BIO PRESENTATION PAPER International Conference On Software Testing Analysis & Review November 14-18, 2005 Anaheim, CA USA F1 11/18/2005 10:00 AM LET'S MAKE BUGS MISERABLE Anibal Sousa Microsoft Corporation

Upload: others

Post on 07-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

BIO PRESENTATION PAPER

International Conference On Software Testing Analysis & Review

November 14-18, 2005 Anaheim, CA USA

F1

11/18/2005 10:00 AM

LET'S MAKE BUGS MISERABLE

Anibal Sousa Microsoft Corporation

Page 2: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Anibal Sousa

Anibal Sousa is a Test Manager for Microsoft in the Microsoft Business Solutionsdivision, working in the Business Contacts Manager for Outlook product. He has about15 years of experience working in many IT departments, from software development tocustomer support. Anibal joined Microsoft in 1998, and since then has worked in theTesting discipline shipping many different products, like Exchange Conferencing andInstant Messaging Servers, GDI+ and Business Contact Manager for Outlook Versions 1and 2. He is passionate about Testing and Quality Assurance, always looking for waysto improve the software development and testing processes, with focus on newmethodologies and practices, like Test Templates, Risk Based Testing, Model BasedTesting, etc. Anibal has a Master of Science degree in Computer Science from PUC/RJin Brazil, and loves his family and soccer.

Page 3: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Let’s Make BugsLet’s Make BugsMiserableMiserable

Anibal SousaAnibal [email protected]@microsoft.com

Test ManagerTest ManagerMicrosoft Corp.Microsoft Corp.

Page 4: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Scope of this presentation - AgendaScope of this presentation - Agenda

Defining a bug databaseDefining a bug databaseSpec critique processSpec critique processPre check in toolsPre check in toolsLooking for more and different bugsLooking for more and different bugsBug bar and Triage processBug bar and Triage processBug charts and data analysisBug charts and data analysisMaking best use of bugs found by customersMaking best use of bugs found by customers

Page 5: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Who am I?Who am I?

8 years working for Microsoft in Test area8 years working for Microsoft in Test areaProducts I worked on:Products I worked on:

Instant Messaging Server 2000Instant Messaging Server 2000Conferencing Messaging Server 2000Conferencing Messaging Server 2000GDI+ versions 1.0 and 1.1GDI+ versions 1.0 and 1.1Business Contact Manager versions 1.0 and 2.0Business Contact Manager versions 1.0 and 2.0

I will be talking about ideas, processes and practicesI will be talking about ideas, processes and practicesdeveloped and tested during these 8 yearsdeveloped and tested during these 8 years

Page 6: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

MotivationMotivation

Bugs will always be there!Bugs will always be there!Can we prevent the creation of bugs?Can we prevent the creation of bugs?How do we keep control of bugs?How do we keep control of bugs?Are we fixing the right bugs?Are we fixing the right bugs?Are they being fixed correctly?Are they being fixed correctly?Where should I look for more bugs?Where should I look for more bugs?What bugs did I miss?What bugs did I miss?

Page 7: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

First, you need a bug database, but ...First, you need a bug database, but ...

Can you afford to buy one? If not, you could useCan you afford to buy one? If not, you could useExcel, SQL, etc.Excel, SQL, etc.After you have it, what kind of data will youAfter you have it, what kind of data will youstore?store?It should simplify the bug management process,It should simplify the bug management process,for you and your team membersfor you and your team membersAnd after you start colleting data, what can youAnd after you start colleting data, what can youdo with it?do with it?

Page 8: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Life cycle of a bugLife cycle of a bug

Bug is found Closed bug

Bug is open but not

assigned

Bug gets into the system

Active bug assigned to developer

Triage inspects bug and assigns to developer

Resolved bug

Bug gets resolved Bug is verifiedthen closed

Bug was notresolved correctly

Bug goes back to Triage for orientation

Page 9: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Some key fields the DB should have:Some key fields the DB should have:

TitleTitleRepro StepsRepro StepsFeature areaFeature areaSeveritySeverityStatusStatusTypeTypeHow foundHow foundTest Case IDTest Case IDReleaseRelease

Assigned to (owner)Assigned to (owner)PriorityPriorityResolutionResolutionHistory logHistory logOpened by and dateOpened by and dateResolved by and dateResolved by and dateClosed by and dateClosed by and dateUA ImpactUA ImpactTriage statusTriage status

Page 10: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Spec Critique/Review, driven by TestSpec Critique/Review, driven by Test

Requirements, feedback, surveys,

bugs, etc.

Spec Draft -Ready for Review

Reviewed Spec -Ready for Critique

1 - PM creates draft of Specbased on requirements

and additional information

2 - Feature team providesinput to the Spec document

Spec Ready -Ready for Coding

3 – Team members review the spec,and critique meeting occurs

Are there open issues with Spec

document?

