analisis angka aman stabilitas lereng …repository.ump.ac.id/386/1/cover_gadis ayudya...
TRANSCRIPT
i
ANALISIS ANGKA AMAN STABILITAS LERENG JALAN
GUNUNG TUGEL - BANYUMAS DENGAN METODE
FELLENIUS DAN PROGRAM SLOPE/W
SKRIPSI
GADIS AYUDYA PRADINI
1203010038
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH PURWOKERTO
AGUSTUS 2016
ii
ANALISIS ANGKA AMAN STABILITAS LERENG JALAN
GUNUNG TUGEL - BANYUMAS DENGAN METODE
FELLENIUS DAN PROGRAM SLOPE/W
SKRIPSI
diajukan sebagai salah satu syarat untuk memperoleh gelar Sarjana Teknik
GADIS AYUDYA PRADINI
1203010038
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH PURWOKERTO
AGUSTUS 2016
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
iii
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
iv
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
v
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
vi
HALAMAN PERSEMBAHAN
Puji syukur kehadirat Allah SWT yang telah melimpahkan rahmat dan
hidayah-Nya sehingga penulis dapat menyelesaikan Skripsi ini dengan judul
“Analisis Angka Aman Stabilitas Lereng Jalan Gunung Tugel – Banyumas
Dengan Metode Fellenius Dan Slope/W”. Penulis menyadari bahwa
terselesaikannya Skripsi ini tidak lepas dari bantuan banyak pihak, maka rasa
terima kasih penulis persembahkan kepada :
1. Ibu (Sulastri) dan Budhe (Mu‟irah) tericnta yang selama ini memberikan
kasih sayang yang begitu besar dan senantiasa memberikan usaha berupa
dukungan dari segala aspek serta doa yang selalu dipanjatkan untuk
mengiringi perjalanan hidup penulis. Tak pernah cukup penulis membalas
sayang dan cinta kalian sampai kapanpun.
2. Untuk Kakak (Angger Hebat Pradana) dan Adik (Dinda Ananing Riski)
yang tercinta, terimakasih sudah selalu mendukung dan selalu
menyemangati.
3. Bapak Amris Azizi,S.T., M.Si dan Ibu Sulfah Anjarwati,S.T., M.T.,
terimakasih atas bimbingan,saran, motivasi dan ilmu yang telah diberikan
selama ini.
4. Bapak Ibu Dosen yang telah mendidik dan memberikan ilmu dan
pengetahuan tentang dunia Teknik Sipil dengan sepenuh hati.
5. Teman – teman seperjuangan Teknik Sipil angkatan 2012, khususnya
sahabat – sahabat Indo Alcander.
6. Arief Khabibur Rohman yang selalu mendukung, menyemangati, dan
berusaha mengubah kegalauan dengan keceriaan.
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
vii
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
viii
KATA PENGANTAR
Assalamu’alaikum Wr. Wb.
Alhamdulillahirobbil‟alamin, puji syukur kehadirat Allah SWT yang telah
melimpahkan rahmat dan hidayah-Nya sehingga dapat menyelesaikan Tugas
Akhir dengan judul “Analisis Angka Aman Stabilitas Lereng Jalan Gunung Tugel
– Banyumas Dengan Metode Fellenius Dan Slope/W”.
Skripsi ini merupakan rangkaian mata Kuliah Program Studi Teknik Sipil
yang harus diselesaikan oleh setiap Mahasiswa guna memenuhi syarat untuk
mencapai gelar Sarjana Teknik pada Program Studi Teknik Sipil Universitas
Muhammadiyah Purwokerto.
Penulis menyadari terselesaikannya Skripsi ini tidak lepas dari bantuan
dan bimbingan dari pihak lain. oleh karena itu, pada kesempatan ini penulis
mengucapkan terima kasih kepada:
1. Drs. H. Syamsuhadi Irsyad, S.H., M.Hum. Selaku Rektor Universitas
Muhammadiyah Purwokerto.
2. M. Taufik Tamam, S.T., M.T. Selaku Dekan Fakultas Teknik Universitas
Muhammadiyah Purwokerto.
3. M. Agus Salim, ST., MT. Selaku Ketua Program Studi Teknik Sipil
Universitas Muhammadiyah Purwokerto.
4. Amris Azizi, ST., M.Si., selaku pembimbing I dan Sulfah Anjarwati,, ST.,
MT selaku pembimbing II.
