an update and look into future management considerations

20
JOHN STEFFAN UTAH DIVISION OF WILDLIFE An Update and Look Into Future Management Considerations at Lake Powell

Upload: others

Post on 25-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: An Update and Look Into Future Management Considerations

J O H N S T E F F A N U T A H D I V I S I O N O F W I L D L I F E

An Update and Look Into Future Management Considerations at

Lake Powell

Page 2: An Update and Look Into Future Management Considerations

History of Cooperative Lake Powell Management

2013- Lake Powell Officially Considered Infested.

2014- Utah Division of Wildlife Resources (UDWR) works in partnership with National Park Service (NPS) in transition from Prevention to Containment. UDWR takes over interdiction process.

2015- Two Lake Powell specific Biologists brought in to manage Uplake (Bullfrog) and Downlake (Page) Lake Powell for the UDWR.

- Memorandum of Understanding signed between UDWR and NPS.

Page 3: An Update and Look Into Future Management Considerations

Current Lake Powell Management

NPS makes initial contact with watercraft upon entrance

UDWR performs watercraft inspections and decontaminations upon exit

MOU allows the UDWR to operate NPS owned machines and to conduct inspections and decontaminations within existing NPS infrastructure

UDWR has the legal authority to enforce wildlife laws including AIS

Page 4: An Update and Look Into Future Management Considerations

Current AIS Rules Regarding Utah and Lake Powell

Mandatory watercraft inspections during hours of operation

Illegal to move water out of Lake Powell

Illegal to move any life stage of a Dreissenid Mussel dead or alive

Must meet a dry time coming off Dreissenid affected body of water

- 30 days (Dec-Feb)- 18 days (Mar- May)- 7 days (June-Aug)- 18 days (Sept-Nov)

Page 5: An Update and Look Into Future Management Considerations

What does the UDWR program look like?

Mandatory Inspections for those not covered by a Commercial Hauler Agreement

Free Decontaminations for most watercraft types

Administrative Checkpoints (Law Enforcement)

Data Collection and Seal Application

Data sharing via ANS Mobile

Local Boater Sticker Program

Page 6: An Update and Look Into Future Management Considerations

Mandatory Inspections

All watercrafts must stop during hours of operation

Signed with hours of operation

Exceptions are those in the local boater sticker program, concessionaire dry storage watercrafts and those covered by the Commercial Users Agreement (CUA).

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

Page YTD BullfrogYTD

2015

2016

Page 7: An Update and Look Into Future Management Considerations

Free Decontaminations

Free Decontaminations are given to watercrafts the size of wakeboard boats and smaller

Cabin Cruisers are given free decontaminations in Bullfrog- for now

Must meet requirements set forth in the MOU to receive decontamination:- Have attached Mussels- Need a decon in order to abide by a state law (dry times)

0

100

200

300

400

500

600

700

800

Page YTD BullfrogYTD

2015

2016

Page 8: An Update and Look Into Future Management Considerations

Administrative Checkpoints

Administrative Checkpoints are administered by UDWR law enforcement personnel.

Checkpoints are conducted during the boating season to check compliance of boaters with state law.

Can be held to check boater compliance at inspection stations or to check if boaters are abiding by state law (mainly water transfer). Did you clean, drain and dry?

8 have been held so far in 2016. More to come.

Page 9: An Update and Look Into Future Management Considerations

Data Collection and Seal Application

Collect Bow ID, Zip Codes, Next anticipated water body, number of people contacted and seal number.

Attach seal to each watercraft inspected/

decontaminated. (Orange if inspection only, Blue if Decontaminated)

Page 10: An Update and Look Into Future Management Considerations

UDWR Shares Bow ID’s, date of contact, types of inspection and seal numbers with users of ANS Mobile.

Data Sharing

Page 11: An Update and Look Into Future Management Considerations

Local Boater Sticker Program

Local Boater Sticker Program gives locals a “pass” on inspection process as long as they follow certain parameters:

1) Fill out a paper application and test.

2) Go through an online training. The UDWR year long AIS certification.

3) If boating somewhere other than Lake Powell, boaters are required to receive decontamination at Lake Powell and carry receipt to next body of water

4) Local boaters are still required to clean, drain, and dry, and to follow other state laws (Arizona-pull the plug)

• 140 given out this year

Page 12: An Update and Look Into Future Management Considerations

Future Management Considerations

Updating Laws to reflect 2016 and future

Continued Cooperation with NPS

Certificate of Registration (COR) for Colorado River Rafting companies

Privatizing of Decontaminations

Seal Reciprocity

Continued Outreach

Research Opportunities

Page 13: An Update and Look Into Future Management Considerations

Updating Utah Rules and Laws

Laws/Rules were written in 2007, prior to having a Dreissenid affected body of water in the state.

New rules specific to watercraft with unidentifiable water compartments such as hard shell ballasts.

Quarantining or Mandatory dry times associated with mussel encrusted watercrafts in addition to a decontamination

Page 14: An Update and Look Into Future Management Considerations

Continued Cooperation with NPS and other partners

Continue our cooperative management efforts with the NPS.

Resigning of the MOU.

NPS is going to start collecting Bow Registrations of watercrafts entering Lake Powell in ANS Mobile.

Page 15: An Update and Look Into Future Management Considerations

Certificate of Registration (COR)

Certificate of Registrations allow the public or businesses to avoid following wildlife rules if they have good reason and file with the state.

The AIS COR would allow Colorado River rafting companies to use Quaternary Ammonium on areas of their rafts instead of receiving hot water decontaminations or making dry times.

Must be areas where hot water would damage rafts.

Page 16: An Update and Look Into Future Management Considerations

Privatizing Decontaminations

Have WIT trained 10 individuals from two separate companies in the Bullfrog area. Should be operational by spring of 2017.

Would like to see private companies handle large watercrafts >24’. *Page already has this policy.

Bullfrog area will be the first in the state of Utah to offer privatized decontaminations

UDWR already accepts decontaminations performed by Mussel Busters in Page, AZ.

Page 17: An Update and Look Into Future Management Considerations

Seal Reciprocity

UDWR is working with neighboring states on seal reciprocity.

UDWR has taken the initiative to decontaminate out of state boats upon request.

UDWR has quarantined mussel encrusted boats headed out of state and will continue to if neighboring states request it.

Page 18: An Update and Look Into Future Management Considerations

Continued Public Outreach

UDWR utilizes Facebook, Instagram and other media outlets to get the word out on quagga mussels.

Present to grade school and college classrooms

Attend boating and hunting shows

Page 19: An Update and Look Into Future Management Considerations

Research Opportunities

Growth rate studies

Quagga effects on native bentos

Continue to look for other AIS