4a - No

4b - Yes

Page 11: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Killing bugs before they get youKilling bugs before they get you

Code Review (dev and test)Code Review (dev and test)Buddy Build and Buddy TestBuddy Build and Buddy TestPre Check in toolsPre Check in toolsAutomated daily buildsAutomated daily buildsAutomated Code Coverage buildsAutomated Code Coverage buildsAutomated tests and tools executionAutomated tests and tools execution

Page 12: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Looking for different bugsLooking for different bugs(and the bugs you missed)(and the bugs you missed)

Focus and Ad hoc daysFocus and Ad hoc daysBug huntsBug huntsBug bashesBug bashesFeature rotation between testersFeature rotation between testers

Different eyes will find different problems!

Page 13: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Bug Bar – motivation (1/2)Bug Bar – motivation (1/2)

5000+ bugs during product development life5000+ bugs during product development lifecyclecycleSubjective and not deterministic process forSubjective and not deterministic process fortriaging bugstriaging bugsTesters were confused about what kind of bugsTesters were confused about what kind of bugswere still being accepted – they wanted to be ablewere still being accepted – they wanted to be ableto focus on the right set of problems toto focus on the right set of problems toinvestigateinvestigateBad for morale and team engagementBad for morale and team engagement

Page 14: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Bug Bar – motivation (2/2)Bug Bar – motivation (2/2)

Bugs will occur during the whole projectBugs will occur during the whole projectQuality should go up and not downQuality should go up and not downRisk of regression gets higher with timeRisk of regression gets higher with timeNot all features get ready at the same timeNot all features get ready at the same time

Page 15: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Bug Bar is the proposal!Bug Bar is the proposal!

These might not be even considered bugs.Wish7

This bug is hard to find, not noticeable, causes minor problems (or none) and can beignored.Improvement6

This is a bug, but might be obscure, rare or have small impact. Normally it has an easyworkaround.Bug5

This bug might be very visible and affect functionality significantly. In case it has aworkaround, it is not so obvious or simple.

KnowledgeBase (KB)article4

This bug will cause Customer Support calls. Publishing KB article is not enough,since workaround may not exist or be too complicated.PSS3

Serious bug. If a customer finds this bug, we will have to issue a QFE (patch).QFE2

Reasonable region of a feature is not working as expected because of the bug, andthere is no workaround. We can not ship the product with this bug!Ship Stopper1

DefinitionNameImpact

Define the bug categories:

Page 16: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Bug Bar @ Alpha stageBug Bar @ Alpha stage

Each feature is considered independentlyEach feature is considered independentlyEach feature will have its bar changed thru timeEach feature will have its bar changed thru timeWhen deciding bar, consider: new/old feature, risk andWhen deciding bar, consider: new/old feature, risk andimpact of changes, development stage, coverage, etc.impact of changes, development stage, coverage, etc.

Wish7

Improvement6

Bug5

KB4

PSS3

QFE2

Ship Stopper1

UserAssistance

SBAIntegrationPDAPerformanceForms

ImportExportReportsAreas

Page 17: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Bug Bar @ Beta and RTM stagesBug Bar @ Beta and RTM stages

KB4

PSS3

QFE2

Ship Stopper1

UserAssistance

SBAIntegrationPDAPerformanceForms

ImportExportReportsAreas

Bug5

KB4

PSS3

QFE2

Ship Stopper1

UserAssistance

SBAIntegrationPDAPerformanceForms

ImportExportReportsAreas

Page 18: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Bug triage (aka, war team)Bug triage (aka, war team)

TESTER DEVELOPER

TRIAGE/WARTEAM

1 – Tester opens bug and assigns to

Triage

2.1 – Triage assigns the bug back to tester for more information, or resolves the bug, applying the bug bar

2.2 – Triage assigns the bug to developer for

investigation

3 – Developer assigns the bug back to Triage, with all necessary

information to help Triage, like impact, risk, code reviewer and

tester, etc.

4.1 – Triage assigns the bug back to developer

for check-in4.2 – Triage decides to not fix the bug, so assigns to Test for

follow-up

5 – Developer checks-in the fix and assign the bug

to tester for closure

6 – Tester verifies the bug is fixed, writes automation, update Test

Plan, etc., and then closes the bug

Page 19: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

After the bug bar process …After the bug bar process …

Clear communication of resultsClear communication of resultsTeam engagement and commitment – high moraleTeam engagement and commitment – high moraleNumber of regressions (metrics) went downNumber of regressions (metrics) went downsignificantlysignificantlyNumber of opened bugs did not go down, but acceptedNumber of opened bugs did not go down, but acceptedbugs didbugs didProduct was shipped in timely mannerProduct was shipped in timely manner

Page 20: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Metrics (using Excel and Pivot Tables)Metrics (using Excel and Pivot Tables)

0

20

40

60

80

100

120

140

160

Developers

Bug

s as

sign

ed 04

3

21

Weekly Resolution of bugs - Linear

0

50

100

150

200

250

Weeks

Bug

s re

solv

ed

Won't Fix

Postponed

Not Repro

Fixed

External

Duplicate

By Design

•Who is working on the bugs?

