4/30/2009
Scope of Work Remark
1 Site Levelling and Grading Available Wherever Areas Available
2 STG Building Available Work in Progress
3 GTG Building Available Work in Progress
4 Electrical Building No Work Requires Drawing
5 Control Room Building No Work Requires Drawing
6 BFP Building Available
7 GT Foundation Available pilecap in progress
8 STG Foundation Available
9 BFP Foundation (Equipment) No Work Requires Drawing
10 HRSG Foundation Available Completed completed
11 No Work Requires Drawing
12 No Work Requires Drawing
13 No Work Requires Drawing
14 No Work Requires Drawing
15 No Work Requires Drawing
16 No Work Requires Drawing
17 No Work Requires Drawing
18 Bus Duct Foundations No Work Requires Drawing
19 Oil Water Seperator Pit No Work Requires Drawing
20 No Work Requires Drawing
21 Miscellaneous Sumps & Pits No Work Requires Drawing
Civil, Structural & Architectural work for Main Power Block for 1 X 350 MW for
CCPP at Hazira, GSEGL, Dist. SuratDetails of the scope of work, availability of
construction Drawings & status of the work
Sr.No.
Availability of
Drawing
Status of the work as on
25.03.09
Piling Work Completed. Pilecap work in progressPiling Work Completed. Pilecap in Progress
Not Available
Not Available
piling work completed,
pilecap work in progress
Piling finished on 24'Apr, Pilecap work in progress
start date: 27/04/09
Piling work completed
piling work in progress
only piling layout dwg available
Not Available
Air Washer Building System Civil Works
Not Available
Compressor Building Including Compressor Foundations
Not Available
AC, Ventilation System Civil Works
Not Available
Foundations DG and other Misc. Equipment
Not Available
Chlorination Plant System Civil Works
Not Available
Generator Transformer Foundation
Not Available
Unit Auxiliary Transformer Foundation
Not Available
Not Available
Not Available
Miscellaneous Civil Works in Transformer Yard like Fir Barrier Wall, Fencing around Transformer etc.
Not Available
Not Available
22 No Work Requires Drawing
23 Roads No Work Requires Drawing
24 Drains & Culverts No Work Requires Drawing
25 No Work Requires Drawing
26 Pipe Support Pedestals No Work Requires Drawing
27 Stack Foundation Available Completed completed
28 HRSG to Stack Area Paving No Work Requires Drawing
29 DG Building No Work Requires Drawing
30 CW Chlorinatio Building No Work Requires Drawing
31 CW Pipeline Civil Works No Work Requires Drawing
32 No Work Requires Drawing
33 No Work Requires Drawing
34 available No Work
35 RW Pipeline Civil Work No Work Requires Drawing
36 No Work Requires Drawing
37 Stores Building No Work Requires Drawing
38 No Work Requires Drawing
39 Fuel Pipe Support Pedestals No Work Requires Drawing
40 No Work Requires Drawing
41 Effluent Holding Tank No Work Requires Drawing
42 Overhead Water Tank Available Work in Progress
43 No Work Requires Drawing
Misc. Outdoor Equipment Foundations & Trenches
Not Available
Not Available
Not Available
Pipe Rack/Cable Tray Supporting Structures and their Foundations
Not Available
Not Available
Not Available
Not Available
Not Available
Not Available
CW Pump House including forebay and CW/CT switchgear room
Not Available
Civil Works for CW Duct from Cooling Tower to CWPH
Not Available
Raw Water Reservoir & Pump House
released on 18/04 & kept on hold since 23/04/09
after completion of 6000 cum excavation & 88 cum
PCC
Not Available
Clarified Water Reservoir & Pump House
Not Available
Not Available
Miscellaneous Tank Foundations like Fuel tank Foundation, DM Tank Foundation, Condenstae Storage Tank Foundation etc.
