from the proposed project will be reused / disposed as per CPCB norms only. Waste / used / spent oil and used batteries if any will be sold to authorized recyclers/re-processors.

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

9

1.16 Facilities for long term housing of operational workers?

No No colony is proposed.

1.17 New road, rail or sea traffic during construction or operation?

No There has been a marginal increase in traffic volume during construction of the units for transportation of construction materials. During operation of the plant the raw materials will be brought by rail upto the nearest railway facility and from there it will be brought upto the site by road in covered trucks. The existing roads can handle this additional increase in vehicular traffic. Hence there will not be any adverse impact on road traffic/rail traffic during the implementation of unimplemented units.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

No No new road / rail transport infrastructure is proposed.

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No No closure or diversion of existing transport routes is envisaged in the expansion projects for units for which EC has been obtained.

1.20 New or diverted transmission lines or pipelines?

No No such works are envisaged.

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No No damming, culverting, realignments are envisaged. There will not be any changes to the hydrology of water courses or aquifers due to the units for which EC has been obtained.

1.22 Stream crossings? No No stream crossing is involved

1.23 Abstraction or transfers of water form ground or surface waters?

Yes Water required for project will be sourced from Ground water / River Shivnath.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No No changes in water bodies, drainage and land surface are anticipated as the site is more or less flat.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes During Construction Few vehicles will be used for transport of personnel during construction of unimplemented unit. Construction materials will be transported in covered trucks. During Operation Few vehicles are being / will be

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

10

provided for transport of personnel during operation of the plant. Raw materials are being / will be transported by rail & road. Hence there is no significant impact on environment due to transportation during implementation of unimplemented units.

1.26 Long-term dismantling or decommissioning or restoration works?

No No such works are envisaged

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No No such works are envisaged

1.28 Influx of people to the area either temporarily or permanently?

Yes Influx of people will be temporary.

1.29 Introduction of alien species? No No such activity is envisaged

1.30 Loss of native species or genetic diversity?

No As a part of greenbelt development plan native species that are suitable to that soil condition have been planted in consultation with DFO as per CPCB guidelines. Similar system will be followed during implementation of other units also.

1.31 Any other actions? No Nil

2. Use of Natural resources for construction or operation of the Project (such as land, water,

materials or energy, especially any resources which are non-renewable or in short supply)

S.No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

No Total land acquired for the project is 64.0 acres, of which greenbelt will be development in the 21.0 acres.

2.2 Water (expected source & competing users) unit: KLD

Yes Water required for project will be sourced from Ground water / River Shivnath.

2.3 Minerals (MT) Yes Iron ore & Coal is / will be sourced

2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

Yes All construction materials such as stone, sand, soil are available locally.

2.5 Forests and timber (source – MT) No Nil

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes Electricity required for the plant is will be sourced from Captive power plant and State Grid.

2.7 Any other natural resources (use No Nil

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

11

appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health

S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

No No such works are envisaged

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No There will be no effluent generation from the process & cooling of DRI Kilns, Induction Furnace, Rolling Mill as close circuit cooling system will be installed. Sanitary waste water is being treated in Septic tank followed by soak pit and same practice will be continued after implementation of unimplemented unit. Dolochar generated during manufacturing of Sponge Iron will be utilized in the own FBC power plant. Slag generated during the manufacturing of the Ingots/Billets/ Blooms will be crushed and after recovery of iron the inert material will be used as landfill/given to brick manufacturers. Mill scales generated from the Rolling Mill will be reused in the Sinter Plant. Slag from Ferro Alloys will be given to Cast Iron foundries (FeSi slag) / will be used in Road Construction or given to Slag cement manufacturing (SiMn Slag) / will be reused in the manufacture of SiMn as it contains high SiO2 and Si (FeMn Slag).

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

12

All the solid wastes generated from the proposed project will be reused / disposed as per CPCB norms only. Waste / used / spent oil and used batteries if any will be sold to authorized recyclers/re-processors.

