  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    1/22

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    2/22

    Project objectives

    Brief history of public procurement system of Georgia

    Analysis of public procurement system

    Conclusion and recommendations

    2

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    3/22

    Improvement of public procurement system and policy ofGeorgia

    Analysis of public procurement system

    Analysis of best foreign practices

    Preparing recommendations in order Georgian

    procurement system to be in correspondence tointernational standards and best practice

    3

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    4/22

    Table 1. General government expenditure on goods and services

    2007 2008 2009 2010 2011 2012 2013 2014

    Goods and services

    (million GEL) 1591 1606 1105 1139 1211 1298 985 1079

    As percent of budget

    Expenditures 36.3 29.7 20.5 20.8 21.7 21.4 15.4 15.0

    As percent of GDP 9.4 8.4 6.1 5.5 5.0 5.0 3.6 3.7

    Source: Ministry of Finance of Georgia

    In 2007-2013 total expenditure of the budget on public procurement was almost 9billion GEL.

    Including non budgetary public organizations, in 2012 the indicator of totalprocurement is 2.8 billion GEL

    4

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    5/22

    Expanses on public procurement tax payers money/publicproperty

    Main principles of spending:

    Transparency Econom

    Efficiency

    Quality of the procured goods and services - one of the key

    factor of public institutions efficiency

    5

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    6/22

    Procurement system reform began in January 2010

    Before the reform:

    - Unsuccessful system

    - Lack of transparency

    - Limited competition

    - Bureaucratic procedures

    - High risk of corruption

    6

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    7/22

    The reform had five main goals:

    Transparency Non discrimination Fair selection

    Easy procedures

    Electronic system of state procurement start functioningSince October 2010

    Paper based tenders were completely substituted by theelectronic tender within two months

    7

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    8/22

    By the end of 2012, electronic system had 14 801 registered users,among them 3 927 were procuring entities and 10 847 suppliers

    In 2011, number of suppliers were 7 400

    In 2011-2012 , 300 million GEL was saved

    White and black lists of suppliers

    Dispute resolution board, which consists of 3 representatives of state

    procurement agency and 3 representatives of civil society

    8

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    9/22

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    10/22

    Number of contracts in 2012

    Goods

    9984

    Services

    4614

    Cost (mln GEL)

    Goods 437

    Constructions 702

    Services 253

    Source: Competition and State Procurement Agency

    Constructions

    3890

    10

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    11/22

    The method of state procurement:

    Electronic tender for 200 000 GEL or more value goods andservices in a year

    Simplified electronic tender for under 200 000 GEL value goodsand services in a earSimplified procurement

    Design contest

    Electronic tender

    Simplified electronic tender Simplified procurement for under 5 000 GEL value goods andservices or for specific cases

    Design contest alternative procurement method for design(project) services

    11

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    12/22

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    13/22

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    14/22

    Public procurement by means of procurement, 2012

    5

    55

    Simplified procurements

    45 percent of public money is spent in less competitive environmentSource: Competition and State Procurement Agency

    55

    14

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    15/22

    Contract value Number of contracts Cost (GEL)

    Under 5 000 GEL 443670 1.1 billion

    5 000 - 50 000 GEL 24947 0.4 billion

    50 000 - 500 000 GEL 4712 0.7 billion

    Statistics of simplified procurements, sum of 2011-2013 indicators

    1 - 10 mln GEL 315 0.9 billion

    10 - 50 mln GEL 20 0.3 billion

    Above 50 mln GEL 7 1.5 billion

    Total 473671 5 billion

    Source: Competition and State Procurement Agency

    15

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    16/22

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    17/22

    Advantages of a systemAdvantages of electronic system of state procurement:

    -Transparency

    - Competition

    - Easy procedures

    - Low risk of corruption

    - Savings

    - Technically well designed

    17

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    18/22

    Problems of a systemProblems:

    - Quality of procured goods and services, especially in constructionservices

    - Quality of preparing technical requirements

    - ua y o prepar ng ec n ca sen ences

    - Planning of procurements

    - High share of simplified procurements

    - Consolidated tenders and small business

    18

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    19/22

    RecommendationsTo improve the quality of procured goods and services:

    Standardization of the most frequently procuredgoods and services

    Ca acit buildin in re arin technical re uirements

    Capacity building in preparing technical sentences

    To reduce the list of those procurements, which arenot covered by the state procurement low

    19

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    20/22

    To minimize the simplified procurements

    To improving planning of procurements by procuringagencies

    Desired:

    Recommendations

    To prepare catalogues for available goods and services

    To improve the qualification of the members oftender commission of procuring entities

    20

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    21/22

    Further goals of researchTo study the best international practices of state

    procurements

    To study the environment and ways how toimplement international best practices in Georgia

    To prepare final recommendations for increasing thequality of procured goods and services significantly

    21

  • 8/12/2019 Analysis of the State Procurement Policy of Georgia

    22/22

    Thank you for your attention!

    [email protected]

    22