workgroups

Post on 30-Dec-2015

26 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

WorkGroups. Workgroup C oncentration Areas. Group 1: Operations Program Funding, Inventory, Planning, Design , Construction, Maintenance , Other Group 2: Administration - PowerPoint PPT Presentation

TRANSCRIPT

WorkGroups

Group 1: Operations

◦ Program Funding, Inventory, Planning, Design, Construction, Maintenance, Other

Group 2: Administration

◦ National and Program Policy, Definitions, eligibility issues, Service Delivery and Contracting, Program Reviews, National Stewardship and oversight, Rights-of-Way, Other

Workgroup Concentration Areas

24 members of the TTPCC 1 member from each region should be

assigned to each workgroup◦ Look at the strengths of your regional members

and decide Elect Chair and Vice-Chair for each group

Workgroup membership

Establish Ground Rules Brainstorm a list of issues within your area that you

believe should be addressed.◦ From the list determine the deliverable and timeframe for each

item. Next, determine both the priorities as well as what can

easily and quickly be accomplished (low bearing fruit) Now as a workgroup, decide how to attack each of the

items you have selected.◦ Together as a workgroup; or◦ Smaller subgroups with team leaders.

Assemble a draft workplan for the group to present the entire PCC tomorrow.◦ Show the items, deliverables and timeframes if possible.

Take back to tribal members for comment

Initial Assignment

FHWA and BIA will participate on each workgroup and provide meeting space, teleconferences, and technical advisors as needed.

Support

top related