•Which area has the most bugs?

•How are we resolving the bugs?

•What is the quality of the bugs?

Page 21: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

More metrics – Bug TrendsMore metrics – Bug Trends

Bug Trends

0

200

400

600

800

1000

1200

Weeks

Bugs

OpenedResolvedClosedActivePoly. (Active)

When are we going to be able to ship the product?

Page 22: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Release CriteriaRelease Criteria

Use can use bugs as part of your ExitUse can use bugs as part of your Exitand Release Criteriaand Release Criteria

80%80%60%50%50%40%Pri 4 TC Pass Rate

90%90%80%70%50%40%Pri 3 TC Pass Rate

100%100%100%90%80%60%Pri 2 TC Pass Rate

100%100%100%100%100%100%Pri 1 TC Pass Rate

0 active0 active0 active0 activeNANAPri 2 Bugs

0 active0 active0 active0 active0 active0 activePri 1 Bugs

RTMRC1BetaAlphaM3M2Criteria/Goals

Page 23: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Looking for bugs after they areLooking for bugs after they arereleasedreleased

Microsoft Customer ExperienceMicrosoft Customer ExperienceMicrosoft Error ReportingMicrosoft Error Reporting(Watson)(Watson)Customer SupportCustomer SupportInternet newsgroupsInternet newsgroups

Page 24: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Questions?Questions?

Anibal SousaAnibal [email protected]@[email protected][email protected]

Thank you!Thank you!

Check the white paper for more information about this presentation,Check the white paper for more information about this presentation,

or feel free to contact me at anytime.or feel free to contact me at anytime.

Page 25: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

Let’s Make Bugs Miserable!

Best practices, recommendations and ideas todeal with software development bugs during

the product life cycle

Anibal [email protected]

Test ManagerMicrosoft Corporation

StarWest 2005

Page 26: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

.........List of Contents

Introduction..................................................................................................................................................1

Why does this document exist? .................................................................................................................1

I got a bug, then what? ...............................................................................................................................1

Bug prevention is important!.......................................................................................................................3

Few ideas to prevent bugs from getting into the product ..........................................................................4

Code Review, Buddy Build and Buddy Testing ........................................................................................... 4

Pre-Check in tools ......................................................................................................................................... 5

Automated daily builds and Code Coverage builds..................................................................................... 5

Automated tests execution and code validation tools.................................................................................. 5

Looking for bugs in different ways..............................................................................................................5

Bug hunts, Focus and Adhoc days............................................................................................................... 5

Bug Bashes.................................................................................................................................................... 5

Feature rotation.............................................................................................................................................. 6

Why should we have a bug bar?................................................................................................................6

Motivation....................................................................................................................................................... 6

Process .......................................................................................................................................................... 7

Results............................................................................................................................................................ 9

Too many bugs - Triage/War team process ..............................................................................................9

Simple bug database analysis and charts .............................................................................................. 10

Bugs and their relation to Exit and Release Criteria............................................................................... 12

Few more ways to get bugs directly from customers ............................................................................. 13

Instrumentation (Customer Experience and Microsoft Error Reporting, a.k.a. Watson) ......................... 13

Customer Support ....................................................................................................................................... 13

Newsgroups................................................................................................................................................. 13

Conclusion ............................................................................................................................................... 13

Page 27: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

1

Introduction

During years of experience in shipping software at Microsoft, many different best practices, processes and ideaswere introduced to me, some were modified by me and my team and new ones proposed. This documentpresents many of these according to the different stages of the Software Development Lifecycle (SDL).

Note: This document will concentrate on how to reduce the impact of bugs that already exist, touching slightlysome techniques that could be deployed to prevent them from becoming real. The focus is on what the TestManager and the whole Test Team can do to increase the quality of the software, having key participation ordriving most of the processes to achieve this.

Why does this document exist?

There are many techniques out there to prevent bugs from happening in the real life, but the truth is that they willalways be there, one way or another – this is a fact which can’t be ignored. Starting from this point, we have tomake sure that:

Is there anything we can do to prevent bugs from occurring at all? Even before becoming codebugs?

We are finding as many bugs as we can, and we are also finding them as early as possible;

Bugs are being taken care in a correct manner (example: not all bugs have to be fixed);

The bugs that are being fixed, are being fixed in a correct way, and enforce that they won’tcome back to haunt us in the future;

Are there siblings of the bugs found by your team? What kind of bugs does you product have?What information can you extract from past bugs?

These questions and goals are the motivation of this document. We know that product bugs will occur, and thatwe will have to deal with them. So we want to be proactive, efficient and thorough – bugs are not our friends, sowe want to make their life a short one and a bad experience overall for them – Let’s make their lives Miserable!

I got a bug, then what?

Since you know that bugs will be in your way, it is important that you have a way to store, catalog and haveeasy access to all bugs found during the SDL. There are commercial products available that provide thisfunctionality, but you could also use homegrown tools, or simply a database to store them. The importantaspects to be considered are:

1) What information you will store for every bug found. If you don’t save good data, the data mightbecome useless;

2) What you will do with this information as it starts to grow. Now that you have data, you need toact on it;

3) The tool should allow the whole team to use it, and simplify the workflow, maximizingefficiency.

