1

ANNEXURE 1

GENERAL RENOVATION WORKS TO

QUEENS WAREHOUSE

2

Renovation works to Queens Warehouse

1. PRELIMINARIES AND GENERAL

Activity Unit Quantity Rate Cost (VEP)

a) Allow for Mobilisation and De-

mobilisation LS 1

b) Allow for site establishment LS 1

c) Allow for Insurance and

permits and approvals from local

Authorities.

LS 1

d) Allow for site clearing, debris

Disposal and surrounding cleaning.

LS 1

Total carried over to main Summary

3

2. Demolition:

Activity Unit Quantity Rate Cost (VEP)

a) Allow to demolish existing

mezzanine floor and remove all

debris from site.

Make good to any damages.

Item 1

b) Demolish existing

damaged/rotten flooring from the

office.

Item 1

c) Allow to remove existing toilet

pan & cistern.

No 1

d) Remove existing hand-basin in

washroom.

No 1

e) Allow to remove rear and front

roller shutter door and FRCS to

confirm its disposal.

No 1

f) Remove existing sink bench

which is in the office.

No 1

Total carried over to main

Summary

4

3. Doors:

Activity Unit Quantity Rate Cost (VEP)

a) Supply & install “Lockwood”

locks to office and storage room.

No’s

2

b) Floor mounted door stoppers to

ditto.

No’s 2

c) Door handles to ditto. No’s 2

d) Replace electronic operated

roller shutter doors (Front and rea)

No. 2

Total carried over to main

Summary

5

4. Windows

Activity Unit Quantity Rate Cost (VEP)

a) Allow to fix all broken window

glass including hinges and lock.

item

1

b) Allow to construct

SHUTTER’s to all windows

including numbering.

Construct with 20 x 20 Galv.

Tubing with gothic mesh

complete with all brackets.

Item 1

Total carried over to main

Summary

6

5. CARPENTARY

Activity Unit Quantity Rate Cost (VEP)

a) Replace all damaged or rotten

ceiling boards. Item 1

b) Replace all damaged or rotten

fascia boards. Item 1

c) Supply & install new Eave

battens.. Item 1

d) Replace all flooring in the

office area with T & G lining

complete with solid timber stain.

Item 1

e) Remove timber structure

shelves, realign shelves to the wall

and erect new shelves.

Item 1

f) Allow to double wall toilet

walls with 4mm Hardiflex board Item 1

Total carried over to main

Summary

7

6. ROOFING

Activity Unit Quantity Rate Cost (VEP)

a) Allow to replace all roofing

sheets with Colour-bond (Colour

to be confirmed by FRCS) roofing

sheets complete with Stormtite

type 17 roofing screws. 24g

Item

1

b) Supply & install Colour-bond

ridge cap to ditto. Item 1

c) Supply & install Colour-bond

flashing. (Embed where required)

f) Supply & Install “Colour Bond

box gutter” including fixing

brackets, end caps.

Item 1

g) Supply & Install 80mm PVC

downpipes to ditto complete with

fixing brackets, spout fittings and

elbow connectors

Item 1

h) Contractor to engage one of the

Engineer’s from the panel of

Engineer’s provided, obtain a

report for cyclone certification,

carry out the works as required

and submit the cyclone certificate

to FRCS.

Item 1

Total carried over to main

Summary

8

7. PLUMBING

Activity Unit Quantity Rate Cost (VEP)

a) Supply & install INOX/Caroma

brand Toilet pan, cistern and toilet

seat complete with new 15mm

stopcock with flexible hose. (Toilet

seat to be Black in colour)

No. 1

b) Supply & install toilet roll holder

to ditto.

No. 1

c) Supply & install single bowel

stainless steel sink to kitchen and

‘DOE’ brand tap to ditto.

No. 1

d) Supply & install hand-basin to

washroom complete with new in-let

and outlet piping. Note: No surface

piping.

No. 1

e) Supply, fabricate to size, install

and test all necessary pipes and

fittings required to supply water to

all desired locations within the

building in accordance with the

current Fiji National building code.

A licensed plumber should be

engaged for such works.

Item

1

Total carried over to main

Summary

9

8. ELECTRICAL

Activity Unit Quantity Rate Cost (VEP)

a) All electrical works and

installations including wiring to be

carried out as per current Fiji National building code. All works

to be carried out by a licensed

electrician.

Item 1

b) Supply & install including

rewiring for 4 ft. forested LED tube

lights complete with Clipsal brand

switch controls.

No’s 15

c) Up-grade Electrical meter box –

installation of ELCB circuits

breakers.

Item 1

d) Allow to supply & install

10amps double power-point in

office. (Clipsal brand).

Item 1

Total carried over to main

Summary

10

9. JOINERY

Activity Unit Quantity Rate Cost (VEP)

a) Construct sink bench with

19mm exterior ply in office

complete with White Two Pac

finish with granite top,

dimensions to be confirmed on

site.

Item

1

b) Self closing hinges to doors

and drawer sliders to ditto Item 1

c) Construct open overhead

complete with White Two Pac

finish. Confirm dimensions on

site.

Item 1

Total carried over to main

Summary

11

10. TILING & Plastering

Activity Unit Quantity Rate Cost (VEP)

a) Supply and install 300 x 300

quarry tiles to wet area floors.

Colours will be confirmed by

FRCS. (Toilet).

Item 1

b) Supply and install 300 x 300

glazed ceramic white tiles to toilet

walls at a finishing height of

1.5m.

Item 1

c) Supply & install ceramic glazed

tiles to back splash of sink bench,

size to be confirmed on site and

colour to be confirmed by FRCS.

Item 1

d) Allow to repair concrete cracks

on floor, wash & polish with

cement and cemestic.

Item

1

Total carried over to main

Summary

12

11. PAINTING

Activity Unit Quantity Rate Cost (VEP)

a) Supply materials, labour and

plant for surface preparation and

general painting of all interior &

exterior of the building as per

paint manufactures specification

and as per colour schemes to be

provided by FRCS.

Method of paint application to

wall surfaces shall be by use of

rollers.

General internal & external

painting with premium quality.

item

1

b) Paving paint to warehouse

floor.

Item 1

Total carried over to main

Summary

12. Mechanical Services

Activity Unit Quantity Rate Cost (VEP)

a) Supply & install 12, 000

BTU air-con in the office

complete with electrical

works Remove existing

AC.

No. 1

13

Tender prices to be valid for 3 months.

Trade Summary

1. Preliminaries & General $.............................

2. Demolition $.............................

3. Doors $.............................

4. Windows $.............................

5. Carpentry $.............................

6. Roofing $.............................

7. Plumbing $.............................

8.Electrical $.............................

9. Joinery $.............................

10. Tiling $.............................

11. Painting $.............................

12. Mechanical Services $.............................

Sub-Total

9% VAT

Total VIP Price

Total Tender Price