3.3 Affect the welfare of people e.g. by changing living conditions?

No Not Applicable as the project has already created employment and thereby a substantial improvement in the socio-economic status of people in the area.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No ESPs will be provided to DRI Kilns & Power plant to control the emissions within 50 mg/Nm3. Fume extraction system with bag filters are provided to control the fugitive emissions from Induction Furnaces, Ferro Alloys & Coal Washery will be collected through hoods then treated in bagfilters to bring down the particulate matter in the exhaust gases to within the standards and then discharged into the atmosphere through stacks whose heights are in accordance with CPCB norms. There will be no effluent generation from the process & cooling in DRI Kilns, Steel Melting Shop, Ferro Alloys units & Coal washery. Sanitary waste water will be treated in Septic tank followed by soak pit. There are no hospitals and schools in the vicinity of the plant. Hence there is / will not be any adverse impact on vulnerable groups due to the proposed project.

3.5 Any other causes

No Not Applicable

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

13

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes Yes The dug soil during excavation will be used for filling of low lying areas.

4.2 Municipal waste (domestic and or commercial wastes)

Yes MSW will be disposed off as per norms.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

No Not Applicable

4.4 Other industrial process wastes Yes Dolochar generated will be reused in the FBC based Power plant. Slag generated during the manufacturing of the MS Billets is crushed and after recovery of iron the inert material is used as landfill/given to brick manufacturers. Ash generated will be given cement plant and brick manufacturing units. All the solid wastes generated from the proposed project will be reused/disposed as per CPCB norms only.

4.5 Surplus product No Not Applicable

4.6 Sewage sludge or other sludge from effluent treatment

No Not Applicable

4.7 Construction or demolition wastes Yes Construction wastes are / will be disposed off as per guidelines.

4.8 Redundant machinery or equipment No No redundant machinery will be kept in the premises.

4.9 Contaminated soils or other materials No No contamination of soils or no contaminated materials will be kept in the plant.

4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes No Not applicable.

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

14

5.Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes The emissions of concern from the project will be are PM, SO2 & NOx. ESPs are will be provided to DRI Kilns & Power plant to control the emissions within 50 mg/Nm3. Fume extraction system with bag filters will be provided to control the fugitive emissions from Induction Furnaces will be collected through hoods then treated in bagfilters to bring down the particulate matter in the exhaust gases to within the standards and then discharged into the atmosphere through stacks whose heights are in accordance with CPCB norms. Hence there will not be any adverse impact on environment due to the expansion project.

5.2 Emissions from production processes Yes The emissions of concern from the project will be are PM, SO2 & NOx. ESPs are will be provided to DRI Kilns & Power plant to control the emissions within 50 mg/Nm3. Fume extraction system with bag filters will be provided to control the fugitive emissions from Induction Furnaces will be collected through hoods then treated in bagfilters to bring down the particulate matter in the exhaust gases to within the standards and then discharged into the atmosphere through stacks whose heights are in accordance with CPCB norms. Hence there will not be any adverse

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

15

impact on environment due to the expansion project.

5.3 Emissions from materials handling including storage or transport

Yes Dust suppression system will be provided at raw material unloading areas. Dust extraction system with bag filters will be provided at all the dust emanating areas. All conveyors will be covered with GI sheets to prevent the fugitive dust. Junction hoppers and other areas where fugitive dust is likely to be generated will be provided with dust extraction system with bag filters.

5.4 Emissions from construction activities including plant and equipment

Yes Some dust emissions will be generated during construction. Dust curtains will be provided all round the area to prevent the dust emissions.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

No Not applicable

5.6 Emissions from incineration of waste No Not applicable

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

No All such wastes will be disposed along with municipal solid waste.

