Surrey Minerals and Waste Development Framework
Annex D
Primary AggregatesDevelopment Plan Document
(For adoption)
July 2011
s
The Primary Aggregates DPD is a development plan document under Regulation 7(c) of the Town and County Planning (Local Development) (England) Regulations 2004 (as amended)
Iain Reeve Assistant Director for Strategy, Transport and Planning County Hall Penrhyn Road Published by Kingston upon Thames Surrey County Council Surrey KT1 2DY July 2011
Surrey Minerals Plan Primary Aggregates Development Plan Document
CONTENTS Page
1 Introduction 1
2 Primary aggregates 2
3 Vision and objectives 4
4 National policy on primary aggregates 6
5 Aggregates in the south east 7
6 The provision of primary aggregates in Surrey 9Policy MA1 13
7 Preferred areas for sand and gravel extraction 14 Policy MA2 15
Policy MA3 16
8 Implementation and monitoring 18
Appendix 1 – Preferred Areas 23
Concreting aggregateA Addlestone Quarry Extension (Wey Manor Farm), Addlestone 24
C Hamm Court Farm, Weybridge 26
D Milton Park Farm, Egham 28
E Whitehall Farm, Egham 31
F Home Farm Quarry Extension, Shepperton 34
G Homers Farm, Bedfont 37
H King George VI Reservoir, Stanwell 39
J Manor Farm, Laleham 41
K Queen Mary Reservoir, Ashford 44
L Watersplash Farm, Halliford 46
Soft sandP Mercers Farm, Nutfield Marsh 49
Appendix 2 – Relationship between ‘saved’ policies of the Surrey Minerals 52
Local Plan 1993 and the Surrey Minerals Plan Primary Aggregates DPD
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
1
1 INTRODUCTION
1.1 This document forms part of the Surrey Minerals Plan and sets out proposals with regard to the working of primary aggregate resources across the county. Primary aggregates found in Surrey are sand and gravel used principally for producing concrete (concreting aggregates), and soft sand which is used principally in the building and construction industry for mortar and asphalt.
1.2 The document identifies the preferred areas for future primary aggregate extraction for the period 2009-2026. It should be read alongside the Core Strategy DPD which contains policies to manage mineral extraction and mineral development in Surrey.
1.3 The policies and preferred areas set out in this document will be used to determine individual planning applications.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
2
2 PRIMARY AGGREGATES
2.1 Aggregates are a basic material used in construction, and principally consist of primary aggregates – sand, gravel and crushed rock. In addition some secondary and recycled materials are used for construction purposes. These include mineral wastes such as colliery spoil and slate waste, other industrial wastes including pulverised fuel ash (PFA) and blast furnace slag, and recycled materials such as demolition arisings (e.g. crushed concrete), glass and asphalt road planings.
2.2 Concreting aggregate in Surrey (sharp sand and gravel) is produced mainly from shallow fluvial and glacial deposits in the valleys of the main rivers. Production is predominantly in north-west Surrey in the Thames valley. The sand and gravel deposits of the Thames valley produce high quality material used mainly in concrete manufacture. Other sand and gravel deposits occur along the Rivers Wey, Blackwater and Mole, although their quality may be more variable. Marine sand and gravel, crushed rock or secondary or recycled materials can be used as an alternative to these minerals but there is little evidence of their extensive use in Surrey.
2.3 Soft sand production is located in the Folkestone Formation, part of the Lower Greensand which is exposed in a belt stretching across Surrey from Limpsfield in the east to Farnham in the west. Other sandstones within the Lower Greensand are not generally suitable for mortar or asphalt purposes but may be used in construction as bulk fill or other uses. There are also sand strata in the Reading and Bagshot Beds north of the Downs but their quality tends to be poor and
SandGravel
Crushed rock
Mineral waste Industrial waste
Demolition arisings Glass
Asphalt road planings
Primary aggregates
Secondary aggregates
Recycled aggregates
Aggregates
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
3
suitable only for low specification purposes. Other materials cannot be substituted for soft sand in high specification uses.
Supply and markets
2.4 The south east region has large resources of concreting aggregate, and to a lesser extent, soft sand. The region also imports significant amounts of marine dredged sand and gravel (5.9 million tonnes in 2005), and has limited supplies of crushed rock (1.2mt were imported to the region in 2005)1. Only limited quantities of land-won sand and gravel are thought to move between different regions. However, strong demand in London means that the south east region as a whole is an important exporter of sands and gravels to London (1.04mt in 2005)2.
2.5 The Government’s mineral survey of 2005 indicated that 33% of the sand and gravel raised in Surrey was used within the Surrey and Sussex sub-region, with a further 26% used elsewhere in the south east3. It is expected that most of the remaining production was used in Greater London, as the cost of transporting sand and gravel means that it generally travels relatively short distances.
2.6 Differences in the quality of soft sand deposits in Surrey mean that they can serve different markets and some can travel greater distances. Some sands have been used locally as fill material in major engineering projects, whilst the higher quality building sands may travel further afield for specific building uses.
2.7 The spatial development strategy for London encourages it to increase rates of recycling and re-use of aggregate and to safeguard wharves and rail depots for import of marine aggregates and crushed rock. Western boroughs are expected to contribute 0.5mtpa of land-won aggregates towards meeting demand. Surrey’s proximity, however, means that London (particularly the south-west sector) will continue to import primary aggregates from Surrey if they are available.
2.8 Surrey has no hard rock reserves and crushed rock primary aggregates are predominantly imported from other regions by rail. Similarly small amounts of marine dredged aggregates are imported. Whilst this is not a significant amount at present it could become a more important source of primary aggregates for Surrey in the future.
1 Collation of the results of the 2005 Aggregate Minerals Survey for England and Wales BGS/CLG May
2007 – Table 2a 2 Ibid Table 4b 3 Ibid Table 9b
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
4
3 VISION AND OBJECTIVES
3.1 The Core Strategy DPD provides an overall vision for the Surrey Minerals Plan. This is summarised in the statement:
exploitation of mineral resources in Surrey should be efficient, environmentally responsible, adequate, as far as possible, to meet the needs of the economy and should not impose significant adverse impacts on the community.
3.2 The Primary Aggregates DPD contributes to the vision by identifying specific areas for future mineral extraction. The key element is its role in seeking to meet the needs of the economy by identifying potential areas in a way that is socially and environmentally responsible.
3.3 Guidance on requirements for primary aggregates is given at a national and regional level. The latter is apportioned to mineral planning authorities, although MPS1 makes it clear that this still needs to be tested locally when preparing development plan documents.
3.4 In Surrey, resources of sand and gravel available for the future have been significantly reduced by the scale of previous working. The preferred areas that have been identified for aggregate extraction will contribute to production in the period to 2026. However, production cannot be sustained indefinitely at current levels of apportionment without unacceptable impact on social and/or environmental considerations.
