an overview 2017-2018 - karachikmc.gos.pk/docs/cms/file/budget 2017-18/ovweview-2017-18...
TRANSCRIPT
![Page 1: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/1.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 1
EXPLANATORY MEMORANDUM
The purpose of explanatory memorandum is to provide a guide
to the Karachi Metropolitan Corporation annual budget. It entails
budgetary planning and an over-view of the two major components of
the budget: revenues and expenditure.
It contains three main chapters:
i. An Overview: Fiscal Policies of KMC.
ii. Estimates of Receipts: Revenue resources of KMC and its
analytical study.
iii. Estimates of Expenditure: Current and Development of
Expenditure and KMC’s obligatory
Responsibilities.
![Page 2: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/2.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 2
Brief History.
Board of Conservancy now Karachi Metropolitan
Corporation.
The local government institution as a basic democratic entity and as a
basic administrative unit has been recognized all over the civilized world. The body
which is elected by the residents on their own to regulate and manage public
affairs and meet the need of local residents and to improve efficient service
delivery at the local level to develop a sustainable quality of life for people.
The Local Government in Karachi has a strong history. It can be
claimed that Karachi is one of the few cities in the Indo-Pak sub-continent where
municipal administration was established primitively during the early British Period,
to cope with the epidemic of cholera, which was then ravaging the city.
• In the year 1846 “Board of Conservancy” was established.
• In the year 1852 the Board of Conservancy was converted in a
“Municipal Commission” under the Municipal Act of 1850 with its
temporary offices established at McLeod Road (the present I.I.Chundrigar
Road).
• In the year 1878, however the Bombay District Municipal Act (Act VI of
1873) was extended to Provence of Sindh areas including the “City
Municipality of Karachi.”
• The promulgation of Local Government legislation was continued when in
the year 1933 the “City of Karachi Municipal Act, 1933” was promulgated
and the “Municipal Corporation of the City of Karachi”came
into being.
![Page 3: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/3.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 3
• In the year 1947 the Karachi Metropolitan Corporation formulated its own
Rules - The Karachi Municipal Corporation Rules 1947. In the same year
India was partitioned and Pakistan, the dream of millions of Muslims of the
sub-continent, came into being. All the affairs of the KMC continued to be
dealt with under the Karachi Municipal Corporation Rules 1947 until 1960
when the Local Bodies system was altogether changed through the Basic
Democracies Act 1959 introducing the Basic Democracy System throughout
the country. The new system was enforced through the promulgation of
‘’West Pakistan Municipal Administration Ordinance 1960. Elections of
the local bodies under this system were held twice - first in 1960 and then in
1965.
• With the enforcement of Martial Law in 1971 the Basic Democracies system
was also abolished in 1971.
• After separation of East Pakistan to deal with the affairs of local bodies in
the respective jurisdiction of each province promulgated its own local bodies
laws. Accordingly in Sindh “The Sindh Peoples’ Local Government
Ordinance” was promulgated in 1972.
• In the year 1976 the status of Metropolitan Corporation was awarded on
KMC and areas constituting Landhi Korangi Municipal Committee, Drigh-
Malir, Baldia Township and North Karachi were merged into the
Corporation. After the imposition of Martial Law in 1977, a Citizens’
Committee comprising of nominated members was however formulated in
1978.
• It was in the year 1979 when the Sindh Peoples Local Government
Ordinance 1972, was superseded by another ordinance namely “The
Sindh Local Government Ordinance, 1979” was promulgated.
![Page 4: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/4.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 4
• At the same time for the management of water supply system a Water
Management Board was constituted in 1982 which was later on converted into
Water & Sewerage Board to function under the umbrella of KMC.
• On 12-2-1986 the council of Karachi Metropolitan Corporation was dissolved
by the Government of Sindh and the elected council was substituted by an
Advisory Committee.
• With a view to administer the development and maintenance of civic services
in Karachi the two tier federated system was introduced and pursuant to the
Sindh Local Government (Fourth Amendment) Ordinance, 1987, the 4 Zonal
Municipal Committees (district -wise) came into existence i.e. South, East,
West and Central respectively. For the first time in the history of KMC the
elected council was constituted through Zonal Municipal Committees by
adopting one third members of each Zonal Municipal Committees. The
distribution of functions between the KMC and the Zonal Municipal
Committees were made on the principle that city-wide functions were entrusted
to the Metropolitan Corporation and function of local nature particularly the
maintenance of infra-structure and delivery of services were entrusted to the
Zonal Municipal Committees. To ensure that the functions are clearly
enumerated eliminating any overlapping it was provided that the Zonal
Municipal Committees would perform all functions of Municipal Committees as
laid down in the law and would not perform the functions assigned exclusively
to the Metropolitan Corporation. The distribution of resources between KMC
and Zonal Municipal Committees were made in a manner so as to ensure that
both institutions remain financially viable and have proportionately sufficient
resources in relation to the functions assigned to them.
• Again the council of Karachi Metropolitan Corporation was abolished on 18-7-
1992 along with all with the Zonal Municipal Committees and to run the affairs
Administrators were posted in KMC as well as in all the respective Zonal
Municipal Committees.
![Page 5: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/5.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 5
• In the year 1994 the two tiers federated system was also done away with and
all the Zonal Municipal Committees were merged in KMC, to continue to
function as District Municipal Offices under the supervision and control of
KMC. In the mean time a new district namely the District Malir was also
established and consequently the District Municipal Office Malir also came into
existence.
• So to say the unified KMC system was allowed to continue up till mid 1996
when through an amendment in the Sindh Local Government Ordinance 1979,
the two tier federated system was restored again and now 5 District Municipal
Corporations viz. South, Central, West, East and Malir were established on
1996 on almost the same pattern of former Zonal Municipal Committees. This
time the District Municipal Corporations have been given a wider scope of
functions and more funds as per the formula fixed by the Government.
• For the accomplishment of objectives the District Municipal Corporations have
been allowed to levy taxes and collect Advertisement Tax, License Fee
(Dangerous/offensive trades) and general trades, etc. The KMC revenues
comprise of Octroi (the main stay and constitutes 93% of its revenue receipts
and 81% of the total receipts of the financial year 1996-97), Fire Rate
(collected by Karachi Water & Sewerage Board) and other minor sources and
also the Capital Receipts generated through sale of land and cottage
industries including development charges. After deducting the committed
liabilities out of the total revenue income so generated by KMC, the net
revenue was distributed amongst the District Municipal Corporations on the
basis of 70% on population and 30% on inverse ratio which in percentage
terms comes to as under :
(a) Karachi Metropolitan Corporation 33.00 % (b) District Municipal Corporation (South) 14.98 % (c) District Municipal Corporation (East) 16.15 % (d) District Municipal Corporation (Malir) 05.99 % (e) District Municipal Corporation (West) 12.96 % (f) District Municipal Corporation (Central) 16.93 %
![Page 6: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/6.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 6
• In the year 2001 through promulgation of the Sindh Local Government
Ordinance 2001 a third tier was added to the earlier two tiers and replacing
the earlier provincial administrative units of divisions, districts and talukas in
Sindh with three level of local governments viz. District/City District
Governments, Talukas / Town Municipal Administrations and Union
Councils.
a) The District Governments have been assigned the functions
which were formerly being performed by the Provincial
Governments including district developments planning,
revenue collection, education, health, community
development, infrastructure development, agriculture
extension, development of strengthening the information
technology etc.
b) Whereas the Talukas and Town Administrations have been
made mostly responsible for the municipal functions.
The Sindh Local Government Ordinance 2001 was promulgated to devolve
the political power and decentralize administrative and financial authority to
accountable Local Governments for good governance, effective delivery of
services and transparent decision making through institutionalized
participation of the people at grass-roots level. Under the devolution plan
the City District Government Karachi emerged replacing the Karachi
Metropolitan Corporation and various department from the Provincial
Government as provided in the First Schedule of Sindh Local Government
Ordinance 2001 were devolved to City District Government. Beside merger
of various civic agencies like KDA, KW&SB, MDA, LDA, KBCA etc. with all
their assets and liabilities.
• In 2001 with the promulgation of Sindh Local Government Ordinance 2001 the
City District Government Karachi emerged in place of KMC until the revival of
Sindh Local Government Ordinance 1979 in the July 2011.
• In the year 2013 on promulgation of Sindh Local Government Act 2013, the
KMC re-emerged in place of City District Government Karachi.
![Page 7: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/7.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 7
Budget Preparation Exercise.
The KMC’s budgeting is now being done as per the Sindh Council Budget
Rules 1985 adhering to its schedules and procedures. Over the years, there has
been steady expansion in all round development in Karachi bringing improvement
in almost all areas of civic services: Municipal Services, Medical & Health, Roads
& Communication, Sewerage and Disposal of Solid Waste Management,
Environment.
Since the elected public representatives have assumed the charge of
offices, the preparation of budget is a nightmarish task in view of the prevalent
complexities such as curtailment of powers of Mayor Karachi, curtailment of right
full OZT share of KMC, other deduction were also made by the GOS from OZT
Share. Besides the inflationary pressures, rising cost of maintenance of services,
annual increases in salaries and pension announced by the Government from time
to time.
The preparation of budget for the year 2017-2018 is a difficult task:
• As the KMC already faced heavy shortfall for payment of salaries to the
employees, the Finance Department, GOS has distributed the OZT Share
among KMC and respective DMCs without any formula and protected the
salaries of devolved departments of DMCs and forcing KMC to bear the
shortfall amount in salaries of KMC employees from own resources.
• As in the same manner on revival of KDA, the salaries of KDA employees
were protected by the GoS by giving share of Rs.200.00 million P.M. from
the Grant-in-Aid of KMC while requirement of salaries of employees of KMC
was ignored.
• As there is already huge gap between the income and expenditure which
has rendered KMC almost financially handicapped to meet its essential
obligations. It is pertinent to mention here that KMC did not bear essential
requirements of their medical institutions from own resources since several
years.
• As the GoS have taken away following many important functions from the
purview of KMC.
![Page 8: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/8.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 8
➢ Solid Waste Management.
➢ Building Control Authority.
➢ Master Plan.
➢ Water & Sewerage Board.
➢ Transport Department.
➢ Charged Parking.
➢ Local Taxes. (Advertisement).
➢ Karachi Package (Executing by the GoS).
(As the Sindh Local Government Act 2013 reveal the fact that all the development schemes/ works are to be undertaken by the concerned Councils i.e. Karachi Metropolitan Corporation).
• As the legitimate and due share of KMC on account of OZT share has not
revised as yet which is the main contention of KMC.
The core responsibility of the Karachi Metropolitan Corporation is to finance
development projects for Karachi from its own resources as well as funds released
by the Government of Sindh. Projects are of various natures: funding KMC-run
health institutions and one of its institutions widely known as Abbasi Shaheed
Hospital and Karachi Institute of Heart Diseases to accommodate poor patients of
city, road repair as Karachi’s developed road. Recreational Activities for over 25
million people like Women Sports Complex, KMC Sports Complex, Karachi Zoo,
Safari Park, Welfare for the needy / poor citizens of city and lifting of millions of
tones of Solid Waste to the landfills sites to dump. There are plenty of works and
projects being funded by KMC.
![Page 9: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/9.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 9
To meet its financial obligations such as development projects and its
establishment expenses, the situation worsened when the pace of government
grants does not match with the rise which surpassed the later with huge margin.
The KMC suffers with the persistent problem of resources constraint. Yet it
can hardly afford to keep its development plan on low pitch. The resources
constraints have further been aggravated as various financial issues still remain to
be resolved by the Provincial Government some of which are as under:
Provincial Finance Commission Award.
Constitution of PFC.
• In light of Section 112(1) of the Sindh Local Government Act, 2013
(hereinafter referred to as the SLGA, 2013) the Government of Sindh
re-constituted ‘the Composition’ and ‘Terms of Reference’ of the
Provincial Finance Commission (hereinafter referred to as PFC) vide
Notification bearing No. SO(C-IV) SGA&CD/4-37/2005 dated
24.11.2016.
Main points of TOR of PFC.
• To determine obligatory and priority expenditure of the Local Bodies
and formulation of Divisible Pool for distribution of resources.
• To preparing bench marks of revenues and expenditures and revenue
and expenditure projections for Local Governments.
• To determine the criteria and formula for vertical distribution of
resources between the provincial Government and Local Government.
• To determine the fiscal distribution criteria/ formula and mechanisms for
the horizontal distribution between Local Councils of the allocable
amount.
![Page 10: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/10.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 10
Suggestions/ Recommendations for PFC.
It is pertinent to mention that since the promulgation of SLGA, 2013 the
Government of Sindh has failed to convene a meeting of the Commission, let
alone, making any award as mandated by the SLGA, 2013; the Government of
Sindh issued the aforementioned Notification dated 24.11.2016, but the first
meeting has held on 2nd June 2017 after more than six months. There is a one
Metropolitan Corporation i.e. KMC, 28 District Municipal Corporations, 108 Tehsil
Councils and 1,128 Union Councils are working in Provence of Sindh, in the best
interest of all the councils of province and KMC the following steps are required to
be adopted by the GoS.
• That the functions of PFC include providing recommendations to
Government of Sindh for the distribution of resources i.e. Provincial
Finance Commission Award between the Provincial Government and
the Local Councils out of the Provincial Consolidated Fund into a
Provincial Retained Amount and a Provincial Allocable Amount.
Furthermore, it also includes distribution of Provincial Allocable Amount
amongst the Local Governments to meet the council expenses
development or non-development which is called the PFC Award.
• Thus, Government of Sindh should first of all calculate and decide the
amount of PCF into PRA and PAA / Local Councils which is the basis of
PFC award.
• Once the due share of PFC has been decided and share of Local
Councils determined, the Government of Sindh should decide the share
of municipal development funds out of total Provincial Annual
Development Program / Budget on the pattern of KPK PFC which
decided to apportion 30% of the total KPK Provincial ADP. (And this
fund should only be utilised by the respective councils only not on the
pattern of Karachi Mega City Project etc.
• Another recommendation is to make the PFC Commission more
unbiased and truly representative if the half of its members is nominated
by the Government Side while remaining half are made by the
opposition side as the KPK PFC Commission embodies to make this
forum more representative.
![Page 11: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/11.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 11
• That the Mayor of Karachi being one of the members of PFC as well as
head of a Council and bound to receive the PFC Award wrote a letter
dated 07.03.2017 to the Finance Minister, Sindh being the Chairman of
the PFC Commission, wherein he mentioned the functions of PFC and
provided the solution as to how the PFC Award should be distributed as
soon as possible and to reconstitute the PFC by following the
transparent procedure adopted by Khyber Pakhtunkhwa’s PFC
(hereinafter referred to as the KPK PFC). That letter should be
discussed in the meeting and agree upon after due discussion.
• That it is pertinent to mention that unless the issue of distribution is
resolved and the PFC Award distributed between the Government and
Local Councils, the citizens will have to suffer as most of the Councils
will be unable to pay the salaries or pensions to the government
employees let alone the development functions.
• The most important issue which should be highlighted in today’s
meeting is that the Government should not try to confuse the OZT which
was given to respective councils in Sindh against their lost revenues
and the GoS and GoP both agreed to fund the councils against the
withdrawal of Octroi and Zila Tax from the respective councils. Likewise,
some other forum first of all should finalise the actual amount against
lost income of OZT with 15% increase every year which should have
been released to respective councils. For example, KMC has calculated
and informed GoS many times about the release of fair share to KMC as
the later is in serious financial crises.
• Likewise, the fact should be born in minds here that the OZT grant was
a factor of compensation income which should not be discussed in this
forum as part of PFC since PFC talks about the provincial revenues and
not the factor of OZT.
• Another important issue to discuss here should be fair share of Karachi,
while deciding factors of Karachi, we should be mindful of the fact that
Karachi is the highest revenue generation city in Pakistan and greatest
source GST on Services (Records tell that over 90% of the total revenue
which came to Rs. 60 billion comes from Karachi), yet the peoples of
Karachi are bereaved of their right of water, electricity, cleanliness and
other civic amenities. Hence, GoS and GoP should be accountable to
peoples of Karachi as to why proper infrastructure development is not
![Page 12: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/12.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 12
being made here. The forum should also discuss the ways and means
to pay special attention to Karachi as more infrastructure investment in
Karachi shall bring more economic activity for the Province as well as
for the Country. Thus, Special attention should be given to Karachi.
Matching Grants in lieu of Octori and Zila tax
Historical Mismatch of OZT Share:
The KMC appears to be as cash strapped entity today while it was not
the case before the prime most Octroi incomes was not taken away from the
federal government.
The Octroi & Zila Tax (henceforth OZT) was abolished by the Federal
Government in 1999 and the rate of General Sales Tax (GST) was increased from
12.5% to 15% to absorb the proceeds of 2.5% additional GST was given to the
provinces as compensation for the loss of Octroi revenue for distribution amongst
Local Governments. The funds meant to be utilized primarily for salaries and no-
development expenses which constituted around major allocation and rest had to
be used for the development schemes. Thus from this source KMC was able to
meet its development outlay along with other sources of revenue.
