anglian water at smart homes 2013 conference cambridge
DESCRIPTION
http://www.hvm-uk.com/smarthomes http://www.hvm-uk.com/smartgridsTRANSCRIPT
Weather Data and Automated ‘Real-time’ Control of Sewerage Systems Smart Homes & Cleanpower 2013 Conference 5 November 2013 Cambridge www.hvm-uk.com/smarthomes David Singerton Innovation, Anglian Water Services
A Changing World
Great Yarmouth 2006
"It's flash-flooding caused by prolonged torrential rain. The weathermen can predict rainfall but it's very hard to predict
where this kind of flooding can occur.”
Rainfall prediction
Real time Control
Flow Management Pump station Optimisation
Pollution prevention
Innovation Opportunities for Wastewater Networks
19/09/2006 17:10
PO INTTPOINTTPOINTT
AWS AM K now ledg e Centre
S tra teg ic Targ ets – Water In f ras tructu re
ANGLIANServiceability of water infrastructure assets
0.0
1.0
2.0
3.0
4.0
5.0
6.0
90-91 91-92 92-93 93-94 94-95 95-96 96-97 97-98 98-99 99-00 00-01 01-02 02-03 03-04 04-05 05-06
Year
Ratio
to A
ve o
f Act
uals
Pressure (DG2) Interruptions (DG3) Bursts Water quality (Fe zonal failures)
90-91 91-92 92-93 93-94 94-95 95-96 96-97 97-98 98-99 99-00 00-01 01-02 02-03 03-04 04-05 05-06 avgPressure (DG2)a 2.34 1.77 1.61 1.31 1.13 1.56 0.98 0.65 0.34 0.27 0.26 0.27 0.16 0.06 0.05 0.06 1.56Ratio to average 1.50 1.13 1.03 0.84 0.72 1.00 0.63 0.42 0.22 0.17 0.17 0.17 0.10 0.04 0.03 0.04 1.00Interruptions (DG3)b 0.14 0.09 0.25 0.77 0.11 0.40 0.10 0.03 0.01 0.09 0.72 0.37 0.08 0.05 0.16 0.45 0.19Ratio to average 0.76 0.49 1.35 4.16 0.59 2.16 0.54 0.16 0.05 0.49 3.89 2.00 0.43 0.27 0.86 2.41 1.00Burstsc 8,605 5,948 4,890 4,693 4,500 3,843 3,546 3,763 5,304 5,621 3,999 5,225 5,680 5,676 4,467 5,488 5,183Ratio to average 1.66 1.15 0.94 0.91 0.87 0.74 0.68 0.73 1.02 1.08 0.77 1.01 1.10 1.10 0.86 1.06 1.00Irond 62.56 56.31 55.41 44.70 35.38 27.75 26.21 20.10 17.86 14.94 9.33 10.00 7.25 7.89 4.94 26.71Ratio to average 2.34 2.11 2.07 1.67 1.32 1.04 0.98 0.75 0.67 0.56 0.35 0.37 0.27 0.30 0.18 0.00 1.00
4500450045004500450045004500490050005000Complaints
5.005.005.005.005.005.005.005.005.005.00Iron
4700
0.20
0.05
2011/12
4700
0.20
0.05
2010/11
4700
0.20
0.05
2009/10
4700
0.20
0.05
2008/09
4700
0.20
0.05
2007/08
4700
0.20
0.05
2006/07
4700
0.20
0.05
2012/13
4700
0.20
0.05
2013/14
5488
0.45
0.06
Current
0.05Pressure (DG2)
0.20Interruptions (DG3)
4700Bursts (Nr)
2014/15Target
G
R
A
R
BRAG
5.00
5488
0.45
0.06
Current
Iron
Pressure (DG2)
Interruptions (DG3)
Bursts (Nr)
A ctual
Ed it Targ ets
4 January 2006Date
Business PlanRef
1Scenario Number
Previous Targets
Password
Targets AbovePoint to � Below Cost Investment Analysis Data
Sewernet – Intelligent Networks
Wastewater Systems
Assets
Planning & Control
Operating &
maintaining
IT & Systems
Sensor Technology
Management & Control
Information Analysis
Wastewater Systems
Assets
Planning & Control
Operating &
maintaining
Wastewater Systems
Assets
Planning & Control
Operating &
maintaining
IT & Systems
Sensor Technology
Management & Control
Information Analysis
Weather Radar – Rainfall impact on Sewer Networks
Operational dashboard–monitor & analyse
A Changing World
Great Yarmouth 2013
“Flash-flooding can be caused by prolonged torrential rain. The weathermen can predict rainfall and we can now use this information to better manage our sewer networks to help protect against flooding.”
Thanks for listening