18 BioProcess International 15(5) MAY 2017 An Industry Proposal for Change Notification Practices for Single-Use Biomanufacturing Systems Jeffrey Carter, Sabrina Restrepo, Eric Isberg, and James Vogel FOCUS ON... DISPOSABLES C urrent practices for change notification in the biopharmaceutical industry are neither efficient nor conducive to accelerating the adoption of single- use systems ( 1, 2). Drug manufacturers (end users) often observe that supplier change data packages lack technical content or detail and that the time allowed for change implementation is too short. Occasionally, customers (end users or next tier in supply chain) learn of changes after the fact, possibly even by happenstance. Suppliers, however, can find the potential affect of a change on a customer difficult to understand: The regulatory environment is a murky picture, how drug manufacturers use supplier data is likewise opaque, and drug manufacturers do not have a uniform set of needs and expectations. Thematically, those observations can be attributed to industry-wide deficiencies in communication and process standardization. Communication requires that customers explicitly inform suppliers of their regulatory, business, and technical drivers and expectations related to change notification as well as ways in which a supplier’s products are being used. Suppliers likewise must communicate changes clearly, promptly, and technically. Aligning all parties to a change notification process, to definitions of terms, and to clarified roles and responsibilities would facilitate communication and process standardization across the industry. To address that issue, the BioPhorum Operations Group (BPOG) and the BioProcess Systems Alliance (BPSA) formed a team comprising contributors from 17 drug manufacturers and 12 suppliers. Their efforts led to the creation of a proposed practice to the industry, which is the subject of this article. Our discussion herein presents elements of customer expectations, attributes of an effective change notification practice, categories of change, change and prechange notification content, and change notification workflow. A more comprehensive handling of these topics can be found in a white paper accessible through the BPOG (www.biophorum. com/change-notification) and BPSA (www.bpsalliance.org) web sites. The team’s objective is that this proposed practice to the industry be adopted by the vast majority of customers and suppliers in the single- use supply chain, to the point where Figure 1: Time frames associated with implementing changes of varying complexity; arrows depicting that change complexity can be viewed as a continuum divided into discrete change levels. The diagonal indicates time frames required by recipients of changes before a recipient can qualify the change and accept the changed state. 0 1 2 3 High Medium Low Not notifiable Up to 6 months 6–24 Months 12 Months – 5 years Complexity Level of Change 3 Months 6 Months 12 Months 24 Months 5 Years Implementation Time/Range REPRINT WITH PERMISSION ONLY

Upload: others

Post on 03-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: An Industry Proposal for Change Notification Practices for ... · single-use or hybrid manufacturing sites. But when a company has several sites across the world, it can be difficult

18 BioProcess International 15(5) May 2017

An Industry Proposal for Change Notification Practices for Single-Use Biomanufacturing SystemsJeffrey Carter, Sabrina Restrepo, Eric Isberg, and James Vogel

FOCUS ON... DISPOSABLES

C urrent practices for change notification in the biopharmaceutical industry are neither efficient nor conducive

to accelerating the adoption of single-use systems (1, 2). Drug manufacturers (end users) often observe that supplier change data packages lack technical content or detail and that the time allowed for change implementation is too short. Occasionally, customers (end users or next tier in supply chain)learn of changes after the fact, possibly even by happenstance. Suppliers, however, can find the potential affect of a change on a customer difficult to understand: The regulatory environment is a murky picture, how drug manufacturers use supplier data is likewise opaque, and drug manufacturers do not have a uniform set of needs and expectations.

Thematically, those observations can be attributed to industry-wide deficiencies in communication and process standardization. Communication requires that customers explicitly inform suppliers of their regulatory, business, and technical drivers and expectations related to change notification as well as ways in which a supplier’s products are being used. Suppliers likewise must communicate changes clearly, promptly, and technically. Aligning all parties to a change notification process, to definitions of terms, and to clarified roles and responsibilities would facilitate communication and

process standardization across the industry.

To address that issue, the BioPhorum Operations Group (BPOG) and the BioProcess Systems Alliance (BPSA) formed a team comprising contributors from 17 drug manufacturers and 12 suppliers. Their efforts led to the creation of a proposed practice to the industry, which is the subject of this article.

Our discussion herein presents elements of customer expectations, attributes of an effective change

notification practice, categories of change, change and prechange notification content, and change notification workflow. A more comprehensive handling of these topics can be found in a white paper accessible through the BPOG (www.biophorum.com/change-notification) and BPSA (www.bpsalliance.org) web sites.