Historically, the KMC was the cash rich organization because of its
potential income from Octroi was not taken away from the KMC. This can be
gleaned from the fact that the Octroi income for the year 2001-2002 was pitched
by the Government of Sindh budget as Rs.4,508,101,501 (Rs.4.508 billion) where as
the 33% of that amount was supposed to be transferred to KMC which stood at
Rs. 1321.459 million while KMC received Rs 1288.320 million. With each year, the
OZT share was received often less and sometimes more.
The table below gives an accurate figure that reflects that over the
periods unto 2016-17, the shortfall in receipts of OZT share, KMC received
whooping Rs. 34,778.00 million less than its due share and if we add the Grant in
Aid given to KMC in the year 2011-12 onward, reduced this outstanding to
Rs.3,624.41 million short up till year 2016-17.
![Page 13: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/13.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 13
Projected OZT Share (KMC) on the basis of average rise in Octroi Receipts:-
Financial
Year
OZT
Released
(KMC
Share as
per
Indicative
Share)
Special
Grant-in-
Aid
OZT Share
for Karachi
on the
assumption
of 15%
increase
each year
OZT Share
for KMC @
33% of the
total share of
Karachi
Difference
(Shortfall/
Surplus)
Difference
including
the Grant
in Aid
2000-2001 1,288.32 0 4,004.42 1,321.46 33.14 33.14
2001-2002 2,030.20 0 4,605.08 1,519.68 (510.53) (510.53)
2002-2003 2,682.43 0 5,295.85 1,747.63 (934.80) (934.80)
2003-2004 2,324.60 0 6,090.22 2,009.77 (314.83) (314.83)
2004-2005 1,939.08 0 7,003.76 2,311.24 372.16 372.16
2005-2006 2,420.44 0 8,054.32 2,657.93 237.49 237.49
2006-2007 2,862.17 0 9,262.47 3,056.61 194.45 194.45
2007-2008 3,411.74 0 10,651.84 3,515.11 103.36 103.36
2008-2009 3,411.74 0 12,249.61 4,042.37 630.63 630.63
2009-2010 3,411.74 0 14,087.05 4,648.73 1,236.98 1,236.98
2010-2011 3,923.50 0 16,200.11 5,346.04 1,422.54 1,422.54
2011-2012 3,923.50 3,153.60 18,630.13 6,147.94 2,224.45 (929.15)
2012-2013 3,923.50 6,000.00 21,424.65 7,070.13 3,146.64 (2,853.36)
2013-2014 3,923.50 6,000.00 24,638.35 8,130.65 4,207.16 (1,792.84)
2014-2015 4,250.46 6,000.00 28,334.10 9,350.25 5,099.80 (900.20)
![Page 14: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/14.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 14
2015-2016 3,698.92 6,000.00 32,584.21 10,752.79 7,053.87 1,053.87
2016-2017 1,790.23 4,000.00 37,471.84 12,365.71 10,575.51 6,575.50
50,511.07 29,653.60 260,588.00 85,994.04 34,778.00 3,624.41
It is pertinent to mention here that on devolution of Education, Health &
Local Taxes department to respective DMCs, the Finance Department, GoS has
distributed the OZT share without considering the sharing formula between KMC
and DMCs (33% and 67%) and protected the gross salary of DMCs employees
without adhering to the grievances of KMC due to shortfall being faced by KMC
due to transfer of income of Local Taxes. An amount of Rs.141.690 million only
was released on account of OZT share of KMC from Feb.2015 to Jun.2016. Now
in the financial year 2016-17 the GoS being released OZT share to KMC by
increasing 15% of the unlawful and unjustified last year OZT share of Rs.140.040
million i.e. Rs.21.006 P.M which comes to Rs.252.072 million P.A. Similarly the
DMCs share have been increased by 15% of Rs.252.320 million p.m. i.e.
Rs.37.848 million p.m. comes to Rs.454.176 million p.a.
KMC’s Sources of Revenues:
Income derived from KMC’s resources such recovery of Fees, Charges & etc;
i. Grant (in lieu Octroi / Zila tax) from the Provincial Government out of the
share of General Sales Tax.
ii. Income from sale of land and lease.
iii. Income from the quarterly bills of Municipal Utility Charges ; and
iv. Releases from the Provincial Government under District ADP.
![Page 15: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/15.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 15
Municipal Utility Charges.
The Municipal Utility Charges Department, KMC came into being in January
2009 through the Council Resolution, No. 364, dated 02nd June 2008 as provided
in 39(b) of the Sindh Local Government Ordinance-2001. It started billing to its
around 1.3 million consumers since then in collaboration with the Millennium
System & Consultant pvt. Limited (MSCL) outsourced by KMC for three years.
MSCL’s jobs entail:
a) I.T services b) Printing of bills c) Distribution of bills d) Updating the record of consumers
The Karachi Metropolitan Corporation introduced the Municipal Utility Service
Charges (MUSC) by replacing Fire Tax / Conservancy charges. The Council
Resolution No. 452, dated 18 February 2009, unanimously decided, extended its
approval to stop collecting Conservancy Tax from the inception of Municipal Utility
Service Charges i.e. January-2009 and the Fire Rate be replaced with the newly
imposed MUSC.
PRESENT STATUS
• The Department has been circulating its bills among its consumers since January 2009.
• Out of 1.3 million consumers, around only 40,000 consumers are paying their bills.
• To improve the collection, notices have been issued among the consumers reluctant to pay their dues towards MUSC.
• Rs.50 to Rs.60 million is realized by MUCT department, KMC every quarter.
• Gulshan-e-Iqbal is the most responsive Town of Karachi.
• Lyari is the least responsive Town of Karachi.
• The Board of Revenue, Government of Sindh delegates the powers under
the Land Revenue Act 1967 vide Govt. of Sindh order No. DD
(E&A)/HQ/BOR/201/6/269 dated 31.10.2016, the Financial Advisor KMC
has been declared as an Assistant Collector Grade-I for the issuance of
![Page 16: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/16.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 16
Notices against the defaulter of Municipal Utility Services. (Non-Payers) of
MUCT.
• The contract of I.T services, printing of bills, distribution of bill updated the
record of consumers were provide the MSCL the contract of the same has
been expired and the new contractor i.e.
• M/S. Sprint Express (Pvt.) limited takeover the responsibilities for next three
(03) years through the press tender after the complication of all cordial
formalities.
• In the current year three quarterly bills have already been distributed.
K-Electric formerly known as KESC.
Although the KMC is basically service rendering agency yet the K-electric
previously known as KESC has been billing on commercial charges with other
levies like additional surcharges, energy charges, fixed charges, fuel adjustment
charges, electricity duty, sales tax as well as late payment charges. It should have
a separate tariff distinct from industrial / commercial organization at par with other
WASA’s charges in Lahore.
K-Electric also owes an amount of Rs.1716.176 million estimated to be
received by KMC from K-electric on account of land rent etc.
In order to get rid of the fiscal deficit, KMC has taken lots of steps which
include development of its Asset Management System, Public Private Partnership
Scheme to lower the expenditure side and introduction of various taxes, Municipal
Utility Charges (MUC) which if made effective would help KMC become a
sustainable financial entity.
![Page 17: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/17.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 17
World Bank Funded Projects/ Schemes.
Since the day, the present local government election have been held and
the elected council has taken oath, the donor agencies have taken keen interest in
the affairs of local government and have assured of their full support. A project
namely Karachi Neighborhood Improvement Project (KNIP) is being undertaken
which shall help KMC execute following projects with Rs.8500 million in different
phases.
1. Redevelopment of Saddar Downtown Area (Rs. 4500 Million).
2. Malir Area Road and Public Spaces Enhancements (Rs. 800 Million)
3. Korangi Neighborhood Mobility Improvements (2000 million)
4. Support to Improved Citizen Services and City Capacity Development (Rs. 750 million)
In addition to above, World Bank has committed an amount of Rs. 450
million for the following important Tasks.
1. Modernizing KMC financial management information system
2. Improving own-source revenue (OSR) collection
3. Public asset management system
4. Enhancing citizen participation, feedback and communications
It is expected that the above interventions would on the one hand, create
excellent infrastructure in the Saddar, Korangi and Malir while on the other hand,
important initiatives in the field of modernizing KMC Financial System on the SAP
model, survey of MUCT through improving OSR Collection, development of Public
Asset and enhancing Citizen Participation, feedback and communication shall help
develop Public Service Delivery System in KMC.
![Page 18: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/18.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 18
Budget At a Glance 2017-2018
The Budget at a Glance for the year 2017-2018 in a nut shell is summarized
as under:
(Rs. in Million)
RECEIPTS.
Current Receipts. Rs.18,325.484
Capital Receipts. Rs.1,795.500
Total Rs.20,120.984
Funds for Provincial & District ADP and VGF. Rs.7,024.602
Grand Total Receipts. Rs.27,145.586
EXPENDITURE.
Establishment. Rs.11,738.239
Contingent. Rs.2,075.664
Repair & Maintenance. Rs.251.685
Total. Rs.14,065.588
Major Development Projects/ Works. Rs.6,045.480
Funds for Provincial & District ADP and VGF. Rs.7,024.607
Grand Total Expenditure Rs.27,135.670
Surplus(+) Rs.9.916
The above Budget at a Glance for the year 2017-2018 is indicated that the
a shortfall of Rs.(300.084) million total out-lay comprises of Current and Capital
Receipts of Rs.27,145.586 million inclusive of budget estimates of Provincial &
District ADP & VGF of Rs.7,024.602 million.
The total expenditure of KMC of Rs. 27,135.670 million is allocated in the
budget estimates for the next financial year’s 2017-2018 comprises of an
allocation of Rs.11,738.239 million for Establishment, Contingencies
Rs.2,075.664 million and Repairs & Maintenance, Rs.251.685 million have been
earmarked for Development Works / Project of KMC and for Provincial & District
ADP & VGF of Rs.7,024.602 million.
![Page 19: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/19.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 19
Performance
Review
ANNUAL DEVELOPMENT PROGRAMME 2016-2017 DISTRICT KARACHI
(Completed Schemes) 2016-17 (Rs. In million)
ADP No.
2016-17
Sector / Sub-Sector / Name of Scheme Estimated
Cost
Physical Planning & Housing
Rural Sewerage / Water Supply Schemes (Ongoing)
1 Improvement of Sewerage Line & Water Supply at Faqira Goth, UC-05 Gujro, Gadap Town.
20.00
Total Rural Sewerage / Water Supply
20.00
Infrastructure (Roads & Bridges) On-going
2 Construction of Hut # 70 Hawks bay. 19.98
5 Construction of Protection Wall along Orangi Nallah Near Chota Medan Nazimababd District Central, KMC.
19.51
9 Installation of LED Lights at remaining Portion of Shahrah-e-Quaideen from Khudadad Chowrangi up to main gate of Mazar-e-Quaid, Karachi.
10.56
10 Installation of Street Lights Poles and Lights at Jinnah Avenue Road, Model Colony from Malir Halt to Tank Turning.
20.00
11 Improvement of Street Lighting System at Main road Saffora from University road to Madaras Chowk (Distt Malir)
20.00
14 Improvement / Rehabilitation of Street Lighting System at Westharf Road.
20.00
16 Providing / Erection of G.I Sheet (curtain wall i/c Frame) for Security Arrangement at Clifton Bridge for Khana-e-Farang Iran, Karachi.
5.50
22 Rehabilitation / Improvement of Road & Footpath on PIDC Bridge District South Karachi.
9.96
26 Rehabilitation / Reconstruction of Adam Khan Road, Karachi. 49.80
27 Construction of Un-Interrupted U-Turn of Hakeem Ibin-e-Sina Road, Nazimababd.
14.96
28 Improvement / Rehabilitation of Nazimabad Intersection No.7 near AO Signal, Liaqatabad Town, District Central, KMC.
19.72
![Page 20: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/20.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 20
33
Construction / Rehabilitation of Sharah-e-Noor Jehan from Abdullah College to Qalndaria Chowk North Nazimabad (Ph II) from Qlandaria road about to block renew Ship-owner College (314.660)
157.34
35 Improvement of road From BC—6 to St-10 D-47 to D-52 Block 1 Scheme 5 Clifton District South KMC Karachi
19.99
36 Improvement of Road Carpeting Hijrat Colony UC-9 Saddar Town Karachi.
20.00
39 Rehabilitation / Improvement of road Along Railway line Near Hijrat Colony District South.
20.00
41 Improvement / re-construction of Road opposite Zain-ul-Abideen Hospital in Rizvia Society, Liquatababd Zone (Central)
20.00
42 Construction of Road Carpeting Internal Roads of UC-02, Manzoor Colony, Jamshed Town.
20.00
43 Construction of Road Carpeting near Mufti Mehmood Chowk UC-02, Baldia Town.
20.00
45 Construction / improvement of Roads in Shahnawaz Bhutto Colony / Zarina Colony near Arsalan Homes Sector 1-A/(PS-98) at North Karachi
20.00
46 Construction / Improvement of Roads at Surrounding Area of Abdul Islam Park in Sector-9 Ps-98 at North Karachi
20.00
48 Improvement and construction of Road Between 3000 to 3100 in sector 3 & 4 Ps-98 at north Karachi (PS-98).
20.00
49 Improvement of Street lights system from Karachi University Silver Jubilee Gate towards Mosamyat.
19.84
51 Construction of Road from Service Road of Shahrah-e-Faisal Underneath Natha Khan Bridge to Railway Society behind COD, KMC.
8.17
52 Improvement & Construction road carpeting Umer Colony UC-07, Jamshed Town.
20.00
62 Construction of Road from Khaskhali Goth to Ghulam Mohammad Sain Rakhio Goth (2.00.)KM
20.00
63 Construction of Road from Chanesr Goth to Ghulam Ali Kokhio (2.00)KMC.
20.00
64 Improvement / Rehabilitation of road Kabri Chowk & Pakora Chowk to Zainab Market 9 number Road NA-239 KMC West Baldia Zone
20.00
66 Reconstruction of Kabail Masjid Towards 13-D road in NA-239 KMC West Baldia Zone.
20.00
67 Reconstruction / improvement of road Different area in Keamari and Maripur Jurisdiction of NA-239 KMC West Baldia Zone.
20.00
69
60’ Dia. Thrust Boring across Railway Crossing near Urdu University & Improvement of Service Road in front of Chase Department Store & Sadqain Lawan Nipa, Gulshan-e-Iqbal.Phase II
19.98
![Page 21: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/21.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 21
70 Construction Of Road and Carpeting In Block-1, 2,3,4 & 5 at Clifton, KMC South Karachi.
19.82
71 Construction of the Internal Road and link Roads & footpath Curve Stones & Drainage lines at Hassan Zaheer Road, Saddar Town, KMC South, Karachi.
18.57
72 Improvement of Sewerage lines & C.C flooring in the Different Areas of UC-4, 9,10 & 11 Saddar Town KMC South Karachi.
19.08
73 Construction Of Park at Gulshan-e-Faisal & Road Carpeting at Gulshan-e-Faisal Saddar Town, KMC South, Karachi.
16.51
74 Construction Of Road and Carpeting Of Hassan Zaheer Road, UC-11,Saddar Town, KMC, South, Karachi.
19.05
75 Improvement Of Street Lights System In Different Areas Of UC-4, 9, 10 & 11 Of Saddar Town ,KMC South, Karachi.
20.00
79 Improvement of Sewerage system and construction of road, internal and surrounding areas of Dhani Bux Goth, Gulistan -i- Jauhar, Karachi.