Not Available
Not Available
Fuel Gas Metering & Receiving Station Civil Works
Not Available
Not Available
Civil Works related to Potable and Service Water Systems
Not Available
44 No Work Requires Drawing
45 No Work Requires Drawing
46 Available Completed
Any building/ Structure required from system point of view but not included above
Not Available
Civil Works for sewerage system including Septic tanks, soak pits & Manholes
Not Available
Arrangement for Drawing Construction Water from Existing Reversoir
ERA INFRA ENGG LTD371-371/2, SAHI HOSPITAL ROAD, JUNGPURA, BHOGAL, NEW DELHI-110014
PROGRAMME AS PER LOA FOR THE CONSTRUCTION OF 1X350 MW CCPP EXTN AT GSEG HAZIRAPROGRESS COMPARATIVE STATEMENT L2 VS ACTUAL (ACCORDING RECEIPT OF DRAWINGS) AS ON 30/04/09
DATE OF LOA: 07/08/2008ACTUAL DATE OF START:25/10/2008 (DATE OF ISSSUED OF RFC DRAWING OF HRSG AREA PILING)
S NO AREA ACTIVITY
1 MAIN BLOCK A GT-GTG & STG BUILDING FOUNDATION 7 MONTHS 12/17/2008
GTG BLDG PILING LAYOUT
PILECAP EXCAVATION
PCC
RCC
PEDASTAL
STG BLDG PILING LAYOUT
PILECAP EXCAVATION
PCC
RCC
PEDASTAL
PILING LAYOUT
PILECAP EXCAVATIONPCC RCCOPEDASTAL
B BLDG STRUCTURES- FABRICATION 9 MONTHS 2/1/2009BLDG STRUCTURES- ERECTION 10 MONTHS 4/1/2009
C 15 MONTHS 7/1/2009
D GT-GTG FOUNDATION 5 MONTHS
PILING LAYOUTPILECAP EXCVNPCC RCCOPEDASTAL
E STG EQPT STG FOUNDATION 6 MONTHS
DURATION FROM ACTUAL START DATE
AS PER LOIPLANNED DATE OF
START
AUX COLUMN
BLDG SUPERSTRUCRURE CIVIL INCLUDING INTERNAL FLOORING
AFTER RECIPT OF DWG
AFTER RECIPT OF DWG
PILE LAYOUT
PILECAP EXCVNPCC RCCOPEDASTAL
F STG DECK SLAB 9 MONTHS
G 6 MONTHS 10/25/2008
HRSG HRSG PILE LAYOUTPILECAP INCLUDING PEDASTAL
STACK STACK PILING LAYOUTSTACK PILECAPSTACK PEDASTAL
H OTHER MAJOR EQUIPMENT FOUNDATIONS 12 MONTHS 6/1/2009
I 18 MONTHS NOV'2009
J ALL AUXILIARY/FACILITY BUILDINGS 18 MONTHS AUG'2009
BFP BUILDING PILING LAYOUTPILECAP 4/26/2009PEDASTALBOILER FEED PUMP (EQPT-BPF)PILING LAYOUTPILECAP
PILING LAYOUT
PILECAPSUPERSTRUCTURE
K TRANSFORMAR YARD, FENCING, OWS ETC 16 MONTHS OCT'20092 WATER SYSTEMS
A 18 MONTHS MAY'2009
3 PIPE/CABLE RACKSA FOUNDATION 11 MONTHS JUNE'2009B STRUCTURE FABRICATION/ERECTION 15 MONTHS AUG'2009
4 21 MONTHS JAN'2010
AFTER RECIPT OF FDN DWG
HRSG FOUNDATION & STEEL STACK FOUNDATION
EXTERNAL PAINTING & OTHER MISCELLANEOUS WORKS INCLUDING ARCHITECTURAL WORK OF GTG & STG BUILDINGS
BFP BUILDING
OH WATER TANK
RW & CW PUMP HOUSE, FORBAY, CHLORINATION BLDG, CW DUCT, DM TANK, DMPRF PH, POTABLE WATER PH ETC
PLANT, ROADS, DRAINS, FENCING, PAVING & OTHER MISCELLANEOUS WORKS
PLANNING ENGINEER
ERA INFRA ENGG LTD371-371/2, SAHI HOSPITAL ROAD, JUNGPURA, BHOGAL, NEW DELHI-110014
PROGRAMME AS PER LOA FOR THE CONSTRUCTION OF 1X350 MW CCPP EXTN AT GSEG HAZIRAPROGRESS COMPARATIVE STATEMENT L2 VS ACTUAL (ACCORDING RECEIPT OF DRAWINGS) AS ON 30/04/09
DATE OF LOA: 07/08/2008ACTUAL DATE OF START:25/10/2008 (DATE OF ISSSUED OF RFC DRAWING OF HRSG AREA PILING)
SCHEDULED FINISH DATE CURRENT STATUS
5/24/2009 5.5 MONTHS
12/16/200812/31/2008 FINISHED 2/13/2009
3/10/20093/20/2009 50% completed
3/21/2009 3/23/2009 50% completed
3/22/2009 45% completed
in progress
12/17/2009 COMPLETED 3/21/2009
3/9/2009 3/12/2009
3/10/2009
3/11/2009
UNDER PROGRESS
3/30/2009 3/31/2009 UNDER PROGRESS4/21/2009 UNDER PROGRESS
7/24/2009 6 MONTHS 4/16/2009 4/14/2009 UNDERPROGRESS8/24/2009 5 MONTHS UNDER PROGRESS
1/24/2010 7 MONTHS
3/24/2009UNDER PROGRESS
2/9/2009 2/15/2009 FINISHED 3/28/20094/18/2009 UNDER PROGRESS
4/24/2009
SCHEDULED DURATION OF
ACTIVITY
DATE OF RECEIPT OF DRAWINGS
(RFC)
DATE OF START
DATE OF FINISH
17/12/08 & 7/03/09
50% COMPLETED UNDER PRORESS
50% COMPLETED UNDER PRORESS
50% COMPLETED UNDER PRORESS
4/21/2009
7/24/2009
4/24/2009 6 MONTHS
11/5/2008 10/20/2008 COMPLETED 12/27/200812/9/2009 12/20/2008 COMPLETED 4/22/2009
12/16/2008 12/15/2008 COMPLETED 2/12/20091/30/2009 2/11/2009 COMPLETED 3/31/2009
COMPLETED
10/24/2009 4 MONTHS
4/24/2010 6 MONTHS
4/24/2010 9 MONTHS
3/14/2009 3/17/2009 COMPLETED 4/19/2009
5/31/2009 4/3/2009 Work in Progress
1/30/2009 2/12/2009 COMPLETED 2/20/2009
1/30/2009 4/16/2009 UNDERPROGRESS
2/24/2010 7 MONTHS
APRIL' 2010 12 MONTHS 4/18/2009 4/18/2009 Hold (23/04/2009)
9/24/2009 4 MONTHS 24/01/2010 6 MONTHS 7/24/2010 7 MONTHS
Hold (22/04/2009) , Released on 29/04/2009
Under progress
PROJECT IN CHARGE
ERA INFRA ENGG LTD371-371/2, SAHI HOSPITAL ROAD, JUNGPURA, BHOGAL, NEW DELHI-110014
PROGRAMME AS PER LOA FOR THE CONSTRUCTION OF 1X350 MW CCPP EXTN AT GSEG HAZIRAPROGRESS COMPARATIVE STATEMENT L2 VS ACTUAL (ACCORDING RECEIPT OF DRAWINGS) AS ON 30/04/09
DATE OF LOA: 07/08/2008ACTUAL DATE OF START:25/10/2008 (DATE OF ISSSUED OF RFC DRAWING OF HRSG AREA PILING)
REMARKS
COMPLETED EXCEPT 19 HOLD PILES PARTLY RELEASED
TRUSS FAB WORK ONLY
AFTER STRUCTURE ERECTION
WORK IN PROGRESS
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
balance after gt eqpt fdn & aux column piling
COMP ON: 30/04/09
DWG AWAITED
Drawing not received
Hold since 23/04/2009 change in design' not released so far, Excavation
6000 cum & PCC 88Cum completed before hold.