5. Bapak/ Ibu Dosen dan Staf Karyawan Fakultas Teknik Sipil Universitas
Muhammadiyah Purwokerto.
6. Teman-teman Mahasiswa Fakultas Teknik Universitas Muhammadiyah
Purwokerto.
7. Semua pihak yang telah membantu kelancaran penyusunan Tugas Akhir ini.
Penulis menyadari bahwa Laporan Tugas Akhir ini masih jauh dari
kesempurnaan dikarenakan keterbatasan waktu dan kemampuan yang dimiliki
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
ix
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
x
ANALISIS ANGKA AMAN STABILITAS LERENG JALAN
GUNUNG TUGEL - BANYUMAS DENGAN METODE FELLENIUS DAN
PROGRAM SLOPE/W
Gadis Ayudya Pradini, Amris Azizi, S.T., M.Si., Sulfah Anjarwati, S.T., M.T.
ABSTRAK Ruas jalan Pegalongan-Gunung Tugel sepanjang 4,9 km dengan lebar 8-10
m, termasuk dalam jalan Provinsi dengan kelas jalan IIIA mengalami kerusakan
pada awal bulan Februari 2015. Penelitian ini bertujuan menganalisis stabilitas
lereng pada ruas jalan Gunung Tugel – Kabupaten Banyumas menggunakan
metode Fellenius dan Program Slope/W. Hasil analisis menunjukan bahwa pada
titik koordinat S 07° 28. 076 ´ dan E 109° 14. 027´ (Sta 2 + 850) dengan
menggunakan metode Fellenius didapatkan angka aman F = 1,20 > 1 ,dan
menggunakan program Slope/W didapatkan F = 1,230 Sehingga Lereng Stabil.
Pada titik koordinat S 07° 28. 389´ dan E 109° 14. 091´ (Sta 2 + 200)
menggunakan metode Fellenius didapatkan F = 1,28 >1, dan menggunakan
program Slope/W didapatkan F = 1,252 Sehingga Sehingga Lereng Stabil. Pada
titik koordinat S 07° 28. 432´ dan E 109° 14. 093´ (Sta 2 + 000) dengan
menggunakan metode Fellenius didapatkan angka aman F = 1,48 > 1 , Sedangkan
menggunakan program Slope/W didapatkan F = 1,476 > 1 Sehingga Lereng Stabil
(Aman).
Kata Kunci : Angka Aman, Stabilitas Lereng, Jalan Gunung Tugel,Fellenius,
Slope/W.
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
xi
AN ANALYSIS OF STABILITY AND SAFETY FACTOR TO
SLOPE OF GUNUNG TUGEL-BANYUMAS ROAD THROUGH
FELLENIUS AND SLOPE/W METHODS
Gadis Ayudya Pradini, Amris Azizi, S.T., M.Si., Sulfah Anjarwati, S.T., M.T.
ABSTRACT Pegalongan-Gunung Tugel road spends 4,9 km and 8-10 m width, it is part
of provincial road in IIIA class with a landslide in early February 2015. The
research aimed to analyze the slope stability in Gunung Tugel- Banyumas through
Fellenius and Program Slope/W methods. The research found that in the
coordinate S 07° 28. 076 ´ and E 109° 14. 027´ (Sta 2 + 850) through Fellenius
method obtained the safety factor F =1,20 > 1, and Slope/W showed F =1,230 so
the slope was stable. In S coordinate 07° 28. 389´ dan E 109° 14. 091´ (Sta 2 +
200) through Fellenius method,it proved the safety factor was F =1,28 >1, and the
Slope/W method obtained F =1,252 so the slope was stable. In S coordinate 07°
28. 432´ and E 109° 14. 093´ (Sta 2 + 000) through Fellenius method obtained the
safety factor was F =1,48 > 1, , and the Slope/W program obtained F =1,476 so
the slope was stable.
Key Words : Safety Factor, Slope Stability, Gunung Tugel Road, Fellenius,
Slope/W.
