world bank documentdocuments1.worldbank.org/curated/en/...(bank) at yumbo thermal plant). to be...
Post on 26-Jan-2021
4 Views
Preview:
TRANSCRIPT
-
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
INTERNATIONAL DEVELOPMENT ASSOCIATION
FROM: The Acting Secretary
MONTHLY OPERATIONAL SUMMARY OF BANK and IDA PROPOSED PROJECTS
August 1964
Member State 1,/
CAMEROON
~ (Brazzaville)
Amount 2/ & Probable
Lender
To be de-termined
(IDA)
Cie des Potasses To be de-du Congo termined
Common Services Organisation
East African Posts and Telecom-munications Administration
(Bank)
30. 0 (Bank)
4. 2 (Bank)
Project 1/ I . AFRICA
Agricultural and road project.
Potash mining.
Telecommunications equipment.
CONFIDENTIAL
SecM64-216
September 4, 1964
Present Status
Awai ting completion of cocoa rehabilitation and road studies.
Awaiting further information.
Awaiting further in-orma J. on to comp
appraisal report .
Preliminary information being considered.
1/ 2/ }I
The Government is the proposed borrower, unless otherwise indicated. The amount is in millions of U.S . dollars and is approximate and tentative. The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that information about the project has been revised since the last issue of the Summary. Kenya, Tanganyika and Uganda.
Distribution:
Executive Directors and Alternates President Vice Presidents Department Heads Assistant Department Heads Division Chiefs
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
-
Member~]/
ETHIOPIA
Imperial Board of Telecommunications in Ethiopia (IBTE)
GUINEA
KENYA
M.ADAGASCA..~
MALI
MAURITANIA
MOROCCO
Amount 2/ & Proba'.Jle
Ler.ce,·
6.0-7. 0
(Bank)
- 2 -
Project)./
(R) Telecommunications.
Present Status
Appraisal report being prepared .
To be de- (N) Railway and port for Boke Awaiting further termined bau.xite mining operations. information.
(Uncertain)
4.5 (IDA)
Main roads . Appraisal report being prepared .
2. 8 (R) Smallholder tea Credit signed on Aug. 17. (IDA) cultivation.
To be de- Roads in tea growing Awaiting further in-mation. termined areas .
(IDA)
J.6 (R) Education (Lac Anosy) . (Uncertain)
Appraisal mission planned for Novo/Dec,
10.0 (Uncertain)
Irrigation for rice production in Lac Alaotra area.
Preliminary information being considered.
7~0 (R) Road improvement, Appraisal mission planned for Nov./Dec. (Uncertain) Majunga-Tananarive .
500-7.0
(IDA)
7.0 (IDA)
17.5 (Bank)
Railroad rehabilitation. Consultants• report being considered.
(R) Roadsa Appraisal report being considered . Discussions being held with other foreign aid agencies on their possible participation.
(R) Sidi-Slimane agricultural Loan signed on Augn 26 . development .
Seep. 1 for footnotes 1./ 3./ and 1J.
-
Member State }/
NIGERIA
NORTh'ERN AHD SOUTHERN RHODESIA
Central Africa Power Corporation
SIERRA LEONE
Sierra Leone Electricity Corp.
SENEGAL
SOMALIA
SUDAN
Amount 2/ & Probc-,ble
Lender ----·-20.0 (IDA)
15. 5 (IDA)
5.o-10.,0 (IDA)
7.7 (Bank)
3.8 (Bank)
3.0 (~~c)
To be de-termined
(Bank)
7.0 (IDA)
27 oO-30c5
(Bank)
To be de-termined
(Uncertain)
- 3 -
Project}./
(R) Secondar
-
~mber State ]/
UGANDA
JAMAICA
NEW ZEAL!-,.ND
NORWAY
PORTUGAL
Empresa Termoelec-trica Portuguesa
TURKEY
Industrial De-velopment Bank
UNITED KINGDOM
Basutoland
Amount 2/ & Probable
Len'.:1er --·-To be de-termined
(IDA)
5.6 (Bank)
To be de-termined
(Bank)
25.o (Bank)
To be de-termined
(Bank)
14.5 (Bank)
• (Bank)
35.o (Bank)
5.o (IDA)
4.1 (IDA)
- 4 -
Project]/
Roads.
