MOVING BAHRAIN FORWARD

Tahleeq: Graduate Training ProgramPresented by: Husain Baqer

Placement Department (Or Contractor): Hill Int. , DG Jones, and ADPi

Bahrain22nd Feb 2015

“Tell me and I forget. Teach me and I remember. Involve me and I learn”

-Benjamine Frankline

Presentation Layout

1) Hill Int. (4 weeks)100% DD SubmissionValue Engineering Workshop

2) DG Jones (2 weeks)BOQContracts

3) ADPi (2 weeks)Master PlanningEnabling Works Package 1-A

100% DD Submission

• Reviewing of the Detailed Design reports and drawings (100% submission).

• Identifying some of the missing details in the drawings.• Reviewing the comments on the 50% submission• Questions and answers regarding some of the HVAC

systems.• Working on the 100% DD submission comments.

HVAC Drawing

Example from 50% Submission Comments

Item No.

Title / Reference No. of Document Reviewed

Hill Design Review Team Comments

Review Status

Designer’s Response

85

PD-D3000-M-RPT-001-0Clause-6 (Maintenance considerations)

AHU plant rooms to be provided with treated water facility/drain facility and filter drying facility to carry out periodic maintenance.

B

To be implemented in 100% submission

Value Engineering Workshop

• Why is it important?Reducing the capital cost while improving quality.Team building as every participant has to work in a team-

oriented environment. Improved qualities and values. Problem solving and more effective use of resources.

Pre-Design Workshop Session

Presentation Layout

1) Hill Int. (4 weeks)100% DD SubmissionValue Engineering Workshop

2) DG Jones (2 weeks)BOQContracts

3) ADPi (2 weeks)Master PlanningEnabling Works Package 1-A

Bill of Quantity (BOQ)

• What is BOQ? Is a document used in tendering. Materials, parts, and labor (and their costs) are

itemized.Shows the terms and conditions of the construction

contracts.• Why is it important?Without BOQ the client will not be able to estimate the

cost of the construction.To finish the project on time and within budget.

Presentation Layout

1) Hill Int. (4 weeks)100% DD SubmissionValue Engineering Workshop

2) DG Jones (2 weeks)BOQContracts

3) ADPi (2 weeks)Master PlanningDesign (Enabling Works Package 1-A)

ADPi (Design)

• Reviewing the scope of Mechanical Enabling Works at phase 1-A.

• Reviewing of the contractor’s queries.• Attending the Site Kick-off Meeting.

Contractor’s Query Example

Query No.

Queries Response

1

Vol. 2 Bill of Quantities- in the page Bill 4/1 under the provision Sums, the amounts have not been given. Please clarify.

Please include BD 10,000 for each of the 2 provisional sums.

Site Visit with Contractor

Learning Outcomes

• Developing a good understanding of the role and function of PMC.

• Building a professional network.• Identifying the purpose of BOQ.• Witnessing the importance of Value Engineering

Workshop.• Team working and coordination are keys for success.• Get exposed to the other disciplinary design aspects.

Inspiring Activities

• Starting the Enabling Works Package 1-A.• Attending the Value Engineering Workshop.• Attending the meeting for BHS and PLB.• Commenting on the 100% DD submission.• Sitting with the Lead Mechanical Engineer at the VE

Workshop.

Questions and Answers

?