Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Storage & Treatment Tanks
D/K Environmental -Ancillary Equipment Closure Procedure DKE Form TVC-IA Rev. (2-06)
Ancillary Equipment Interior SamplinglMonitoring:
rculationltransfer
If Monitoring wlFID:
Page 1 of 2
1"
M"
3
3
3
2"
1"
%"
Ball
Ball
Gate
Ball Check
Swing Check
Ball Check
Ball Check
Ball Check
Processflransfer line Reagent Injection Line Block valve at tanks
Processltransfer line Pump discharge
Processflransfer line Processflransfer line Reagent injection line
Record Readings:
Ancillary Equipment Release:
Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date:
Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Storage & Treatment Tanks
Ancillary Equipment Interior SamplinglMonitoring:
If Monitoring w/FID:
Record Readings:
ff-site Facility Name: nifestlBill of Lading:
DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06) Page 2 of 2
ABRS
(0 INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (pr~nt name) (s~gnature) (date)
DKE Form TVC-1
Employee: (pr~nt name) (s~gnature) (date)
Employee: (print name) (signature) (date)
Employee: I (print name) (s~gnature) (date)
TankNessel DataIService: TanWessel #: M-3
Diameter (feet): 10
Height (feet): 16
Initial Capacity (gal): 8,808
Primary Service: Acids
Other Service:
Tank Bottom Design:
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TankNessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date:
* **Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TAN WESSEL CLOSURE PROCEDURE
Supervisor: (print name) (s~gnature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanMVessel DataIService: TanWessel #: M-4
Diameter (feet): 10
Height (feet): 16
Initial Capacity (gal): 8,808
Primary Service: Acids
Other Service:
Tank Bottom Design:
Closure: Rinsate Volume: Transfer/Disposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume:
Liquid Gallons: Chain of Custody:
Vessel:
Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBiii of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
) INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TankJVessel DataIService: TankIVessel #: M-5
Diameter (feet): 8
Height (feet): 15
Initial Capacity (gal): 5,261
Primary Service: Acids
Other Service:
Tank Bottom Design:
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring wIFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
B **Attach Photos
DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (s~gnature) (date)
TanWessel DataIService: TanWessel #: M-6
Diameter (feet): 9
Height (feet): 6
Initial Capacity (gal): 3,876
Primary Service: Acids
Other Service:
Tank Bottom Design: Cone / Flat / (circle one)
Closure: Rinsate Volume: TransferlDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring w1FID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date:
a **Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Acid Bulk Receiving & Storage Unit
Ancillary Equipment Interior SamplingIMonitoring:
If Monitoring w/FID:
Record Readings:
ff-site Facility Name: anifesUBill of Lading:
DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)
Page 2 of 2
CSUW
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Silpervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService:
TanklVessel #: Container Storage Unit West
Diameter (feet): nla
Height (feet): nla
Initial Capacity (gal): nla
Primary Service: nla
Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Volume: TransferlDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release:
Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date:
**Attach Photos
D/K Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Container Storage Unit West
Page 1 of 2
Ancillary Equipment Interior SamplinglMonitoring:
If Monitoring w1FID:
Ancillary Equipment Release:
DIK Environmental - Ancillaiy Equipment Closure Procedure DKE Form TVC-IA Rev. (2-06)
Check discharge
----
Off-site Facility Name: ManifestlBill of Lading: Shipping Date:
Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Container Storage Unit West
Ancillary Equipment Interior Sampling/Monitoring:
If Monitoring wlFID:
I I I I I I I I I I
DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06) Page 2 of 2
CSSU
I TANKNESSEL CLOSURE PROCEDURE DKE Form TVC-1
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
Supervisor: (print name) (signature) (date)
Employee: (pr~nt name) (signature) (date)
Employee: I (print name) (signature) (date)
Employee: ate
TanldVesael DataIService: TankIVessel #: DCU-601
Diameter (feet): nla(est.3')
Height (feet): nla(est.9')
initial Capacity (gal): 2,550 GPH
Primary Service: Drum Crusher
Other Service:
Tank Bottom Design: Gone 1 Flat 1 Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring wIFID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
a **Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (s~gnature) (date)
Employee: (print name) (s~gnature) (date)
Employee: (print name) (signature) (date)
TanWessel DataJService: TankIVessel #: MX-601
Diameter (feet): n/a
Height (feet): n/a
Initial Capacity (gal): 2 cu. Yd.
