andré augustinus 26 october 2004 alice technical board dcs for ‘services’ costs on behalf of...

5
ALICE Technical Board André Augustinus 26 October 2004 DCS for ‘services’ costs On behalf of Lennart Jirdén

Upload: jordan-poole

Post on 03-Jan-2016

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén

ALICE Technical Board

André Augustinus26 October 2004

DCS for ‘services’

costs

On behalf of Lennart Jirdén

Page 2: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén

26 October 2004ALICE Technical BoardAndré Augustinus

LAN

WAN

Storage

Configuration DB,ArchivesFSM serversTerminal servers,ACR consoles, etc

Experimental equipment

Controller/PLC VME

Field Bus

LAN

Node Node

coolin

g

gas

Magnets

Rack

contr

ol

Ele

ctri

city

Safe

ty:

DSS

Safe

ty:

CSA

M

Infr

ast

ruct

ure

Services

Central DCS

Detectors

250K(racks, computers, network, cabling)

Total 1511K

Detailed costing per detector being prepared by Lennart.

(for a next TB)

Note: gas and cooling controls included in the overall costs of gas and cooling

Presented by Lennart

in September T

B

Page 3: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén

26 October 2004ALICE Technical BoardAndré Augustinus

Magnets

Rack control

Power distribution control

Safety: DSS

Safety: CSAM (LHC safety)

Experimental Environment

Services 664

185

200

152

70

20

Safety: Sniffer 200

Cost of services (detail)

L3 300 K

Dipole

364 K

Hardware (PLC etc.)

80 K

Sensors 2 K

Cabling 70 KSensors only; restcovered by LHC

50% by LHC50% ALICE

B-field, temperature, alignment etc. (only connection to DCS, not the sensors)

Nex

t sl

ide

Area monitoring+smoke det. Smoke detection covered by LHC;rest (20K) by TS/LEA

Total 1511K

20

Page 4: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén

26 October 2004ALICE Technical BoardAndré Augustinus

“Hazemeyer”

Racks

PLC

PC

LAN

T T T T T T T T

S S S S S S S S

LAN

CANbus

Rack control

Power distribution control

185

200

“interlock”

“PLC”

Services

Cost of services (detail)[Power distribution & racks]

Hardware

116 K

Software 22 K

Cabling 62 K

Rack monitoring

90 K

cabling 15 K

Smoke detection

80 K

Rack Mon.

Smoke detection

Page 5: André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén

26 October 2004ALICE Technical BoardAndré Augustinus

OverviewSystem Detail Cost Budget

Magnets L3 300 KCommon fund

Dipole 364 K

Rack Control Rack monitoring 90 K

Common fundCabling 15 K

Smoke detection 80 K

Power distribution control Hardware 116 K

Rack budgetSoftware 22 K

Cabling 62 K

Safety: DSS Hardware 80 K

Common fundSensors 2 K

Cabling 70 K

Safety: CSAM (LHC safety) CSAM system - - LHC budget

Sensors 70 K Common fund

Safety: Sniffer 200 K 100 K TS/LEA; rest (100 K) common fund

Smoke detection - - LHC budget

Area monitoring 20 K TS/LEA budget

Experimental environment 20 K TS/LEA budget

Total: 1171 K from common fund; 200 K from rack budget; 140 K from TS/LEA budget