20.00
84 Repairing of road at Shahrah-e-Landhi and ISL road Landhi industrial Area Karachi.
19.99
86 Improvement and Installation of LED Street Lights from Yasinababd to Aisha Manzail.
20.00
88 Construction / Improvement of Road and Streets in UC-08, PS-90 KMC (South), Kemari Zone.
19.97
89 Improvement of Ameer Khusro Road in Ps-116. 19.90
90 Improvement of Internal Roads in Sharfabad Society in PS-116.
19.79
91 Rehabilitation of Roads in Different Areas of Block-11&12, Gulistan-e-Johar, Karachi.
19.95
92 Rehabilitation / Improvement of Roads in different areas of Orangi Town (UC-06 07 08) Karachi PS-95.
19.85
94 Improvement / Reconditioning of Roads Surrounding Streets of TABBA Heart Hospital, Karachi.
19.59
95 Improvement / Reconditioning of Roads block-07,08,11, F.B.Area, Karachi.
19.87
96 Improvement of Waheed Murad Road (Gul Plaza) in NA-249 District South Karachi.
20.00
97 Improvement of Chand Bibi Road upto SIUT in NA-249 District South Karachi.
19.95
98 Carpeting of Road & construction of road 2300 from 7000 to road 9000 at north Karachi
20.00
104 Rehabilitation of Road and CC Flooring in UC-01 (PS-110) Saddar Town.
20.00
108 Improvement of Road in the Areas of UC-06 (PS-95) Orangi Town, Karachi.
20.00
109 Construction of Road at Sector No.38/A Scheme No.33 Jahangir Town Karachi.
20.00
![Page 22: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/22.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 22
110 Re-construction of Road in UC-01 Lyari Town. 20.00
111 Re-construction of Rd in UC-01 Malir Town (PS-121) Karachi 20.00
112 Improvement of Roads in the areas of UC-04 (PS-95) Orangi Town Karachi.
20.00
114 Improvement of Lavatories at Various floors from Ground floor to 10th floor in Civic Centre Building Karachi.
16.83
115 Improvement of Footpath Green Belt at Mehran Highway Karachi.
16.88
117 Improvement of Main Street Roads & Laying of Sewerage Line in Block -14, Gulistan-e-Jouhar, Karachi. (Balance Work)
20.00
118 Improvement of street lights system at Shahrah-e-Faisal from Regent Plaza towards FTC Flyover.
19.80
119 Construction of Additional Block in Sindh Governor’s House Karachi Meeting Hall (Block A)
19.99
120 Construction of Additional Block in Sindh Governor’s House Karachi (Block B)
19.99
121 Construction of Additional Block in Sindh Governor’s House Karachi (Block C)
19.64
122 Improvement of Roads around House No.43-9-E PECHS Block 6, Jamshed District East KMC.
4.31
123 Construction of cricket Ground at Block-L North Nazimabad Karachi Pavilion Jogging Track compound wall Allied works (Phase –II)
19.90
124 Rehabilitation of Nalas of the Akhtar Colony, Manzoor Colony, Kashmir Colony, Azam Basti & Junejo Town.
20.00
131 Improvement / Construction Sewerage line CC Flooring Road Carpeting of Sultanabad UC-02 Kemari Town Karachi
19.72
132 Improvement / Construction Sewerage line 9 12 15 DIA at Railway colony UC-04
19.98
134 Improvement / Construction Road Carpeting and Sewerage line Sachal Goth UC-12 Gulshan-e-Iqbal Town.
19.94
135 Improvement / Rehabilitation of Head Quarter Abdullah Shah Ghazi Rangers at PECHS Karachi
19.97
136 Widening & Reconstruction of road sector L-1 to L-I Chowrangi Surjani Town Gadap Town Karachi Phase I.
19.91
137 Improvement / Construction of CC Flooring at Faqira Goth, UC-05 Gujro Gadap Town
19.98
138 Construction of CC Flooring at Shah Rasool Colony UC-09 Saddar Town.
19.78
140 Improvement of street light system Kashmir Colony Akhtar Colony Manzoor Colony Azam Basti Junejo Town Jamshed Town UC-01 & UC-02
19.99
142 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-18, KMC Central.
19.99
![Page 23: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/23.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 23
143 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-31, Gujjro KMC East.
9.93
144 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-17, Bhattiabad KMC East
9.99
145 Construction of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-16, KMC South.
9.94
146 Construction of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-17, KMC South
9.94
147 Construction of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-21, KMC South
9.95
148 Construction of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-31, KMC South
10.00
149 Construction of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-06, KMC West
9.94
150 Construction of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-07, KMC West
9.96
151 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-29, KMC West
9.90
152 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-32, KMC West
9.94
153 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-11, KMC West
9.98
154 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-17, KMC West
9.90
155 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-21, KMC West
9.98
156 Construction Of C.C Flooring Sewerage Line, Water Supply & Road Carpeting in UC-31, Abidabad Baldia Town, KMC West.
9.94
159 Improvement / Reconstruction of Road Surrounding Area of Abbasi Shaheed Hospital & Backside of Anu Bhai Park, Liaquatabad Zone Central, KMC
20.00
160 Rehabilitation of Road Streets near Imam Bargah Jaffer-e-Tayyar Malir Karachi.
14.49
161 Construction of road Lines area UC08-09 Jamshed Town Karachi.
2.88
162 Carpeting and Patch Repair Works of Roads I/C Water Lines, Sewerage Lines & Flooring in Khandu Goth Block A, B & C, North Nazimabad, District (Central), Karachi.
17.94
163 Rehabilitation / Improvement of Roads, Construction of CC Streets & Providing and Laying Sewerage System in Mujahid Colony, Liaquatabad Zone, District (Central).
17.98
164 Rehabilitation / Improvement of Internal Roads in Akhtar Colony, UC-1, Jamshed Zone, Karachi.
18.04
![Page 24: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/24.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 24
165 Rehabilitation / Improvement of Roads and Providing and Laying of Water & Sewerage Line in Manzoor Colony UC-2, Jamshed Zone, Karachi.
17.66
166 Carpeting and Patch Repair Work of Internal Roads I/C Water Lines, Sewerage Lines & Flooring of Block F, G & H, North Nazimabad Zone, District (Central), Karachi.
18.42
167 Construction and rehabilitation of drain from star Gate to Railway Crossing Shah Faisal Town District East KMC Moria Goth
11.14
168 Construction of road and laying of 4 6 & 16 DIA P.E water supply line at Sector 5/B North Karachi PS-98. Karachi.
20.00
172 Construction / Rehabilitation of Road 4000 Saba Cinema (Left Side Main Track) to Lyari River at North Karachi Zone, District Central Karachi.
19.74
173 Construction / Rehabilitation of Road 4000 Saba Cinema (Right Side Main Track) to Lyari River at North Karachi Zone, District Central.
19.45
174 Construction of Service Road & Storm Water Drain along Sector 5-B/3 & 5-B/4 from Road 3100 to Road 5000 North Karachi Zone, District Central, Karachi.
19.80
175 Construction / Carpeting of Service Road and Box Culverts along Mohammad Shah Graveyard from Road 2200 to Sector 7-A at North Karachi Zone, District Central, Karachi.
19.06
176 Rehabilitation Work on Main Roads Nawab Siddique Ali Khan Road, Altaf Ali Baralvi Road, S. M. Taufiq Road, Ibn-e-Sina Road, District (Central), KMC.
17.57
177 Rehabilitation Work of Link Roads of Nawab Siddiq Ali Khan Road, Altaf Ali Baralvi Road, S. M. Taufiq Road, Ibn -e- Sina Road, District (Central).
18.25
180 Improvement / repairing of Trenches at Nawab Mohbbat Khan JI Road from Hussainia Iranian Imam Bargha to Nigar Cinema District South
8.72
181 Improvement / Reconstruction of road in Nazimababd No.03 Near Baqui Hospital District Central.
20.00
182 Improvement / Reconstruction of road in KMC work Shop to Masjid-e-Khair- ul-Amal District Central Nazimabad No.04
19.99
183 Improvement of work of the Link Road between Rabia Flower and Iqra City of Abu Hasan Isphahani Road at Gulshan-e-Iqbal
5.00
184 Construction / Improvement of Mandir 2nd Floor at Soldier Bazaar Jamshed Zone District East Karachi.
5.63
185 Improvement / Construction of Surrounding roads / allied Works Rangers Head Quarters Nazimabad District Central
18.90
186 Repairing of Different Bridges in District East & Korangi KMC 10.00
187 Improvement of Maripur road by Repairing of Patches & Trenches leading upto KANNUP.
9.79
![Page 25: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/25.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 25
188 Improvement & repair of road Super Highway cut to Jewani Heights upto Madras Chowk Scheme 33 Malir.
19.78
191 Rehabilitation / Construction / Reconstructions of Barracks at Headquarters Abdullah Shah Ghazi Rangers at PECHS Karachi Phase-II
19.96
197 Rehabilitation & Improvement of Services Road 4000 & Internal Roads, North Karachi
18.98
198 Rehabilitation & Improvement of Service Road 9000 in Sector 6-B Connecting of Road 4300 North Karachi industrial Area North Karachi Zone District Central.
19.07
199 Rehabilitation & Improvement Of Services Road 4000 & Internal Road North Karachi Industrial North Karachi Zone District Central.
18.80
201 Improvement of Internal Road Of Block-09, F.B Area, District Central Karachi.
18.19
202 Improvement of Internal Road / Streets & Sewerage System of Block-04, Gulshan-e-Iqbal Karachi.
19.59
203 Improvement of Road & Patch Work From Anda More to Nagan Chowrangi District Central Karachi
19.97
204 Improvement / Patch work from Imam Clinic to Farooq-e-Azam Masjid District Central Karachi
19.96
205 Improvement of Internal Streets & Sewerage System of Block-J, North Nazimabad, District Central, Karachi.
19.43
206 Improvement of Road & Patch work from Water Pump to Peoples Chowrangi District Central Karachi
19.98
207 Improvement of Internal Roads / Streets Of Block-L North Nazimabad District Central Karachi
19.18
208 Improvement of Internal Roads of Block-06&07 Gulshan-e-Iqbal Karachi
19.48
209 Improvement Of Roads & Patch work from Peoples Chowrangi to Namak bank north Nazimabad District Central Karachi
19.94
210 Construction of Roads from Geo Road to Rabu Goth (1.75KM) 19.97
215 Construction of Metalled Road in Sector 4/C Naiabad Baldia Town KMC
19.69
216 Improvement of Streets Lights in Lyari Town. 20.00
218 Construction of Road Drainage system at Village Shahbaz Goth Near Northern Bypass Tool Plaza Gadap Town District Malir Karachi 1.8 KM Road Work
19.90
219 Construction of road and drainages system at village Shabaz goth near Northern Bypass too Plaza Gaddap Town District Malir Karachi 1.20Km Part A Road Works (1.8 to30)
19.95
220 Road Carpeting Akhtar Colony, Kashmir Colony, Junejo Town, UC-01,02 & 04 Jamshed Town, KMC East, Karachi
20.00
221 Road Carpeting in Mehmoodabad, Green Belt, Awami Chock, Baloch Colony UC-04 & 05 Jamshed Town, KMC East, Karachi
20.00
![Page 26: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/26.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 26
222
Improvement of Sewerage System in Different Areas of Kashmir Colony, Manzoor Colony, Azam Basti, Chanesar Goth, Baloch Colony, UC-01,02,03,04 & 05, Jamshed Town, KMC East, Karahi.
19.99
223
Improvement of water Supply Dia 03”,04”,06” & 08” in The Different Areas of Kashmir Colony, Manzor Colony, Azam Basti Chanesar Goth, Baloch Colony, UC-01 to 05, Jamshed Town, KMC East, Karachi.
19.99
224 C.C. Flooring in Different Areas of Kashmir Colony, Manzor Colony, Azam Basti, Chanesar Goth, Baloch Colony, UC-01 to 05, Jamshed Town, KMC East, Karachi.
19.98
225 Road Carpeting in Azam basti, Chanesar Goth, Mehmoodabad, Azam Town, Nala Par, UC-03 & 04 Jamshed Town, KMC East, Karachi.
20.00
226 Construction / Replacement of old sewerage Pipe lines Dia 24" at Hassan Zaheer Road UC 11 Saddar town
20.00
227 Construction of Road CC Flooring in UC-30 PS-126 KMC West Kemari Town Karachi.
19.98
228 Construction of Road CC Flooring in UC-27 PS-126 KMC West Kemari Town Karachi 19.98
229 Construction of Road including Sewerage line in UC-27 PS-126 KMC West Kemari Town Karachi 20.00
230 Construction of Road CC Flooring including Sewerage line in UC-06 PS-92 KMC West Karachi
19.90
231 Construction of Road CC Flooring including Sewerage line in UC-31 PS-112 KMC South Saddar Karachi
20.00
232 Construction of CC Flooring Providing and laying Sewerage line in UC-29 PS-112 KMC South Karachi
20.00
233 Providing and laying Machine Carpeting in UC-29 PS-112 KMC South Karachi
20.00
234 Providing and laying Machine Carpeting in UC-30 PS-112 KMC South Karachi
20.00
235 Construction Of Services Lane from Korangi Road to Expressway to Facilities Traffic Flow For Iqra University
20.00
Total (Roads & Bridges) = 2,765.14
Fire Brigade
251 Development of New Cells for Operation & Maintenance of Landfill Sites, KMC
137.67
253 Supply of Fire Fighting Suits & SCBA for Karachi. 20.00
![Page 27: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/27.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 27
254 Providing of Alcohol-Resistant AFFF Fire Extinguishing Foam Concentrate.
19.90
255 Providing of Hazardous Material (HAZMAT) Equipment. 18.91
256 Providing of Decontamination Equipment for KMC 19.99
Total Fire Brigade = 216.46
Transport & Communication
261 Construction of Pedestrian Bridge Near Khatoon-e-Pakistan College Agha Khan Hospital At Stadium Road (Additional Work)
8.37
262 Installation / Improvement and Up-Gradation of existing Traffic Signals in Karachi Zone I
13.50
263 Installation / Improvement and Up-Gradation of existing Traffic Signals in Karachi Zone II
13.90
Total Transport & Communication 35.77
Total Schemes PP & H
3,037.37
Education Sector
275 Rehabilitation of GBSS Elementary Aligarh Colony, Orangi Town, Karachi.
20.00
279 Reconstruction / Renovations of School No.09/10 Mehmoodabad #06 Jamshed Town, Karachi.
20.00
280 Major Repair / Renovation of Government Boys Primary School (Bangali), Jamshed Town, Karachi.
20.00
281 Reconstruction / Renovations of school #47/48 Mehmoodabad No.6, Jamshed Town, Karachi.
20.00
285 Repair / Renovation of existing Building @ GLSS No.(13-14), Shah Faisal Town.
20.00
289 Rehabilitation of Existing Football Stadium, Syed Muhammad Shah Bukhari Ground Chanessar Goth Jamshed Town, Karachi.
20.00
290 Construction of Pavilion of Gull Baloch Football Ground at Siddique Goth Shah Faisal Colony, Karachi.
19.91
291 Community Center of Siddique village UC-07, Shah Faisal Town, Karachi.
16.07
294 Repair / Maintenance / Renovation of Jinnah (Boys/Girls) Primary & Secondary School No.2 Local Bodies UC-5 Jinnah Square Malir.
19.92
300 Construction of five Roomed Primary school and computer Lab at Govt. Boys Primary School Sujani L- 1 Gadap Karachi
19.95
![Page 28: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/28.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 28
301 Repair / Maintenance / Renovations of KMC Boys/Girls Primary School No. 6&7 Jaffar Tayar Society UC-5 Malir Karachi
10.54
303 Repair / Renovation / Maintenance of existing Boy Secondary school Zahra BIBI KMC No.04 Kohokrapar No.05 UC-6 Malir Karachi
19.93
Total Education (On-going) = 226.30
Health Sector (Ongoing)
330 Repair / Renovations of Abbasi Shaheed Hospital civil & Electrical Works.
20.00
331 Repair / Renovations of Karachi Institute of Heart Diseases Hospital, Civil & Electrical Works.
20.00
333 Improvement & Rehabilitation Works Of Rafiqui Shaheed Hospital At New Chali Sadder Town Karachi
16.68
Total Health 56.68
Culture & Tourism Sector
347 Improvement / Rehabilitation & Renovation of Toilet Blocks in Shohda Park, F.B.Area.
19.88
348 Improvement / Rehabilitation of Children Play Ground adjacent to Khursheed Memorial Hall Aziza bad.
19.88
349 Improvement / Rehabilitation & Renovation of Health Club in Shohda, Park F.B.Area.
19.76
350 Repair & Renovation of Korangi Mohammad an Football Club, Landhi Town, Karachi. (Phase II)
15.44
351 Construction of Cricket Ground at Mujahid Ground Nazimabad No.1 Karachi (Compound wall)
19.94
353 Development of Sports stadium in Sindh at Kali Pahari Orangi Town No.1 Karachi (Phase I)
20.00
357 Improvement of Abadkari Park in UC-01 PS-92 Site Zone KMC-West Karachi
20.00
358 Construction of Fitness Club and Pavilion Facilities at Ansar Memorial Football Ground Near Khadi Stop 13000, Road UC-12, Landhi Town, Karachi
20.00
359 Renovation / Improvement of Model Park Sector 14-A near Farhan School UC-08 Orangi Town Karachi PS-95
20.00
360 Renovation / Improvement of Pak Flag Ground / Stadium, Block-17, F.B.Area, Karachi.
20.00
361 Renovation / Improvement of Noorani Ground Stadium, Block-20, F.B.Area, Karachi.
20.00
362 Renovation / Improvement of Model Park at Tee Ground Street 06/B, Block-15, F.B.Area, Karachi
20.00
366 Construction of National (Cricket) Ground Adjacent to Government Secondary School Korangi No.6 UC-9 Korangi Town Karachi.