Page 28: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

2

There is commercial software that provides this functionality, but as we are in cost reduction times, I will presenta list of some of the fields that the bug database should have, in case you decide to develop you own system,and also a flow that the bug database front end should provide to the team members. In the list below, I present2 columns: the name of the field and a brief explanation why I think you should have this field.

Field Name ExplanationTitle Short but precise description of the bug. Ideally, just reading the title of the

bug should give a good idea about the bug.Repro steps List of steps that can reproduce the bug, hopefully in any machine and by

any person. Any additional data to help repro the bug should be in the bugreport – developers will thank you for this.

Test Case ID The test case that led the tester to find the bug.Severity This indicates how bad the bug is. Normally it is numeric and has a preset

range of values, like 1 to 4.Problem Type If you use the database to store different things, like product bugs, work

items, spec defects, etc., this field could become necessary.Description /History

New data found during the investigation of the bug, or changes in its state,should be logged in the history of the bug. This field could be adding-only.

Feature / area The feature of the product where the bug was found. This is important toidentify the most problematic areas (Pareto analysis).

Release The bug might have a specific point in time when it should be fixed, like amilestone or special event. This field could be used for this goal.

Opened by The unique identifier of the person entered the bug in the database.Opened date The date the bug was entered. This field will be important to track bug

activity and future trends.How found As a way to improve testing practices, this field would store how the bug

was found, like by manual or automated testing, ad-hoc or bug bash, testpass, etc.

Source It might be necessary to keep data about who really found the problem,like a previous customer, alpha or beta tester, etc.

Assigned to /Owner

During the many different stages in the bug’s life, many different people willbe working on the bug, and this is where this field becomes necessary. Byquerying this field, every team member can check which bugs are waitingfor their input or action.

Status We need to know if the bug is active, resolved or closed.Priority By comparing the priority of other bugs, anyone can determine which ones

should be fixed first. Normally it is set by senior team members.Resolved by The person that solved the problem or decided its fate, like triage.Resolved date The date when it was resolved. This could be used to track progress and

estimate future bug resolution trend.Resolution How the bug was solved? Some possibilities are: Fixed, Not Repro, Won’t

Fix, Dupe, External, By Design, Postponed, etc.Closed by The person that closed the bug, after assuring it was resolved correctly.Closed date The date the bug was closed in the system.UA impact If you product ships in many different languages and/or has

documentation, you might need a way to track changes in the UI of theproduct, which would have an impact in the documentation or localization

Page 29: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

3

efforts.Triage status This field will be explained in more details later, but it could be used to

track progress while the bug is still active.

Also, to make the access and control of bugs simpler, the tool should facilitate team members to interact withthe bugs throughout the possible stages of a product bug. Here is a common flow of a bug:

Bug is found Closed bug

Bug is open but not

assigned

Bug gets into the system

Active bug assigned to developer

Triage inspects bug and assigns to developer

Resolved bug

Bug gets resolved Bug is verifiedthen closed

Bug was notresolved correctly

Bug goes back to Triage for orientation

Some additional features the tool could provide are: ability to query the bugs you opened, bugs assigned to you,bugs per product feature and/or milestone, etc. Notifications, like when a bug gets assigned to you, or someonemodified a bug you opened are great, but not mandatory.

Bug prevention is important!

It is known that the sooner we can identify and fix bugs, cheaper and less risky it will be. Because of this, everyproduct team should try to identify them as soon as possible; and a very early spot where we can find bugs is inthe product specifications and requirements. One procedure deployed in my current group at Microsoft that wasvery successful was to review and critique the specs written by the Project Managers (PM). It is important tonote that this process was driven and owned by the Test team. Here is a series of steps showing this processand its main activities:

1) PMs collect the customer requirements and translate them into a product specification;

2) The Feature Team (consisted of at least one member of each discipline: PM, Developmentand Testing) participate actively in creating the document. Later it reviews the spec internallyand bring it to a quality level where it can be reviewed by team members outside of the featureteam (Ready for Critique);

3) When the spec is at Critique Level, the tester in charge of this feature schedules a critiquemeeting. He/she also sends the document in advance to team members so they can read andcritique the document. They open bugs and assign them to the PM prior to the meeting. Ideallybefore the meeting, PM will resolve all open issues in a correct manner, often updating thespec with more information or clarifications. Remaining issues wait for the meeting;

4) The meeting occurs, where all open issues and resolved issues are discussed. At this moment2 things can happen:

Page 30: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

4

a) There are no more open issues: at this moment the development team can start coding,and tester should continue with his test plan document (ideally, should be in progressalready);

b) There are still issues: PM needs to resolve them, with the help of the feature team. Afterupdates are completed, step 3 is repeated.

Requirements, feedback, surveys,

bugs, etc.