Primary Service: Solids Mixer
Other Service:
Tank Bottom Design: Cone / Flat / Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankNessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
) INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (pr~nt name) (s~gnature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Tanmessel DataIService: TanWessel #: S-600
Diameter (feet): 9
Height (feet): 20
Initial Capacity (gal): 9,512
Primary Service: Reagent Powder
Other Service:
Tank Bottom Design: Gone 1 Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
Tanmessel Interior SamplingIMonitoring: If Monitoring wIFID: -
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
Tanmessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanldVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Consolidation of Solids & Sludges Unitt
ncillary Equipment Interior SamplinglMonitoring:
Off-site Facility Name: ManifesffBill of Lading:
Page 1 of 1
DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)
BSSU
I TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1
@ INSTRUCTIONS: Complete all sections, print name, sign, and date - submit t o Operations Supervisor
Supervisor: (print name) (signature) (date)
Employee: (print name) (Signature) (date)
Employee: (print name) (s~gnature) (date)
Employee: (print name) (S~gnature) (date)
TanldVessel DataIService: TankNessel #: Gondola (Railcar)
Diameter (feet): nla
Height (feet): nla
Initial Capacity (gal): 100 yd3
Primary Service: Container
Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
To:
TanldVessel Interior SamplinglMonitoring: If Monitoring w1FID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DatalService: TanWessel #: Portable Hopper
Diameter (feet): nla
Height (feet): n/a
Initial Capacity (gal): 2 yd3
Primary Service: Container
Other Service:
Tank Bottom Design: Cone I Flat 1 Dish (circle one)
Closure: Rinsate Volume: 1 Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: k Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
@ INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TAN WESSEL CLOSURE PROCEDURE
Supervisor: (print name) (s~gnature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (s~gnature) (date)
Employee: (print name) (signature) (date)
TanWessel DatalService:
TankIVessel #: Portable Hopper
Diameter (feet): nla
Height (feet): nla
Initial Capacity (gal): 1.5 yd3
Primary Service: Container
Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankJVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (prfnt name) (signature) (date)
DKE Form TVC-1
Employee: I (prfnt name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: I I (print name) (signature) (date)
TanWessel DataJService: TankIVessel #: Roll-off Bin
Diameter (feet): nla
Height (feet): nla
Initial Capacity (gal): 20 yd3
Primary Service: Container
Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release:
Date:
Off-site Facility Name:
ManifesUBill of Lading:
Shipping Date:
e **Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: I (print name) (signature) (date)
Employee: (print name) (signature) (date)
TankNessel DataIService: TanWessel #: Roll-off Bin
Diameter (feet): nla
Height (feet): nla
Initial Capacity (gal): 30 yd3
Primary Service: Container
Other Service:
Tank Bottom Design: Cone I Flat I Dish (clrcie one)
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
To:
TankJVessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifestlBill of Lading:
Shipping Date:
a **Attach Photos
DIK Environmental - TankiVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: 1 (pnnt name) (signature) (date)
DKE Form TVC-1
Employee: (pr~nt name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TankNessel DatalService: TanWVessel #: Roll-off Bin
Diameter (feet): nla
Height (feet): n/a
Initial Capacity (gal): 40 yd3
Primary Service: Container
Other Service:
Tank Bottom Design: Cone 1 Flat 1 Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestlBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Bulk Solids & Sludges Unitt
Ancillary Equipment Interior SamplingNonitoring:
Page 1 of 1
DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)
RLUU
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (pr~nt name) [s~gnature) (date)
DKE Form TVC-1
Employee: (print name) (s~gnature) (date)
Employee: \ (print name) (s~gnature) (date)
Employee: I (print name) (s~gnature) (date)
TanWessel DataIService: TanWessel #: Railcar Loading & Unloading Unit
Diameter (feet): n/a
Height (feet): nla
Initial Capacity (gal): nla
Primary Service: nla Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