19.94
Total Culture & Tourism 254.83
![Page 29: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/29.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 29
P & H
368 Tree Plantation & Development of Central Island from Nadeem Medical Centre to NED University.
19.99
371 Digging of PITS and GAP filling for Central Island of different roads of North Karachi, KMC,
19.99
372 Maintenance of Plants For 4000, 6000, 10000 Roads North Karachi
20.00
373 Supply of Decorative Plants Different Types for Different Area of Division-V & VI, KMC,
19.88
375 Development of Green Belt Along Surjani Round About KMC,
17.02
376 S/S Sweet Earth, Cow dung manure and Supply of Plants in Different Parks of Division I&II KMC.
20.00
377 Improvement of Sohrab Khan Khatak Park with irrigation system at Parsi Colony KMC.
20.00
380 Development / Improvement of Bilawal Chowrangi Clifton Karachi.
19.41
381 Remaining works at Coconut Park ST-30 and ST-30/A Park Clifton.
17.42
385 Improvement of Shalimar Park at Nazimababd no #2 District Central.
20.00
386 Improvement and renovation of ABS park triangular park near Gujjar nallah in Nazimabad No.3 and Aqsa Park and Islamic Park in Nazimabad #2 District Central
19.88
387 Improvement of lawns for Baradari Gulshan Jinnah KMC
8.50
390 Improvement of Park Rizvia Cooperative Society Nazimabad Karachi
3.84
391 Improvement of lawns at Bagh Ibne Qasim Clifton KMC 19.94
392 Improvement / Rehabilitation of irrigation and lighting system at different parks and roads of Division I II III IV VI PH KMC
19.98
396 Tree Plantation in Central Island at Road 4000 from 3000 to 9000 Road North Karachi, Balance work
3.00
397 Development of central island and side belt 12000 road Korangi KMC
20.00
400 Providing and Fixing Different Type of Physical Appliances at Shaheed Benazir Bhutto Park Boat Basin Block-6 Clifton
3.96
405 Construction of model park at Liaquatabad Town. 20.00
406 Improvement of Sir Syed Park and Nursery at Block -13 F.B.Area Gulberg,KMC
18.95
407 Florence Family Park ST-10 Block A North Nazimabad in front of Masjid Ibrahim
10.00
408 Irrigation system in central Island from Liaquatabad DakKhana signal to Bara Board signal Div IV.
9.44
![Page 30: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/30.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 30
409 Improvement & Development of Agha Khan Park Block-7, Clifton, P&H, KMC.
10.26
410 Tree plantation and filling sweet earth under the Tipu sultan Flyover at Shahrah -e-Faisal
20.00
412 Improvement of Central Island and Side belt 8000 Road from Vita Roundabout to Bilal Chowrangi, Korangi, P&H, KMC.
3.45
Total Park
384.90
C S & R
421 Providing & Laying Complete Irrigation System in Safari Area, Safari Park.
19.99
422 Providing and Lying of underground Cabling and providing Lighting Arrangement System at Safari Park.
19.90
432 Improvement of Parking Lot / Parking Area at Safari, CS&R, KMC.
19.90
Total CSR
59.79
G-Total Culture & Tourism
699.52
Information Technology
436 Up-Gradation of I.T Infrastructure (Hardware) for IFMIS of F&A KMC.
20.00
437 Refurbishment of F&A Department, KMC for One Window Operation.
20.00
438 Data Centre / Front End Lab Infrastructure Up-gradation / Expansion of F&A KMC.
20.00
Total Information Technology =
60.00
Total Schemes
4,079.87
Schemes completed From Block Allocation 2016-17
1
Improvement / Rehabilitation of Roads at Surrounding Area of KAKA Ground Block-N North Nazimabad District (Central) Karachi.
19.99
2 Improvement of Internal Roads and Sewerage System at Block-M North Nazimabad District Central Karachi 19.82
3 Improvement of Internal Roads at Block-C Near Haidery Market North Nazimabad District Central Karachi.
19.87
4 Improvement / Rehabilitation of Roads & Sewerage Line Along Block-P & Q North Nazimabad Karachi
19.70
5 Improvement / Rehabilitation of Roads & Sewerage Line Along Block-S, N & T North Nazimabad Karachi
19.98
![Page 31: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/31.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 31
6
Improvement / Rehabilitation of Internal Roads / Streets in Sector-14/A Shadman Town Anda More North Nazimabad Karachi
19.92
7 Improvement / Rehabilitation of Roads & sewerage Line Along Block-N & H North Nazimabad Karachi
19.62
8 Improvement / Rehabilitation Of Internal Roads / Streets in Sector-16/A Block-01 KBR Society Bufferzone North Karachi
19.93
9
Improvement / Rehabilitation of Internal Roads / Streets in Sector-15/B Near Misbha-ul-Uloom Mosque Bufferzone North Karachi
19.99
10 Improvement of Services Roads Shahrah-e-Faisal from Baloch Colony Flyover to Lal Qila Restaurant District East KMC.
19.29
11 Improvement / Rehabilitation of Internal Roads / Streets in Block-3 Gulshan-e-Iqbal Karachi
19.97
12 Improvement of Internal Roads from BABA More to Sarya Mill Surjani West Karachi.
20.00
13 Improvement / Rehabilitation of Internal Roads / Streets in Sector-10/L Orangi Town West. Karachi
19.92
14 Improvement of Internal Roads and Sewerage System at Garden West Karachi.
19.73
15 Improvement / Rehabilitation of Roads at Block-15 Gulistan-e-Juhar District East Karachi
19.94
16 Improvement of Internal Roads & Patch Work at Garden East Karachi
20.00
17
Improvement of Internal Roads & Sewerages System at Olympian Islahuddin Roads Near Disco Bakery Gulshan-e-Iqbal District East Karachi
19.89
18 Improvement of Internal Roads & Sewerage System at Block-4 Near Discovery Store Gulshan-e-Iqbal District East Karachi
19.86
19 Improvement of Internal Roads / Streets at Block-07 Gulistan-e-Jauhar Karachi
19.95
20
Rehabilitation / Reconstruction of Internal Roads in Jinnah Court (D G RANGERS office / Head Qarters & DG Rangers House
10.00
21 Improvement / Rehabilitations of CC Streets At Nayabad in Lyari Karachi
19.99
Total
407.34
Grand total
4,487.21
![Page 32: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/32.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 32
No. Of Scheme
List of Schemes Which have been completed under District ADP2016-17
Cost In millions
Sector
167 Infra-Structure (Roads) 3,192.47
5 Fire Brigade 216.46
3 Transport & Communication 35.77
12 Education 226.30
3 Health 56.68
42 Culture & Tourism 699.52
3 Information Technology 60.00
235 Total (Rupees in millions) 4,487.21
No. Of Scheme
Sector / Sub-Sector / Allocation
2016-17
1 Rural Water Supply 6.000
250 Infra-Structure (Roads) 1,703.500
8 Fire Brigade 120.000
8 Transport & Communication 120.000
42 Education 230.000
29 Health 209.428
96 Culture & Tourism 870.000
7 Information Technology 75.072
440 Total (Rupees in millions) 3,334.000
1 Block Allocation (New Schemes) 833.500
441 Grand Total.(441 Schemes) 4,167.500
Department Wise Summary of Completed Scheme
S. No. Department No. of Scheme
1. Engineering. 90
2. Municipal Services. 8
3. Transport & Communication. 8
4. Education. 16
5. Health. 2
6. Culture & Sports. 10
7. Parks & Horticulture. 16
![Page 33: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/33.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 33
Pre-View of District ADP 2017-2018
As per the guideline and directives of competent authorities, for ADP for
the year 2017-2018 the allocation for on-going schemes have been kept at
maximum level, whereas the inclusion of new schemes was discouraged.
Sufficient has been allocated for new under block allocation 2017-2018. It is
expected that the GoS will release the entire funds under District ADP 2017-2018.
ANNUAL DEVELOPMENT PROGRAMME 2017-2018
DISTRICT KARACHI
(Rs. In million)
ADP NO.
2017-18 Sector / Sub-Sector / Name of Scheme
Estimated Cost
1 2 5
Infrastructure (Roads & Bridges)
1 Asphalt Wearing Course (5 CM) along Shaheed Benazir Bhutto Park from Bilawal Chowrangi to Boat Basin. 19.989
2 Channelization / Construction of Natural Nallah (RCC Wall) Orangi Nallah Liaquatabad, Zone (Part A)
19.990
4 Improvement / Rehabilitation of Street Lighting System at Shahrah-e-Noor Jehan from Abdullah College to Sakhi Hasan Chowrangi
20.000
8 Patch work of Main Road in Sector No.10,11,12,13 & 14 both Track in Scheme-41 Surjani Town, Karachi.
2.184
13 Improvement of 300ft wide Road along Sector-14 & 15 connecting Northern By-Pass Surjani Town, Karachi.
19.682
14 Rehabilitation & Up-Gradation of Center of Vocational Excellence Karachi (CoVEK) Sharafabad, Jamshed Town Karachi.
19.988
16 Rehabilitation / Construction of Nallah Backside of Hydri Market. Zone II
20.000
17 Rehabilitation / Improvement of road from FL-1 to ST-21 Block 2 Scheme-5, Clifton District South KMC.
19.980
18 Construction of Both Track of Road 1000 from Road 3000 to Malir Bund at Korangi.
9.115
19 Construction & Rehabilitation of Nallah from Sharah-e-Faisal in Morrio Goth Railway Crossing Shah Faisal Town.
10.239
![Page 34: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/34.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 34
22 Improvement of CC flooring and Sewerage Line Upper Gizri UC-11 Saddar Town Karachi.
20.000
24 Construction of road in Hijrat colony from Mai Kolachi Railway Track to Gulistan Hotel District South.
20.000
25 Repair of Rain Foot Patch Damages of Korangi Causeway Down Stream side in Malir River
11.079
26 Improvement / construction of connecting road between Road 3100 Road 4400 in sector 5-A/1, 5-A/2 5-A/3 5-A/4 (Ps-98) at North Karachi.
20.000
27
Construction of 40ft, 20ft wide Roads Passing through Survey Nos.66, 66/2,,66/3-2,67/2,123,125, nai Malir Tappo Ibrahim Hyderi and service road of road 8ooo Opposite Honda Showroom at Korangi town Ship.
11.187
28 Improvement & Construction of CC Flooring and water/sewerage line upper Gizri UC-11 Saddar Town.
20.000
29 Rehabilitation / Construction of Road, C.C. Flooring & Sewerage System at Moosa Goth, North Nazimabad, District (Central), Karachi.
9.900
30 Rehabilitation / Construction of Road, C.C. Flooring & Sewerage System in Pahar Gunj, North Nazimabad District (Central), Karachi.
19.990
31 Rehabilitation / Construction of Road, C.C. Flooring & Sewerage System Disilva Town, North Nazimabad District (Central), Karachi.
19.990
32 Rehabilitation / Construction of Road, C.C. Flooring & Sewerage System Kausar Niazi Colony, North Nazimabad District (Central), Karachi.
10.000
33 Rehabilitation / Construction of Road, C.C. Flooring & Sewerage System in Ashraf Nagar Paposh & Sarhad Colony, North Nazimabad District (Central), Karachi.
19.990
34 Rehabilitation / Construction of Road, C.C. Flooring & Sewerage System at Khamosh Colony, North Nazimabad District (Central), Karachi.
19.990
35 Rehabilitation / Construction of Road, C.C. Flooring & Sewerage System in Khyber Colony & Ajab Khan Colony, North Nazimabad District (Central), Karachi.
19.910
36 Improvement of Nishter Road from Teen Hati to Zoo Jamshed District East , KMC,
20.000
37 Improvement / Rehabilitation of Qazi Hospital Double Track road in Entire Jurisdiction of NA-239 Baldia zone West Zone.
20.000
38 Improvement of Service road from Tipu sultan road to Shahrah-e-Faisal and Places Jamshed District.
19.990
39 Improvement of Shahrah-e-Faisal Service Road updown from Tipu Sultan to Shahrah-e-Quaideen, Jamshed District.
19.990
40 Improvement of Sewerage system and construction of road, internal and surrounding areas of Rashidi Goth, Gulistan -i- Jauhar, Karachi.
20.000
![Page 35: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/35.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 35
41 Imp./Const.of Sewerage system & road, internal & surrounding areas of Bakhtawar Goth,Gulistan-i-Jauhar, Karachi. 20.000
42 Improvement of Sewerage system and construction of road, internal and surrounding areas of Chashti Nagar, Gulistan -i- Jauhar, Karachi.
20.000
43 Construction or Road and Surrounding areas of Masjid Rehmani, UC-05, Malir Town, Karachi.
20.000
44 Construction of Rehabilitation of Road and Sewerage System of behind Citizen foundation School, UC-05, Malir Town, Karachi.
20.000
45 Construction of RCC Pipe Culvert on Nallah at Abbas Town Gulshan-e-Iqbal.
4.770
46 Construction CC flooring of Roads in Distt Malir NA257 20.000
47 Improvement / Reconditioning of Roads in Gulshan-e-Iqbal Block-01, 02, 05, 13-D, 13-D1, Karachi.
19.987
48 Improvement / Rehabilitation of Road at UC-08 (PS-97) Surjani Town Karachi.
19.963
49 Improvement of Roads in the Areas of UC-10 (PS-95) Orangi Town Karachi. 20.000
50 Rehabilitation of Road and CC Flooring in UC-06 (PS-110) Saddar Town.
20.000
51 Construction of Road from Khoprapar KDA Bus Stop to Amar Yasir Society via Gharibadab Madarsa Darul Ulum Mujadadia Neemia 1.75 KM.
20.000
52 Rehabilitation of Road from Khoprapar Chaman Colony Seven Star Bus Stop to Mehran Hostel via Police Station 2.0 KM.
20.000
55 Construction of Road Carpeting at Kashmir Colony, Junejo Town and Azam Basti, UC-01, 02 & 05, Jamshed Town.
19.678
56 Improvement / Construction of Sewerage Line at Shah Rasool Colony, Saddar Town.
19.720
57
Construction of Road Carpeting, C.C. Flooring, Sewerage Line & Water Supply Line at Patel Para, Balouch Mohalah, Sindhi Hotel Jacob line, Jamshed Quarters, Bijli Ground, Soldier Bazar & Martan Quarters, UC-6, UC-7, UC-9, UC-10, UC-11, UC-12 & UC-13, Jamshed Town.
19.970
58 Improvement of Construction of Road Carpeting Shiree Jinnah Colony, UC-11, Saddar Town.
20.000
59 Improvement of street lights system at Shah Rasool colony Hijrat colony sheerin Jinnah colony UC-09 11 Saddar Town UC-03 Landhi Town.
20.000
60 Improvement of street lights system at Faqirah Goth UC-05 Gujro Gadap Town UC-01 Jamshed Town Karachi.
20.000
61 Improvement / Construction of Road Carpeting of UC-04 SITE Town Karachi.
19.780
![Page 36: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/36.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 36
62 Construction of Link Road Including new Jersey Barriers from Left Side Nehar-e-Khayyam From Grammar College to F-42, Clifton South, Karachi.
19.563
64 Improvement / reconstruction of Road in Nazimababd No.1 Liquatababd District (Central Karachi)
20.000
65 Carpeting / Repairing of Trenches of Road 9000 from Road 2300 to Road 4000 & Road 2300 from Road 7000 to Road 9000 North Karachi Zone, District Central, Karachi.
19.980
66 Carpeting / Repairing of Trenches in North Karachi Industrial Area, Road 2300 & 9100 North Karachi Zone, District Central, Karachi.
19.160
67 Construction / Carpeting of Road 4100 & Storm Water Drain from Road 5000 to Road 5200 North Karachi Zone, District Central, Karachi.
19.444
68 Construction of 2nd track and rehabilitation of Ist track of 100 Ft wide road from 10000 to Allahwalla Town Road at Korangi
19.083
69 Construction of 2nd track of 100 FT wide road from road 3000 to Allhwala Town road and up to road 12000 at Korangi
19.227
70 Improvement / Reconstruction of road in Golimar and Waheedabad Colony District Central Karachi.
19.258
71 Improvement / Reconstruction of road in Orangabad Mumtaz Nehari to Chota Midan District Central.
19.490
72 Construction of Road, C.C flooring and sewerage works in Rahim Shah Colony, Muhammad Nagar, UC-04 in District West, Karachi.
19.871
73 Construction of Road,C.C flooring and sewerage works in Madina Colony, Siddiqui Akbar Colony, UC-05 in District West ,Karachi.
17.549
74 Construction of Road , C.C flooring and sewerage works in Afridi Colony,UC-03 in District West.
17.549
75 Construction of Road , C.C flooring and sewerage works in Gosia Baloch Colony,UC-09 in District West.
18.477
76 Construction of Road, C.C flooring and sewerage works in Fakheer Colony,UC-02 in District West.
18.201
77 Rehabilitation & Improvement Of Services Road 9000 (SABA CINEMA) and Link Roads North Karachi Industrial North Karachi Zone District Central.