Spec Draft -Ready for Review

Reviewed Spec -Ready for Critique

1 - PM creates draft of Specbased on requirements

and additional information

2 - Feature team providesinput to the Spec document

Spec Ready -Ready for Coding

3 – Team members review the spec,and critique meeting occurs

Are there open issues with Spec

document?

4a - No

4b - Yes

Even though these steps look simple, it is hard to stick to them. To prevent this from happening, it is critical that:this process is driven by the Tester, and that he/she is empowered to declare the spec ready for coding. Thisway the feature won’t start being coded until the open issues are resolved; the team is aware of the process andengaged into making it successful. But nothing prevents the tester to start writing his Test Plan or Spec whilethis process is occurring – it can happen in parallel, what could trigger good discussions during the review andcritique meetings.

Few ideas to prevent bugs from getting into the product

Even though we perform Spec Reviews at work, bugs always slip through. But there are other layers of defensethat everybody could deploy. Below I present some that many different groups at Microsoft currently have inplace:

Code Review, Buddy Build and Buddy Testing

Even though not all testers have access to product’s source code, or even are familiar with code programming,executing buddy build (building the product in your machine with the proposed changes from the developer) andbuddy testing it (after you build the product run some tests to verify if it works as expected and no regressionswere introduced) are good practices most testers could perform. In case the tester knows how to write code, gethim/her to do code reviews for the developers - most developers will appreciate having more eyes on his code,assuring his code meets the standards we require. There are only advantages of doing Code Review, fromanother developer or from a tester – make it a practice and your team will appreciate it in the future.

Page 31: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

5

Pre-Check in tools

Another good idea is to build the product and then run automated tests before the developer’s changes get intothe product build system. Basically, if your team can afford some machines and more test code development,you should be able to have automated tests that would run for every check in into the product source code treebefore it really occurs – in case any test fails, the check in is aborted, so the developer either has to fix his codeor the automated test. A possible alternative, in case you can’t afford it, would be to convince your developmentteam to do it☺. This will actually benefit them more than you.

Automated daily builds and Code Coverage builds

But, in case the idea above is not feasible, I still got few more for you. One big serious problem is when there isa build break, when there is no product to be tested, what makes the whole team go into waiting mode. Also,you should make every effort to have recent product builds, this way you would be maximizing the results ofyour test team, as they would be testing the most recent version of the product, not outdated ones. So what Iam suggesting is to have as often builds as possible, like daily builds. And if you implement this idea, why not dothe same for Code Coverage builds? This way your test team can have them easily available whenever theywant to perform code coverage analysis..

Automated tests execution and code validation tools

And if you want to take another extra step: produce the build automatically at night, like at midnight or so, andthen also run all or some of automated tests you might have, including development ones. You could also runsome tools that will verify your source code for bugs and bad practices, like FXCOP. This way, the next daywhen you arrive at work, you will not only have a new product build to test, but results from the automation,which will indicate how good or bad it is. If you are able to deploy any (or all, hopefully) of these ideas, you willbe taking few steps towards a higher quality product; and your test team will become more efficient and lessfrustrated too.

Looking for bugs in different ways

It is common to have product features assigned to individual testers, who conduct spec reviews, write the testspec, execute it and provide support to the feature developer. But if you have just the same group of peoplelooking at the feature, they could get “too” used to the feature, ignoring problems and bugs that someone withfresh eyes would not let slip through. The techniques below focus in this concept, and normally producesignificant results when deployed in working groups.

Bug hunts, Focus and Adhoc days

There is a chance that some testers end up spending too much time developing test automation, ignoring adhocand/or manual testing – it is important to keep a good balance, and because of this we used bug hunts andadhoc days while testing past MS products. This practice would set some specific time where test teammembers would simply play, test and have fun testing the product, focusing on specific areas or picking randomareas, depending on the need and stage of the product: let’s say there is a big check in that occurred recently,and the feature tester is worried about possible regressions – this could become the focus of a bug hunt.

Bug Bashes

Similar to the bug hunt, the major difference in the bug bash is that it involves the whole team, not just testers –you should get developers, program managers, documentation writers, product support folks, etc. to participatein the bug bash. Again, depending on the situation, it could be focused or free for all. But to maximize its results,

Page 32: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

6

I’d recommend preparing for it and getting people engaged and motivated for it: decide the scope of it, sendinvitations in advance so participants can set time aside for it, provide prizes for top bug finders, and send reportwith the results after it is completed. If you do it right, everybody will see the value that bug bashes bring, andwill ask for future ones (get the prizes, and people will require more bug bashes in the future!).

Feature rotation

One more practice that often produces good results is to perform some shuffles in the feature assignments inthe test team. It might be hard in some cases , where the ramp up time would be too time consuming, but inmany cases it is a good idea, since the feature tester might be tired and used to the feature – remember thatnew and fresh eyes will likely see new bugs you missed for no good reason.