a Date Emptied: Gallons: Date: Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Faceity: To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestlBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Railcar Loading & Unloading Unit
Ancillary Equipment Interior SamplinglMonitoring:
Record Readlngs
ff-s~te Faclllty Name: an~festIB~II of Ladlng
Page 1 of I
D/K Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)
VAPOR RECOVERY
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (s~gnature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService: TankIVessel #: C-710
Diameter (feet): 2.3
Height (feet): 8.7
Initial Capacity (gal): 47
Primary Service: Inorganic Scrubber
Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Vol~me: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TanWessel Interior SamplingIMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestJBill of Lading:
Shipping Date:
a **Attach Photos
D/K Environmental - TankiVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKIVESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (s~gnature) (date)
Employee: (print name) (s~gnature) (date)
TanWVessel DataIService: TanWessel#: 0-706
Diameter (feet): 3
Height (feet): 4
Initial Capacity (gal): 150
Primary Service: Caustic RecirculationIBleed Drum
Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
To:
TanWVessel Interior SamplinglMonitoring: If Monitoring w/FID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWVessel Release: Date:
Off-site Facility Name:
ManifestlBill of Lading:
Shipping Date:
**Attach Photos
Page 2 of 2
D/K Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04)
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (print name) (s~gnature) (date)
DKE Form TVC-1
Employee: 1 (print name) (signature) (date)
Employee: (print name) (s~gnature) (date)
Employee: (print name) (signature) (date)
TanMVessel DataIService:
TanWessel #: D-708
Diameter (feet): 3
Height (feet): 4
Initial Capacity (gal): 200
Primary Service: Caustic for C-710
Other Service:
Tank Bottom Design: Cone 1 Flat I Dish (circle One)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings.
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date:
0 **Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService: TanWessel #: TOX-700
Diameter (feet): nla
Height (feet): nla
Initial Capacity (gal): 1.0 mmbtulhr.
Primary Service: Thermal Oxidizer
Other Service:
Tank Bottom Design: Cone 1 Flat 1 Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
Tanmessel Interior SamplinglMonitoring: If Monitoring wlFID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestlBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2 i
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKIVESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TankNessel DataJService: TanldVessel #: C-711
Diameter (feet): 2.3
Height (feet): 8.7
Initial Capacity (gal): 47
Primary Service: Caustic scrubber - Organic System
Other Service:
Tank Bottom Design: Cone I Flat / Dish (circle one)
Closure: Rinsate Volume: TransferIDisgosal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifesUBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (s~gnature) (date)
DKE Form TVC-1
Employee: (print name) (s~gnature) (date)
Employee: (print name) (s~gnature) (date)
Employee: (print name) (signature) (date)
TankNessel DataIService:
TanWessel #: D-707
Diameter (feet):
Height (feet):
Initial Capacity (gal): 55
Primary Service: Caustic recirculation/Bleed Drum
Other Service:
Tank Bottom Design: Cone / Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
To:
TankNessel Interior SamplinglMonitoring: If Monitoring w/FID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date:
**Attach Photos
D/K Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
I TANKNESSEL CLOSURE PROCEDURE DKE Form TVC-1
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
Supervisor: (print name) (signature) (date)
Employee: (print name) (s~gnature) (date)
Employee: (print name) (signature) (date)
Tank Bottom Design: Cone I Flat / Dish (circle one)
Employee:
Closure: Rinsate Volume: TransferIDisposal Destination:
I
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
(print name) (signature) (date)
TanWessel DataIService: TankNessel #: D-709
Diameter (feet):
Height (feet):
Initial Capacity (gal): 3.5
Primary Service: Caustic Make-up (Reagent) to C-711
Other Service:
To:
TanWessel Interior SamplingIMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanVVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-1A HWMU: Vapor Recover System (TOX-700, C-711, 0-707, D-709)
Ancillary Equipment Interior SamplinglMonitoring:
If Monitoring wlFID:
DiK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-lA Rev. (2-06)
Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Vapor Recovery System (C-710, D-706, D-708)