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
xii
MOTTO
“ Hijab adalah Identitas Muslimah “
“ Kebaikan menghapus/melenyapka keburukan “
“ Senyum adalah Sedekah Terindah “
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
xiii
DAFTAR ISI
Halaman
HALAMAN JUDUL ....................................................................................... i
HALAMAN PERSETUJUAN ......................................................................... ii
HALAMAN PENGESAHAN ......................................................................... iii
HALAMAN PERNYATAAN ORISINALITAS ............................................. iv
HALAMAN PERSEMBAHAN ..................................................................... v
HALAMAN PERSETUJUAN PUBLIKASI KARYA ILMIAH .................... vi
KATA PENGANTAR .................................................................................... vii
ABSTRAK ....................................................................................................... ix
ABSTRACT ....................................................................................................... x
MOTTO ........................................................................................................... xi
DAFTAR ISI ................................................................................................... xii
DAFTAR GAMBAR ...................................................................................... xiv
DAFTAR TABEL ............................................................................................ xv
DAFTAR LAMPIRAN ................................................................................... xvi
BAB 1 : PENDAHULUAN
A. Latar Belakang .................................................................................... 1
B. Rumusan Masalah .............................................................................. 2
C. Tujuan Penelitian ............................................................................... 3
D. Manfaat Penelitian ............................................................................. 3
E. Batasan Masalah ................................................................................ 3
BAB II : TINJAUAN PUSTAKA DAN LANDASAN TEORI
A. Tinjauan Pustaka .................................................................................. 5
B. Landasan Teori ..................................................................................... 7
1. Teori Kelongsoran ......................................................................... 7
2. Stabilitas Lereng (Slope Stability) ................................................ 9
3. Angka Keamanan ......................................................................... 9
C. Analisis Stabilitas Lereng .................................................................. 11
1. Prosedur Massa (Mass Procedure) ............................................... 11
2. Metode Irisan (Methode Of Slice) ................................................ 11
D. Geostudio (SlOPE/W) .......................................................................... 14
BAB III : METODOLOGI PENELITIAN
A. Lokasi Penelitian ................................................................................. 16
B. Cara Pengumpulan Data ....................................................................... 17
1. Metode Literatur ........................................................................... 17
2. Metode Observasi .......................................................................... 17
C. Jenis Data ............................................................................................. 17
1. Data Primer .................................................................................. 17
2. Data Sekunder ............................................................................... 17
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
xiv
D. Teknik Analisis Data ............................................................................ 17
1. Metode Ordinary/ Metode Fellenius ............................................ 17
E. Tahapan Penelitian .............................................................................. 19
F. Program Geostudio 2007 Slope/W ..................................................... 20
BAB IV : HASL DAN PEMBAHASAN
A. Letak dan Kondisi Umum Ruas Jalan Gunung Tugel – Kabupaten
Banyumas ............................................................................................ 27
B. Kondisi Kerusakan .............................................................................. 29
C. Kondisi Tanah ..................................................................................... 30
D. Kondisi Topografi dan Vegetasi ......................................................... 31
E. Data Teknis Tanah dan Kemiringan Lereng ....................................... 31
1. Titik Pengamatan pada Sta 2 + 850 .............................................. 31
2. Titik Pengamatan pada Sta 2 + 200 .............................................. 36
3. Titik Pengamatan pada Sta 2 + 000 .............................................. 40
BAB VKESIMPULAN DAN SARAN
A. Kesimpulan ......................................................................................... 45
B. Saran ............................................................................................. 45