II . EUROP#
Highway and bridge construction.
Railways.
(R) Electric Power.
Ports .
Electric Power .
•
(R) East Coast Expressway.
(R) Financing of industry.
(R) Roads .
See p . 1 for footnotes 1/ 2/ and 3/.
Present Status
Awaiting further information.
Awaiting Govt. decision on scope and timing of project.
Awai ting Govt. proposal to improve financial position of Railwa:rs,
Appraisal mission planned for Sept. 15.
Awaiting further pre-paration of project.,
Appraisal report being prepared.
scheduled for Oct.
Appraisal mission scheduled for Nov.
Credit signed on Aug. 31.
Appraisal report being consideredo
!dl The Department of Operations for Europe handles matters relating to European countries, Australia, New Zealand, and certain of their dependencies, and South Africa, Jamaica, and Trinidad and Tobago.
-
Member State"];/
YUGOSLAVIA
Yugoslav Invest-ment Bank
CHINA
Taiwan Railway Administration
China Develop-ment Corp.
JAPA!J
Tol0Jo Expressway Corp.
E!ec c111e rowe1•
MALAYSIA
Federal Land Development Authority
Singapore Public Utilities Board
Singapore Harbour Board
Amount y & Pro'b:.'::le
I,er:dc]"
To be de-termined
(Bank)
3.,7 (Bo.!lk)
20. 0 (Bank)
To be de-te:::-mined
(Banlc)
25.o (Bank)
25.o
16. 0 (Bank)
- 5 -
Project'}./
Railways - II.
III • FAR EAST
Harbor improvement.
(R) Dieselization, rolling stock and improvement of line and control fa-cilities.
Industrial Finance - II .
(R) Haneda-Yokohama expressway.
Kuzuryu hydroelectric
(R) Muda River irrigation project.
To be de- (R) Land development program. termined
(Bank)
7o0 (Bank)
21.,0 (Bank)
(R) Singapore water supply.
Port development.
Seep. 1 for footnotes!/~ and]/.
) )
Present Status
Appraisal report being prepared.
Appraisal report being prepared.
Appraisal mission in field.
Appraisal report and proposals to improve financial position of CDC being considered.
)Appraisal reports being )prepared.
Appraisal mission planned in Dec.
Consultants invited by Govt. to submit pro-posals for preparing project.
Negotiators invited.
Awaiting further in-formation from Govt. to complete appraisal.
-
Member State 1/ PHILIPPINES
National Power Corporation
THAILAND
AFGF.ANISTAN
INDIA
Amount 2/ & Proba'-:)le
Lender
- 6 -
To be de- (R) ternri.ned
(Bank)
Pro.1ect ]/
Modernization and rehabi-litation of about 750 km. of road in Luzon and Mindanao.
6.o (Bank)
11. 5 (Bank)
(R) Expansion and improvement of facilities of College of Agriculture of Univ. of Philippines.
(R) Bataan Thermal Power.
Meklong irrigationo
To be de- (R) Nan River power and termined irrigation.
(Bank)
To be de- (R) Tecl~'1:i.cal and vocational terminzd
(Bank) education.
Present Status
Project in abeyance .
Negotiations completed; expected to be pre-sented to Exe cu ti ve Directors in Octo
Awaiting further in-formation from Govt. to complete appraisal.
Appraisal report being prepared~
Appraisal mission planned in Dec.
Appraisal mission planned for Oct.
7o5 Yanhee Power - Stage III. Appraisal report being (Bank) preparedo __ .....:
IV. SOUTH ASIA A::JD MIDDLE EAST
3.5 (IDA)
3.,0-10.0
(Uncertain)
23 . 0 (Bank)
14.o (Bank)
(R) Agricultural and voca-tional schools construc-tion and equipment.
(R) Calcut ta water supply -Stage I .
Indus Basin equipment.
(R) Kothagudem power -Stage II.
Negotiators invitedo
Appraisal mission scheduled in mid-Sept.