ncillary Equipment Interior SamplingIMonitoring:
Page 1 of 2
DIK Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-1A Rev. (2-06)
BULK REAGENT
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: I (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService: TankNessel #: T-726
Diameter (feet): 7.5
Height (feet): 9.83
Initial Capacity (gal): 2,700
Primary Service: Reagent
Other Service:
Tank Bottom Design: Cone I I Dish (circ e one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestlBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankiVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
I TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1 1 INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
Supervisor: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (prtnt name) (signature) (date)
TanWessel DataIService: TankIVessel #: T-727
Diameter (feet): 7.5
Height (feet): 9.83
Initial Capacity (gal): 2,700
Primary Service: Reagent
Other Service:
Tank Bottom Design: Cone 1 9 I Dish (circ e one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release:
Date:
Off-site Facility Name:
ManifestlBill of Lading:
Shipping Date:
**Attach Photos
D/K Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
1 TANKNESSEL CLOSURE PROCEDURE DKE Form TVC-1
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
Supervisor: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (pr~nt name) (signature) (date)
TanWessel DataIService: TanWessel #: T-741
Diameter (feet): 7.5
Height (feet): 9.83
initial Capacity (gal): 2,700
Primary Service: Reagent
Other Service:
Tank Bottom Design: Cone I Flat 1 Dish P (circ e one)
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring wIFID: ~ -
Date: Date:
Time: Time:
Lab Namc: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TankiVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit t o Operations Supervisor
TANWESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: 1 (print name) (s~gnature) (date)
Employee: 1 (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel#: T-791
Diameter (feet): 10
Height (feet): 10.33
Initial Capacity (gal): 5,000
Primary Service: Reagent
Other Service:
Tank Bottom Design:
Closure: Rinsate Volume: TransferlDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
Tanmessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanldVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANWVESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService: TankNessel #: T-792
Diameter (feet): 8.5
Height (feet): 10.33
Initial Capacity (gal): 3,750
Primary Service: Reagent
Other Service:
Tank Bottom Design: Cone 1 9 I Dish (circ e one)
Closure: Rinsate Volume: TransferIDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifesUBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04)
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: I (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (pr~nt name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService:
Tanmessel #: T-793
Diameter (feet): 7.5
Height (feet): 8.58
Initial Capacity (gal): 2,560
Primary Service: Reagent
Other Service:
Tank Bottom Design:
Closure: Rinsate Volume: TransferlDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility: To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
a **Attach Photos
DIK Environmental - TanWessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
Ancillary Equipment Closure Procedure - DKE Form TVC-IA HWMU: Bulk Reagent Tank System
Ancillary Equipment Interior SamplingIMonitoring:
If Monitoring w/FID:
Flanges
Pipeline
D/K Environmental - Ancillary Equipment Closure Procedure DKE Form TVC-IA Rev. (2-06)
1"
%"
3
2"
1"
3
2
1 "
W
ball
ball
Chemical transfer Process
Process Process
Reagent transfer line block valves Reagent transfer pump sample spigot
Reagent fill line connection Reagent pumps suction line Reagent pumps discharge & transfer
Reagent fill line
Reagent pumps suction Reagent transfer Reagent injection
-----
Start Time:
Record Readings:
Ancillary Equipment Release:
Date:
Off-site Facility Name: ManifesffBill of Lading:
Shipping Date:
Page 1 of 1
SUMPS
TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1 I INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
Supervisor: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TankNessel DataIService: TanWessel #: Sump 5
Diameter (feet): 38.17 x 6.75
Height (feet): n/a
Initial Capacity (gal): 6,579
Primary Service: Non-Haz Wastewater
Other Service:
Tank Bottom Design: Cone I Flat I Dish (circle one)
Closure: Rinsate Volume: TransferlDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TankNessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifestBill of Lading:
Shipping Date:
