    ANNEXURE

    Project Details

    Project Building Building Space (squre -foot) Site area (acers)

    Project 53792 (5000 m2) 1.5

    Eq 1 Development Density (sf/acre)= Gross Building Area(sf)/Site Area (acres)

    From Eq 1 Development Density (sf/acre) 35861.3

    Eq 2 Density radius (ft) = 3 * (Site area* development density)(1/2)

    From Eq 2 Density radius (ft) 695.8

    Eq 3 Average Property Density within density Boundry= sum of square footage/sum of site area

    Assumption

    In the density radius total site area = 20 acers (out of 35 acers)

    In the density radius total building space = 10 acers

    From Eq 3 Average property density ( m2) 8093.7 >1500 m2/acre net (Satisfied Credit 2.2 requirements)

  • 7/30/2019 ANNEX SS

    2/7

    Alternative Transportation Map

    Reduced Site Disturbance

    Eq 4 50% of Site (excluding building footprint) = (Total site area-building foot print area)*0.5

    From Eq 4 50% of site (excluding building footprint) ( m2) 2035

  • 7/30/2019 ANNEX SS

    3/7

    Eq 8 Minimum draw down rate (Qr) = Tank Capacity (m3)/Rainfall

    even interval (s)

  • 7/30/2019 ANNEX SS

    4/7

    Table 1: Monthly Rain Details And Dischar

    Month Jan Feb March April May Jun Jul Aug Sep Oct Nov Dec

    Average Precipitation

    (mm) 89 69 147 231 371 224 135 109 160 348 315 147

    From

    Eq 7

    Qv from roof 169 131 279 439 705 426 257 207 304 661 599 279

    Qv from ground 111.25 86.25 183.75 288.75 463.75 280 168.75 136.25 200 435 393.75 183.75

    Captured total runoff 280 217 463 728 1169 706 425 343 504 1096 992 463

    From

    Eq 8

    Qr 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007

    Actual Qr due to rain 0.003 0.003 0.005 0.008 0.014 0.008 0.005 0.004 0.006 0.013 0.011 0.005

    Actual Qr < Qr Maximum (Therefor it is adequate 40*20*1.4 m3

    pond to collect strom water within one day)

    Satisfied Credit 2.6 requirement

    Quality Control of Stromwater

    Technology use

    Average removal

    of suspendad

    solids

    Considarable Factors

    Vegitated Filter strips 65% runoff volume, slope and infiltration rater of soil

    Pond 50% pool volume and pond shape

    Impervious pavement 70% storage volume and percolation rate

    Credit 2.7 requirement

  • 7/30/2019 ANNEX SS

    5/7

    Heat Island Effect, Non-roof

    Eq 9 Q = S+E+A+R+O

    S= area shaded area by trees or other landscape featureE= area shaded by solar energy pannels

    A= area shaded by architectural devices

    R= all the hardscape surfaces that have an SRI of at least 29

    O= all hardscape surfaces that have and open-grid paving

    Description Area (m2)

    Total non-roof hardscapes 2500

    Shaded area 750

    Areas of hardscapes with minimum SRI-29 800

    From Eq 9 Total qulifing surfaces (Q) 1550

    Eq 10 Q >T/2

    T = total non roof area

    From Eq 10 T/2 ( m2 ) = 1250 < Q Satisfied Credit 2.8 requirement

    Heat Island effect -Roof

    Eq 11 (Area of Roof meeting Minimum SRI / Total roof area) + (SRI of Installed roof / Required SRI ) >= 0.75

    From Eq 11 2000/2000 + 29/29= 2

    > 0.75 Satisfied the Credit 2.9 requirement

  • 7/30/2019 ANNEX SS

    6/7

    Lighting Pollution Reduction

    Identification

    Code of Practice for energy efficient

    Building in Sri Lanka LPD (W/m2)

    Actual

    LPD

    (From

    Site

    Lighting

    table)

    Actual

    LPD

    Reduction

    (%)

    Required LPD

    Reduction (%) Complies

    Parking 3.20 2.00 38% 20% yes

    Walkways 2.00 1.50 25% 20% yes

    Courtyard 3.00 2.20 27% 20% yes

    Building Faade 3.00 1.20 60% 50% yes

    (Credit 2.10 requirement)

    Without Shilding waste of light

  • 7/30/2019 ANNEX SS

    7/7

    With shilding reduce the polution

    (Credit 2.10 requirement)