To be presented to Ex-ecutive Directors after AID and India are ready to sign their loan agreement.
Negotiators invitedo
Seep. 1 for footnotes];/~/ and]/.
-
~ember State y ~ (Cont'd.)
Tata Iron and Steel Co. (TISCO)
Indian Iron and Steel Co. (IISCO)
Hindustan Allied Chemicals Ltd.
IRAN
JORDAN
PAKISTAN
Amount 2/ & Probable
Ler..cer ---·-60o0 (IDA)
25oO (IDA)
35oO (Bank)
60,,0 (Bank)
14.5 (Bank)
17.0-20.,0
(Bank)
30 .. 0 (Bank)
10.,0-1500
(Bank)
s .. o (IDA)
5. 25 (IDA)
10.0 (I DA)
- 7 -
Project]/
(R) Railways.
Bangalore water supply.
Power transmission.
Coal mining and improved utilization of steel capacity.
(R) Improved utilization steel capacity.
Kothagudem fertilizer project .
(R) Highway and Feeder roads .
(R) Highway construction.
Potash industry.
Gaja waterlogging and sal1:1i ty control in w. Pakistan.
(R) Improvement of inland water transport in E. Pakistan.
(R) Food grain storage .
of
To be de- (R) Industrial imports. termined
(IDA)
Seep. 1 for footnotes];_/ 'l,j and]./.
) ) ) ) ) ) )
Present Status
Negotiations to begin on Sept. 14c
)Appraisal reports being )prepared. ) ) ) ) ) ) )
Appraisal mission in field.
Negotiations substan·-tially completed,
Awaiting further information.
Govt., reviewing project.
Credit signed on Aug. 26.
Appraisal mission scheduled in Nov.
Preliminary mission's findings being con-sideredo
-
Member State"};_/
PAKISTAN (Cont'd.)
Amount 2/ & Probab!e
Lender
To be de-termined
(Uncertain)
To be de-termined
(IDA)
To be de-termined
(Uncertain)
- 8 -
Project J/ Lahore Water Supply and Sewerage.
East and West Pakistan Education ..
West Pakistan roads .
Industrial De-velopment Bank of Pakistan
To be de- (R) Industrial development.
ARGENTINA
BRAZIL
Centrais Electricas
Usinas Eletricas do Paranapanema
CHILE
termined (Bank)
To be de-termined
(Bank)
45.o (Bank)
14. 0 (Bank)
4oO (Bank)
2.0-400
(Bank)
v. rJES'l'ERN HEMISPHERE
ACIND.AR steel project.
(R) First stage of Estreito hydroelectric develop-ment.
(R) Xavantes hydroelectric development .
(R) Expansion of distribu-tion facilities in Rio de Janeiro and Sao Paulo.
(R) ENDZSA power facilities.
(R) Technical and vocational education facilities.
Seep. 1 for footnotes"};_/~/ and JI.
) ) ) )
Present Status
)Appraisal missions )planned in fall . ) ) ) ) )
) )
Report being considered by Govt. Project not eA'}Jected to reach active stage during current year.
In abeyance pending Govtis decision on investment priorities, review of Argentina's economic and financial position, and re-ap-praisal of steel sector.
)Appraisal m.ission in )field. ) )
Request withdrawn by Govt.
Bank planning to invite negotiators ..
Appraisal mission scheduled for late Sept.
-
Member State"};/
COLOMBIA
Empresa Nacional de Telecomunica-ciones
Amount 2/ & Prob2.ble
Lender
10. 0 (Bank)
26. 0 (Bank)
- 9 -
Proje~ ]/
(R) Private Investment Fund (for Financieras).
{R) Expansion program.
eve - eHIDRAL To be de- (R) Power expansion program termined (including fourth unit
(Bank) at Yumbo thermal plant) .
To be determined
C0STA RIGA
To be de-termined
(Bank)
To be determined To be de-termined
{Bank)
ECUADOR
Empresa Electrica QU'.1.to, 5 . A.
6.o-7 .u
Autoridad Portua- To be de-ria de Guayaquil termined
(Uncertain)
Power int erconnection between Bogota, Medellin, Cali and Manizales.