At this moment, I hope the message I am trying to deliver is clear: even though the feature tester will likely bethe person that knows and understands the feature the best, getting other people to look at it will only increasethe team confidence on the feature and the tester (or present you with a problem to solve, but at least ahead inthe game).

Why should we have a bug bar?

In this section, I will talk about one common problem that will occur in any product development team: do wehave to fix this bug? Is there any difference if the same bug is found in the early or late stages of the SDL? Howcan we get the whole team to understand and agree on a process to determine the fate of product bugs? If thisis interesting to you, go ahead and check this section.

Motivation

At every product I worked at Microsoft, there was always discussion about “why isn’t this bug being fixed?” It iscommon to see developers wanting to fix bugs because it is easy to, or testers that get frustrated because theproblems they find don’t get fixed in the product. If this is not the case in your group and/or company, whatabout these other issues:

• Every product will have bugs, no matter how good and tight the team and process are. As anexample, during BCM V1 development, more than 5000 bugs were found;

• Are testers confused about what kind of bugs are being fixed or rejected by triage team? Ifthere is confusion, how can they focus on the right set of problems to investigate?

• Is the process for triaging bugs non deterministic or random, or maybe even worse, likesubjective to role or status of triage members in the group?

• Do you think the morale and engagement of team members is affected by the problemsabove?

• Do you agree that bugs will occur during the whole project, and that product overall qualityshould go up and not down?

• Do you agree that as we get deeper in the development life cycle, the risk of regression getshigher? And do you believe that not all features will get ready at the same time? And that it willbe hard to have one unique rule that applies to all features in the product because of the pointsabove?

• Last but not least, are you considering all aspects when evaluating all bugs, like the cost offixing it and testing it, risk of fixing or not fixing it, impact to other teams, like User Assistance,Product Support, Localization and Translation, Marketing, etc?

Page 33: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

7

So, how can we solve some, if not all of the problems above? Having a clear bug bar and enforcing it willsignificantly help. If you think so, keep on reading.

Process

There was a lot of ambiguity while triaging bugs, and this was causing problems to the morale of the group, sowhatever solution we wanted to deploy would require the buy-off and agreement from the whole team. As firststep, I created the table below, where I made very clear: what was the impact of the bug, a nickname that wouldmap to the category of the bug, and a quick definition of the category.

Impact Name Definition

1 Ship Stopper

Reasonable region of a feature is not working as expectedbecause of the bug, and there is no workaround. We can not shipthe product with this bug active.

2 QFESerious bug. If a customer finds this bug, we will have to issue aQFE (patch).

3 PSS

This bug will cause Customer Support calls. Publishing KB articleis not enough, since workaround may not exist or be toocomplicated.

4Knowledge Base(KB)

This bug might be very visible and affect functionality significantly.In case it has a workaround, it is not so obvious or simple.

5 BugThis is a bug, but might be obscure, rare or have small impact.Normally it has an easy workaround.

6 ImprovementThis bug is hard to find, not noticeable, causes minor problems (ornone) and can be ignored.

7 Wish These might not be even considered bugs.

Another very useful point in the table was the use of colors, making it very easy for team members tounderstand the impact of the bug to customers and Microsoft. This table was explained to the whole team andput in the team internal’s web site, where it could be accessed by anyone, including Managers and the Warteam, where it could be used as reference during the triage process.

Now that the categories are set, next step is to determine for each feature of the product in which category it is,at this moment of the SDL. There are 2 crucial aspects here:

• Each feature should be considered independently, as some will be new and others will belegacy features; some will be under hard development or changes, while others will bestable, etc.;

• Through time, each feature will change its status, hopefully becoming more stable, andconsequently tightening the type of bugs being accepted.

So, for each product feature you need to determine its stage, which will work as a filter mechanism for futurebugs. You should consider many different aspects when making this decision, like current milestone in the SDL,development stage of the feature, if it is a new or legacy feature, risk and impact of making changes, etc. BelowI have an example with some features and their corresponding categories. You can see that one feature, SBAintegration, was at the Improvement level, since it was a new one that was still being developed, while others,like Reports and Import Export were at QFE level, mostly because they were old features that we did not wantto touch (unless big problems were found). This way, more bugs were being accepted in the first one than thelast two. At Microsoft we use the term “raise the bar” often, meaning that we are taking less bugs as times goesby, and the table allows members to see this in a graphical way too.

Page 34: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

8

Areas ReportsImportExport Forms Performance PDA

SBAIntegration

UserAssistance

1 Ship Stopper2 QFE

3 PSS

4 KB

5 Bug

6 Improvement 7 Wish

We stored this table in a web page, with public access to all team members. And it was often used during Warteam and triage meetings (more on it later). This way it was easy, fast and straightforward to decide what to dowhen we were faced with bugs. After triage was done, the results and resolutions made during the meetingwere sent to the team, with no real big surprises to team members, since they knew what to expect. And everytime any feature status changed, a new table was sent to the team and pushed to the web page for future triagemeetings – very clear and transparent process. Next I added 2 more tables with the same feature set that showhow the bug bar was raised and evolved thru time, approximately around Beta and close to RTM milestones (astime passed, we took less bugs for all features).