a **Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: I (pr~nt name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (s~gnature) (date)
TankNessel DatalService: TanWessel #: Sump 10 (PP-010)
Diameter (feet): 6 x 6
Height (feet): n/a
Initial Capacity (gal): 1,885
Primary Service: Wastewater
Other Service:
Tank Bottom Design: Cone / Flat I Dish (circle one)
Closure: Rinsate Volume: TransferlDisposal Destination:
0 Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TankNessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifestBill of Lading:
Shipping Date:
t **Attach Photos
Page 2 of 2
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04)
CONTAINMENT AREAS
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (prtnt name) (signature) (date)
DKE Form TVC-1
Employee: (pr~nt name) (signature) (date)
Employee: (prlnt name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DatalService: TankIVessel #: Containment Area A
Diameter (feet):
Height (feet):
Initial Capacity (gal):
Primary Service:
Other Service:
Tank Bottom Design: Cone 1 Flat I Dish (circle one)
Closure: Rinsate Volume: TransferlDisposal Destination:
Date Emptied Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TankNessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TankNessel Release: Date:
Off-site Facility Name:
ManifesffBill of Lading:
Shipping Date: -
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
Employee: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanldVessel DatalService: TanWessel #: Containment Area B
Diameter (feet):
Height (feet):
Initial Capacity (gal):
Primary Service:
Other Service:
Tank Bottom Design: Cone I Flat 1 Dish (circle one)
Closure: Rinsate Volume: TransferlDisposal Destination: Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
TanldVessel Interior SamplinglMonitoring: If Monitoring w1FID: Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanldVessel Release: Date:
Off-site Facility Name:
ManifesUBill of Lading:
Shipping Date:
a **Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-I Rev. (8-04) Page 2 of 2
I TANWESSEL CLOSURE PROCEDURE DKE Form TVC-1
INSTRUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
Supervisor: (print name) (signature) (date)
Employee: (pdnt name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService: TankNessel #: Containment Area C
Diameter (feet):
Height (feet):
Initial Capacity (gal):
Primary Service:
Other Service:
Tank Bottom Design: Cone 1 Flat I Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
a Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring wlFID:
Date: Date:
Time: Time:
Cab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
e **Attach Photos
DIK Environmental - TankIVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
NSl-RUCTIONS: Complete all sections, print name, sign, and date - submit to Operations Supervisor
TANKNESSEL CLOSURE PROCEDURE
Supervisor: (print name) (signature) (date)
DKE Form TVC-1
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
Employee: (print name) (signature) (date)
TanWessel DataIService:
TankNessel #: Containment Area D
Diameter (feet):
Height (feet):
Initial Capacity (gal):
Primary Service:
Other Service:
Tank Bottom Design: Cone 1 Flat 1 Dish (circle one)
Closure: Rinsate Volume: TransferIDisposal Destination:
Date Emptied: Gallons: Date:
Date: Tank #:
Waste Volume: Vessel:
Liquid Gallons: Chain of Custody: Facility:
To: Date:
Solids:
To:
TanWessel Interior SamplinglMonitoring: If Monitoring w1FID:
Date: Date:
Time: Time:
Lab Name: Record Readings:
Analytical Date:
TanWessel Release: Date:
Off-site Facility Name:
ManifestIBill of Lading:
Shipping Date:
**Attach Photos
DIK Environmental - TanWVessel Closure Procedure DKE Form TVC-1 Rev. (8-04) Page 2 of 2
Bankof America -* BANK OF hMRR.TCA - CONFLWUN'I'IAL PAW: 1
I A I APRIL 27, 200'1
~MENDMENT TO IRREVOCAELO STANDBY' L ~ T E R OF cnGnrrp ~ m m : 3009169
ISSUING BANK WK os A ~ R L C A , N . A . 1000 W. TmPLE STREET
DLRECTOK, DEPARTMENT OF TOXIC SUBSTANCES CONTROL FINANCIAL RESPONSTRTT,ITY UNT'I' 8800 CAL CENTER DRXVE
7'rH FLOOR, CA~-505-07-05 LO$ ANGELES, CA 90012-1514
Tl.lTS AMEM)MEN'17 IS TO EE CONSIDEREIJ AN INTEGRAL PAW' OP THE AROVE CREDIT AN13 MUST BE AWACWED THERETO.
THE Ai3OVE WiiTSONED CREDIT IS AMRNDED AS FOLLOWS:
'1~1g AMOUNT OF TXIS CREDIT HAS BEEN XNCREASED BY USD 2 5 , 6 4 9 . ~ ~ THE AGC;lZEGArl'E AMOUNT OF THE CREIJTT IS WOW. USD 941,681.92
ALL OTFlFR TERMS AND CONDITIONS REMAIN WNCWGED.
IF YOU REQUIRE: ANY ASSISTANCE OR WAVE ANY QUESTIONS REGARUXNC THIS AMENDMFXT, PLEASE CRLL 213-481-'1843. *
- .. LL' ---------- AU TURE
THIS DOCUMENT CONSTSTS OE' 1. PAGE(S).
CHERVL JEFFERSON
ORIGINAL
uS.it.1186D 7 J O W
QPR 27 2007 16:13 2135808445 PRGE .02