18.798
78 Construction of Various Causeway Saan Nadi 17.109
79 Construction of Internal Road & CC Flooring Sewrage Line Muslimabad UC Dawood Chowrangi Moinabad Muzffarabad.
20.000
81 Improvement / Renovation of CC Flooring Street in Lyari Town. 20.000
151 Improvement / Beautification of Shahrah-e-Quaideen Aman Exercise 2017.
6.153
155 Improvement and lane marking Painting of Road at Mai Kolachi Road Karachi
10.000
156 Rehabilitation / Repair of SWD at Nehar-e-Khayyam. 19.900
![Page 37: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/37.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 37
UC Schemes
241 Improvement / Rehabilitation of Infrastructure in Different Area of UC-01,04,06,12,18,20,23,30 (East) , KMC Council (Regular)
20.000
242 Improvement / Rehabilitation of Infrastructure in Different Area of UC-03,19,24,31, (East) 12,18,21,32 (Korangi) ,, KMC Council (Regular)
20.000
243 Improvement / Rehabilitation of Infrastructure in Different Area of UC-01,02,04,05,07,08,09,10(Malir) ,, KMC Council (Regular)
20.000
244 Improvement / Rehabilitation of Infrastructure in Different Area of UC-02,03,05,06,09,10,11,30 (South) ,, KMC Council (Regular)
20.000
245 Improvement / Rehabilitation of Infrastructure in Different Area of UC-07,08,12,13,14,15,17,20 (South) , KMC Council (Regular)
20.000
246 Improvement / Rehabilitation of Infrastructure in Different Area of UC-04,21,24,24,25,27,29,31(South) ,, KMC Council (Regular)
20.000
247 Improvement / Rehabilitation of Infrastructure in Different Area of UC-18,19,20,22,23,26,27,28 (South) ,, KMC Council (Regular)
20.000
248 Improvement / Rehabilitation of Infrastructure in Different Area of UC-01,24,30 (South)01,04,10,12,23 (West) ,, KMC Council (Regular)
20.000
249 Improvement / Rehabilitation of Infrastructure in Different Area of UC-02,09,31,33,36,37,42,43 (West) ,, KMC Council (Regular)
20.000
250 Improvement / Rehabilitation of Infrastructure in Different Area of UC-03,04,06,21,22,44,45,46 (West) KMC Council (Regular)
20.000
251 Improvement / Rehabilitation of Infrastructure in Different Area of UC-07,15,31,32,37,40,45, (West) 23 (Central) ,, KMC Council (Regular)
20.000
252 Improvement / Rehabilitation of Infrastructure in Different Area of UC-06,07,09,10,11,17,21,50 (Central) ,, KMC Council (Regular)
20.000
253 Improvement / Rehabilitation of Infrastructure in Different Area of UC-38,44,45,46,47,48,49,51 (Central) ,, KMC Council (Regular)
20.000
254 Improvement / Rehabilitation of Infrastructure in Different Area of UC-12,13,16,18,22,39,41,43 (Central) , KMC Council (Regular)
20.000
255 Improvement / Rehabilitation of Infrastructure in Different Area of UC-26,28,29,33,35,36,37,42 (Central) ,, KMC Council (Regular)
20.000
256 Improvement / Rehabilitation of Infrastructure in Different Area of UC-19,26,27,30,31,32,34,40 (Central) ,, KMC Council (Regular)
20.000
![Page 38: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/38.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 38
257
Improvement / Rehabilitation of Infrastructure in Different Area of RSW-251, RSW-252, RSW-270,RSW-271, RSL-284,RSY-298, RSM-303, RSM-307, ,, KMC Council (Reserved)
20.000
258 Improvement / Rehabilitation of Infrastructure in Different Area of RSW-225,RSW-233,RSW-235, RSW-241,RSW-247, RSW-277,RSL-285,RSL-288, ,, KMC Council (Reserved)
20.000
259
Improvement / Rehabilitation of Infrastructure in Different Area of UC-6, 12, 13 (Malir), UC-20 (Central) RSW-256, RSW-259, RSW-264 & RSW-265,KMC Council (Regular / Reserved).
20.000
260 Improvement / Rehabilitation of Infrastructure in Different Area of UC-1, 4, 5, 17, (Korangi), & UC-08, 10, 23,(West) UC-16 (South) ,, KMC Council. (Regular / Reserved)
20.000
261 Improvement / Rehabilitation of Infrastructure in Different Area of UC-03, UC-31 (East) RSY-293, RSW-221, RSW-244, RSW-237, RSW-238, RSW-250, KMC Council. (Regular / Reserved)
20.000
Total (Roads & Bridges) 1,645.863
Municipal Services
262 Provision of essential Instruments for Food Laboratory, KMC, Karachi
20.000
Total Municipal Services 20.000
Transport & Communication
274 Shifting of Pedestrian bridge from Pipe Factory Dalmia Road to Banuri Town Masjid,Karachi.
4.599
Total Transport & Communication 4.599
Total Schemes PP & H 1670.462
Education Sector (Ongoing)
284
Major Repair / Renovation in existing Secondary Schools (6 Units): (i) Boys Jahangir East (ii) Girls 5/A N. Karachi (iii) Girls Anjuman-e- Islamic, Liaquatabad (iv) Boys Anjan Colony (v) Girls M.H. Baldia (vi) GGSS Paposh Nagar, Karachi
116.597
285 Construction of Football Academy @ Shireen Jinnah Colony Block-I ST-20, Clifton Karachi (Changing Room, Pavilion, Small Structures).
19.952
286 Construction of Football Academy @ Shireen Jinnah Colony Block-I ST-20, Clifton (Ground, Flood Lights & Energy)
19.972
287 Construction of Pavilion at various Grounds at Karachi (03 units).
18.003
288 Repair / Renovation of Schools Pertaining to Korangi Town, Karachi.
16.213
289 Repair & Renovation of School pertaining to Korangi Town (i) School No.1-2 Girls / Boys (ii) Primary School,3-4 Boys/Girls Primary School 11-12 Primary School.
20.000
![Page 39: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/39.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 39
290 Repair & Maintenance of Elementary Secondary School in Karachi GSS#02 GBHSS K-Area Korangi, Landhi Town, (Electric Works).
16.600
293
Construction / Reconstruction of Government Boys Girls Primary School Monara Cantt. Keamari & Construction / Reconstruction of GBPS AL-Falah Bhutto Village, Keamari, Karachi.
20.000
296 Repair / Maintenance / Renovation of Elementary Primary & Secondary Schools in Karachi @ GGSS K-Area Market Landhi Town, Karachi.
20.000
297 Re-Construction of Dangerous School at Govt Boys Primary School No.04 Drigh Colony, Shah Faisal Town.
19.943
300 Addition of XI - XII Classes in Existing Secondary School at GGSS 51B, Korangi Town, Revised.
22.745
301
Repair / Renovation of Schools Pertaining to Korangi Town, Karachi.i) Government Boys Primary School 33-E, Korangi, Karachi.ii) Government Boys Primary School 32-A, Korangi, Karachi.iii) Government Boys Primary School St. THREASE Korangi, Karachi.
19.305
302
Repair / Renovation of Schools Pertaining to Korangi Town, Karachi.i) C.D.G.K No. 1-2 Girls / Boys Primary School, Korangi, Karachi.ii) C.D.G.K No. 11-12 Girls / Boys Primary School, Korangi, Karachi.
18.788
303 Repair / Renovation & New Construction Of School to Korangi Town at (1) Govt Girls Primary School 33/E Korangi No2 /1/2. (2) Govt Boys Primary School 32/A Korangi No.1 1/2.
19.997
305 Repair / Renovation of G.B.P Modal School 48/E Korangi , Repair / Renovation of G.U.B & G.P.S Abbasi Nager Korangi No.2
19.991
306 Repair / Renovation & Construction of School to Korangi Town at (i) GGLSS # 4 Nasir Colony Korangi (ii)GGPS Nasir Colony Korangi, Karachi
19.987
307 Construction Re-Construction of Existing School at Govt Boys & Girls Primary School 3&4 Korangi Town Karachi. 19.932
Total Education (On-going) 428.025
Health Sector (Ongoing)
315 Improvement / Reconstruction of Dispensaries, Hospitals & Health Centers (Local Bodies) in Karachi. 189.808
316 Up-gradation of 50 bedded Hospital into 100 bedded Hospital at New Karachi Town, Karachi. 59.035
317 Improvement & Rehabilitation of DG(T.S)H Centre/ Dispensaries & other Health Units of Liquatababd Town, Karachi.
19.553
Other Health 268.396
![Page 40: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/40.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 40
Health Sector (KMC)
318 Repair / Renovations of KMC Hospitals Civil & Electrical Works.
20.000
321 Leprosy Hospital Converted into the Institute of Infectious Diseases, KMC.
139.217
322 Requirement of Auditorium in Abbasi Shaheed Hospital, KMC. 6.786
323 Provision of essential Equipment / Instruments for Strengthening / Up-Gradation of Accident Emergency Department Abbasi Shaheed Hospital.
20.000
324 Provision of essential Equipment / Instruments for Strengthening / Up-Gradation of Molecular Lab in Pathology Department Abbasi Shaheed Hospital, KMC.
20.000
329 Provision of essential Equipment / Instruments for Strengthening of Operation Theatre & Improvement of Patient Treatment of at Spenser Eye Hospital, Karachi.
10.600
330 Improvement of Spencer Eye Hospital, KMC, through "Provision of Essential Equipment / Instruments".
12.800
331 Provision of essential Equipment / Instruments for Strengthening of existing Operation Theatre of SRS Hospital .
19.045
332 Provision of Equipment / Instruments/ Furniture for Sarfaraz Rafiqui Shaheed(SRS) Hospital, KMC
19.750
334 Provision of Essential Electro Medical Equipments/ Instruments for Strengthening/ Up gradation of Landhi Medical Complex.
19.495
335 Providing / Installation & Commissioning of Diesel Generator Sets at Landhi Medical Complex,
5.500
336 Improvement and maintenance Landhi Medical Complex KMC 13.000
338 Addition of Cardiac Emergency Centre in KMC Hospital at Shah Faisal Town.
208.697
Health KMC 514.890
Total Health 783.286
Culture & Tourism Sector
Play Grounds
348 Construction of Pavilion in Red Rose Cricket Ground in UC-2, Malir Town.
45.229
349 Construction of Stadium at ST-36 in UC-8, SITE Town, Karachi.
90.842
350 Repair / Renovation of Rashid Latif Cricket Academy, Korangi No.5, Landhi Town, Karachi. (Construction of VIP Pavilion & Fixing of Steel Grill).
20.000
351 Repair / Renovation of Rashid Latif Cricket Academy, Korangi No.5, Landhi Town, Karachi, (Construction of Double Roof Pavilion)
20.000
352 Installation of Floodlight in Rashid Latif Cricket Academy, Korangi No.5, Landhi Town, Karachi.
20.000
353 Improvement / Rehabilitation of Compounds on Jinnah Ground, Aziza bad No.8, Karachi.
19.725
![Page 41: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/41.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 41
354 Construction of Cricket Ground Block L North Nazimabad Karachi
19.904
355 Construction of Community Centre at Sector ST-14 in UC-8, SITE Town.
113.264
358 Construction of Cricket Pavilion at Annu Bhai Park Nazimabad No.04 Karachi Phase I
19.983
359 Construction of Cricket Pavilion at Annu Bhai Park Nazimabad No.04 Karachi Phase II
19.985
360 Construction of Farooq-e-Azam (Cricket) Ground Sector 51-B Adjacent to Tayyaba Masjid UC-9 Korangi Town Karachi.
20.000
361 Rehabilitation of existing sports stadium in Sindh Azam Football Ground Drig Road Shah Faisal.
20.000
367 Development of Kaka Cricket ground at Block N North Nazimabad (Phase I)
19.789
TOTAL Play Grounds 448.721
P & H (KMC)
368 Procurement of Water Boozers for Watering for Tree Plantation on different Roads of Division No. I, II, III.
19.900
369 Development of Park at ST-32 Block-15 Gulistan-e- Jauhar, KMC.
20.000
370 Supply of Garden Tools, Lawn Movers, Gang Movers for Division-I, II & III, KMC.
10.960
371 Tree Plantation at side belt of 5000 road from Nagan to Surjani, KMC
19.951
372 Improvement of Plants by Watering & Trimming at 6000 Road, North Karachi.
19.990
373 Improvement of Central Island with Irrigation System at central Island Jinnah Avenue Malir (P&H) KMC
19.890
374 Development of lawns a Beach Park Phase II Clifton (P&H)KMC
19.890
375 Construction of internal Pathways at Beach Park (Phase II) KMC
19.980
376 Lighting arrangement and irrigation system at Beach Park (Phase-II) Clifton.
19.980
377 Remaining work of Park at ST-3 Block 15 Gulistan-e- Jouhar KMC
13.900
378 Development of Horticulture and Electrical works of Park at Block L N.Nazimababd KMC
19.990
379 Tree Plantation in Central Island at Road from Police chowki to Lyari River Surjani
11.000
380 Development of triangle park opposite Dolman Mall Clifton P&H KMC
19.990
382 Providing and Fixing Wooden Floor Board Walk at Park St-1, ST-2, Block-5, Clifton.
18.040
383 Providing and Fixing Children Play Castle and Fibre Cubes for Bridge at Park St-3 Block-6 Scheme 5 Clifton.
18.110
![Page 42: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/42.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 42
384 Development and Improvement Of Baloch Park, KMC. 9.993
385 Improvement of Boundary Wall Gates, Ponds & Physical Appliances at Beach Park, Clifton.
12.825
386 Improvement & Development of ST-10 Park Block-IV, Clifton, KMC.
20.000
387 Improvement of lawn of lawns at Beach park Clifton
20.000
388 Improvement of Park at ST-15 Clifton.
19.790
389 Development of Gulshan-E-Jinnah ( Polo Ground) KMC (Balance Work of Governor Package) 36.000
390 Supply of Fibre Glass Dust Bins P F inauguration stone and stone Benches at Gulshan-Jinnah (polo ground) 4.972
391 Improvement of Gulshan-e-Jinnah (Polo ground),KMC. 19.968
396 Development of Lawns , Improvement of grill Fencing and Construction of Canopies and gate at Burns Garden KMC. 19.400
397 Tree Plantation in Central Island and Side Belt of Maripur road District West KMC 14.455
398 Improvement Of Jahangir Kothari Parade and repairing of Boundary Wall at Bagh-e-Ibne Qasim Clifton, KMC. 12.376
401 Development of Park at ST 16/B Block-3 Clifton, KMC. 10.780
402 Development of Park at ST 14/15 Block-3 Clifton,KMC.
10.000
403 Development of Park at ST-11 Block-3 Clifton.KMC. 10.000
404 Renovation of Boundary Wall and pathways at Park in Block-3 Clifton KMC 10.000
405
Improvement/ Rehabilitation of irrigation system in park at block-3 Clifton, KMC 10.000
406 Improvement/ Rehabilitation of Lighting system in park at block-3 Clifton, KMC. 10.000
409 Development of Family Akbar Park at Baldia Town, KMC 20.000
410 Development of Park at ST-13 Block-5 Clifton, KMC.
19.980
411 Improvement of Lawns at Bagh-e-Ibne Qasim Clifton Karachi 20.000
415 Procurement of Tractors with hydraulic trolley and leveller for Parks & Horticulture Department, KMC. 20.000
Total Park
602.110
![Page 43: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/43.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 43
C S & R
416 Construction and Renovation of Boating Area and Reptile House at Karachi Zoo. 19.770
417 Construction of New Aquarium Building at Karachi Zoo. 19.900
418 Constructions Renovations of Black Swan Pound at Karachi Zoo 20.000
419 Construction of Hockey Stadium in Sports Complex Kashmir Road KMC. 207.000
Total CSR 266.670
G-Total Culture & Tourism 1,317.501
Information Technology
434 Consultancy service for Development & Implementation of IFMIS, F&A KMC. 20.000
435 Digital Archiving of Land Record of KMC. 20.000
436 Procurement of Office Equipments Furniture / Fixture and Other Material for Different Dept of KMC (S&P). 20.000
437 Up-gradation of IT Infrastructure (Net working) For IFMS, KMC 20.000
438 Up-gradation of IT Infrastructure System Software For IFMS 20.000
439 Computerisation of all KMC Departments (Phase I) 20.000
Total Information Technology 120.000
Total Allocation for On-going Schemes 4,319.274
No. Of Scheme
List of Schemes which will be completed under District ADP2017-18
Cost In millions
Sector
89 Infra-Structure (Roads). 1,645.86
1 Fire Brigade. 20.00
1 Transport & Communication. 4.60
17 Education. 428.03
16 Health. 783.29
53 Culture & Tourism. 1,317.50
6 Information Technology. 120.00
Total 183 Schemes (Rupees in millions) 4,319.274
![Page 44: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/44.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 44
The following table shall further reveals the department-wise / head-wise
expenditure for the financial year 2016-2017, Revised Estimates of the same year
and the Budget Estimates for the next financial year 2017-2018:
Sr. No.