Beta:

Areas ReportsImportExport Forms Performance PDA

SBAIntegration

UserAssistance

1 Ship Stopper2 QFE

3 PSS

4 KB

5 Bug

6 Improvement 7 Wish

RTM:

Areas ReportsImportExport Forms Performance PDA

SBAIntegration

UserAssistance

1 Ship Stopper2 QFE

3 PSS

4 KB

Page 35: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

9

5 Bug

6 Improvement 7 Wish

Results

By using this procedure, we were able to ship the product on time, which was a big concern due to the amountof bugs that were being found during testing stage. The morale of the team increased significantly, sinceeverybody felt important and that the process was fair, focusing on the customer and shipping the best productwe could within the business limitations we had. Team members were engaged and continued looking for andopening bugs, even though they knew that some of them would not meet the bar set at the moment for specificfeature – the number of opened bugs did not go down, but the number of fixed bugs did, as expected, since wewere not fixing all bugs as before. By applying this bar we also reduced the number of regressions, since wewere not taking as many bugs as we would, and we considered the risk and state of the feature when definingthe bar. Overall, it showed to be an effective but simple process to handle product bugs.

Too many bugs - Triage/War team process

But even though we had defined the bug bar, the triage process is where the rubber meets the road, and wherebugs were ultimately accepted or rejected. But you might be asking: what is this War team or triage team? Whatdo they do? Simply speaking, it is a group of people, with representatives from all disciplines (test, dev, programmanager, user assistance, etc.), that makes important decisions about the product and work, including whichbugs will get fixed or won’t, among many other things, like schedule, issues, dependencies, etc.. Since we arefocusing on bugs, I presented below a quick flow of what happens to a bug from the moment it is found, until itgets closed in the bug database, and the role of the triage team:

TESTER DEVELOPER

TRIAGE/WARTEAM

1 – Tester opens bug and assigns to

Triage

2.1 – Triage assigns the bug back to tester for more information, or resolves the bug, applying the bug bar

2.2 – Triage assigns the bug to developer for

investigation

3 – Developer assigns the bug back to Triage, with all necessary

information to help Triage, like impact, risk, code reviewer and

tester, etc.

4.1 – Triage assigns the bug back to developer

for check-in4.2 – Triage decides to not fix the bug, so assigns to Test for

follow-up

5 – Developer checks-in the fix and assign the bug

to tester for closure

6 – Tester verifies the bug is fixed, writes automation, update Test

Plan, etc., and then closes the bug

Page 36: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

10

This process comes with a price though. As you can see, it takes time for a bug to get into the product, but weconsider it an acceptable one, especially at critical moments, like when getting close to public releases or end ofmilestones. Similar or same process is used in many different groups across Microsoft. The combination of thebug bar and the triage process gives the confidence to all team members that the decisions we are making arethe best ones, and are not unilateral or subjective.

And in case you want to make the process tighter, you could also enforce some requirements into the overallcheck in process, like mandating that all product check ins need to have bugs associated to them, and onlyallow check ins that were approved by triage (as in step 4.1, and that’s where Triage field in the bug databasebecomes handy). These changes might generate some problems with the developers’ team, especially ifcurrently they have total freedom to make changes to the product. But this brings more control over the product,and also a good side effect, which is that every change will have a bug associated to it, allowing the test team tovalidate them and become fully aware of all changes in the product! For a tester, this is closest to the idealscenario. ☺

Simple bug database analysis and charts

Assuming you have the bug database which stores all the information about all bugs found in the product (like ahistory of the product so far), what else can you do with it? Is there any way to extract more juice from this fruit?You probably have heard of Pareto Analysis, so there is no excuse to not use this technique with all the datayou have stored in your database. And as a Test Manager, you always need to collect metrics and indicators ofquality. Below I present some tables and charts that can be easily created by using Excel and the Pivot Tablesfeature in it, getting raw data directly from the SQL database designed using the fields presented previously (Iremoved some labels to keep the data confidential).

Name: Active bugs to individuals, with priority

0

20

40

60

80

100

120

140

160

Developers

Bug

s as

sign

ed 04

32

1

Why: We have this chart on our team web page. It shows who has most bugs on their plate,and quickly indicates the priority of them. Simply looking at this chart can trigger some loadbalancing and other activities.

Page 37: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

11

Name: Weekly resolution of product bugs, with types of resolution

Weekly Resolution of bugs - Linear

0

50

100

150

200

250

Weeks

Bug

s re

solv

ed

Won't Fix

Postponed

Not Repro

Fixed

External

Duplicate

By Design

Why: This chart gives you good idea about how active the dev team has been on dealing withthe bugs on their plate. It also shows how the bugs are being resolved. In this example, themajority are being fixed (about 60% of them).