The team’s objective is that this proposed practice to the industry be adopted by the vast majority of customers and suppliers in the single-use supply chain, to the point where

Figure 1: Time frames associated with implementing changes of varying complexity; arrows depicting that change complexity can be viewed as a continuum divided into discrete change levels. The diagonal indicates time frames required by recipients of changes before a recipient can qualify the change and accept the changed state.

0 1 2 3

HighMediumLowNotnoti�able

Up to6 months

6–24 Months

12 Months –5 years

Complexity Level of Change

3 Months

6 Months

12 Months

24 Months

5 Years

Implementation Time/Range

REP

RIN

T W

ITH P

ERM

ISSIO

N O

NLY

Page 2: An Industry Proposal for Change Notification Practices for ... · single-use or hybrid manufacturing sites. But when a company has several sites across the world, it can be difficult

parties ref lect it in their own quality management practices and in formal business agreements.

Attributes of An effective chAnge notificAtion PrActice

A principal underlying concept is that material that contacts a regulated

product or process (directly or indirectly) must be qualified sufficiently to preclude substances from being transferred to the product in quantities large enough to endanger human health, to bring about an unacceptable change to the composition of the product, or to affect the process. The elements of effective change notification listed below form the foundation of the proposed practice to the industry:

• Well-defined terms• Defined lead times and timing for

change milestones and deliverables• A well-understood workflow• Clear and aligned expectations• High-quality data packages• Content that anticipates customer

needs• Standardized report template• Educated suppliers that continue

to learn customers’ ways of working• Common understanding of roles

and responsibilities of suppliers and customers

• Single point of contact (SPOC) to facilitate and manage formal communication

Expectations that customers should have of suppliers who adopt this proposed practice to the industry are listed below. Without such rigor, there can be little confidence that the content of change notifications is grounded in a solid process and is traceable and defensible.

Quality• Quality management system (QMS) is robustly and actively managed.

• Quality risk management (QRM) is practiced.

• Good documentation practices (GDP) are followed.

• Supplier quality management program is robust.

• Change control process is documented.

Supply Chain• Product is controlled, including traceability, change management, lot release, and corrective and preventive

actions (CAPA).

• Control, monitoring, and tracking of materials is in place (e.g., traceability, auditing, incoming).

Manufacturing Practices• Environmental controls are in place.

• Cleanroom etiquette and gowning practices are followed.

• “Real-time” in-process monitoring and controls signal impending issues related to key process parameters.

Technical• Subject matter experts (SMEs) are used.

• Capabilities, design space, and process variability are understood.

• Market (biopharmaceutical), product application, and end-user processes are understood.

• Technical collaboration and communication with subsuppliers are practiced.

customer exPectAtions

©2017 Colder Products Company

WHERE A DIFFERENT WAY OF THINKING MEETS MAKING A DIFFERENCE.

As single-use bioprocessing technology becomes more important, companies are increasing their number of global single-use or hybrid manufacturing sites. But when a company has several sites across the world, it can be difficult to streamline efforts, manage costs and share valuable information. To optimize their processes, companies should implement global best practices for defining technology and specifying components across their single-use and hybrid manufacturing facilities.

Read our white paper to learn more about globalizing best practices for single-use systems for your company at: cpcworldwide.com/Globalization.

Global Coordination of Single-Use Manufacturing Sites

BPI_May_ColderProducts.indd 1 4/20/17 4:44 PM

Page 3: An Industry Proposal for Change Notification Practices for ... · single-use or hybrid manufacturing sites. But when a company has several sites across the world, it can be difficult

• Ample opportunity and expectation for bidirectional feedback, as related to individual changes and to overall process effectiveness.

cAtegories of chAnge The proposed practice to the industry was structured with an effort to align to other standards or guidance (3–8), while also recognizing that several relevant existing structures are not themselves aligned. Five levels of change are included in the proposed practice: emergency, 0, 1, 2, and 3. Figure 1 shows four of them.

The emergency change category acknowledges the reality of occasional changes that must be managed in an accelerated manner. Level 0 changes are non-notifiable changes that nevertheless must be managed within a supplier QMS. It is recommended that effective handling of level 0 changes be covered in a quality agreement.