3.5 The following objectives of the Surrey Minerals Plan, set out fully in the CoreStrategy DPD, are particularly relevant to the implementation of the Primary Aggregates DPD:
Objective 3: Meet the need for minerals; by
O3.1 seeking to ensure that sufficient land is identified to enable the regional requirement for aggregates to be met and to provide appropriate landbanks for silica sand and clay.
Objective 4: Address adverse impacts from mineral development on communities and the environment; by
O4.1 identifying preferred areas for mineral development that have been selected following assessment of their potential impacts on local communities and their quality of life or on the integrity, character and quality of the environment, when considering Surrey as a whole.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
5
O4.3 protecting the integrity of internationally designated sites and sites and features that have been designated as having national importance, other than where exceptional circumstances can be demonstrated.
Objective 5: Address adverse impacts from the transportation of minerals; by
O5.1 ensuring the potential impacts from transportation are considered when identifying areas for future mineral development.
Objective 6: Restore mineral workings to the highest standards; by
O6.1 promoting an holistic approach to mineral working, where progressive restoration is integrated into the management and phasing of the mineral extraction;
O6.2 ensuring that mineral workings are restored in a timely way, consistent with Green Belt policy and objectives, and to a state that is consistent with – and enhances – local social and environmental character, incorporating priority habitats and flood alleviation capacity where appropriate;
O6.3 ensuring that land used for mineral working is restored to an appropriate future use, and managed so that it brings value to the environment and local community.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
6
4 NATIONAL POLICY ON PRIMARY AGGREGATES
4.1 Mineral planning is the subject of government advice contained in mineral policy statements (MPS) and minerals planning guidance (MPG) notes. Minerals Policy Statement 1:– Planning and Minerals (MPS1), November 2006, provides overarching guidance and Annex 1: Aggregates sets out planning policy on construction aggregates.
National and regional guidelines for the provision of primary aggregates
4.2 The Department for Communities and Local Government (CLG) publishes national and regional guidelines for the provision of aggregates in England. These guidelines indicate total and annual production requirements for the supply of aggregates from each region. The 2003 guidelines cover the period 2001-2016 but were replaced in June 2009 by revised guidelines for 2005-2020.
4.3 The national guideline for each region is apportioned sub-regionally to give guidance to each mineral planning authority (MPA). A review of the methodology for apportionment in the south east undertaken in 2007/2008 was subject to independent examination in October 2009 and “Proposed Changes” were published by the Secretary of State in March 2010. The “Proposed Changes” reduce the regional total for the south east included in the June 2009 guidelines from 12.18mtpa to 11.12mtpa.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
7
5 AGGREGATES IN THE SOUTH EAST
Provision for aggregates in the south east
5.1 Policy M3 of the Regional Spatial Strategy (RSS) sets out the regional apportionment for primary aggregates in Surrey. This is derived from the 2003 national guidelines covering the period 2001-2016 and is an average of 2.62 million tonnes per annum (mtpa).
5.2 New regional guidelines were issued by government in June 2009 which for the south east are in total some 8% lower than previously.
5.3 The regional aggregate guidelines are apportioned to mineral planning authorities and these are to be taken into account in development plan documents and in determining planning applications. In the south east, the apportionment methodology has been subject to recent review and the results were published as “Proposed Changes” to the then regional policy in March 2010. Subsequent advice issued in July 2010 stated that authorities in the south east should work from the figures in the “Proposed Changes”.
5.4 MPAs should maintain a landbank of at least seven years planning permissions for land-won sand and gravel as reflected in the guidance in MPS1. The setting of separate apportionments for sharp sand and gravel and for soft sand, as appropriate, is also encouraged.
5.5 The minerals plan must have regard to national planning policy and be in general conformity with the RSS, including the need to address the sub-regional apportionment. This is reflected in Policy MC7 of the Core Strategy DPD.
5.6 Preparation of the minerals plan has included a detailed assessment of potential resources of primary aggregates. This shows that resources, particularly those suitable for concreting aggregate, are becoming increasingly scarce. In part this reflects the long history of sand and gravel extraction in north west Surrey. The most accessible resources have already been used. Remaining resources are becoming increasingly difficult to exploit either because of their potential impact on local communities or the environment, because they are too small to be economically viable, or because land ownership issues prevent working.
5.7 The county council accepts that demand considerations should continue to play a role in assessing requirements. In this sense, resources in north west Surrey are well located to serve adjoining parts of Greater London. However, continuing primary aggregate extraction will deplete remaining resources and make it increasingly difficult to identify further areas for working where potential impacts on local communities and their environment are judged to be acceptable.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
8
5.8 National and regional guidance acknowledges that the guideline apportionment is subject to review through the development plan process. In preparing the minerals plan, there is an opportunity to determine whether or not the regional guidelines can be met at acceptable environmental cost.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
9
6 THE PROVISION OF PRIMARY AGGREGATES IN SURREY
Requirement for aggregate supply 2009-2026
6.1 Policy M3 is the current statutory guideline for Surrey, but at 2.62mtpa results in an unattainable requirement of 44.5mt over the plan period. Even if the 8% reduction indicated in the 2009 national guidelines were applied, the figure only falls to 41.0mt.
6.2 The guideline for Surrey proposed by the Panel Report on the Partial Review of the South East Plan is 1.27mtpa amounting to a total of 20.32mt for the period 2010-2026. This can be regarded as the minimum to plan for, as it should be increased to take account of the requirement for 2009 of 2.62mt, bringing the requirement to a total of 22.94mt. The Panel Report recommendations on sub-regional apportionment were confirmed as “Proposed Changes” by the then Secretary of State in March 2010. Subsequent advice issued in July 2010 stated that authorities in the south east should work from the figures in the “Proposed Changes”.
6.3 At present, the guideline requirement which the plan should address could range somewhere between 22.94mt to 44.5mt.
6.4 At the end of 2008, the total permitted aggregate reserve was 10.28mt (2.32mt of concreting aggregate and 7.96mt of soft sand). However, production of soft sand at one permitted site will continue after 2026 and the reserve available for production in the plan period is reduced to 8.00mt overall and 5.68mt of soft sand.
6.5 This reserve is taken away from the potential guideline figure(s) to give an indication of the amount of additional aggregate resources that the plan should be seeking to identify. This is set out in Table 1 below:
Table 1 Estimated resource requirement
LOW(Based on apportionment in “Proposed Changes”
March 2010)
HIGH (Based on RSS
apportionment of 2.62mtpa)
Potential guideline 22.9mt 44.5mt
Minus Reserves 8.0mt 8.0mt
Resources required 14.9mt 36.5mt
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
10
Separate requirements for concreting aggregate and soft sand
6.6 Concreting aggregate and soft sands generally come from different parts of Surrey, are used for different purposes and serve different markets.
6.7 To split the total primary aggregates apportionment into separate concreting aggregate and soft sand apportionments, the annual production figures for each mineral over the last seven years (excluding the highest and lowest figures) have been averaged. When applied to the most recent seven years of production with reliable data (2001-20084), concreting aggregate production has averaged 1.40 mtpa and soft sand production 0.64mtpa, a ratio of 68:32.