Name: Active bugs per product feature with priorityCount of ID Priority Area 1 2 3 4 Grand TotalCustomization 18 38 20 2 78Financial Integration 16 36 17 69First Use 4 9 4 17Offline 14 32 28 3 77PPC - PDA 3 7 11 2 23Grand Total 55 122 80 7 264

Why: You can see where the active bugs are in the product. It only means that the found bugsare in these areas, but can be used to identify problematic areas, with many bugs, regressionsand potential risk to destabilize due to intense check ins. It might be used to pulse check testprogress in features, especially if table is generated in weekly manner.

Name: General bug trends.

Page 38: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

12

Bug Trends

0

200

400

600

800

1000

1200

Weeks

Bugs

OpenedResolvedClosedActivePoly. (Active)

Why: If you need to know which direction the product is going, this graph gives you some gooddata. You can see the trend in active bugs, and the weekly find/resolution/close rates. Thiskind of graph is also critical to check the pulse of product and alignment with schedule.

These are some of the graphs I quickly generated by using Excel and pivot tables. Modifying them and creatingnew ones is also very easy (simple drag drop of fields). But the key point here is that with this kind of informationyou can make better and more accurate decisions, and be more proactive and make adjustments on the fly.

Bugs and their relation to Exit and Release Criteria

Without getting into many details about Release Criteria, which could require a document for itself, I just wantedto point some suggestions and ideas of how to apply some criteria based on number of active and types of bugsin the product (note: this is just part of the criteria you could use, only focusing on the bugs matter). One simplething I was able to get into product release criteria was the amount of active bugs in the product should notexceed a preset and agreed number. Again, this criterion is defined and blessed by the leadership team, andthen communicated to all team members. One more time, we want transparency to the team, and in returnexpect commitment and engagement from them. Below, I have an example of how we could possibly havebugs and test cases as part of the Exit Criteria of a product thru different milestones.

Criteria/Goals M2 M3 Alpha Beta RC1 RTMPri 1 Bugs 0 active 0 active 0 active 0 active 0 active 0 activePri 2 Bugs NA NA 0 active 0 active 0 active 0 activePri 1 TC Pass Rate 100% 100% 100% 100% 100% 100%Pri 2 TC Pass Rate 60% 80% 90% 100% 100% 100%Pri 3 TC Pass Rate 40% 50% 70% 80% 90% 90%Pri 4 TC Pass Rate 40% 50% 50% 60% 80% 80%

Page 39: Anibal Sousa Microsoft Corporation - StickyMinds€¦ · 15 years of experience working in many IT departments, from software development to customer support. Anibal joined Microsoft

13

Few more ways to get bugs directly from customers

I talked a lot about bugs found during the SDL, but you should be prepared to deal with bugs that customers willfind after the product is released. And the more proactive you are, the quicker you will be to respond to them.But how can you become proactive? We are talking about customers outside of your working group, so youneed to have ways to communicate with them, or at least hear from them.

Instrumentation (Customer Experience and Microsoft Error Reporting, a.k.a. Watson)

If you have used new Microsoft products, like Windows XP or Office 2003, you probably have seen situationswhere a problem occurred and a message box showed up asking if you wanted to send this problem toMicrosoft, or if you wanted to participate in sending data to make the product better. These are mechanismsdeveloped by Microsoft to help individual teams solve real problems our customers are having. Even though thismight be tricky or hard to deploy, since it should not get private or confidential data from customers, and wouldrequire technology and servers to store the data, it gives you real critical data about customers’ pain, which thencan be used in multiple ways, like quick fixes, future service packs and/or next version improvements. For moredata on it, please look for information at the Microsoft web sites.

Customer Support

If your software goes to external customers, it is likely you will have some Customer Support group taking careof your customers. They are the main connection between you and your customers, so you should becomefriends with the folks working there. Sometimes I see the PSS group (how we call Customer Support here atMicrosoft) as an extension of the test team, since we share many values, concerns, tasks and activities. PSSprovides us with tables of incidents, repro scenarios, customer contact information, etc. They are a big help tous, filtering issues, keeping customers happy and allowing us to concentrate on solving the problems. So, thereis no reason to have a strong bond with your customer support team.

Newsgroups

Another way to listen to customers is the public newsgroups available in the internet. Even though there is a lotof traffic and noise in there, you can definitely get very useful information, and sometimes connect directly withcustomers. I have testers always asking for customer feedback and data, and this is a cheap and easy way forthem to gather this kind of information. There are cases where you can’t reproduce bugs, and you might findsomeone in the newsgroups experiencing it and willing to help you. I always encourage my team members tonavigate through them and see what customers are saying about your product, the good, the bad and the ugly.

Conclusion

If you are still reading this document, I hope you had a good time and were able to learn something new anduseful. I would be happy if you also believed that some of these ideas are really useful to your product and teamtoo. All of them worked pretty well in my team at Microsoft, and are also being used by other teams. Many ofthese ideas were introduced across the years by different people and products, and have survived the test oftime. If you have other ones, or have suggestions to improve them, feel free to contact me [email protected] or [email protected].

I wish all of you Happy Testing and good luck in your future endeavors.