Port expansion.
Two additional units at cumoaya nyaroelectric
•
Port improvement, including banana handling f acilities.
GUATEY1ALA To be de- (R) Expansion of power faci-
HONDURAS
t er mined lities. (Bank)
To be de-ter·nined
(Bonk)
4.1 (Bank)
Mining and processing nickel ore .
Rehabi litat ion and re-orgaxd.zat i on of Puerto Cortes .
Seep. l for footnotes ll 3/ and]/.
) )
Present Status
Proposals of Govt . being examined.
)Awaiting rate in-)creases before complet-)ing appraisal reports~ ) )
Awaiting results of con-sultants' studies on engineering and opera-tions .
Awaiting results of UN Special Fund study of port and railwayso
Awaiting definite !inancmg plan.
Feasibility study being reviewed.
Awaiting further information.
In abeyance pending receipt of Govt.ts views and further information.
Govt. to establish Port Authority; draft charter of Authority being reviewed; ap-praisal r eport being updat ed.
-
- 10 -
Amount 2/ & Pr'obatie
Member State]:_/ Lender Project]/ Present Status
HONDURAS (Cont'd . ) To be de- (R) Reconstruction and con- Feasibility studies termined struction of Northern being reviewed; ap-
(Bank) Highway. praisal mission planned for mid- Sept.
MEXICO 30.0 (R) Toll transport facili- Appraisal mission (Bank) ties. planned for late
Sept.
20 . 0 Federal highways. ) (Bank) )
) 15000 Electric power. ) (Bank) )
)Awaiting completion of To be de- Irrigation. )project studies and terrnined )financing plans.
(Bank) ) )
To be de- Agricultural credit . ) termincd )
(Bank) )
NICARAGUA i.~ UQ i ;I; ,u;i I, Q Qur.J. c.i~iJHiliA;t )
(Ban.l{) )Awaiting completion of )feasibility studies.
To be de- Feeder roads . ) termined )
(Bank) )
PANAMA 5.0- Supplementary road Awaiting progress on 7. 0 project. project financed by
(Bank) existing loan.
PARAGUAY 3.2 (R) Port improvement and Awaiting further (Bank) development. in.formationo
2 .. 0 (N) Supplemental highway. Under consideration . (Uncertain)
See p . 1 for footnotes _1/ 3/ and ]./.
-
Member State ]/
PERU
Amount 2/ & Probc:-.ble
Lender
Banco de Fomento Agropecuario
URUGUAY
Administracion General de las Usinas Electricas del Estado (UTE)
Corporacion Anonima de Administracion (CADAFE)
C.A. Telefonos Nacionales de Venezuela (CANTV)
Institute Nacional de Obras Sani tarias (INOS)
Bc0-10. 0
(Bank)
Be0-12. 0
(Bank)
1500-20 . 0
(Bank)
5~0-12e0
(Bank)
10,,7 (Ban.l{)
To be de-termined
(Bank)
termined (Bank)
To be de-termined
(Bank)
30. 0 (Bank)
14. 0 (Bank)
40.0-50.0
(Bank)
20.0-30 .. 0
(Bank)
- 11 -
~ject }/
Agricultural credit and other facilities to complete colonization of San Lorenzo project area.
Chira-Piura Irrigation project . (Previously listed as part of above San Lorenzo project.)
(R) Highway reconstruction.
Agricultural credit pro-gram.
Second livestock project.
Power.
' project.
Zulia flood control and drainage project.
(R) Second highway project.
(R) High voltage transmission line .
Expansion of long-dis-tance telecommunications facilities .
Caracas water supply.
See p. 1 for footnotes ll y and ]/.
) )
Present Status
)Mission to review )status of projects )scheduled in late )Sept. ) ) )
)
Technical appraisal mission in field .
Appraisal report being prepared .
Appraisal report being preparedo
Awaiting further in-formation.
)Preliminary mission )preparing reports . ) ) )
) ) ) )Loans signed on )Aug. 28. )
Appraisal report being prepared.
Preliminary findings of consulting engineer being reviewed,.
top related