6.8 The total aggregate requirement can be split into separate concreting aggregate and soft sand requirements by applying this ratio. Permitted reserves for the two materials differ so this has to be taken into account when estimating how much of each resource is required, as shown in Table 2 below.
Table 2 Estimated resource requirement by type (million tonnes)
Concreting aggregate LOW HIGH
Potential guideline 15.57 30.26
Minus Reserves 2.32 2.32
Resources required 13.25 27.94
Soft Sand LOW HIGH
Potential guideline 7.33 14.24
Minus Reserves 5.68 5.68
Resources required 1.65 8.56
Potential future resources of primary aggregates
6.9 The estimated recoverable mineral resource for each preferred area is shown in Tables 3 and 4 below. The resource figures quoted in these tables are based on geological survey information provided by the minerals industry and landowners and assessed by the county council’s consultant geologist. They are estimates of recoverable or saleable mineral, with some allowance made for unworked margins at the boundaries. If preferred areas E and P are given consent, then they may continue to be worked beyond 2026, and an estimate has been made of likely production from these areas within the plan period.
4 The production figures for 2004 are excluded. The Quarry Products Association had concerns relating to
the implications of the Freedom of Information Act 2004 for commercial confidentiality.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
11
Table 3: Estimated resource in preferred areas for concreting aggregate
PreferredArea
Name Estimated resource available 2010-26 (million tonnes)
A Addlestone Quarry Extension 0.40
C Hamm Court Farm 0.78
D Milton Park Farm5 2.38
E Whitehall Farm 0.82
F Home Farm Quarry Extension 0.54
G Homers Farm 0.76
H King George VI Reservoir 3.24
J Manor Farm 1.30
K Queen Mary Reservoir 1.25
L Watersplash Farm 1.25
TOTAL 12.72
Table 4: Estimated resource in preferred areas for soft sand
Preferredarea
Name Estimated resource available 2010-26 (million tonnes)
P Mercers Farm 2.70
TOTAL 2.70
TOTAL TABLES 3 & 4 15.42
6.10 The estimated production available from the preferred areas is 12.72mt of concreting aggregates and 2.70mt of soft sand. This means that the proposals in the plan are likely to supply 15.42mt compared to the low scenario requirements of 14.9mt.
6.11 The preferred areas represent the extent of the resource that has been identified as suitable to contribute to regional aggregates supply. Overall they provide a potential aggregates resource of 15.42mt compared with a requirement of 14.9mt under the low scenario. Separate provision should be made for soft sand and for sharp sand and gravel resources where appropriate. The land assessment work undertaken for the plan indicates that available resources for concreting aggregate are becoming increasingly difficult to identify. The likely outcome is that identified potential reserves of concreting aggregate will be almost fully exploited before 2026 even under the low scenarios given above. The potential resource identified in Table 3 of 12.72mt compares with the estimated
5 To avoid cumulative impacts, it is not anticipated that the entire reserve of preferred areas D and E could
be extracted within the plan period.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
12
requirement of 13.25mt in Table 2. Additional resources occur within Preferred Area E and a modest change in production at this site could cover this gap.
6.12 Comparison of Tables 2 and 4 indicates that there should be a potential surplus of soft sand resources available to meet requirements in the plan period. However, the likely exhaustion of permitted reserves elsewhere in the county during the plan period means that soft sand production from the identified preferred areas will be required. Soft sand production will continue to contribute to the regional aggregate requirements beyond the plan period given the reserves that will remain at 2026, but precise amounts would depend on market conditions and the capability of individual workings in production terms, matters over which the authority has limited control.
Landbanks
6.13 The Government advises on the use of phasing when granting planning permission in order to achieve a balance between meeting the demand for aggregates and keeping the number of operations and permitted reserves to a minimum to reduce environmental consequences. The length of the landbank is the main indicator that should be used to assess this balance. Landbanks are expressed as the number of years supply of a mineral, calculated by dividing the total amount of permitted reserves by the annual apportionment/production.
6.14 Current national planning policy guidance6 requires the maintenance of a landbank equal to at least seven years extraction for sand and gravel at the annual apportionment. Table 1 indicates that at the end of 2008 permitted reserves amounted to some 8mt comprising 2.32mt of concreting aggregate and 5.68mt of soft sand. The landbank for concreting aggregate of some 2.7 years is well below the guideline, but for soft sand is almost 14 years. The consideration of landbanks needs to be sufficiently flexible to reflect market conditions, for instance a large landbank concentrated in few sites may restrict competition and hence justify the need for further sites to be permitted.
6.15 At the regional and local level, authorities have to report each year on the relationship between aggregate reserves, production and demand, and review plans if necessary. The landbank position will therefore be kept under review in the Annual Monitoring Report but it will be for the industry to determine when it brings forward applications to address any shortfall. The Primary Aggregates DPD will be reviewed well in advance of 2026, to assess the implications of supply beyond that date given the critical supply position that is likely to emerge by then.
6 Minerals Policy Statement 1 Planning and Minerals - (November 2006) Annex 1: Aggregates.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
13
Policy MA1 - Aggregate supply
Provision will be made for the supply of around 24 million tonnes of primary aggregates, comprising 15 million tonnes of concreting aggregate and 9 million tonnes of soft sand between 2009 and 2026. Preferred areas will be identified, which together with permitted reserves will enable production of concreting aggregate at an average rate of 0.90 million tonnes per annum, and production of soft sand at an average rate of 0.50 million tonnes per annum in the period 2009-2026.
In determining proposals for mineral working, regard will be paid to the level of permitted reserves, and the need to maintain continuity of supply in terms of an appropriate landbank.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
14
7 PREFERRED AREAS FOR SAND AND GRAVEL EXTRACTION
The approach
7.1 The provision of locations to meet the aggregate apportionment may take the form of specific sites, preferred areas, or areas of search identified in development plans and proposals maps7.
7.2 The approach adopted in this plan is to limit specific sites to existing sites with planning permission. These make up the permitted reserves that contribute to the landbank. New areas with potential for working will be identified as preferred areas. Specific requirements are set out relating to each preferred area, its restoration and to any controls on the way in which land comes forward to be worked. Areas of search are not identified for aggregates.
Process of assessment
7.3 In order to ensure that all alternatives were considered and the selection of areas was as comprehensive as possible, 106 potential mineral zones (PMZs) for aggregates were identified and assessed8. These zones came from three sources of information:
all sites in the Surrey Minerals Local Plans 1993 and 1989, and North West Surrey Minerals Local Plan 1985 were assessed to see if there were remaining unworked reserves;
economically viable primary aggregate deposits in Surrey identified by the county council’s consultant geologist;
other land put forward by industry.
7.4 In selecting preferred areas for inclusion in the plan, assessment of the PMZs was undertaken to weigh up the choices and alternatives. This is recorded in the Primary Aggregates Land Assessment Report9.
7.5 In drawing up development plans, MPAs are required to appraise the policy and site options in terms of the social, environmental and economic effects against the objective of securing a prudent use of natural resources10. This appraisal process is known as sustainability appraisal (SA) and can incorporate strategic environmental assessment (SEA). A combined SEA/SA was undertaken alongside the assessment process, informing different stages in the assessment of
7 MPS 1 Annex 18 Report on Potential Mineral Zones (PMZ Report) (SCC) 2004 9 Primary Aggregates Land Assessment (SCC) November 2009 10 Mineral Policy Statement 1- Good practice guidance, paragraph 28
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
15
the implications of alternative options. The results are recorded in an SEA/SAEnvironmental Report11.
Preferred areas
7.6 Preferred areas have been identified from within which future concreting aggregate and soft sand production can contribute towards the regional guideline. These are listed in policies MA2 and MA3 respectively. The preferred areas provide the locations where it is considered that mineral working is possible without imposing significant adverse impacts on the environment or local community. Appendix 1 includes plans and key development requirements for each preferred area.
7.7 The boundaries of the preferred areas do not necessarily indicate the extent of mineral extraction that may be permitted. It is possible that some land outside the preferred area boundaries may have to be included in proposals, for example, to provide access to the site from the public highway or allow room for additional landscaping. However, actual mineral extraction beyond the boundaries of the preferred areas will not normally be permitted without good justification. More detailed assessments will be required when applications for working are submitted to establish precisely the acceptable boundaries of the working area.
7.8 Environmental Impact Assessments (EIAs) will be required to support planning applications which may identify additional issues and constraints. Identification of a preferred area does not mean that permission will automatically be granted for aggregate extraction because proposals will also be tested under the relevant development plan policies. In addition, conditions will be imposed on planning permissions to protect features of importance and restrict operations in order to address impacts on local communities and the environment. Detailed matters relating to the operation of sites will be considered and addressed at the time a planning application is made.
Policy MA2 – Preferred areas for concreting aggregate
Provision for the extraction of concreting aggregate will be met from land within the following preferred areas.
A - Addlestone Quarry Extension (Wey Manor Farm), Addlestone C - Hamm Court Farm, Weybridge D - Milton Park Farm, Egham E - Whitehall Farm, Egham F - Home Farm Quarry Extension, Shepperton
11 Strategic Environmental Assessment and Sustainability Appraisal (SCC) November 2009
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
16
G - Homers Farm, Bedfont H - King George VI Reservoir, StanwellJ - Manor Farm, Laleham K - Queen Mary Reservoir, Ashford L - Watersplash Farm, Halliford
7.9 The above list excludes some preferred areas that were identified in the Preferred Option Minerals Plan (April 2006). Preferred area B (Knight and Bessborough Reservoirs) has been deleted from the list following the outcome of the Habitats Regulations Assessment undertaken subsequently. The assessment identified that aggregate could not be extracted from the reservoirs without an adverse impact on the integrity of the South West London Reservoirs and Water Bodies Special Protection Area. Preferred area M (Monkton Lane, Farnham) has been deleted because planning permission was granted in April 2009, after being called-in by the Secretary of State, for alternative development on part of the area.
7.10 Preferred area K (Queen Mary Reservoir) is retained in the list as a preferred area despite planning permission being granted in 2009 because the resource was not included in the permitted reserve figure at the end of 2008.
Policy MA3 - Preferred areas for soft sand
Provision for the extraction of soft sand will be met from land within the following preferred areas.
P - Mercers Farm, Nutfield Marsh
7.11 Policy MA3 also excludes some preferred areas that were identified in the Preferred Option Minerals Plan (April 2006). Preferred area N (Eashing Farm) has been excluded in order to safeguard land within the Area of Great Landscape Value from major mineral development in advance of a potential review of the boundary of the Surrey Hills Area of Outstanding Natural Beauty. Preferred area R (Runfold South extension) was granted planning permission on appeal in 2007. Preferred area O (Common Field, Betchworth) was granted planning permission in 2008. In both latter cases the resource is included in the permitted reserve figure for the end of 2008.
Low-grade soft sands
7.12 No provision was made in the Surrey Minerals Local Plan 1993 for low-grade aggregate extraction, and most of the primary aggregates extracted in Surrey have been of a quality suitable to meet British Standard specifications for
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
17
building and construction sands. However, some soft sand is used inappropriately in low-grade applications such as landfill cover and engineering, and bulk fill. It is unsustainable to use a higher quality material where a poorer substitute could be used. Annual monitoring surveys have indicated that up to 10% of soft sand may have been used in this way.
7.13 In order to safeguard higher-grade primary aggregates for the future, the plan recognises that working lower grade sands would be beneficial in conserving higher quality resources. No specific proposals are made because there is inadequate information, both from an economic and a geological perspective, to assess potential resources. Any application will be considered against the policies in the plan, in particular core strategy Policy MC11. The definition of aggregate used in the four yearly national survey of production includes material used as construction fill. Any material used in this way, including from within the preferred areas identified in Policies MA2 and MA3, will be considered as making a contribution to the regional guideline.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
18
8 IMPLEMENTATION AND MONITORING
8.1 The primary aggregates proposals are a key element of the minerals plan. Throughout the lifetime of the plan, it will be necessary to monitor and review the policies to determine the extent to which they are being successfully implemented. Where they are not being implemented effectively, reasons should be included in an annual monitoring report12.
8.2 In particular, this DPD will be kept up to date in light of:
changes to national policy – particularly in relation to the national need for primary aggregates and to any changes to the regional aggregates apportionment rate;
changes to other development plan documents and supplementary planning documents;
planning permissions granted for preferred areas identified within the plan; and
information from the annual monitoring report regarding progress on policy implementation and in particular the primary aggregate landbank and production rates.
Implementation
8.3 The tables below summarise key aspects of the implementation of each of the three policies within this document.
12 The county council is required to prepare an Annual Monitoring Report each year.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
19
Implementation of Policy MA1
Relevant Objectives O3.1
National policies MPS1
Key outcomes Concreting aggregate production averages 0.90mtpa 2009 – 2026Soft sand production averages 0.50mtpa 2009 – 2026Seek to maintain at least a seven year landbank of permitted reserves of aggregates
Key agencies Mineral planning authority, mineral operators, landowners/developers
Implementation of Policy MA2
Relevant Objectives O4.1, O4.3, O5.1, O6.1, O6.2, O6.3
National policies PPS1, PPS5, PPS7, PPS9, PPS12, PPS23, PPS25, PPG2, PPG13, PPG24, MPS1, MPS2, MPG2, MPG5, MPG7
Key outcomes Grant of planning permission on preferred areas for primary aggregatesSeek to maintain at least a seven year landbank of permitted reserves of aggregates
Key agencies Mineral planning authority, mineral operators, landowners/developers
Implementation of Policy MA3
Relevant Objectives O4.1, O4.3, O5.1, O6.1, O6.2, O6.3
National policies PPS1, PPS5, PPS7, PPS9, PPS12, PPS23, PPS25, PPG2, PPG13, PPG24, MPS1, MPS2, MPG2, MPG5, MPG7
Key outcomes Grant of planning permission on preferred areas for primary aggregatesSeek to maintain at least a seven year landbank of permitted reserves of aggregates
Key agencies Mineral planning authority, mineral operators, landowners/developers
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
20
Monitoring the effectiveness of the primary aggregates
policies
8.4 The MPA is also required to monitor any significant environmental effects of implementing the minerals plan, to identify any adverse effects and appropriate remedial action. The combined SEA/SA includes recommendations for monitoring the social, economic and environmental effects of the plan. Any monitoring requirements arising from this process will be incorporated within the annual monitoring report. This may involve working in partnership with other bodies that collect or hold relevant monitoring data.
8.5 Table 5 below identifies each primary aggregates policy, whether monitoring is qualitative or quantitative, the data required and the agencies that will be involved in undertaking the monitoring and collecting of relevant information.
8.6 Table 5 is concerned only with monitoring the effectiveness of the policies. There are separate mechanisms for monitoring sites once they are in operation, to ensure that development is being carried out in line with the planning permission. The county council and relevant technical bodies, such as the Environment Agency, carry out this monitoring.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
21
Table 5: Monitoring framework for primary aggregates policies
Policyreference
Nature of Target
Type of Indicator
Indicator Data source Prompts for consideration of remedial action
MA1Aggregatesupply
Maintaining supply of aggregateminerals and adequatelandbanks
Contextual
Output/Outcome
Annual production of concreting aggregate and soft sand
Landbank of permitted reserves for primary aggregates (Target to maintain at least seven year landbank)
Surrey CC & mineral operators
Failure to reach a seven year landbank within two years of adoption of the Primary Aggregates DPD and thereafter to maintain at least a seven year landbank for two or more years
MA2Preferredareas for concretingaggregate
Delivery of preferredareas for concretingaggregateextraction
Output Number of planning permissions granted for preferred areas and permitted reserves at year end
Surrey CC See under MC7 and MA1
MA3Preferredareas for soft sand
Delivery of preferredareas for soft sandextraction
Output Number of planning permissions granted for preferred areas and permitted reserves at year end
Surrey CC See under MC7 and MA1
Notes
Types of indicator
Process indicators have been identified where the plan specifies other process-related activities that are required such as the preparation of other planning documents.
Contextual indicators provide a backcloth against which to consider the effects of policies and inform the interpretation of output indicators.
Output/outcome indicators measure the performance of policies in terms of their quantified results. They cover direct planning outputs of the implementation of the policies, along with any outcomes of relevance to wider considerations.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
22
Remedial Action
Remedial action has been identified only where issues that relate to the strategy of the plan as a whole are raised. These issues will also be relevant to the monitoring of the Core Strategy DPD and there will be a degree of overlap between the two. The Annual Monitoring Report will include a commentary on implementation of both of the plans.
Database
The number of planning applications determined by the mineral planning authority each year will form the basic source of most monitoring information. Decisions made on appeal will also be monitored.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
23
Appendix 1
Preferred areas for primary aggregates
PageConcreting aggregate
A Addlestone Quarry Extension (Wey Manor Farm), Addlestone 24
C Hamm Court Farm, Weybridge 26
D Milton Park Farm, Egham 28
E Whitehall Farm, Egham 31
F Home Farm Quarry Extension, Shepperton 34
G Homers Farm, Bedfont 37
H King George VI Reservoir, Stanwell 39
J Manor Farm, Laleham 41
K Queen Mary Reservoir, Ashford 44
L Watersplash Farm, Halliford 46
Soft sand
P Mercers Farm, Nutfield Marsh 49
Preferred Area A: Addlestone Quarry Extension, Addlestone
0 250 500125 Metres
(Elmbridge and Runnymede 506350E 163500N)±© Crown copyright. All rights
reserved. Surrey County Council.100019613, 2009.
Surrey Minerals Plan- Primary Aggregates Development Plan Document, July 2011
24
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
25
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area A : Addlestone Quarry Extension, Addlestone
Location The preferred area lies between Weybridge and New Haw. The River Wey divides the land into two parcels.
Area: 18.5ha
Estimated yield: 0.4 million tonnes of concreting aggregate
Key development requirements
Access : use existing access to Addlestone Quarry with number of HGV movements controlled to current permitted levels
Local amenity : processing should take place within the existing quarry; assess and mitigate potential environmental impacts of noise and dust, and visual impact, on adjoining residents; retain suitable unworked margins to public footpaths (FP11 and FP12)
Biodiversity : safeguard River Wey site of nature conservation importance running through site; assess baseline ecology and record of protected species and species of principal importance; identify and mitigate potential impacts
Heritage : area of high archaeological potential; prior archaeological assessment, and if necessary evaluation, required
Hydrology : within major aquifer so hydrogeological assessment required to ensure that groundwater is not contaminated; leave suitable unworked margins to protect integrity of River Wey; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Infrastructure : leave suitable unworked margins to protect Network Rail and National Grid infrastructure
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use.
Restoration : restore to agricultural use with some nature conservation wetland habitat
Preferred Area C: Hamm Court Farm, Chertsey
0 250 500125 Metres
(Runnymede 506540E 165270N)±© Crown copyright. All rights
reserved. Surrey County Council.100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
26
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
27
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area C : Hamm Court Farm, Weybridge
Location The preferred area lies north-east of Addlestone and west of Weybridge; Weybridge Road (A317), which links the two, is to the south.
Area: 26ha
Estimated yield 0.78 million tonnes of concreting aggregate (this includes 150,000t of variable silty sand and gravel)
Key development requirements
Access : a suitable new traffic signal junction from the site with the A317 is required
Local amenity : assess and mitigate potential impact of noise and dust, and visual intrusion, on Meadowlands Park and Hamm Court; phase working and locate processing plant so as to mitigate the impact on nearby residents; divert footpaths FP9 and FP10 and provide suitable unworked margins to these
Biodiversity : Chertsey Meads Local Nature Reserve (LNR), part of a larger site of nature conservation interest (SNCI) abuts the site and should be safeguarded; the Rivers Thames, Bourne and Wey in the vicinity are also SNCI; assess baseline ecology and record of protected species and species of principal importance; identify and mitigate potential impacts; assess quality of the wet woodland in the south of the site and safeguard this BAP priority habitat
Heritage : safeguard setting of Hamm Court Farm which includes a grade II listed pigeon house and moat of archaeological interest, and Woburn Park to the west which is a Registered Park and Garden of Historic Interest; landscape survey required to aid restoration of historic features; prior archaeological assessment and, if necessary, evaluation required
Hydrology : within major aquifer so hydrogeological assessment required to ensure that groundwater is not contaminated and assess impact of inert infill on groundwater flow; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Infrastructure : leave suitable margins from the oil pipeline and electricity pylons to protect Pipeline and National Grid and EDF Energy infrastructure
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use.