Department Budget
Estimates 2017-2018
Revised Estimates 2016-2017
Budget Estimates 2016-2017
1
Secretariats (Administrator / Mayor, Deputy Mayor, Metropolitan Commissioner, Council, Vehicle, Veterinary, HRM, Religious Affairs & Media Management. 773.230 568.744 725.702
2 Finance & Accounts. 315.207 242.380 264.628
3 Parks & Horticultural. 897.468 534.188 816.600
4 Law 135.924 92.816 124.826
5 Information & Technology. 83.834 41.062 173.365
6 Enterprise & Investment Promotion. 59.901 41.734 51.316
7
Revenue Departments (Land, Enforcement, Estate, Katchi Abadi, PD Orangi & Charged Parking) 865.927 683.194 762.083
8 Recreation, Culture & Sports. 673.930 474.655 678.478
9 Medical & Health Department. 4,042.965 2,378.084 3,603.651
10 Transport & Communication. 424.615 85.500 471.940
11 Municipal Services. 3,079.05 2,537.490 2,961.601
12 Engineering. 3,762.418 752.751 3,413.985
13 Repayment of Loans & Pension Fund & other Misc Expenditure. 4,996.00 3,697.084 4,245.164
14 District ADP. 5,001.50 4,167.50 4,167.50
15 Provincial ADP. 1,023.602 2,557.516 2,738.988
16 Share of DMCs 1,000.000 ---- ----
Grand Total KMC(1 to 16) 27,135.670 18,854.701 25,199.827
![Page 45: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/45.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 45
Information Technology.
For the expansion of Information Technology, the following allocations
have been made.
(Rs. in Millions)
Sr. No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.83.834
2. 2016-2017 (R.E) Rs.41.062
3. 2016-2017 (B.E) Rs.173.365
The Information & Technology department, KMC trying introduce computer
based culture for day to day work, communication and integration and generation
of MIS for timely decision making and delivery of municipal services to the end
user i.e. consumer . The following steps are going to be taken by the I.T
Department as first instance:
• Development of Wi-Fi environment (WAN/ LAN) for e-communication
passing day to day instruction, orders, and massaging departments
to department and hierarchy of the Organization.
• Digital Archiving and Land Management System by using modern
technology for digital archiving and establishment state-of-Art Land
Management System.
• Computerization of all KMC Department, KMC, is a gigantic task to
computerize and ntegrate all KMC departments to work on computer
base applications, instead of day to day work manual. The
application will be developed as there needs, nature and requirement
of work.
![Page 46: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/46.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 46
Medical & Health Services:
The Medical & Health Department, KMC running the 13 major hospitals of
KMC within the limited resources and spent funds by the KMC to provide curative
and better medical facilities to the citizens of Karachi. An amount of Rs.4,042.965
million has been provided in the next year’s budget estimates indicating an
increase of Rs.1,664.881 million over the revised budget estimates for the year
2016-2017.
The KMC is running the following hospitals in the mega city of Karachi:
• Abbasi Shaheed Hospital.
• Karachi Institute of Heart Diseases
• Newly established Cardiac Center in Shah Faysal & Landhi
• Spencer Eye Hospital
• SRS Hospital
• Sobhraj Maternity Home
• Leprosy Hospital (Institute of Indigenous Diseases).
• Landhi Medical Complex.
Besides above Karachi Medical & Dental College and Hospital is also being
run under the umbrella of KMC. Latest equipments have already been provided to
the hospital with all the facilities for the poor patients on subsided rates. An
amount of Rs.456.000 million has been provided in the next year’s budget 2017-
2018.
Nowadays a large number of dialyses patients have been increased in the
city and facing hard treatment special poor patients. Especially non availability of
dialyses machines in the government sector/ hospitals and high cost treatment of
dialyses poor patients being faced hardship for treatment. To combat the dilemma
of increasing of dialyses patient in the city, the present local body representatives
of city of Karachi have taken various measures including the following:
• Decided to install 10 dialyses machines each in the Abbasi Shaheed
Hospital and Landhi Medical Complex without the any fee/charge.
• Start the dialyses treatment for poor patients of city at Nazeer
Hussain Kidney Center after completion of electoral work.
![Page 47: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/47.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 47
The present leadership is also delegated to provide:
• Medicine, x-ray facilities and other essential items to the KMC’s
hospital.
• Latest equipments and apparatus and made functional inoperative
diagnostic laboratory at Abbasi Shaheed Hospital in the next
financial year.
• Life savings drugs in all the KMC’s Hospital.
• Sufficient funds in the District ADP 2017-2018 for betterment of
KMC’s hospitals.
Culture, Sports & Recreation.
The Culture, Sports & Recreation Department, KMC is basically based on
Culture, Recreation and Sports sections under the leadership of Senior Director
CS&R, KMC. Its major function is to promote culture sports and recreational
activities/ facilities to people of Karachi also promote sports activities for disable
persons & provide them better recreational facilities.
The culture section support / arrange the cultural activities in the city and on
Sadeqain Art Gallery and Library Markaz-e-ilum-o Saqafat to hold art exhibitions.
Other included are Mehfil-e-Millad, Food Mela, different competitions,
Environment Day Festival, Painting Contest & Exhibition Tableaus speed
contest and Tree Plantation. Effective measures have also been taken to promote sport facilities in the
City. Whereas the sports section support / arrange the sports activities in the city
and run the following institutions of KMC:
• City Sports Complex Kashmir Road
• Women Sports Complex
• Landhi Korangi Sports Complex
![Page 48: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/48.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 48
Similarly the Recreation Section is support and run the following institutions
of KMC:
• Karachi Zoo.
• Safari Park.
• Landhi Korangi Zoo.
(Rs.in million)
Sr. No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.865.792
2. 2016-2017 (R.E) Rs.683.194
3. 2016-2017 (B.E) Rs.762.083
An amount of Rs.865.792 million has been provided in the next year’s
budget estimates indicating an increase of Rs.103.709 million over budget
estimates for the year 2016-2017.
![Page 49: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/49.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 49
It shall be worthwhile to append herewith the list of the Major Projects to be
funded under the ensuing budget estimates 2017-2018:
(Rs.in million)
Sr.
No. Nomenclature
Budget
Estimates
1 District ADP (Block Allocation) including U.C Scheme Rs.380 Mn)
1,667.000
2 Public Private Partnership Project (VGF)
1,000.000
3 Development works at different Union Councils (KMC Funds).
1,000.000
4 Development works at different Union Councils (ADP Funds).
420.000
5 Improvement & Up-gradation of Nehar-e-Khayyam
350.000
6 Commercial Parking Plaza at Shahabuddin Market including Phase-II
350.000
7 Improvement of Roads, Footpaths & Bridges (Patch Work)
250.000
8 Development & Improvement of Major Roads
250.000
9 Special Development Project / Works (Mayor Discretions).
200.000
10 Cleaning & Desalting of Strom Water Drains.
200.000
11 Unforeseen Development expenditure
150.000
12 Development Works at Orangi Cottage Industrial Area
100.000
13 Construction of New Fire Stations.
100.000
14 Lighting arrangement at Major Roads (KMC).
100.000
15 Development of Zulfiqarabad Oil Terminal Ph-II
100.000
16 Improvement of Flyovers, Underpasses & Bridges
100.000
17 Development & Improvement of KMC Parks
80.000
18 Repair & Maintenance of Fire Tenders & Snorkel.
50.000
19 CCIS (1339). 50.000
![Page 50: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/50.jpg)
AN OVERVIEW 2017-2018
Explanatory Memorandum Page 50
19 Annual Maintenance of Hospitals, Clinics, Maternity homes & staff Quarters.
40.000
20 Wireless Videos Surveillance Security System
25.000
21 District ADP
Infra-structure of Roads
1,884.098
Municipal Services
130.000
Transport & Communication
115.599
Education
147.010
Health
290.313
Culture & Tourism (CSR & P&H)
675.980
Information Technology
86.000
![Page 51: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/51.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 51
Karachi Metropolitan Corporation
Revenue Budget
2017-2018
Nomenclature
Budget
Estimate
2017-2018
%
Revised
Budget
2016-2017
%
Budget
Estimate
2016-2017
Matching Grants in Lieu of
OZT 3,360.352 12.38 1,790.020 9.49 3,050.352
Special Grant in Aid 6,000.000 22.10 4,000.000 21.21 6,000.000
Misc. Grant in Aid 700.000 2.58 600.000 3.18 600.000
OZT for Pensioners 3,032.000 11.17 3,162.384 16.77 2,065.448
Dues of KMC against K-
Elect. 1,716.180 6.32 0.000 0.00 1,716.180
Transfer of income from
SBCA. 500.000 1.84 500.000 2.65 1,000.000
KMC Own Income 4,312.453 15.89 2,081.530 11.04 4,216.662
MUCT (KPT) 500.000 1.84 0.000 0.00 -
Development Portfolio
(Prov. & Dist. ADP & VGF) 7,024.602 25.88 6,725.106 35.66 6,906.488
Total Receipts 27,145.586 100 18,859.040 100 25,555.130
![Page 52: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/52.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 52
![Page 53: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/53.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 53
Analysis of Revenue 2017-2018
1,023.602 ,
15%
5,001.500 ,
71%
1,000.000 ,
14%
DISTRICT ADP, PROVINCIAL ADP & VGF
Provincial ADP District ADP VGF
![Page 54: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/54.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 54
The Budget of Karachi Metropolitan Corporation basically aims for the
improvement of civic services especially to the less privileged people, which is
envisaged under the Sindh Local Government Act 2013. The emphasis has been
made on good governance, effective delivery of services and transparent decision
making through institutionalized participation of people. The development and
extension of environmental conditions and improvement in the quality of life is to
be ensured.
The deteriorating infrastructure of civic services, rapid growth of population,
expansion of span of development plan and increase in the non-developmental
activities beside the persistent escalation in prices and constant decline in the
income from the revenue resources which are static and inelastic in nature are the
factors which has made the task of budgeting more complex.
A sound revenue base is a pre-requisite for ensuring the performance of the
obligatory functions and to achieve the targets of development and improvement
set in various fields and to translate the policies into action, in order to provide
maximum services to the people. All possible sources within the ambit of Karachi
Metropolitan Corporation are mobilized to find funds.
The major revenue resources of KMC have already been abolished/
transferred (SBCA, Conservancy & Fire Tax, Master Plan, Local Taxes & Charged
Parking Fee) to other departments, which was used to cover the shortfall in salary
/ pension and met the major essential expenditures i.e Medicine, Medical Gas,
Utility Bills, POL and Day to Day expenses.
![Page 55: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/55.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 55
The total budget outlay, as reflected in the Budget at a Glance for the next
financial year 2017-2018, is discussed below which would be indicative of the
efforts made to generate funds through various sources:
TOTAL RECEIPTS.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs. 27,145.586
2. 2016-2017 (R.E) Rs.18,859.049
3. 2016-2017 (B.E) Rs. 25,555.130
The budget estimates for the financial year 2017-2018 of the Karachi
Metropolitan Corporation portray the total outlay of Rs. 27,145.586 million as
under: (Rs.in Million)
Current Receipt Rs.25,350.086
• Income is derived from recovery of Fees, Charges, Tax, Rent, Other Recoveries etc. collected by the different departments of KMC.
• Matching Grant (in lieu of Octroi/ Zila Tax) from the Government of Sindh out of the share of General Sales Tax.
• Grant in Aid (in lieu of Octori) from the Government of Sindh.
• Releases of fund from Government of Sindh towards District Annual Development Programme and VGF.
• Releases of fund from the Government of Sindh on account of Provincial Annual Development Programme.
Capital Receipt Rs.1,795.500 • Income from sale of land and lease proceeds.
• Auction of shops, offices, etc at Parking Plaza Lines Area & Commercial/ Parking Plaza at Shahbuddin Market.
Total Rs.27,145.586
![Page 56: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/56.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 56
The following table shall further reveal the department-wise / head-wise
revenue income of KMC for the next financial year 2017-2018 and budget
estimates for the financial year 2016-2017 revised estimates of the same year:
(Rs.inmillion)
Sr. No.
Department Budget
Estimates 2017-2018
Revised Estimates 2016-2017
Budget Estimates 2016-2017
1 Grants/Releases/ Share from
Government
Matching Grants in Lieu of Octroi from GoS.
3,360.352 1,790.023 3,050.352
Grant in Aid. 6,000.000 4,000.000 6,000.000
Misc. Grant in Aid. 700.000 600.000 600.000
OZT share of DMCs for Pensioners 3,032.000 3,162.384 2,065.448
Total 13,092.352 9,552.407 11,715.800
2. Revenue Department.
Land 1,242.000 300.000 1,181.000
P.D.Orangi 197.100 85.300 195.300
Katchi Abadis 40.000 30.000 50.000
Estate 152.500 131.550 147.500
Charged Parking / Toll Tax. 111.050 60.040 161.050
Enforcement/ Anti-Encroachment. 88.110 36.200 95.000
Total 1,830.760 643.090 1,829.850
3. Recreation, Culture & Sports.
Culture & Sports & Sports Complex 29.500 20.650 29.500
ZOO. 66.322 55.029 53.700
Safari Park. 27.944 14.574 29.680
Aladin Park. 36.800 29.760 35.130
Total 160.566 120.013 148.010
4. Engineering 16.800 8.260 16.760
Total 16.800 8.260 16.760
![Page 57: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/57.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 57
(Rs. in millions)
Sr. No.
Department Budget
Estimates 2017-2018
Revised Estimates 2016-2017
Budget Estimates 2016-2017
5. Finance & Accounts..
Financial Resources & etc. 291.010 406.371 1,231.010
Municipal Utility Charges. 1,000.000 500.000 1,000.000
Total 1,291.010 906.371 1,231.010
6. Secretariat
Misc.Income from different departments. 1.385 0.170 1.966
Parks & Horticultural. 33.900 19.694 35.600
Veterinary. 177.230 45.380 100.300
Total 212.515 65.244 137.866
7 E & I Promotion 41.500 15.500 96.500
8 Medical & Health Department. 88.776 73.361 89.881
9 Transport & Communication 612.430 207.237 620.189
10 Municipal Services 58.000 42.500 46.500
11 Information Technology 0.100 0.050 0.100
Total.(1 to 11) 17,094.809 11,634.033 15,932.466
12. Other Revenues
Provincial ADP. 1,023.602 2,557.516 2,738.988
District ADP. 5,001.000 4,167.500 4,167.500
VGF 1,000.000 --- ---
KMC dues of defunct KMC against K-Electric.
1,716.176 --- 1,716.176
Transfer of income from SBCA. 500.000 500.000 1,000.000
KMC dues against KPT 500.000 --- ---
Total 9,740.778 7,225.016 9,622.652
Grand Total.KMC (1 to 12) 27,145.586 18,859.049 25,555.130
![Page 58: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/58.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 58
The major sources of revenue income of various Departments shown in the
above table are detailed and discussed as under:
1. Grants / Releases from Government.
• Matching Grant from Government in Lieu of Octroi
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs. 3,360.352
2. 2016-2017 (R.E) Rs.1,790.023
3. 2016-2017 (B.E) Rs. 3,050,352
While abolishing the Octroi / Zila Tax by the Federal Government the local
councils were to be compensated for their losses from the additional 2.5% GST
levied with the objective of counterbalance the loss of Octroi and Zila Tax. Octroi
used to be the back bone of the local council finances. Unfortunately the income
from the additional 2.5% GST has not been able to make up for the foregone
Octroi / Zila Tax which used to cover all the entire non-development expenditure
including salaries which have now swelled up enormously due annual normal
increase ad time to time increases in salary and pension permitted by the
Government was considered. It is pertinent to mention here that on devolution of
Education, Health & Local Taxes department to respective DMCs, the Finance
Department, GoS has distributed the OZT share without considering the sharing
formula between KMC and DMCs (33% and 67%) and protected the salary of
DMCs employees without adhering to the grievances of KMC due to shortfall being
faced by KMC due to transfer of income of Local Taxes. An amount of Rs.141.690
million only was released on account of OZT share of KMC from Feb.2015 to
Jun.2016. Now in the financial year 2016-17 the GoS being released OZT share to
KMC by increasing 15% of the unlawful and unjustified last year OZT share of
Rs.140.040 million i.e. Rs.21.006 P.M which comes to Rs.252.072 million p.a.
Similarly the DMCs share have been increased by 15% of Rs.252.320 million p.m.
i.e. Rs.37.848 million p.m. comes to Rs.454.176 million p.a.
![Page 59: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/59.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 59
• Grant in Aid (in lieu of Octroi
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.6,000.000
2. 2016-2017 (R.E) Rs.4,000,000
3. 2016-207 (B.E) Rs.6,000.000
The Government has been releasing the share of KMC at the historical
share of Rs.326.958 million per month. In the year 2011-2012 the Government
was approached with a request to increase the share of KMC. Acceding to the
request the then Honorable Chief Minister Sindh was pleased to enhance the
share to Rs,852.55 million per month. The enhanced amount of Rs.525.600 million
was treated as Grant-in-aid. It was reiterated to take it as Matching Grant in lieu of
Octroi. The request was not acceded and an amount of Rs.500.00 per month was
fixed by the GoS since then an amount of Rs.6,000.000 million has usually been
reflected in the next year’s budget 2017-2018.