DAFTAR PUSTAKA .................................................................................... 46
LAMPIRAN
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
xv
DAFTAR GAMBAR
Gambar 2.1 Model Pembagian Irisan dan Gaya – Gaya yang Bekerja
Pada Irisan ........................................................................................ 14
Gambar 2.2. Kohesi dari Titik Pusat Ligkaran untuk (β) < 53° ........................... 15
Gambar 2.3 Tampilan Kerja Geostudio “ Slope/W” ........................................... 17
Gambar 3.1 Peta Lokasi Penelitian ..................................................................... 18
Gambar 3.2 Model Pembagian Irisan dan Gaya – Gaya yang Bekerja
Pada Irisan ........................................................................................ 20
Gambar 3.3 Langkah Penelitian .......................................................................... 22
Gambar 3.4 Tampilan Lembar Kerja awal Geostudio 2007 ............................... 23
Gambar 3.5 Tampilan Kotak Dialog Page .......................................................... 24
Gambar 3.6 Tampilan Kotak Dialog Scale ......................................................... 24
Gambar 3.7 Tampilan Kotak Dialog Grid ........................................................... 25
Gambar 3.8 Tampilan Geometri Lereng ............................................................. 27
Gambar 3.9 Tampilan Kotak dialog Analisis Setting ......................................... 27
Gambar 3.10 Tampilan Kotak dialog Keyln Soil Properties ................................ 28
Gambar 3.11 Tampilan Hasil Kotak dialog Verify Data ...................................... 29
Gambar 3.12 Tampilan Kotak dialog SOLVE ...................................................... 30
Gambar 4.1 Tipikal Eksisting Struktur pada lokasi penelitian Ruas Jalan
Gunung Tugel – Kabupaten Banyumas .......................................... 32
Gambar 4.2 Peta Lokasi Ruas Jalan Gunung Tugel – Kabupaten
Banyumas ......................................................................................... 33
Gambar 4.3 Kondisi Kerusakan Ruas Jalan Gunung Tugel –
Kabupaten Banyumas ....................................................................... 34
Gambar 4.4 Kondisi kemiringan Lereng Titik 1 pada Sta 2 + 850 ...................... 36
Gambar 4.5 Tinggi dan Kemiringan Lereng pada Sta 2 + 850 ........................... 37
Gambar 4.6 Pembagian Pias Pada Lereng Sta 2 + 850 ....................................... 39
Gambar 4.7 Hasil Perhitungan Angka Keamanan (F) Menggunakan
Slope/W Sta 2 + 850 ....................................................................... 40
Gambar 4.8 Kondisi kemiringan Lereng Titik 2 pada Sta 2 + 200 ...................... 41
Gambar 4.9 Tinggi dan Kemiringan Lereng Pada Sta 2 + 200 ........................... 42
Gambar 4.10 Pembagian Pias Pada Lereng Sta 2 + 200 ....................................... 44
Gambar 4.11 Hasil Perhitungan Angka Keamanan (F) Menggunakan
Slope/W Sta 2 + 200 ....................................................................... 45
Gambar 4.12 Kondisi kemiringan Lereng Titik 3 pada Sta 2 + 000 ...................... 46
Gambar 4.13 Tinggi dan Kemiringan Lereng Pada Sta 2 + 000 ........................... 46
Gambar 4.14 Pembagian Pias Pada Lereng Sta 2 + 000 ....................................... 48
Gambar 4.11 Hasil Perhitungan Angka Keamanan (F) Menggunakan
Slope/W Sta 2 + 000 ....................................................................... 50
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
xvi
DAFTAR TABEL
Tabel 2.1 Nilai dari Safety Factor berdasarkan intensitas kelongsoran ................ 11
Tabel 2.2 Letak Titik Pusat Lingkaran ( 0 ) dengan ( β ) < 53° ............................ 16
Tabel 4.1 Data Properties tanah ruas jalan Gunung Tugel – Kabupaten
Banyumas ............................................................................................ 35
Tabel 4.2 Hasil Pengujian Sondir ........................................................................ 35
Tabel 4.3 Letak Titik Pusat Lingkaran ( 0 ) dengan ( β ) < 53° ........................... 38
Tabel 4.4 Hasil Perhitungan Angka Keamanan (F) Menggunakan Metode
Fellinius 2 + 850 .................................................................................. 39
Tabel 4.5 Letak Titik Pusat Lingkaran ( 0 ) dengan ( β ) < 53° .......................... 43
Tabel 4.6 Hasil Perhitungan Angka Keamanan (F) Menggunakan Metode
Fellinius 2 + 200 .................................................................................. 44
Tabel 4.7 Letak Titik Pusat Lingkaran ( 0 ) dengan ( β ) < 53° .......................... 48
Tabel 4.8 Hasil Perhitungan Angka Keamanan (F) Menggunakan Metode
Fellinius 2 + 000 .................................................................................. 49
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016
xvii
DAFTAR LAMPIRAN
LAMPIRAN 1
1. Foto Dokumentasi
LAMPIRAN 2
1. Lembar Bimbingan
2. Daftar Hadir Seminar Tugas Akhir
LAMPIRAN 3
1. Gambar Perencanaan Jalan Gunung Tugel – Kabupaten Banyumas
2. Laporan Pengujian Tanah PU Bina Marga Banyumas
3. Laporan Pengujian Tanah Juli 2009
4. Laporan Pengujian Tanah Desember 2012
Analisis Angka Aman..., Gadis Ayudya Pradini, Fakultas Teknik UMP, 2016