Restoration : restoration should contribute to meeting informal recreational, landscape and nature conservation objectives, and provide for public access linking through to Chertsey Meads; assess opportunity to provide flood storage and flood risk mitigation
Preferred Area D: Milton Park Farm, Egham
0 370 740185 Metres
(Runnymede 501000E 169940N)±© Crown copyright. All rights
reserved. Surrey County Council.
100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
28
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
29
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area D : Milton Park Farm, Egham
Location The land lies immediately south-east of Egham, north of Stroude village and west of the M25
Area: 57ha
Estimated yield: 2.38 million tonnes of concreting aggregate
Key development requirements
Access : mineral traffic should be routed to avoid Egham town centre by accessing the site via Stroude Road, and on to the primary route network via New Wickham Lane, Thorpe Lea Road and Vicarage Road; access to Stroude Road should preferably be via a new roundabout; potential cumulative impact of traffic on the local road network requires extraction to be phased with that at preferred area E Whitehall Farm
Local amenity : processing plant should be located within the northern segment of the area adjacent to the M25, away from Manorcrofts School and towards New Wickham Lane; assess landscape and visual impacts on Stroude Road of conveyor to the processing plant; provide suitable unworked margins and screening adjacent to Manorcrofts Road and Whitehall Lane; assess the potential environmental impact of noise and dust, and visual impact, and phase working to minimise the impact on nearby residents and school; provide suitable unworked margins for footpath (FP39) on the southern edge
Biodiversity : applicant required to provide sufficient information to enable competent authority to undertake Appropriate Assessment, if required, under the Habitat Regulations to protect integrity of South West London Waterbodies SPA; assess baseline ecology including record of protected species or species of principal importance (stag beetle may occur); identify potential impacts and mitigation
Heritage : area of high archaeological potential; assess the impact of working and restoration on preserving the character and setting of Great Fosters, a Grade I listed building with Grade II Registered Historic Park and Garden and Milton Park and its South Lodge, both Grade II listed buildings, which adjoin the site; build on previous archaeological assessment and evaluation to develop a stage 2 evaluation programme for areas of interest
Hydrology : within major aquifer and source protection zone 3 for public water supply (Chertsey) and local abstraction licences within 0.5 km so hydrological and hydrogeological assessments to include potential impacts on local properties and trees from dewatering, impacts on local aquifers, the impacts on local groundwater flow and to assess possible hydrological connectivity between the area and Thorpe No.1 Gravel Pits SSSI is required;attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
30
Infrastructure : suitable unworked margins required to safeguard stability of the M25 motorway embankment where it adjoins the site
Landscape : visual impact assessment required; assess important landscape characteristics and features, and in particular identify any surviving element of wider historic parkland represented by Windsor Great Park
Air quality : within AQMA; assess impact taking into account objectives set by Runnymede BC Air Quality Management Plan
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use.
Restoration : restoration should contribute to meeting informal recreational, landscape and nature conservation objectives creating a landscape of open grazed parkland with areas of wet woodland, enhanced public access and respect the setting of Great Fosters and other listed buildings; link with restoration of preferred area E Whitehall Farm
Preferred Area E: Whitehall Farm, Egham
0 270 540135 Metres
(Runnymede 500500E 169540N)±© Crown copyright. All rights
reserved. Surrey County Council.100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
31
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
32
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area E : Whitehall Farm, Egham
Location The preferred area lies south of Egham, north of Stroude village, and immediately to the east of the Egham to Virginia Water railway line.
Area: 47.1ha
Estimated yield: 1.40 million tonnes of concreting aggregate overall plus 0.22 mt if land north of Luddington House is worked[estimated 0.82million tonnes within plan period]
Key development requirements
Access : access via preferred area D Milton Park Farm, would be preferable with mineral traffic then routed via Stroude Road and onto the primary route network via New Wickham Lane, Thorpe Lea Road and Vicarage Road; the land should not be worked simultaneously with preferred area D to avoid cumulative impact of traffic on the local road network
Local amenity : processing material off-site at preferred area D Milton Park Farm is proposed; provide suitable unworked margins and screening adjacent to Stroude Road and Luddington Avenue; assess the potential environmental impact of noise and dust, and visual impact, and phase working to minimise the impact on nearby residents; provide suitable diversions for footpaths crossing the area, FP45, FP64 and FP39, and leave suitable unworked margins to protect users
Biodiversity : applicant required to provide sufficient information to enable competent authority to undertake Appropriate Assessment, if required, under the Habitat Regulations to protect integrity of South West London Waterbodies SPA; assess baseline ecology including record of protected species and species of principal importance (stag beetle may occur); identify potential impacts and mitigation
Heritage : assess the impact of working and restoration on preserving the character and setting of Great Fosters, a Grade I listed building with Grade II Registered Historic Park and Garden and Luddington House and its Walled Green, both Grade II listed buildings, which adjoin the area; prior archaeological assessment and, if necessary, evaluation is required
Hydrology : within major aquifer and source protection zone 3 for public water supply (Chertsey) and local abstraction licences within 0.5 km so a hydrogeological assessment to include potential impacts on local properties and trees from dewatering, impacts on local aquifers, the impacts on local groundwater flow and to assess possible hydrological connectivity between the area and Thorpe No.1 Gravel Pits SSSI is required; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
33
Infrastructure : suitable unworked margins required to safeguard stability of adjacent railway line; consult Network Rail
Landscape : assess important landscape characteristics and features, and in particular identify any surviving element of wider historic parkland represented by Windsor Great Park
Air quality : within AQMA; assess impact taking into account objectives set by Runnymede BC Air Quality Management Plan
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use
Restoration : restoration should contribute to meeting informal recreational, landscape and nature conservation objectives creating a landscape of open grazed parkland with areas of wet woodland, enhanced public access and respect the setting of Great Fosters and other listed buildings; link with restoration of preferred area D Milton Park Farm
Preferred Area F: Home Farm Quarry Extension, Shepperton
0 220 440110 Metres
(Spelthorne 506510E 168340N)±© Crown copyright. All rights
reserved. Surrey County Council.100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
34
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
35
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area F : Home Farm Quarry Extension, Shepperton
Location The preferred area lies south of Shepperton Studios and west of Shepperton Green, with the existing mineral operations at Home Farm to the west
Area: 7.86 ha
Estimated yield: 0.54 million tonnes of concreting aggregate
Key development requirements
Access : move mineral by conveyor via Home Farm Quarry to the processing plant at Littleton Lane; minimise cumulative traffic impacts on the communities of Laleham and Shepperton Green by not working area at the same time as the working of preferred area J Manor Farm
Local amenity : processing should be at Littleton Lane; assess and mitigate potential environmental impacts of noise and dust, and visual impact, on nearby residents
Biodiversity : appropriate assessment required under Habitat Regulations to assess possible implications on South West London Waterbodies special protection area of working on SPA species that may be attracted to nearby waterbodies; assess baseline ecology including record of protected species and species of principal importance; identify and mitigate potential impacts; avoid indirect impacts on River Ash and associated sites of nature conservation importance at Littleton Lake/Shepperton Green and River Ash-Splash Meadows
Heritage : prior archaeological assessment has highlighted potential of area and need for evaluation
Hydrology : mostly within source protection zone 3 of a public water supply (Chertsey) and within major aquifer so hydrogeological assessment required to ensure that groundwater flow is not affected and contamination avoided; assess possible hydrological connectivity between the area and Thorpe No.1 Gravel Pits SSSI; leave suitable unworked margins to protect integrity of River Ash; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Landscape: assess visual impacts on landscape and character of area, including impact of restoration proposals
Air quality : within AQMA; assess impact taking into account objectives set by Spelthorne BC Air Quality Management Plan
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
36
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use.
