annex ss
TRANSCRIPT
-
7/30/2019 ANNEX SS
1/7
ANNEXURE
Project Details
Project Building Building Space (squre -foot) Site area (acers)
Project 53792 (5000 m2) 1.5
Eq 1 Development Density (sf/acre)= Gross Building Area(sf)/Site Area (acres)
From Eq 1 Development Density (sf/acre) 35861.3
Eq 2 Density radius (ft) = 3 * (Site area* development density)(1/2)
From Eq 2 Density radius (ft) 695.8
Eq 3 Average Property Density within density Boundry= sum of square footage/sum of site area
Assumption
In the density radius total site area = 20 acers (out of 35 acers)
In the density radius total building space = 10 acers
From Eq 3 Average property density ( m2) 8093.7 >1500 m2/acre net (Satisfied Credit 2.2 requirements)
-
7/30/2019 ANNEX SS
2/7
Alternative Transportation Map
Reduced Site Disturbance
Eq 4 50% of Site (excluding building footprint) = (Total site area-building foot print area)*0.5
From Eq 4 50% of site (excluding building footprint) ( m2) 2035
-
7/30/2019 ANNEX SS
3/7
Eq 8 Minimum draw down rate (Qr) = Tank Capacity (m3)/Rainfall
even interval (s)
-
7/30/2019 ANNEX SS
4/7
Table 1: Monthly Rain Details And Dischar
Month Jan Feb March April May Jun Jul Aug Sep Oct Nov Dec
Average Precipitation
(mm) 89 69 147 231 371 224 135 109 160 348 315 147
From
Eq 7
Qv from roof 169 131 279 439 705 426 257 207 304 661 599 279
Qv from ground 111.25 86.25 183.75 288.75 463.75 280 168.75 136.25 200 435 393.75 183.75
Captured total runoff 280 217 463 728 1169 706 425 343 504 1096 992 463
From
Eq 8
Qr 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
Actual Qr due to rain 0.003 0.003 0.005 0.008 0.014 0.008 0.005 0.004 0.006 0.013 0.011 0.005
Actual Qr < Qr Maximum (Therefor it is adequate 40*20*1.4 m3
pond to collect strom water within one day)
Satisfied Credit 2.6 requirement
Quality Control of Stromwater
Technology use
Average removal
of suspendad
solids
Considarable Factors
Vegitated Filter strips 65% runoff volume, slope and infiltration rater of soil
Pond 50% pool volume and pond shape
Impervious pavement 70% storage volume and percolation rate
Credit 2.7 requirement
-
7/30/2019 ANNEX SS
5/7
Heat Island Effect, Non-roof
Eq 9 Q = S+E+A+R+O
S= area shaded area by trees or other landscape featureE= area shaded by solar energy pannels
A= area shaded by architectural devices
R= all the hardscape surfaces that have an SRI of at least 29
O= all hardscape surfaces that have and open-grid paving
Description Area (m2)
Total non-roof hardscapes 2500
Shaded area 750
Areas of hardscapes with minimum SRI-29 800
From Eq 9 Total qulifing surfaces (Q) 1550
Eq 10 Q >T/2
T = total non roof area
From Eq 10 T/2 ( m2 ) = 1250 < Q Satisfied Credit 2.8 requirement
Heat Island effect -Roof
Eq 11 (Area of Roof meeting Minimum SRI / Total roof area) + (SRI of Installed roof / Required SRI ) >= 0.75
From Eq 11 2000/2000 + 29/29= 2
> 0.75 Satisfied the Credit 2.9 requirement
-
7/30/2019 ANNEX SS
6/7
Lighting Pollution Reduction
Identification
Code of Practice for energy efficient
Building in Sri Lanka LPD (W/m2)
Actual
LPD
(From
Site
Lighting
table)
Actual
LPD
Reduction
(%)
Required LPD
Reduction (%) Complies
Parking 3.20 2.00 38% 20% yes
Walkways 2.00 1.50 25% 20% yes
Courtyard 3.00 2.20 27% 20% yes
Building Faade 3.00 1.20 60% 50% yes
(Credit 2.10 requirement)
Without Shilding waste of light
-
7/30/2019 ANNEX SS
7/7
With shilding reduce the polution
(Credit 2.10 requirement)