Levels 1, 2, and 3 changes reflect increasing magnitudes of complexity, qualification, and impact on bioprocessing as well as implementation efforts associated with a change. The magnitude can be derived using risk assessment techniques (part of quality risk management in the proposed practice to the industry) and generally will be guided by a supplier’s statement of intended use and its customers’ typical use of affected products. In deriving a change level, the following should be considered: impact on form, fit, or function; size of study required to qualify the change; size of study required to demonstrate equivalence to the prechange state; and the potential impact on patients.

content of A PrechAnge notificAtion A prechange notification informs customers of an intent to initiate a relatively complex change. It provides them with an opportunity to ask for clarification or to request that certain information be part of an eventual notification package. A prechange notification should indicate, as applicable

• The reason for the change• Affected products • The anticipated date of the change notification• The initial proposed qualification plan for the change

(including timeline expectations and an outline of the anticipated qualification plan and report content)

• Recommendations for stock inventory• Anticipated sample availability for end-user and

customer evaluations.

content of A chAnge notificAtion A change notification provides a customer with the requisite information to understand the nature of a change, assess impact (or determine equivalence, if applicable), and manage the effect to maintain drug supply to patients. Several points should be considered when developing a change notification.

A recipient is a customer who receives the change notification. A thorough description of a change should include what the change is and is not, which allows customer to fully understand the change and be able to react to it G

EA-C

P-01

-009

Aseptic Centrifuge Technology

It’s secure. It’s safe.Pharmaceutical centrifuges with CIP/SIP.

Designed to protect both your product and

your operators, GEA off ers a wide range of

GMP-compliant pharmaceutical centrifuges

that meet the industry’s highest bio-contain-

ment requirements. Our separators and

skids ensure gentle product treatment and

the effi cient recovery of active ingredients.

Special skids for research and pilot plants

allow for a reliable scale-up.

CIP/SIP-compatible, cooled, cleanroom and

through-the-wall options are available as

standard for optimized aseptic process

management, maximum cleaning capability

and contained product handling.

For contact details: gea.com/contact

BPI_May_GEA-Westfalia.indd 1 4/12/17 9:01 AM

Page 4: An Industry Proposal for Change Notification Practices for ... · single-use or hybrid manufacturing sites. But when a company has several sites across the world, it can be difficult

internally. Rationale calls for contextualizing a change. Affected products are required to be listed in a notification for a customer to act on the change. The change level is determined by a supplier’s understanding of the complexity of a customer’s activities needed to qualify a change. Timelines should allow a customer to react to a change notification. Timing communication includes estimated dates for qualification completion, report availability, and implementation.

Identifiers enable a change notification to be traceable to the origin of a change. For an impact assessment in a change notification, the change originator should include a statement of potential impact of the change on its customers. The change originator also should provide information on how to request a qualification package, as applicable.

A change notification also should include information on how a customer may receive samples of materials that represent the changed state, as applicable. For supply chain considerations, a change originator should inform a customer of how to know when it receives product that has incorporated the change. Finally, a change notification should describe last-time buy options and quantity restrictions to mitigate supply disruption risk, as applicable.

chAnge notificAtion WorkfloW Perhaps the single most influential aspect of the proposed practice to the industry is the increased level of high-quality communication. This includes elements of timeliness, interactions between/among the correct individuals, and a right-first-time objective for communication content. The workflow in Figure 2 adds structure to this communication. Figure 2 calls for an SPOC to facilitate effective two-way communication. It further presumes a high-impact change is being managed, and thus contains prechange notification and a full complement of feedback steps. Changes of lesser impact naturally may not need the same level of attention to two-way communication.

feedbAck Continued and high-quality dialog among suppliers and customers helps to ensure alignment with a process and

Figure 2: A representation of a generic change-notification work flow; black arrows indicate a change managed without issues between supplier and customer. Red lines indicate steps that are commonly associated with ineffective change management, steps that suppliers and customers should strive to avoid. (SPOC = single point of contact)

Customer SPOC

No

Yes

Prenoti�cation (when applicable)

Customer Review

Supplier SPOC

Supplier implements change

Customer proceeds to implementation

Customer Review

Noti�cation

Customer SPOC

Address Feedback (as needed)

Concurrence withtimeline/technical data

Challenges identi�ed?

Yes

No

Table 1: Feedback mechanism to support effective change notification practices (SPOC = single point of contact.

Mechanism Option Resource Allocation Communication EffectivenessTransactional relationship Low Low: feedback is absent or reactionaryQuality questionnaire Medium Medium: one-way feedback; no

feedback to supplierSPOC interaction Medium High: real time, bidirectional, supports

individual change casesBusiness review meetings High High: encourages bidirectional process-

effectiveness dialog

We Meet Your Single Use Process Monitoring

Requirements

Pressure

Conductivity

Temperature

UV Absorbance

In-line Sensors: • USP Class VI materials• May be gamma irradiated• No calibration required• Sensors connect to PendoTECH monitors or directly to customer equipment

ISO 9001:2008 Certified www.pendotech.com

Now Available! PendoTECH Air Detector

• Detects presence of air or liquid in tube• Non-invasive - operates with sound waves• Tube installs in seconds• Same technology that is used in critical medical applications

Now Available! PendoTECH Air Detector

• Detects presence of air

• Non-invasive - operates

• Tube installs in seconds• Same technology that is used in critical medical

BPI_May_Pendotech.indd 1 4/21/17 9:20 AM

Page 5: An Industry Proposal for Change Notification Practices for ... · single-use or hybrid manufacturing sites. But when a company has several sites across the world, it can be difficult

to each party’s expectations. Customers adopt communication strategies that vary with respect to resource intensiveness and quality of communication (Table 1).

Establishing a supplier and customer feedback strategy will help identify opportunities for improvement meaningful to both parties. Process misalignments and pain points as well as changes to expectations or needs should be topics for ongoing discussion.

sPecific Actions to begin imPlementAtion

To implement the proposed practice to the industry, we suggest the following actions: First download the change notification template with its instructions and assemble a team to compare it with your current practices. What is similar? What is different? How could its principles be incorporated into your quality management system (QMS)?

Next, introduce the proposed practice to senior management who have the authority to agree to implement it. Develop a training and implementation plan for using the template and the associated work flow. Then implement an SPOC and request that your suppliers use the template and workflow. Finally, cite the proposed practice in your contractual agreements (contracts, quality agreements). Strive for high-quality communication with your suppliers to improve change notification quality over time.

As a support mechanism to the Industry, both BPOG and BPSA commit to housing and maintaining practitioner support materials, including an informational white paper, a change notification template, and a series of case studies. Those can be used to accustom yourself to the nature of various levels of change and to the documentation you can use to support change notification case studies of changes. We also will administer a discussion board and hold several online informational sessions.

imPlementing the PrActice

The team created this proposed practice to the industry to help the biopharmaceutical industry improve the efficiency and quality of change notification process. Implementation of

this practice will help companies and regulators alike to ensure safe medicines. Widespread adoption of this practice will improve communication and education of both suppliers and manufacturers and will result in a more robust quality system. It also should shorten implementation times for changes because suppliers and manufacturers alike will gain a better understanding of one another’s requirements.

references1 White T, Ott K. Management,

Notification, and Documentation of Single-Use Systems Change Orders: Challenges and Opportunities. BioProcess Int. 13(9) 2015: 24–29.

2 Kline S, et al. Change Notifications for Single-Use Components: Criteria from an End-User Perspective. Pharma. Eng. 34(3) 2014: 1–8.

3 The International Pharmaceutical Excipients Council Significant Change Guide for Pharmaceutical Excipients, third revision. The International Pharmaceutical Excipients Council: Brussels, Belgium, 2014; http://ipec-europe.org/UPLOADS/IPEC_Significant_Change%20_Final_printing_09Oct2014.pdf.

4 USP <1195> Significant Change Guide for Bulk Pharmaceutical Excipients. US Pharmacopeial Convention: Rockville, MD.

5 Guidance for Industry: Deciding When to Submit a 510(k) for a Change to an Existing Device. Food and Drug Administration: Silver Spring, MD, 2016.

6 Guidance for Industry Changes to an Approved NDA (New Drug Applications) or ANDA (Abbreviated New Drug Application). Fed. Register 81, 2016: 52443–52444.

7 Postauthorisation Procedural Advice for Users of the Centralized Procedure. European Medicines Agency: London, UK, 2009.

8 ASME BPE: Bioprocessing Equipment. The American Society of Mechanical Engineers: New York, NY, 2016. •

Corresponding author Jeffrey Carter is a strategic projects leader, Life Sciences, at GE Healthcare Life Sciences. Sabrina Restrepo is associate director, Sterile and Validation Center of Excellence, at Merck. Eric Isberg is director of life sciences at Entegris, and James Vogel is the founder and director of The Bioprocess Institute.

To share this in PDF or professionally printed format, contact Rhonda Brown at Foster Printing at [email protected], 1-866-879-9144 x194.

The Dawn of a NEW Manufacturing Paradigm

Introducing our “SCALE-OUT” approach ...that eliminates cell culture scale-up risks …. for ultimate �exibility and scalability …using only disposable bioreactors ….to achieve metric ton outputs

Contact us to learn more about our "scale-out" approach utilizing the world's largest single-use bioreactor manufacturing plant (14 x 2,000 L).

[email protected]

BPI_May_Wuxi.indd 1 3/31/17 12:27 PM