Restoration : preferred restoration for this site would involve inert fill back to existing ground levels, for future use for agriculture and reinstatement as a backlot for the studios; provide a walk along the River Ash and habitat enhancements to the river corridor
Preferred Area G: Homers Farm, Bedfont
0 200 400100 Metres
(Spelthorne 507090E 173190N)±© Crown copyright. All rights
reserved. Surrey County Council.100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
37
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
38
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area G : Homers Farm, Bedfont
Location The land lies to the south of Heathrow Airport between the Staines Road (A30) to the south and oil storage tanks to the north. It is bounded by Short Lane to the west
Area: 11ha
Estimated yield: 0.76 million tonnes of concreting aggregate
Key development requirements
Access : means of access should be direct to A30 or via Short Lane with junction improvement to satisfaction of Highways Agency; traffic entering and leaving via Short Lane should access the site from south only
Local amenity : assess and mitigate potential environmental impacts of noise and dust, and visual impact, on nearby residents particularly if on-site processing is proposed
Biodiversity : assess baseline ecology including record of protected species and species of principal importance; identify and mitigate potential impacts
Heritage : former Roman road from London to Silchester adjacent to area on the alignment of the A30; areas of high archaeological importance within 500m; preliminary rapid archaeological assessment has highlighted need for further assessment and evaluation
Hydrology : within major aquifer so hydrogeological assessment required to address impacts on the aquifer, and any local impacts of dewatering, including potential impacts on the Bedfont and Princes Lakes wetland to the south, which is a Site of Metropolitan Importance/Site of Nature Conservation Importance; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Infrastructure : suitable unworked margin required to safeguard the Longford to Walton fuel pipeline around the northern and western corner
Air quality : within AQMA; assess impact taking into account objectives set by Spelthorne BC Air Quality Management Plan
Agriculture : land classified as grade I so assess impact of mineral working on the viability of the agricultural holding
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use
Restoration : Adjoins Heathrow Airport so filling with inert waste and restoration to agriculture or recreation use is required
Preferred Area H: King George VI Reservoir, Stanwell
0 620 1,240310 Metres
(Spelthorne 504520E 173250N)±© Crown copyright. All rights
reserved. Surrey County Council.
100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
39
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
40
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area H : King George VI Reservoir, Stanwell
Location The reservoir lies north of Staines between Stanwell Moor Road (A3044) and the M25, separated from the latter by Staines Moor
Area: 178ha
Estimated yield: 3.24 million tonnes of concreting aggregate
Key development requirements
Access : use conveyor to move material to Hithermoor Quarry for processing and use existing access to Leylands Lane/Hithermoor Road/M25 Junction 14; consult Highways Agency and Highways Authority about the impacts, mitigation measures and highway improvements required
Local amenity : dredging within reservoir unlikely to have significant impact on local amenity; mineral needs to be processed off-site; assess impact of conveying material from the reservoir to the processing plant at Hithermoor on residents in Stanwell Moor
Biodiversity : reservoir is designated as part of SW London Waterbodies special protection area (SPA) and Ramsar Site for birds; applicant required to provide sufficient information on the method and programming of working to enable competent authority to undertake Appropriate Assessment under the Habitats Regulations at the planning application stage; area also lies within Staines Moor SSSI and potential impacts on interests for which the SSSI was designated should be assessed
Hydrology : attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Infrastructure : assess potential impact of working on the integrity of the reservoir
Air quality : within AQMA; assess impact taking into account objectives set by Spelthorne BC Air Quality Management Plan
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport but as an operational reservoir dredging would not increase risk associated with bird strike
Restoration : main site will continue as an operational reservoir; restoration of the wider Hithermoor site permitted under SP/03/1212 should be implemented without delay save for the final restoration along the conveyor route and of the processing plant and associated silt lagoon areas, final restoration of which should be assimilated into the wider scheme as soon as working of the reservoir ceases
Preferred Area J: Manor Farm, Laleham
0 310 620155 Metres
(Spelthorne 505190E 169700N)±© Crown copyright. All rights
reserved. Surrey County Council.
100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
41
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
42
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area J : Manor Farm, Laleham
Location The preferred area lies west of Ashford Road (B377) and east of Worple and Staines Roads, being part of a broader triangle of open land between Staines and Laleham village
Area: 30.0ha
Estimated yield: 1.3 million tonnes of concreting aggregate
Key development requirements
Access : permanent HGV access to the area is not desirable; temporary access to bring equipment and machinery on and off the site from Ashford Road should be explored; minerals should be moved by conveyor into Littleton Lane Quarry for processing; working of the preferred area should be phased and not occur simultaneously with any working of preferred area F Home Farm Quarry Extension, to avoid any increase in mineral HGV traffic on local roads
Local amenity : on-site processing is not acceptable because of proximity of residential property and unsuitable access; assess potential environmental impact of noise and dust , and visual impact on nearby residents and phase working to minimise the impact; assess the noise and visual impacts of conveyor required to move minerals off-site; footpath (FP30) should be retained during working of the site with provision made for suitable unworked margins to protect users
Biodiversity : applicant required to provide sufficient information to enable competent authority to undertake Appropriate Assessment, if required, under the Habitat Regulations to protect integrity of South West London Waterbodies SPA; assess baseline ecology and record of protected species and species of principal importance; identify and mitigate potential impacts;.
Heritage : demonstrate that there would be no unacceptable impacts on character and setting of Laleham Conservation Area; within an area of high archaeological potential; so prior archaeological assessment and evaluation required
Hydrology : within a major aquifer and mostly within a source protection zone 3 for public water supply (Chertsey) so a hydrogeological assessment to assess impact of working on the aquifer and groundwater flows and to assess possible hydrological connectivity between the area and Thorpe No.1 Gravel Pits SSSI is required; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
43
all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Air quality : within AQMA; assess impact taking into account objectives set by Spelthorne BC Air Quality Management Plan
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use.
Restoration : lack of suitable access for HGVs for the importation of inert fill restricts opportunities to restore the entire area to existing levels; create areas of open space and open water unless a feasible and acceptable method of importation of fill can be found, enabling an alternative restoration option to be considered
Preferred Area K: Queen Mary Reservoir, Sunbury
0 775 1,550387.5 Metres
(Spelthorne 507240E 169760N)±© Crown copyright. All rights
reserved. Surrey County Council.