On revival of KDA, the Finance Department, Government of Sindh act in
similar manner as was done in the case of distribution of OZT share between KMC
and devolved department, DMC’s case and again protected the salary of KDA
employees and at source deducted an amount of Rs.200 millions from grant in aid
of KMC and paid to KDA instead of giving them the average of what KMC was
releasing to KDA (Rs.120.00 million per month), thereby giving another blow to
KMC on account of its grant of Rs.500 million reduced to Rs.300.00 million P.M.
Resultantly, the KMC has been unable to disburse the monthly salary of KMC
employees on net and amount of deductions on account of pension, provident
fund, group insurance and other deductions are outstanding for remittance of
respective account and total amount of Rs.661.289 million on account of monthly
pension deduction is still unpaid.
![Page 60: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/60.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 60
2. Revenue Departments KMC.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,830.760
2. 2016-2017 (R.E) Rs.643.090
3. 2016-2017 (B.E) Rs.1,829.850
The above total revenue of Rs. 1,830.760 million is derived from the
following sources/ Departments and the estimated budget figures for the year
2017-2018 are shown against each:
• Land Department KMC.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,242.000
2. 2016-2017 (R.E) Rs.300.000
3. 2016-2017 (B.E) Rs. 1,181.000
The above income comprises renewal of leases, land rent, mutation
charges etc. an income of Rs.1,181.000 million was estimated to be recovered as
provided in the budget estimates for the year 2016-2017 which was revised and
reduced to Rs.300.000 million as the auction of land was banned almost full
financial year did not fetch the estimated income. An amount of Rs.1,242.000
million has been provided in the next year budget 2017-2018 as against the
revised estimates of 2016-2017 increased an amount of Rs.1,052.80. In order to
boast up recovery of Land Department, KMC council have recently been passed
different CRs. In view of the CR No.41 dated 16th May 2017 a new head of income
under the title of ‘‘Commercialization Fee/ Charges’’ has been reflected in the
budget estimates of 2017-2018.
![Page 61: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/61.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 61
• PD Ornagi Town.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.197.100
2. 2016-2017 (R.E) Rs.85.300
3. 2016-2017 (B.E) Rs.195.300
The estimated income for the financial year 2016-2017 of Rs.195.300
million was revised and reduced to Rs.85.300 million. An amount of Rs.197.100
has been provided in the next year’s budget 2017-2018 indicating an increase of
Rs.110.000 million over the revised budget estimates of Rs.85.300 million for the
year 2016-2017.
• Katchi Abadies.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.40.000
2. 2016-2017 (R.E) Rs.30.000
3. 2016-2017 (B.E) Rs.50.000
The income from Katchi Abadies is derived by renewal of leases, land rent,
mutation charges etc. Due to ban on lease the amount was reduced to Rs.30.000
million in the revised budget of 2015-2016. However an amount of Rs.50.00 million
has been earmarked in the budget estimates for the year 2016-2017 which reflects
an increase of Rs.20.000 million over the revised estimates of Rs.30.000 million
for the year 2015-2016.
![Page 62: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/62.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 62
• Estate Department.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.152.500
2. 2016-2017 (R.E) Rs.131.550
3. 2016-2017 (B.E) Rs.147.500
An amount of Rs.152.500 million has been estimated in the budget
estimates for the ensuing year 2017-2018 which reflects an increase of Rs.20.950
million over the revised budget estimates of 2016-2017.
• Charged Parking/ Toll Tax.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.111.050
2. 2016-2017 (R.E) Rs.60.040
3. 2016-2017 (B.E) Rs. 161.050
As provided in the Schedule-V Part-I item 09 of Sindh Local Government
Act 2013 the KMC empowered to collect/ recover parking fee. Due the decision
made by the Secretary Local Govt. GoS the DMCs are also authorized to collect
the parking fee on DMCs roads and KMC authorized to collect he parking fee on
main roads belong to KMC. Due to aforesaid policy an amount of Rs.111.050
million has been estimated in the budget estimates for the ensuing year 2017-
2018 against the current year’s budget estimates of Rs.161.050 million which
reduced to Rs.50.00 million.
![Page 63: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/63.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 63
• Enforcement . (Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.88.110
2. 2016-2017 (R.E) Rs.36.200
3. 2016-2017 (B.E) Rs.95.000
The income is realized by removal of unauthorized encroachments in the
city. An amount of Rs.95.000 million was provided in the budget estimates for the
year 2016-2017 which was reduced to Rs.36.200 million only due to out of reach
unrealistic target. An amount of Rs.88.110 million has been provided in the next
year’s budget of 2017-2018 which indicates decrease of Rs.6.89 million over the
budget estimates for the year 2016-2017.
3. Culture ,Sports & Recreation.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.160.566
2. 2016-2017 (R.E) Rs.120.013
3. 2016-2017 (B.E) Rs.148.010
The above mentioned total income of Culture Sports & Recreation
department, KMC is derived from different heads of Karachi Zoo, Safari Park,
Sports Complex, Culture & Sports and Alladin Park. Since the income is almost
static in most the heads accept Karachi Zoo only Rs.148.010 million were provided
in the budget estimates for the year 2016-2017. An amount of Rs.160.566 million
has been estimated in the next year’s budget 2017-2018 which indicates an
increase of Rs.40.174 in figures and in terms of percent i.e.35.13% over the
revised estimates of Rs.120.063 million of 2016-2017.
![Page 64: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/64.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 64
4. Engineering Department.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.16.800
2. 2016-2017 (R.E) Rs.8.260
3. 2016-2017 (B.E) Rs.16.760
The income is derived from the asphalt plants, sale of tenders etc. of
KMC. An amount of Rs.16.800 million was provided in the budget estimates for the
year 2016-2017 which has been reduced to Rs.8.260 million in revised budget
estimates. Further an amount of Rs.21.800 million has again been estimated to be
realized during the next financial year 2017-2018.
5. Finance & Accounts Department.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,291.010
2. 2016-2017 (R.E) Rs.906.371
3. 2016-2017 (B.E) Rs.1,231.010
The income derived from Financial Resources (investments) and
Municipal Utility Charges Income. The Financial Resources is mainly generated
on the profit on investments or encashment of term deposits. The budget
estimates for ensuring year an amount of Rs.261.010 is earmarked to be realized
from this source. The profit gained by managing the funds by the Finance &
Accounts Department, KMC an amount of Rs.303.898 million reflected in the
revised budget 2016-2017.
![Page 65: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/65.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 65
• Municipal Utility Charges.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,000.000
2. 2016-2017 (R.E) Rs.350.000
3. 2016-2017 (B.E) Rs.1,000.000
The Municipal Utility Charges Department, KMC came into being in
January 2009 through the Council Resolution (CR), No. 364, dated 02nd June
2008 as was provided in 39(b) of the Sindh Local Government Ordinance-2001.
An amount of Rs.1,000.00 million has been provided in the next year’s budget
2017-2018 which indicates an increase of Rs 500.00 million over the revised
estimates of Rs.500.00 million for the year 2016-2017. The more heedful efforts
can be covered up the loss of income of Local Taxes Department.
6. Municipal Commissioner, Secretariat, KMC.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.212.515
2. 2016-2017 (R.E) Rs.65.244
3. 2016-2017 (B.E) Rs.137.866
The mainly income of Municipal Commissioner, Secretariat, KMC is
derived from Veterinary Department, KMC and P&H Department, KMC including
small revenues heads of different department worked under Municipal
Commissioner, KMC. In order to rationalized the budget estimates an amount of
Rs.212.515 million is earmarked in the next year budget 2017-2018 reflecting an
increase of Rs. 65.244 over the budget estimates of 2016-2017.
![Page 66: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/66.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 66
• Veterinary Department, KMC.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.177.230
2. 2016-2017 (R.E) Rs.45.380
3. 2016-2017 (B.E) Rs.100.300
The above table reflects that an amount of Rs.177.230 million has been
provided in the budget estimates for the year 2017-2018 as against the budget
estimates of 2016-2017 i.e. Rs.100.300 million and registered an increase of
Rs.76.930 million. In view of CRs No.28 & 29 dated 9th May 2017 passed by the
council regarding Milching animals and Cattle Piri, the Veterinary department,
KMC has taken over the charge of both sites. Therefore, recovery under the head
of ‘‘Issuance of Health/ Fitness Certificate and licenses fee from Milching
Animals’’ and ‘‘Cattle Piri Landhi, Malir & Baldia’’ are enhanced.
7. Municipal Services KMC.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.58.000
2. 2016-2017 (R.E) Rs.42.500
3. 2016-2017 (B.E) Rs.46.500
The income is derived from Food Laboratory, Fire Brigade, Solid Waste
Management (Incineration Plant) & Etc. an amount of Rs.58.000 million is
earmarked in the next year budget 2017-2018.
![Page 67: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/67.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 67
8. Enterprise & Investment Promotion Department.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.41.500
2. 2016-2017 (R.E) Rs.15.500
3. 2016-2017 (B.E) Rs.96.500
Income in E&IP Department derived from “Establishment of Buchat Bazar
in the City” and “Income from Ready Mix Batching Plant”& Etc. An amount of
Rs.41.500 million is provided in the next year’s budget as compare to revised
budget estimates of Rs.15.500 million which indicates an increase of Rs.26.000
million.
9. Medical & Health Department.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs. 88.776
2. 2016-2017 (R.E) Rs. 73.361
3. 2016-2017 (B.E) Rs. 89.881
The income comprises of the receipts from all Medical Institutions of KMC
on account of various services provided by KMC in hospitals/ maternity homes and
clinics. In order to rationalize revenue and being the medical service provider to
poor people of city, the budget estimates of Medical & Health Department for the
year 2016-2017 was reduced and rationalized an amount of Rs. 88.776million is
now estimated to be realized for the next financial year 2017-2018.
![Page 68: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/68.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 68
10. Transport & Communication. (Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.612.430
2. 2016-2017 (R.E) Rs.7.237
3. 2016-2017 (B.E) Rs.620.189
The main income is comprised of “Occupancy value of Shahabuuddin
Market”. An amount of Rs.612.430 million is reflected in the next year’s budget
2017-2018 is expected to be realized.
11. Other Revenues.
a. Recovery of Dues KMC from K-Electric.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,761.176
2. 2016-2017 (R.E) ---
3. 2016-2017 (B.E) Rs.1,716.176
An amount of Rs.1,761.176 million was estimated to be received from
KESC now K-Electric on account of land rent etc. as indicated in budget estimates
for the financial year 2016-2017. Since the realization of the amount is still hanging
fire an amount of Rs.1,761.176 million is again be provided in the next year’s
budget of 2017-2018.
![Page 69: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/69.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 69
b. Transfer of Income from SBCA.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.500.000
2. 2016-2017 (R.E) 500.000
3. 2016-2017 (B.E) Rs.1,000.000
The income of SBCA is mainly derived from the Regularization,
Commercialization and Betterment Charges of buildings within the limit of Karachi.
The Government of Sindh has been approved the sharing formula between
different stakeholders on account of ‘‘Levy of Betterment Charges for residential
houses and enhancement of betterment of resident cum commercial and flat sites
within Karachi for support and improvement of infrastructure of the city’’ vide
No.SO/HTP/Gen/SBC/4-161/2016 dated 9th August 2016. The sharing formula is
given here under:
Sr.
No. Department % of
Share
1. SBCA. 25%
2. KW&SB. 20%
3. KMC. 10%
4. DMCs. 45%
In view of aforementioned share of KMC budget estimates is reduced to
Rs.500.00 million in the next year’s budget estimates of 2017-2018 as against
Rs.1,000.00 million of budget estimates of 2016-2017. It may be recalled here that
since 2011 the SBCA did not transfer any fund to KMC/DMC & KW&SB, therefore
huge un-transferred funds should be available into the accounts of SBCA as the
residents of Karachi are being deposited fee/ charges on a/c of betterment
charges.
![Page 70: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/70.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 70
c. Claim of Municipal/ Conservancy Tax from KPT.
(Rs.in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.500.000
2. 2016-2017 (R.E) ----
3. 2016-2017 (B.E) ----
The Karachi Port Trust collecting municipal/ conservancy tax from the
residents of its limits and as per the procedure realized amount was regularly
remitted to the KMC through KW&SB. Since the introduction/ imposition of
Municipal Utility Charges and suspension of Conservancy and Fire Tax by the
defunct City District Government Karachi in 2008, the KPT has been stopped the
remittance of collected municipal/ conservancy tax to KW&SB or other
organization. In this regard several meetings between authorities of KPT and KMC
authorities have been held and Honorable Mayor Karachi has also been attended
a meeting but no result so far been emerged. In order to establish claim of KMC
the same has been included in the budget net of KMC on account of ‘‘Recovery of
arrears/ current Municipal/ Conservancy Tax from KPT’’ and an amount of
Rs.500.00 million has been reflected in the newly created budget head in the year
2017-2018.
![Page 71: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/71.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 71
d. District A.D.P.
(Rs. in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.5,001.500
2. 2016-2017 (R.E) Rs.4,167.500
3. 2016-2017 (B.E) Rs.4,167.500
As per the guideline and directives of competent authorities, for ADP for the
year 2017-2018 the allocation for on-going schemes have been kept at maximum
level, whereas the inclusion of new schemes was discouraged. Sufficient has been
allocated for new under block allocation 2017-2018. It is expected that the GoS will
release the entire funds under District ADP 2017-2018.
e. Provincial A.D.P.
(Rs. in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,023.602
2. 2016-2017 (R.E) Rs.2,557.516
3. 2016-2017 (B.E) Rs.2,738.988
![Page 72: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/72.jpg)
ESTIMATES OF RECEIPTS 2017-2018
Explanatory Memorandum Page 72
f. Public Private Partnership and Joint Venture Project.
(Rs. in Million)
Sr.
No. Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,000.000
2. 2016-2017 (R.E) ----
3. 2016-2017 (B.E) ----
Public Private Partnership initiatives have long been used for
broadening the size of infrastructure development. These initiatives serve as the
development of infrastructure upfront while paying cost in the long run, if the
commercial or revenue streams from these infrastructures are not sufficient.
The other factors which favour PPP mode include efficiency, risk transfer to
private sector and long term maintenance of assets.
Considering this mode as more viable and efficient one, the GoS has
developed an efficient PPP framework in Sindh which is being replicated in
KMC as well and efforts are being made to promote PPPs in KMC service
delivery system. For that purpose, an allocation of Rs.1,000.000 million is being
envisaged in the next financial year 2017-18 from GoS receipts.
![Page 73: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/73.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 73
Karachi Metropolitan Corporation
Major Head Wise Summary of
Expenditure Budget
2017-2018
Development Portfolio Vs Expenditure Nomenclature Budget Estimate
2017-2018
Establishment. 11,738.239
Contingent. 2,075.664
Repairs & Maintenance. 251.685
Total Non Development 14,065.588
KMC Development Portfolio 6,045.480
Provincial A.D.P. 1,023.602
District A.D.P. 5,001.000
VGF 1,000.000
Total Development 13,070.082
Total 27,135.670
83%
15%2%
NON DEVELOPMENT EXPENDITURE
Establishment.
Contingent.
Repairs & Maintenance.
Non Development to
Rs.14,065.588/- 46%
8%
38%
8%
DEVELOPMENT PORTFOLIO
KMC Development Portfolio
Provincial A.D.P.
District A.D.P.
Development to
Rs.13,070.082/-
![Page 74: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/74.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 74
The Estimates of Expenditure of any organization portrays the entire
operation of maintenance, improvement and extension of functions including
committed liabilities. In the financial year 2016-2017 all functions are hampered by
the present financial position as the GoS has reduce Grant in Aid to the tune of
Rs.200.00 million p.m. major revenue resources of KMC have already been
abolished/ transferred (Local Taxes, SBCA, Charged Parking) to other
departments. Especially the transfer of income of Local Tax (Advertisement Tax)
further aggravated the situation which was normally used to cover the shortfall in
salary/ pension and met the major essential expenditures i.e Medicine, Medical
Gas, Utility Bills, POL and Day to Day expenses.
The Karachi Metropolitan Corporation was exert to providing better
amenities and facilities to the citizens of Karachi through providing educations,
health, recreation, sports, environment, communication, including the maintenance
of gigantic infrastructure executed in all services, from its own resources as well as
with the financial assistance of local stake holders i.e. Provincial Government,
Federal Government.
Further in the absences of PFC has resulted in making KMC a cash
strapped entity and it is presently not able to disburse salary pension dues. This all
has resulted in the fact that KMC is not able to fund the hospital items i/c
medicines, medical Gas, Ex-ray and etc. likewise, it has not been able to maintain
its parks, roads and other municipal functions.
![Page 75: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/75.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 75
TOTAL EXPENDITURE.
