An Example of Performance Based Logistics

(Fighter Avionics Upgrade)

Dale Waldo

314-705-1865

Last Rev. 5/10/99 by DFW

Page 2: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Requirements• Implement F3I • Guaranteed mission capability rate• Support peace and war time scenarios• USAF/Contractor forms partnership for sustainment over the system life cycle• Affordable cost to USAF

Page 3: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Implements F3I Requirements• Performance based specifications

– Form, Fit, Function Interface (F3I)– ‘How to’ responsibility given to Contractor

• Contractor Depot Maintenance – Helps mitigate the risk of short lived technologies– Contractor has configuration control internal to LRU

• Facilitates technology insertion

• Utilizes Trigger Based Item Management (TBIM) Process– Provides for trends and targets actions that provide high payoff– ‘Proactive’ rather than ‘reactive’ management

Ref. PBBE Flexible Sustainment Guidehttps://acc.dau.mil/GetAttachment.aspx?id=19314&pname=file&lang=en-US&aid=980 -

Page 4: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

• Proper O level maintainer training and technical information– Tech Pubs (plane side repair data) updated during EMD– CFR/CFI system update; deployment during OT&E– All technical information evaluated vs “as designed”– Inclusive Diagnostic System at all levels of assembly

• Automated configuration management required– For tracking: Base Aircraft LRU SRU Critical Component– Manage parts inventory– Tracking of bad actor hardware, remove when necessary

Elements of PBL(Continued)

PBL Implements F3I CriterionPBL Implements F3I Criterion

Page 5: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Availability: When you need it you will have it!

Base X Flightline

Removal DefectiveLRU

Install GoodLRU - Issues Spare

- Picks Up Bad LRU- Sends Bad LRU to Shipping

- Receives Bad LRU- Generates DIFM via CAMS

Maint. TechExchanges BadLRU for Spare

1

2

5

BASE SUPPLY

Shipping& Receiving

3

4

8 Hrs0 Hrs

Actual On-Aircraft Mean Repair Time (MRT)< 45 Minutes

AMU Support Section

5 Hrs

Page 6: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Shared Responsibility is Key to Success

• Contractor - Provide adequate spares based upon MTBMA

• USAF and Contractor - Minimize Mean Down Time (MDT)– USAF - 45 Minute MTTR– Contractor - 5 Hour stores replenishment time (for spares)– USAF - 8 Hours for local transportation, preparation of maintenance action and requisition forms, pack and ship

• Technical Performance Measurands will be implemented to help manage the program, minimize MDT

Page 7: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Maintenance ConceptOrganizational Level Tasks

Serial Numbers & BIT Matrices

CFRS/CFI

PMA

Skill LvL 3Technician

• Remove/ReplaceFailed LRU

• Perform AdditionalTroubleshooting Procedureand Repair System

• Perform System Verification

DTM Transfer

Maintainer Always Receives PositiveAction From Technical Data (e.g. NextAction).

1) CFRS - Determine existence of fault.

2) CFI - Determine most likely cause of fault. Identify corrective action to be performed.

a DTM is similar to a thumb drive

Page 8: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

CFR/CFI System• Proposed Process (Eliminates need for Fault Isolation Tech manual)

CFR / CFIIdentify Corrective

Action RequiredHow is this Done? Job Guide

Is the Fault Corrected?

If “How To” instructions are not required

CFRS/CFI

DTM

Job GuidePMA

CFR/CFI SystemWiring Diagram on the Fly

Page 9: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Functional Requirements

• Automated Fault Detection– Provided by on-aircraft system BIT and supplemented with CFRS– Accomplished via updates to WIN-95 CFRS

• Automated Fault Isolation capability – Provides “POSITIVE ACTION” to maintainer– Electronic automated tool implementation includes Digital Wire

Diagrams• Currently done with paper manuals today

• Automated data collection– Enables collection and manipulation of data collected– Includes maintenance corrective action and parametric

information

Page 10: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Advantages

• CFI data base can readily be updated in 1-2 weeks time frame– Not Tech Pubs update dependent (months/years

time frame for paper update)– Maintainer now gets real time data to help isolate

failures

• Portable Maintenance Aid (PMA) compatible

• Deletes paper Fault Isolation/Wiring Diagram

(FI/WD) manuals

Page 11: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

* BAD LRU RETURNED FOR REPAIR

•CONFIRM FAILURE•REPLACE BAD SRU•LRU TEST •CONFIRM FIX•INSPECT

SRU SPARES

SRU REPAIR

SPARE PARTS

RFI LRU SHIPPEDPER ASSET MANAGEMENTINSTRUCTIONS

ASSET MANAGEMENT•PREPARE TASK ORDER PACKAGE•TRACK REPAIR• OBTAIN SHIPPING INSTRUCTIONS• PROCESS GFP DOC.

SHIPPING& RECEIVING

BAD SRU

REPAIRED SRU

LRU REPAIR 7 DAYS AVERAGE

SRU REPAIR60 DAYS

2 DAYS FROM Air Base

2 DAYSTO Air Base

REPAIR DEPOT PROCESSCFRS/CFI

Page 12: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

CFR/CFI/DWDSDatabase

Core Automated Maintenance System

(CAMS)

Federal ExpressDatabase

Asset Manager

Supplier DepotSPOWPAFB

MiddlewareMerge Engine

Asset Management Data Information Screens

Elmendorf AFB

Lakenheath RAF

Nellis AFB

Mountain AFB

Langley AFB

Edwards AFB

Eglin AFB

Base Supply / Trans. Databases

AirborneDatabase

USAFE PACAF

Growth

FRACASDatabase

Property Management

Database

LRU / SRU Field Configuration Database

Base Supply / Transportation

Program Office Field Operations

ContractorAsset Manager

DEPOTWRALC

Asset Manager (Middleware Merge Engine)

Page 13: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Asset Manager Field Level Metrics

• System Readiness or Availability Rate• System MTBMA (less -120 Antenna)• Mean Down Time per Maintenance Action • LRU Demand Rates• System CND Rate• Average Duration from JCN Issue to Part Received by

Commercial Shipper• Percent JCNs Awaiting Parts - Off Station• Average Active Maintenance Time for Troubleshooting and

Repair• Average Repair Turn-Around Time Base Dock to Base Dock

Page 14: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW

Depot Metrics• LRU Repair Rates• Number of broken warranty seals on returns• Number of Units in Pipeline• Average Duration of LRUs in Transit • Average Turn-Around Time by Facility• BCS/RTOK Rates• Depot Test Voids/Total Test Required• Number of Parts Produced by Single Source• Technology Obsolescence Projections• Number of Obsolete Part Types in Field• Percent JCNs Awaiting Parts• Current Value of Repair Inventory• Repair Station Availability Rates & Excess Capacity• Number of Open Engineering Investigations • Number of Outstanding BIT ECRAs and Time Outstanding

Page 15: An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW