world bank document · 2016. 7. 16. · rideau de palplanches ancr6es sheet piling (screen) pannes...
Post on 27-Feb-2021
0 Views
Preview:
TRANSCRIPT
35341
Transl. & Interpr.
WBG ANBox k
M I N I - G L O S S A R Y
O F T E R M S
R E L A T I N G T O
P O R T C O N S T R U C T I O N
AND O PER AT IO N
ision
French-English
English-French
Prepared by:Terminology UnitLanguage Services DivisionAdministrative Services DepartmentTHE WORLD BANK April 1978
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
FOREWORD
This glossary has been prepared by the Terminology Unit of the
Language Services Division for internal use within the World Bank.
Its purpose is to assemble some uncommon terms relating to various
aspects of port construction and operation. The terms have been taken from
existing specialized glossaries, from Bank documents and publications, and
from literature on ports. It is hoped that this mini-glossary, by providing
ready access to these terms, will help reduce the time spent by the transla-
tors on individual research.
The scope of the glossary has been intentionally limited by the
decision to exclude many obvious terms or those that can readily be found in
dictionaries or specialized glossaries.
All entries have been fully authenticated by reliable sources.
The glossary will be expanded from time to time, and suggestions for improve-
ments and additions are welcome. They should be addressed to the Terminology
Unit, Language Services Division.
April 1978
Washington, D.C.
II
i
4
FRENCH - ENGLISH
affouillements La protection du vannage contre lesaffouillements est assuree par une
scour; undermining risberme en enrochements de 10 mde largeur
agregats marins Les b6tons sont faits avec desagr6gats marins
marine aggregates
allbge; barge
lighte
appuis en parpaings de beton
concrete block columns
arasement L'arasement du chenal d'accbs a(-6,50) ...
leveling
arribre port; arribre bassin
inner harbor
arrimeur; acconier (parfois aussidebardeur)
stevedore
avant port
outer harbor
bardeur de blocs
gantry crane;travelling crane for blocks
-2-
barges (alleges) transporteespar navire
lighter aboard ship (LASH)
basse mer de morte eau
low water of neap tides
basse mer de vive eau (BMVE)
low water of spring tide (LWOST)
bassin Vaste enceinte form6e dans un port
par des quais et par des digues
dock
bassin a mar6e Cr6ation d'une amorce de bassin a
mar6e
tidal basin
basculeur (v. dumper)
batardeau
cofferdam
b6ton cyclop6en
cyclopean concrete;rubble concrete
bitte
mooring post; mooring bitts
bord a bord Cela signifie que toutes les d6penses
de manutention sont a la charge du
F.I.O. (free in and out) proprietaire de la marchandise
-3-
bouee coulissante
sliding buoy
brise-lames construction elev6e a l'entrded'un port pour le proteger contre
breakwater les vagues du large
cale ... la cale est constitu6e d'undallage de beton arm6
wedge; prop; block; shim
capitaine du port
harbormaster
capitainerie
harbormaster's house
cavalier ... l'ouvrage a 6t6 realise apartir d'un cavalier construit a
chair l'avancement
cellule de stockage Les silos de collecte/la structureest classique en general; les
bin cellules de stockage sont habi-tuellement verticales, hautes etetroites, facilitant les operationsde manutention
cercle d'6vitage
turning basin; turning circle
chaland automoteur;chaland a clapets
self-propelled barge;dump hopper barge
-4-
chambre des vannes, de dessablement
detritor tank
chariot cavalier
straddle carrier
chasse-mer; chasse-mar6e
lugger
chouleur pelleteur
crawler tractor shovel;crawler tractor loader;crawler loader shovel
cote de dragage
dredged depth
courroie transporteuse
conveyor belt
dalle
slab
darse; darce ... la darse a 6te dragu6e etderoct6e ...
harbor basin
d6roctage ... les op6rations de ddroctage
rock removal
digue
lev6e
-5-
dragage au point-fixe
stationary dredging
drague a benne preneuse
grab dredger
drague a 6linde tralnante
trailing suction dredge
drague a godets
bucket dredge
drague aspiratrice a d6sagregateur(ou aspiratrice-refouleuse)
suction cutter dredge
drague benne preneuse, prenante,piocheuse
grab-bucket or clamshell dredge
drague flottante a cuiller, abenne plongeuse
dipper dredge
drague r6trocaveuse
backhoe dredge
duc d'Albe
dolphin
-6-
duc d'Albe d'accostage
mooring dolphin; breasting dolphin
duc d'Albe souple
flexible dolphin
dumper; basculeur ... les materiaux sont repris au stocket charges soit a la chargeuse, soit
dump trailer; dump truck a la chargeuse, soit au grappin dansdes dumpers de 22 t qui vont lesd6verser a l'avancement
echelle de mar6e
tide-gauge
elinde rigide ... la drague ... a 6t6 mise en ser-vice dans le bassin a mar6e avec
roller track (of a dredger) une 6ninde rigide
(couche d')emulsion cationique ... les talus en-dessous ... sontproteges ... par une couche
acid emulsion (coat) d'6mulsion cationique
enrob6
premix (bituminous materials);coated materials;asphaltic concrete
escarpement; escarpe
scarp
estarie
lay-days
-7-
estran D6finition: partie du littoral com-prise entre les plus hautes et les
strand; foreshore beach plus basses mers
... en creusant un port de travauxreli6 a la mer au travers du cordonlittoral et de l'estran par un che-nal d'accbs provisoire ...
fascines Les fascines sont constituees d'untapis en toile tissee de polypro-
fascines pylbne formant le filtre
fascinage
revetment of fascines;fascine works
ferraillage Panneaux prefabriqu6s du ferraillage
reinforcement
filler d'apport Definition: matibre min6rale trbs(v. aussi fines) finement moulue utilis6e comme
agglom6rant
... agregats calcaires ... auxquelsest ajout6 ... du filler d'apport
fines D6finition: terme pr6conis6 parl'Administration pour remplacerfiller (voir filler d'apport)
finisher; finisseur La deuxibme couche a et6 mise enoeuvre au finisher par passes
finisher verticales
fongage des pieux par desjets d'eau
jetting; driving of a pile
-8-
forme de radoub
dry dock
fosse (v. souille)
fournisseurs (au navire de tout
ce qui lui est necessaire:vivres, appareils, agrbs)
ship's chandlers
franc sous palan; franco quai
F.A.S. (free alongside ship)
fruit ... quais ... avec un fruit de
1/10 en parement avant
batter
gabions circulaires
round cribs
goulottes de chargement (avec
disperseur horizontal)
loading, charging chute
grappin ... pelles sur chenilles hydraeliques
6quipees de grappins a cinq dents ...
grapnel; grabhook; nippe ... grues hydrauliques a grappin pour
les enrochements de categories ...
grue a d6placement horizontalde la charge
grue a port6e variable
level-luffing crane
-9-
grutier ... le d6crochage sous l'eau pr6sentequelques difficult6s qu'un grutier
crane operator bien entrafn6 arrive b surmonter
hangar de groupage,d'empotage et de ddpotage
consolidation shed
hangars
sheds
hauteur-limite d'un pilage
piling height
havage (fondations par) Les travaux ont 6t6 execut6s suivantla technique de havage
dredging, grabbing(foundations by)
installations d'entreposage
storage facilities
jetee en dents de peigne
finger pier
jours de planche Nombre de jours stipul6s et alloues(v. estarie) b l'affretement du navire pour les
op6rations de chargement et ded6chargement de la cargaison
laisse de haute mer,de basse mer
high, low water mark
- 10 -
lamanage
inshore pilotage
liernes; lisse ... palplanches reliees en t8te parune lierne en b6ton arme ...
fender waling
longrine Les dalles rejointoyees au mortier de
ciment sont butees en pied par une
waler; riband longrine ... une longrine arasee a
la cote + 8,70 cm ...
marge pour resistance des quaisaux chocs
berthing impact allowance
marnage (amplitude de la mar6e) ... il etait n6cessaire de construireun port de travaux soumis au marnage
tidal range (amplitude)
musoir; tete de mole blocs ... a mettre en place sur chaquemusoir en deux campagnes ...
pier head
nombre d'6quipes employees par Nombre total brut d'heures/equipe,
navire et par vacation divise par le nombre total d'heuresde travail effectif sur les navires
number of gangs employed per a quaiship per shift
palplanches
sheet piles
palplanches (batardeau de)
sheet pile (cofferdam)
- 11 -
palplanches caissons
caisson interlocking sheet piles
palplanches (rideau de) ... un rectangle constitu6 par unrideau de palplanches ancr6es
sheet piling (screen)
pannes (de passerelles flottantes)
purlins
parement vu
face
parpaings (voir appuis enparpaings de beton)
Part des heures de travail Total des heures de travail effectifeffectif dans le temps pour tous les navires a quai,total pass6 a quai divise par le temps total ecoule
entre l'accostage et le d6part pourfraction of time berthed tous les navires
ships worked
part des heures d'inactivitd Nombre total d'heures d'inactivit6,dans le total des heures/ divis6 par le nombre total brut6quipe d'heures/equipe
fraction of time gangs idle
PBM (plus basse mer)
LLW (lowest low water)
pelle 6quip6e en dragline Pelle sur chenilles 6quip6e endragline et circulant sur le
dragline shovel cordon
- 12 -
pelle sur chenilles hydrauliques
self propelled shovel
perre ... il a 6te d6cid6 de prot6gerle terre-plein par un perre
riprap
pieu d'ancrage
spud
pilonnage
tampwork
pilonnement
heave
pilonneuse
pounder (UK); rock breaker;tamper (USA)
plan de coffrage
formwork plan
pleine mer de vive eau (PMVE) ... une cote inf6rieure a cellede la pleine mer de vive eau
high tide; high water(of spring tide)
pompe d'6puisement
drainage pump
ponton-grue; ponton bigue
crane pontoon; floating crane
- 13 -
ponton-grue a benne
grab-dredger
ponton mature
floating sheer legs; floating sheer;floating shear; shear hulk
port de collecte
feeder port
port secondaire; port de sortie
outport
prime pay6e par l'armateur ... pour tout temps gagn6 dans lesop6rations d'embarquement ou ded6chargement d'un navire affr6te
poste de mouillage
anchorage point
rabattement de la nappe Un rabattement de nappe constitu6par une ceinture de puits filtrants
lowering, reduction of the ... a permis le creusement d'unewater table souille a (-7.00)
rade
roadstead
redan; talon Les redans sont retaill6s pour eli-miner les parties insuffisamment
key compact6es et ne pr6senter quedes surfaces saines
refus Palplanches battues au refus
... driven home
-14-
risberme (voir affouillements)
berm
sassement ... la nouvelle ecluse permettra lesassement de navires calant, au
passing (of a ship) through maximum, 20 m
a lock
scraper; decapeuse ... terrassements ex6cut6s auscraper ...
scraper
silo de transit Les silos de transit ou silos portuai-res qui sont essentiellement des
terminal elevator outils de manutention permettant decharger et d6charger le plus vitepossible les navires, les penicheset les wagons sp6cialis6s
souille; fosse (approfondissementdevant un quai de mar6e)
berth; dredge berth
souilles de musoirs L'operation la plus delicate a etele creusement des souilles de
pierhead berths musoirs o
sous palan La marchandise est d6sarrim6e, 6lin-gu6e si cela est necessaire, hiss6e
F.F.A. (free from alongside) hors du navire a l'aplomb des pan-neaux et mise sur le pont du navireaux frais de l'armateur
surestaries Retard dans les operations de charge-ment ou de d6chargement d'un navire
demurrage par rapport a la limite de tempspr6vue ou convenue par une charte-partie ou un accord
_ 15 -
taux d'arrivee Nombre d'entr6es de navires divisepar le nombre de jours du mois
arrival rate
temps d'attente Temps total 6coule entre l'arriv6eet la mise a quai pour tous les
waiting time navires qui accostent, divis6 parle nombre de ces navires
temps de desserte Temps total 6coule entre l'accostageet le d6part pour tous les navires,
service time divis6 par le nombre de navires
temps de rotation Temps total 6coule entre l'arriv6eet le d6part pour tous les navires,
turn-round time divise par le nombre de navires
tenons Execution des ouvrages de protectiondu bassin a mar6e ou tenons
tenon; key
terre-pleins (d'un port)
stacking areas (of a port)
tonnage manutentionne par Tonnage total manutentionn6, divis6eheure-navire passe au port par le temps total 6coul6 entre
l'arriv6e et le d6parttons per ship-hour in port
tonnage manutentionn6 par Tonnage total manutentionn6, divis6eheure-navire passe au port par le temps total 6coule entre
l'accostage et le d6parttons per ship-hour at berth
tonnage par heure-6quipe Tonnage total manutentionn6, divisepar le nombre total brut d'heures-
tons per gang-hour 6quipe
- 16 -
tonnage par navire Tonnage total manutentionne pourtous les navires, divisee par le
tonnage per ship nombre de navires
tout-venant ... ce tout-venant est approvisionn6par des dragues suceuses porteuses
unsorted (dredge) materials auto-dschargeantes ...
trafic de transit
through movement; throughtraffic
transbordement par roulage ... postes pour navires a manutention
direct;* transbordement par roulage direct
direct de vehicules rou-tiers ou de wagons
roll-on/roll-off
transborder (la charge) parla vol6e
luff, to
transroulage
roll-on/roll-off
vacation
shift
zone de service (dans un port)
back-up area
* Travaux Maritimes, Jean Chapon, 1975. The U.N. proposes: transroulage
(Coastal shipping, feeder and ferry services - U.N. - 1970).
I
ENGLISH - FRENCH
acid emulsion coat
couche d'6mulsion cationique
anchorage point
poste de mouillage
anchor ringorganeau
arrival rate Number of ships arriving during a month,taux d'arrivee divided by the number of days in the
month
backhoe dredge
drague retrocaveuse
back up area
zone de service (dans un port)
batter
fruit
berm The nearly horizontal formation along abeach caused by deposit of material
risberme; affouillements under influence of waves; a ledge atthe bottom of bank or cut
berth; dredge berth
souille; fosse (approfondissementdevant un quai de mar6e)
-2-
bin The terminal elevators have manyseparate bins and usually are of
cellule de stockage concrete construction. A typicalbin may be 100 ft. deep and 20 ft.in diameter
breakwater ... a sea wall that breaks the forceof waves
brise-lames
An engineering structure to affordshelter from wave action; may becalled mole, jetty
bucket line dredge (also calledladder dredge)
drague a godets
caisson interlocking sheet piles
palplanches caissons
chair
cavalier
clamshell dredge (also grab-bucketdredge)
drague benne preneuse, prenante,piocheuse
cofferdam A temporary structure for theexclusion of water from a site
batardeau during construction
-3-
concrete block columns
appuis en parpaings de b6ton
consolidation shed
hangar de groupage, d'empotageet de depotage
conveyor belt
courroie transporteuse
crane operator
grutier
crane pontoon; floating crane
ponton-grue; ponton bigue
crawler tractor shovel; crawlertractor loader; crawlerloader shovel
chouleur pelleteur
curtain (of steel sheet) piling;sheet pile
(rideau de) palplanches
reinforcement
ferraillage
cyclopean concrete; rubble concrete
beton cyclop6en
-4-
demurrage
surestaries
detritor tank
chambre des vannes, de dessablement
dipper dredge
drague flottante a cuiller,a benne plongeuse
dispatch money
prime pay6e par l'armateur
dragline shovel
pelle equipee en dragline
drainage pump
pompe d'epuisement
dolphin
duc d'Albe
dredging, grabbing (foundations by)
havage (fondations par)
dry dock
forme de radoub
-5-
dump trailer; dump truck
dumper; basculateur
face
parement vu
F.A.S. (free along side ship)
franc sous palan; franco quai
fascines
fascines
feeder port
poste de collecte
F.F.A. (free from along side)
sous palan
final set
refus (final)
finger pier
jetee en dents de peigne;appontement
finisher
finisher; finisseur
F.I.O. (free in and out)
bord a bord
6-
flexible dolphin
duc d'Albe souple
floating sheer legs; floatingsheer; floating shear; shear hulk
ponton mgture
foreshore beach; strand
estran
formwork plan
plan de coffrage
fraction of time berthed ships Total time that berthed ships were
worked actually worked, for all ships,divided by the total time between
part des heures de travail berthing and departure of all ships
effectif dans le temps totalpass6 a quai
fraction of time gangs idle Total idle gang time, divided by totalgross gang time
part des heures d'inactivit6 dansle total des heures/6quipe
gantry crane A crane or hoisting machine mountedon a frame or structure spanning
grue a portique an intervening space
gantry crane; travelling cranefor blocks
bardeur de blocs
grab-bucket or clamshell dredge
drague benne, preneuse, prenante,piocheuse
-7-
grab-dreger
ponton-grue a benne
grab dredger (also clamshell dredge)
drague a benne preneuse
grapnel; grabhook; nipper
grappin
harbor basin
darse; darce
harbormaster
capitaine du port
harbormaster's office
capitainerie
heave
pilonnement
high, low water mark
laisse de haute mer, de mer
high tide, high water
pleine mer de vive eau
HWST (high water of spring tide)
pleine mer de vive eau (PMMVE)
-8-
inner harbor
arribre port; arribre bassin
inshore pilotage
lamanage
intertidal zone This is the vertical zone between highand low tide. The intertidal zoneof a stationary structure is subjectto alternate wetting and drying.(Note: Sometimes erroneously refer-red to as splash zone).
jetting The process of sinking a pile or cais-son by discharging a stream of water
foncage des pieux par jets d'eau through a pipe or an opening in thepile or caisson below the enteringpoint or edge
key
redan; talon
ladder dredge (see bucket line dredge)
drague a godets
laydays
jours de planche
levee An embankment to prevent inundation
digue
levelling (UK); leveling (USA)
arasement
-9-
level-luffing, crane A crane in which load may be movedradially or, to or from the center
grue a d6placement horizontal of the crane, horizontallyde la charge
grue a portee variable
lighter A barge or other small craft usedin transferring cargo from ship
allbge; barge to shore, or vice versa
lighter aboard ship (LASH) This concept involves placing loadedbarges in a large ocean carrier
barges (alleges) transport6es for part of the voyagepar navire
lighterage
transport par alleges;aconage ou acconage
loading, charging chute
goulottes de chargement (avecdisperseur horizontal)
LLW (lowest low water)
PBM (plus basse mer)
lowering, reduction of thewater table
rabattement de la nappe
low water of neap tides
basse mer de morte eau
low water of spring tide (LWOST)
basse mer de vive eau (BMVE)
_ 10 -
luff, to To move a load toward or away from theaxis of a rotating crane; especially
transborder (la charge) par where it is suspended from the end
la volee of a boom to move it thus by changingthe inclination of the boom
To raise or lower the jib of a crane
marine aggregates
agr6gats marins
mooring dolphin; breastingdolphin
duc d'Albe d'accostage
mooring post; mooring bitts
bitte
number of gangs employed per Total gross gang time, divided by
ship per shift total time that berthed ships wereactually worked
nombre d'6quipes employeespar navire et par vacation
outer harbor
avant port
outport
port secondaire; port de sortie
passing (of a ship) througha lock
sassement
- 11 -
pier head
musoir; tete de mble
pierhead berths
souilles de musoirs
piling height Limit set for stacking cargo to insurethat supports will not be loaded
hauteur-limite d'un pilage beyond stated capacity
pounder (UK); rock breaker;tamper (USA)
pilonneuse
purlins
pannes de passerelles flottantes)
premix (bituminous materials);coated materials; asphalticconcrete
enrob6
revetments Engineering structures to protect fromerosion and to hold in place banks of
d6fenses canals, rivers and harbors
revetments of fascines
fascinages
riprap ... foundation or wall made of brokenstones ...
perre
_ 12 -
rock removal; rock dredging
deroctage
roller track (of a dredger)
6linde rigide
roll-on/roll-off
transroulage
scarp An almost perpendicular slope occur-ring along the shore during periods
escarpement; escarpe of erosion
scour; undermining
affouillements
scraper
scraper; decapeuse
self-propelled barge; dumphopper barge
chaland automoteur; chaland bclapets
self-propelled shovel
pelle sur chenilles hydrauliques
service time Total time between berthing anddeparture for all ships, divided
temps de desserte by number of ships
- 13 -
sheds
hangars
sheet pile
palplanche
sheet pile cofferdam
palplanche (batardeau de)
sheet piling screen
palplanches (rideau de)
shift
vacation
sliding buoy
bou6e coulissante
spud
pieu d'ancrage
stacking areas (of a port)
terre-pleins (d'un port)
stationary dredging
dragage au point fixe
stevedore
arrimeur; acconier (peutsignifier aussi : d6bardeur)
- 14 -
straddle carrier
chariot cavalier
strand; foreshore beach
estran
storage facilities
installations d'entreposage
suction cutter dredge
drague aspiratrice a desagregateur(ou aspiratrice-refouleuse)
tampwork
pilonnage
tenon; key
tenons
through-movement; through traffic
trafic de transit
tidal basin
bassin a mar6e
tidal range (amplitude)
marnage (amplitude de la mar6e)
tide-gauge
6chelle de mar6e
- 15 -
tonnage per ship- Total tonnage worked for all ships,divided by number of ships
tonnage par navire
tons per gang-hour Total tonnage worked, divided bytotal gross gang time
tonnage par heure-6quipe
tons per ship-hour at berth Total tonnage worked, divided by totaltime between berthing and departure
tonnage manutentionn6 parheure-navire pass6 auposte d'accostage
tons per ship-hour in port Total tonnage worked, divided by totaltime between arrival and departure
tonnage manutentionn6 parheure-navire passe au port
trailing suction (hopper) dredge
drague a elinde trainante
turning basin; turning circle
cercle d'evitage
turn-round time Total time between arrival anddeparture of all ships; divided
temps de rotation by number of ships
unsorted (dredged) materials
tout-venant
waiting time Total time between arrival andberthing for all berthing ships,
temps d'attente divided by number of berthing ships
- 16 -
waler; riband
longrine
wedge; prop; block; shim;
cale
ANNEXPage 1 of 2
BIBLIOGRAPHY
A. Books, Publications and Documents
1) Travaux Maritimes, Jean Chapon, 1975
2) Administration et exploitation portuaires, Jean-Georges Baudelaire - 1969
3) Technical and social changes in the world's ports, A.A. Evans - ILO,Geneva, 1969
4) Port maintenance, The American Association of Port Authorities, 1970
5) L. Baudez, Economie portuaire
6) Le regime administratif et financier des ports maritimes, Paris, Librairiegenerale de droit et jurisprudence - 1969, J. Grosdidier de Matons
7) Port planning design and construction - 1973
8) Travaux, in particular: January 1970 and December 1975 issues
9) United Nations - Port performance indicators - 1976 (E/F/S)
10) Coastal shipping, feeder and ferry services UN - 1970 (E/F/S)
11) Publications of Shipping Division of UNCTAD
12) Papers presented at the Seminar on Harbors, Ports and Offshore Terminals -
University of California, Berkeley - January 27-31, 1975
13) R99Oa-EGT - Port of Alexandria Project - March 1976
14) SecM76-689 - Singapore - First Port Project, October 7, 1977
15) E302/69
16) R947a-EC - Ecuador: Appraisal of a Second Guayaquil Port Project
17) SecM77-462 - Pakistan - Second Karachi Port Project
18) R1600 - Distribution of Benefits of Port Improvements: CaseStudies of La Goulette, Pisco, Douala and Karachi main report -
May 1977
19) Port Simulation Model (PORTSIM) User's Manual - January 1974
20) Office national des ports: Cameroun, Rapport sur Douala (364-77)
ANNEXPage 2 of 2
B. Dictionaries
Bucksch - Dictionary of Civil Engineering, 1976
Dictionnaire technique - AIPCN (Association internationale permanentedes congres de navigation)
Glossaire du BCEOM (Bureau central d'etudes pour les equipements d'outre-mer), 1975
IMCO (Inter-Governmental Maritime Consultative Organization) Glossary ofMaritime Technical Terms, 1963
Dictionnaire des termes de marine, 1964
UN (United Nations) Terminology Bulletin 265, Oceanography
OCDE (Organisation de cooperation et de developpement economique) Glossairedes transports maritimes, 1977
Banque de terminologie (Canada)
Elsevier (5002)
Webster, 1970
Heath, 1962
Petit Robert
Lexis, 1975
C. Experts consulted
Mr. Carmichael, Mr. Grosdidier de Matons, Mr. F. Higginbottom
ii::> = r w. .>.>. _, ... ..~~~~~~ 1. - -' r ~tF~E/
II
top related