(Rs.in Million)
Sr. No. Nomenclature Amount
1. 2017-2018 (B.E) Rs. 27,135.670
2. 2016-2017 (R.E) Rs.18,854.701
3. 2016-2017 (B.E) Rs. 25,199.827
The total expenditure reflected in the Budget Estimates for the year 2017-
2018 is estimated to be Rs.27,135.670 million as against the budget estimates of
Rs. 25,199.827 million for the current financial year 2016-2017 which indicates a
increase of Rs.1935.843 million.
Current expenditure includes the funds allocated for the establishment,
contingent and maintenance of existing services expenditures, whereas the
development and Capital Expenditure shows the amounts ear-marked for the
improvement and development of civic facilities.
The summary of budget estimates of Current Expenditure, Development
Expenditure for the next financial year 2017-18 is as under:
(Rs.in Million)
Sr. No. Nomenclature Amount
1. Current Expenditure. Rs.14,065.588
2. Development & Capital Expenditure. Rs.13,070.082
Total. Rs.27,135.670
![Page 76: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/76.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 76
Sr.No. Nomenclature
Budget
Estimates
2017-18
Revised
Estimates
2016-17
Budget
Estimates
2016-17
1 Establishment. 11,738.239 9,459.170 9,493.119
2 Contingent. 2,075.664 1,058.760 2,169.983
3 Repairs &
Maintenance. 251.685 178.705 270.570
Total 14,065.588 10,696.635 11,933.672
11,738.239
9,459.170 9,493.119
2,075.664
1,058.760
2,169.983
251.685 178.705 270.570
Major Head Wise Summary of Expenditure
1 Establishment. 2 Contingent. 3 Repairs & Maintenance.
![Page 77: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/77.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 77
CURRENT EXPENDITURE. Further break-up of the Current Expenditure for the year 2017-2018
comprises of:
ESTABLISHMENT EXPENDITURE.
(Rs. in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.11,738.239
2. 2016-2017 (R.E) Rs.9,459.170
3. 2016-2017 (B.E) Rs. 9,493.119
The budget estimates for next year is Rs.11,738.239 million including of
15% increase in salaries announced by the Government of Sindh and normal
incremental factor. The above figures reflect an increase of Rs.2,279.069 million
over the budget estimates of 2016-2017 amounting to Rs.9,493.119 million.
In order to clear the perception of a lot of ghost employees exist in KMC or
the huge recruitment made by the KMC in the last several years for the which the
following analysis table of last five years reflects the trend of increase in salary and
pension.
ACTUAL ESTABLISHMENT EXPENDITURE FROM 2009-10 TO 2015-16
Years No. of staff (Devolved)
Total Salary
(Devolved)
No. of staff
(KMC)
Total Salary (KMC)
No. of staff
(Total)
Total Salary
2009-10 9,340 1,695.38 13,763 2,505.38 23,103 4,200.76
2010-11 9,069 2,269.46 13,493 3,161.77 22,562 5,431.22
2011-12 10,147 2,906.95 13,192 3,701.79 23,339 6,608.74
2012-13 9,564 2,402.16 14,280 4,794.53 23,844 7,196.68
2013-14 9,178 3,383.20 14,117 5,054.28 23,295 8,437.47
2014-15 8,952 3,201.28 13,919 5,088.99 22,871 8,290.27
2015-16 8,487 3,099.25 13,610 5,267.33 22,097 8,366.58
![Page 78: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/78.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 78
SUMMARY
Year
No of regular
employees
No of Contract employe
e
Total Employ
ees
Per month Salary
(regular employees
) mn
Salary contract
employees in mn
KMDC salary / grant
Total
2016-17 12,648 840 13,488 488.718 11.740 39.000 539.458
The above data has been compiled considering the actual payroll and
the ADLFA has regularly been certificated to that effect from of Feb 2017.
The Finance & Accounts Department, KMC has maintained the details
of all the employees since 1994 the details of each and every employee is
available which can be provided and shown any time. This huge availability of
data/ accounts details confirms sanctity and inviolability of above mentioned data.
The above data clearly indicates following distinct things;
that the number of employees in KMC is not being increased.
that the number of employees decreasing due to retirement of the regular employees.
that the salary of the existing staff has increased more than 100% during last five years.
that the number of employees in the year 2009-10 was 13763 and disbursed salary to the tune of Rs. 2,505.380 million per annum.
that the number of KMC employees in the year 2015-16 was only 13610 which was even less than the staff working in the year 2009-10 but disbursed amount rose to Rs.5267.33 million P.A.
that it shows that number of employees less than the employees working in the 2009-10.
Thus, it is incorrect perception that the KMC has befallen in the
financial chaos due to its appointment policy.
Further the following reasons contributed heavily on the financial side
of KMC as the cost of salary and pension payments increased tremendously.
1. The cost of annual increment has increased the volume of the
salary of about 8% to 10% every year.
![Page 79: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/79.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 79
2. The Government of Sindh enhanced the salary and other related perks on year to year basis as follows:
a) In the year 2009-10, salary was increased to the tune of 20%
(BPS 1 to 16), and 15% to (BPS 17 to BPS 22). b) In the year 2010-11 salary was increased to the extent of 50%
(BPS 1 to BPS 22). c) In the year 2011-12, salary increased to the extent of 15%
(BPS 1 to BPS 22). d) In the year 2012-13, the salary increased to 20% (BPS 1 to
BPS 22). e) In the year 2013-14, the salary increased to 15% (BPS 1 to
16) and 10% (BPS 17 to BPS 22). f) In the year 2014-15, the salary increase to 10% (BPS 1 to
BPS 22). g) In the year 2015-16, the salary increase to 15% (BPS 1 to
BPS 22). h) In the year 2016-17, the salary increase to 10% (BPS 1 to
BPS 22).
Thus, the above mentioned reasons inflated the cost of salary of the
employees of KMC to the tune of 125% and this state of affairs clearly
demonstrates that the Government of Sindh caused the cost of salary to enhance.
This simply demonstrates that the annual cost of per employees rose
from Rs.182,000/- to Rs.358,000/- in the year 2013-14 as compared to year 2009-
10. This led to the issuance of Grant in Aid to KMC @ 500 million per month to
meet the contingent needs only for KMC and not the KDA which was always a
separate entity and KMC fed deficiency (if any) to the KDA, Hence the GoS
decision to curtail KMC Grant-in-Aid to Rs.300 million instead of Rs.500 million
was unjustified.
CONTINGENT EXPENDITURE.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs. 2,075.664
2. 2016-2017 (R.E) Rs.1,058.760
3. 2016-2017 (B.E) Rs. 2,169.983
![Page 80: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/80.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 80
The Contingent Expenditure allocation is earmarked to be utilized for
delivery of better and efficient services and smooth running of all the services
especially the Health, Medical, Municipal Services and Culture Recreational/
Sports activities. The estimated expenditure of Rs.2,075.364 million allocated for
the contingent expenditure for the year 2017-2018 reflects an increase of 48.99%
in percentage terms and Rs.1,016.904 million in absolute terms respectively over
the revised budget estimates 2016-2017. The above figures reflect that the budget
estimates for the year 2017-2018 hugely cut down the revised estimates
mentioned at Sr.No.2 due to non availability of enough funds/ poor cashflow
position in its exchequer.
Repair and Maintenance Expenditure.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs. 251.685
2. 2016-2017 (R.E) Rs.178.705
3. 2016-2017 (B.E) Rs.270.570
The above revised estimates figures mentioned at Sr.No.2 also reflects
that the budget estimates for the current year 2017-2018 significantly cut down
due to non availability of enough funds in its exchequer. The estimated
expenditure incurred on the maintenance of existing services for the year 2017-
2018 of Rs.251.535 million indicates an increase of Rs.72.980 million in absolute
terms and 40.75% in percentage terms over the revised estimates of Rs.178.705
million for the year 2016-2017.
![Page 81: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/81.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 81
Development Expenditure.
The Local Government Act 2013 fully reveals the fact that all the
development activities are to be taken by the concerned council including
Karachi Metropolitan Corporation. Section 72 read with section 76(1) of Local
Government Act 2013 a council shall prepare and implement development plane
which shall amongst other matters including following:
a) Nature and location of scheme or schemes.
b) Total estimated cost;
c) Sources of finances;
d) Date of commencement;
e) Date of completion;
f) Manner of execution;
g) Agencies responsible for maintenance;
h) Benefit tangible or intangible to accrue;
i) Such other matters as may be necessary;
Further as per Sindh Government Rules of Business 1986 as
amended in 2000, which only provides that the Local Government department,
GoS to coordinate, supervise and monitoring of Provincial, Foreign Aided and
Mega Projects of Local Government.
Recently the Local Government has executed undertaking
development activities within the KMC jurisdiction without any authority,
especially in the presences of an elected council and their right to propose
schemes and implement same for betterment and relief for the residents of city
or their voters.
Basically Development and Capital Expenditure means the
expenditure incurred or earmarked on new projects or improvement of the
existing schemes/ services.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.13,070.082
2. 2016-2017 (R.E) Rs.8,185.066
3. 2016-2017 (B.E) Rs. 13,266.155
![Page 82: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/82.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 82
The estimated Development Expenditure for the ensuing year 2017-
2018 of Rs.13,070.082 million indicates an increase of Rs.932.719 million over
the budget estimates for the year 2016-2017 of Rs. 13,266.155 million including
Provincial A.D.P, District A.D.P and VGF.
a. District A.D.P
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.5,001.000
2. 2016-2017 (R.E) Rs.4,167.500
3. 2016-2017 (B.E) Rs.4,167.500
An amount of Rs.5,001.500 million is earmarked for the District ADP for the
year 2017-2018 against 183 Ongoing Schemes of different Sectors / Sub Sectors
and Block Allocation (New Schemes) amounting to Rs.682.226 million is reflected
in the District ADP.
6,045.480
1,023.600
5,001.000
1,000.000
2,148.320 2,557.520
4,167.500
-
6,359.667
2,738.988
4,167.500
-
Budget Proposed 2017-18 Revised Estimates 2016-17 Budget Estimates 2016-17
![Page 83: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/83.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 83
b. Provincial A.D.P.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.1,023.602
2. 2016-2017 (R.E) Rs.2,557.516
3. 2016-2017 (B.E) Rs.2,738.988
c. K.M.C. Own Funded.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.6,045.480
2. 2016-2017 (R.E) Rs.1,433.050
3. 2016-2017 (B.E) Rs.6,359.667
![Page 84: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/84.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 84
The following table shall further reveal that the department-wise
expenditure of KMC for the ensuing Budget Estimates of 2016-2017 along-with
Budget Estimates and Revised Estimates for the current financial year 2015-2016
are indicated in the following department-wise summary of expenditure ::
Sr. No.
Department Budget
Estimates 2017-2018
Revised Estimates 2016-2017
Budget Estimates 2016-2017
1
Secretariats (Administrator / Mayor, Deputy Mayor, Metropolitan Commissioner, Council, Vehicle, Veterinary, HRM, Religious Affairs & Media Management.
773.230 568.744 725.702
2 Finance & Accounts. 315.207 242.380 264.628
3 Parks & Horticultural. 897.468 534.188 816.600
4 Law 135.924 92.816 124.826
5 Information & Technology. 83.834 41.062 173.365
6 Enterprise & Investment Promotion.
59.901 41.734 51.316
7
Revenue Departments (Land, Enforcement, Estate, Katchi Abadi, PD Orangi & Charged Parking)
865.927 683.194 762.083
8 Recreation, Culture & Sports. 673.930 474.655 678.478
9 Medical & Health Services. 4,042.965 2,378.084 3,603.651
10 Transport & Communication. 424.615 85.500 471.940
11 Municipal Services. 3,079.05 2,537.490 2,961.601
12 Engineering. 3,762.418 752.751 3,413.985
13 Repayment of Loans & Pension Fund & other Misc Expenditure.
4,996.00 3,697.084 4,245.164
14 District ADP. 5,001.50 4,167.50 4,167.50
15 Provincial ADP. 1,023.602 2,557.516 2,738.988
16 VGF
1,000.000 ---- ----
![Page 85: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/85.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 85
Grand Total KMC(1 to 16) 27,135.670 18,854.701 25,199.827
Parks & Horticulture.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.897.468
2. 2016-2017 (R.E) Rs.534.188
3. 2016-2017 (B.E) Rs. 816.600
The above revised budget estimates reflects that the revised budget
estimates for the year 2016-2017 has been cut down due to cash strapped
position of KMC therefore almost all the parks and play grounds destroyed in the
city. The present political leadership has decided to provide that initially renovates
and reestablishes the parks in whole city. Further P&H department KMC try to
counter the rising pollution in the city and to improve greenery and for the uplift of
environmental facilities sufficient funds are provided in the ensuing budget 2017-
2018 amounting to Rs.897.470 million against the budget estimates 2016-2017 of
Rs.816.60 million and revised budget estimates of Rs.534.19. It registers an
increase of Rs 363.280 million over the revised estimates of 2016-2017.
Medical & Health Services.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.4,042.965
2. 2016-2017 (R.E) Rs.2,378.084
3. 2016-2017 (B.E) Rs. 3,603.651
For the uplift of Medical & Health facilities and to provide curative and
better medical facilities to the citizens of Karachi an amount of Rs. 4,042.965
million is earmarked in the next budget estimates of 2017-2018. The above
![Page 86: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/86.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 86
revised budget estimates reflects that the revised budget estimates for the year
2016-2017 has been cut down due to cash strapped position of KMC exchequer.
Culture, Sports & Recreation.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.673.930
2. 2016-2017 (R.E) Rs.474.655
3. 2016-2017 (B.E) Rs. 678.478
For the improvement of Recreation and Sports facilities an amount of
Rs. 673.930 million is earmarked in the next year’s budget of 2017-2018 beside
allocations of Rs. 675.980 million is also provided in the next year’s District ADP
against 86 Ongoing Schemes, further an amount of Rs.785.111 million has been
released during the year 2016-2017.
Transport and Communication.
(Rs.in Million)
Sr. No.
Nomenclature Amount
1. 2017-2018 (B.E) Rs.424.615
2. 2016-2017 (R.E) Rs.85.500
3. 2016-2017 (B.E) Rs. 471.940
To improve the traffic problems various measures have already been taken
by the KMC. In order to control the traffic jams at different roads of city, the entire
infrastructure of roads is being redesigning and reformed by the Transport &
Communication, Department, KMC as per the traffic flow of roads for smooth traffic
flow.
An amount of Rs. 424.615 million is provided in the Budget Estimates for
the ensuing financial year 2017-2018 for the development works of Transport and
Communication Department KMC, beside allocations of Rs.115.599 million is also
![Page 87: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/87.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 87
provided in the next year’s District ADP against 10 Ongoing Schemes, an amount
of Rs.28.757 million has also been released during the year 2017-2018.
Development Projects/ Works.
The Karachi Metropolitan Corporation has taken up various Development
Projects for the uplift the civic life of the people of Karachi. A list of such major
projects has been annexed with Over-view.
(Rs.in million)
Sr.
No. Nomenclature
Budget
Estimates
1 District ADP (Block Allocation)
including U.C Scheme Rs.380 Million) 1,667.000
2 Public Private Partnership Project (VGF) 1,000.000
3 Development works at different Union Councils
(KMC Funds). 1,000.000
4 Development works at different Union Councils
(ADP Funds). 420.000
5 Improvement & Up-gradation of Nehar-e-Khayyam 350.000
6 Commercial Parking Plaza at Shahabuddin Market
including Phase-II 350.000
7 Improvement of Roads, Footpaths & Bridges (Patch Work) 250.000
8 Development & Improvement of Major Roads 250.000
9 Special Development Project / Works (Mayor Discretions). 200.000
10 Cleaning & Desalting of Strom Water Drains. 200.000
11 Unforeseen Development expenditure 150.000
12 Development Works at Orangi Cottage Industrial Area 100.000
13 Construction of New Fire Stations.
100.000
14 Lighting arrangement at Major Roads (KMC).
100.000
![Page 88: AN OVERVIEW 2017-2018 - Karachikmc.gos.pk/Docs/CMS/file/budget 2017-18/Ovweview-2017-18 Receipt... · AN OVERVIEW 2017-2018 Explanatory Memorandum Page 3 • In the year 1947 the](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7914916230d15e11145d4b/html5/thumbnails/88.jpg)
ESTIMATES OF EXPENDITUER 2017-2018
Explanatory Memorandum Page 88
15 Development of Zulfiqarabad Oil Terminal Ph-II 100.000
16 Improvement of Flyovers, Underpasses & Bridges 100.000
17 Development & Improvement of KMC Parks 80.000
18 Repair & Maintenance of Fire Tenders & Snorkel. 50.000
19 CCIS (1339). 50.000
19 Annual Maintenance of Hospitals, Clinics, Maternity homes
& staff Quarters. 40.000
20 Wireless Videos Surveillance Security System 25.000
22 District ADP
Infra-structure of Roads 1,884.098
Municipal Services 130.000
Transport & Communication 115.599
Education 147.010
Health 290.313
Culture & Tourism (CSR & P&H) 675.980
Information Technology 86.000