5.8 Emissions from any other sources No Nil

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist confirmation Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

No All machinery used will be as per OSHA/MOEF&CC guidelines. Earplugs will be provided to workers working in the noise prone areas. Ambient noise levels will be in accordance with MOEF notification dated 14-02-2000 i.e. noise levels will be < 75 dBA during daytime and < 70 dBA during night time.

6.2 From industrial or similar processes Yes All noise generating equipments are of internationally reputed make which are manufactured as per

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

16

MOEF&CC / OSHA / other International standards. The ambient noise levels will be in accordance with MOEF notification dated 14-02-2000 i.e. noise levels will be < 75 dBA during daytime and < 70 dBA during night time.

6.3 From construction or demolition Yes Construction equipment will cause some noise. Ear plugs will be provided to construction workers who work near the noise generating equipment.

6.4 From blasting or piling No No such operations are involved.

6.5 From construction or operational traffic

Yes Vehicles used by construction staff are minimal. The noise levels will be in accordance with MoEF&CC notification dated 14-02-2000.

6.6 From lighting or cooling systems No Not applicable

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

7.1 From handling, storage, use or spillage of hazardous materials

No Not applicable

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No There will be no effluent generation from the process & cooling of DRI Kilns, Induction Furnace, Rolling Mill as close circuit cooling system will be installed. Effluent generated from the power plant will be treated in ETP and will be used for Ash conditioning, Dust Suppression and Greenbelt development. Sanitary waste water will be treated in Septic tank followed by sub-surface dispersion trench. No effluent will be let out of the plant premises. Hence Zero discharge concept will be implemented in the proposed project. Sanitary waste water will be treated in Septic tank followed by soak pit.

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

17

7.3 By deposition of pollutants emitted to air into the land or into water

No ESPs are will be provided to DRI Kilns & Power plant to control the emissions within 50 mg/Nm3. Fume extraction system with bag filters will be provided to control the fugitive emissions from Induction Furnaces will be collected through hoods then treated in bagfilters to bring down the particulate matter in the exhaust gases to within the standards and then discharged into the atmosphere through stacks whose heights are in accordance with CPCB norms. Unloading areas will be provided with water sprinklers to prevent the fugitive dust. All conveyors will be completely covered with GI sheets. Hence there will not be any major deposition of pollutants into the air/land/water.

7.4 From any other sources No Not applicable

7.5 Is there a risk of long term build up of pollutants in the environment from these sources?

No Not applicable

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances.

No Not applicable

8.2 From any other causes No Not applicable

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

No Not applicable

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

18

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

• Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

• Housing development

• Extractive industries

• Supply industries

• Other

No

No such activities are envisaged

9.2 Lead to after-use of the site, which could have an impact on the environment

No Not applicable

9.3 Set a precedent for later developments Yes With the improvement in the socio-economic status of the people in the area, later developments are expected.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

Yes Effects already considered in the EIA report.

(III) ENVIRONMENTAL SENSITIVITY

S.No. Areas Yes / No

Aerial distance (within 15 km.)

Proposed project location boundary

1 Areas protected under international conventions, National or local legislation for their ecological, landscape, cultural or other related value

No Nil

2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

Yes Bilari Reserve forest (0.6 Kms.) Bilari Ghughua Reserve Forest (4.3 Kms.) Shivnath River (4.0 Kms.)

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I

19

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

No Nil

4 Inland, coastal, marine or underground waters

Yes Underground water available at the site

5 State, National boundaries No Nil

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

No Nil

7 Defence installations No Nil

8 Densely populated or built-up area Yes Tilda (6.3 Kms.)

9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

Yes Sarora (0.8 Kms.)

10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

Yes Bilari Reserve forest (0.6 Kms.) Bilari Ghughua Reserve Forest (4.3 Kms.) Shivnath River (4.0 Kms.)

11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

No Nil

12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

--- Based on the historical data, the site is not likely to prone to earthquakes, floods, etc.

Khetan Sponge & Infrastructure Pvt. Ltd. Updated Form I