100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
44
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
45
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area K : Queen Mary Reservoir, Ashford
Location The reservoir lies south of Staines Road (A308) and Ashford with Shepperton Studios and Littleton village to the south
Area: 284ha
Estimated yield: 1.25 million tonnes of concreting aggregate
Permission granted in January 2009
Preferred Area L: Watersplash Farm, Halliford
0 310 620155 Metres
(Spelthorne 509340E 1675910N)±© Crown copyright. All rights
reserved. Surrey County Council.
100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
46
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
47
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area L : Watersplash Farm, Halliford
Location The preferred area lies east of Shepperton and south of Upper Halliford, and is bounded by Gaston Bridge Road (A244) to the west, Halliford Road to the north, and Fordbridge Road (B375) to the south
Area: 30ha
Estimated yield: 1.25 million tonnes of concreting aggregate
Key development requirements
Access : existing access to Watersplash Farm not suitable for use by HGV traffic; provide new access from the Gaston Bridge Road/Green Lane roundabout
Local amenity : assess and identify mitigation for potential environmental impacts of noise and dust, and visual impact, on nearby residents arising from mineral working and processing; footpath (FP53) should be diverted and suitable unworked margins left to protect users
Biodiversity : River Ash running through the area is designated a site of nature conservation importance; assess baseline ecology and record protected species and species of principal importance; identify and mitigate potential impacts; assess potential indirect impacts on ecology and biodiversity from any changes to the hydrological regime
Heritage : demonstrate proposals will not cause unacceptable harm to the character and setting of the Upper Halliford conservation area; area lies within an area of high archaeological potential so prior archaeological assessment and evaluation is required
Hydrology : within a major aquifer and local permitted abstraction points occur within the area so hydrological and hydrogeological assessment required to assess risk of dewatering on spread of contamination from filled pits in the vicinity and potential impacts on level, flow and quality of groundwater; suitable unworked margins are required to safeguard the integrity of the River Ash; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Agriculture : area is predominantly grade 1 and 2 agricultural land so assess impact of mineral working on the viability of the agricultural holding
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
48
Landscape : area of attractive open farmland in the Thames Valley so assess visual impacts on landscape and character of the area and scope for integration of significant features into restoration proposals
Air quality : within AQMA; assess impact taking into account objectives set by Spelthorne BC Air Quality Management Plan
Aerodrome safeguarding : preferred area lies within 13km of Heathrow Airport; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use
Restoration : Restore to existing levels for agricultural use and provide enhancements to the River Ash corridor
Preferred Area P: Mercers Farm, Nutfield
0 310 620155 Metres
(Tandridge 530660E 151740N)±© Crown copyright. All rights
reserved. Surrey County Council.
100019613, 2009.
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
49
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
50
The boundary shown on the map is indicative of the area of any future mineral development and will be refined at the planning application stage. The key development requirements described below will need to be addressed as part of any future proposal for mineral extraction. Other requirements may be identified at the time of a planning application. All relevant criteria in the core strategy policies should, nevertheless, be considered when preparing planning applications to assess appropriate mitigation of any impacts, and the EIA process used, where relevant.
Preferred area P: Mercers Farm, Nutfield
Location The preferred area is located in open countryside, west of the M23 motorway, south of the M25 and north of the A25. The small community of Nutfield Marsh lies to the south west, a flat area of open land dissected by Nutfield Marsh Road
Area: 38ha
Estimated yield: 5.40 million tonnes of soft sand overall [estimated 2.7 million tonnes within plan period]
Key development requirements
Access : a comprehensive package of measures is required to provide suitable access and local highways improvements, including as a minimum:
limiting HGV movements to 240 movements daily;
directing access to the wider highway network via Cormongers Lane not Church Hill;
improvement of the junction of Cormongers Lane / Nutfield Marsh Road
provision of two intervisible passing places on the narrow sections of Cormongers Lane;
consideration of the need for improvements to the junction of Cormongers Lane with the A25;
replacement and widening of the bridge on Cormongers Lane; and
contribution to traffic management measures at the Church Hill/A25 junction to protect Church Hill from HGV use.
address potential cumulative impact of traffic on the local road network by capping total HGV movements generated from preferred area and other mineral workings
Local amenity : assess and identify mitigation for potential environmental impacts of noise and dust, and visual impact, on nearby residents arising from mineral working and processing; phase working and restoration to limit adverse impacts on the surrounding communities and environment; select location of processing plant so as to limit visual impact; divert footpath (FP173) and leave suitable unworked margins to it and bridleway (BW182)
Biodiversity : preferred area is designated as a site of nature conservation importance and notable for wintering lapwing, bullfinch and reed bunting, and great crested newts so assess baseline ecology including record of protected species and species of principal importance; identify and mitigate potential impacts; assess potential indirect impacts on
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
51
ecology and biodiversity from any changes to the hydrological regime, particularly around Redhill Brook
Heritage : assess the impact of working and restoration on conserving the character and setting of the listed buildings (Leather Bottle Cottage and Charmin Cottage) adjoining the western boundary; prior archaeological assessment and, if necessary, evaluation is required
Hydrology : within a major aquifer and close to source protection zone 3 for public water supply (Warwick Wold); hydrogeological assessment required to
include a groundwater-monitoring programme to investigate the hydrological regime in the area and to establish baseline information on groundwater quality and any movement of contaminants from adjacent landfills,
assess the relative advantages and disadvantages of working the area wet or of dewatering, both on groundwater flows and contamination
address potential impacts on the adjoining wetland nature reserve to the north, on Redhill Brook and on Mercers Park lake to the west, and
identify suitable margins to Glebe Lake
provide an unworked margin of at least 10m from Redhill Brook; attention is drawn to the guidance in Section 8 of the SFRA and the PPS25 practice guide and applicants will be expected to draw on this guidance in preparing project level flood risk assessment covering all sources of flood risk, including a surface water drainage strategy covering the operational and post restoration phases of development
Agriculture : assess impact of mineral working on the viability of the agricultural holding
Landscape : the preferred area adjoins the AONB and AGLV and is within the Holmesdale Greensand Valley Landscape Character Area; assess important landscape characteristics and features and how they would be protected and integrated into restoration and how any adverse impacts on the AONB and AGLV would be mitigated
Aerodrome safeguarding : preferred area lies within 13km of Biggin Hill and Gatwick Airports; assess potential hazard to aircraft from birds attracted by the development during operations, restoration and from proposed after-use
Restoration : restore to existing levels to meet a combination of local informal recreational, landscape and nature conservation objectives
Surrey Minerals Plan - Primary Aggregates Development Plan Document, July 2011
52
APPENDIX 2
Relationship between ‘saved’ policies of the Surrey Minerals Local Plan 1993 and the Surrey Minerals Plan Primary Aggregates DPD
Minerals Local Plan 1993 Policy Replacement Primary Aggregates DPD Policy
1
2
5
6
7
10 MA2
12 MA3
15
16
17
18
19
21
22
23
24
25
26
27
28
29