WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Number of Pages
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 8
FRONT - DIAGRAM NOT TO SCALE
Inspected by: James Vong State License No. OPR 12977 Signature
You are entitled to obtain copies of all reports and completion notices on this property reported to the Structural Pest Control Board during the preceding two years. To obtain
copies contact: Structural Pest Control Board, 2005 Evergreen Street, Suite 1500, Sacramento, California 95815-3831.
NOTE: Questions or problems concerning the above report should be directed to the manager of the company. Unresolved questions or problems with services performed
may be directed to the Structural Pest Control Board at (916) 561-8708, (800) 737-8188 or www.pestboard.ca.gov. 43M-41 (REV. 10/01)
J&T
Termite
48 Goldenrain Drive San Jose CA 95111
Tel: (408) 826-7573 jttermite@gmail.com
Registration No. PR6798 Report No. 2131 C
Ordered By: Owner and/or Party In Interest: Report Sent To:
DEBORAH SCHOWALTER DEBORAH SCHOWALTER
848 PEACH AVE. 848 PEACH AVE.
SUNNYVALE, CA 94087 SUNNYVALE, CA 94087
COMPLETE REPORT LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT
General Description: ONE STORY SINGLE FAMILY DWELLING Inspection Tag Posted: SUBAREA
WITH STUCCO, WOOD & BRICK EXTERIOR Other Tags Posted:
An inspection has been made of the structure(s) shown on the diagram in accordance with the Structural Pest Control Act. Detached porches, detached steps, detached decks and any other structures not on the diagram were not inspected.
Subterranean Termites Drywood Termites Fungus / Dryrot Other Findings Further Inspection
If any of the above boxes are checked, it indicates that there were visible problems in accessible areas. Read the report for details on checked items.
1 of 9
WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Report No. Page
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 2131 C 2 of 8
J&T Termite
A Separated Report has been requested which is defined as Section 1/Section 2
conditions evident on the date of inspection. Section 1 contains items where
there is evidence of active infestation, infection or conditions that have
resulted in or from infestation or infection. Section 2 items are conditions
deemed likely to lead to infestation or infection, but where no visible
evidence of such was found. Further Inspection items are defined as
recommendations to inspect area(s) which during the original inspection did
not allow the inspector access to complete his inspection and cannot be
defined as Section 1 or Section 2.
(1) Substructure Area
1A. There is evidence of drywood termites noted in the structure as indicated
on the diagram.
RECOMMENDATION: Due to the nature of these infestations, it will be
necessary to seal the entire structure and fumigate it with Vikane (Sulfuryl
Fluoride) gas, with tear gas (Chloropicrin) as a warning agent. The entire
structure must be vacant for this process. We will use all due caution in our
operation, however, we assume no liability for any damage to the roof
coverings, solar panels, TV antennas or plantings adjacent to the structure.
The occupants must sign the Occupants Fumigation Notice and comply with all
of the instructions.
NOTE: Instruction for preparation work will be forthcoming from the
sub-contract fumigation company and must be complied with in order for
fumigation to commence. Fumigations are guaranteed for three (3) years.
Section 1
1B. Drywood termite pellets were found in the area(s) indicated on the
diagram.
RECOMMENDATION: Remove and/or cover the accessible drywood termite pellets.
It is possible for old pellets to sift down and to become visible in
previously infested areas due to normal movement and vibration of a
structure. Our bid is for removing and/or covering the pellets on a one-time
basis.
Section 1
2 of 9
WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Report No. Page
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 2131 C 3 of 8
J&T Termite
1C. There is evidence of subterranean termites entering the structure as
viewed from subarea and exterior.
RECOMMENDATION: Treat the soil adjacent to the foundation around the entire
perimeter with the registered material Termidor SC (Fipronil), drilling
through concrete wherever applicable and sealing drilled holes afterwards
with mortar.
NOTE: We are unable to guarantee an exact match at the areas that are
drilled and then patched. This includes painted surfaces, aggregate, brick,
tile, grout, etc. We assume no liability for damage to sub slab conduits such
as plumbing pipes, etc.
Section 1
1D. There are subterranean termite shelter tubes in the area(s) as indicated
on the diagram.
RECOMMENDATION: Remove or knockdown the visible termite shelter tubes.
Section 1
1E. There is fungus (dry-rot) damage in the substructure access door/framing.
RECOMMENDATION: Remove and replace the fungus damaged wood as necessary.
This bid does not include painting.
Section 1
1F. Cellulose debris was found on the subarea soil.
RECOMMENDATION: Remove and dispose of the cellulose debris.
Section 2
(2) Stall Shower
2A. The shower tile appear to be secure; but, there are voids between the
tiles and/or trim for the plumbing where grout/sealant is missing. This
condition could allow moisture to penetrate the enclosed areas.
RECOMMENDATION: Reseal the voids using grout/caulking compound or similar
product designed for this type of application.
Section 2
(8) Garages
8A. The garage door in the area indicated on the diagram has been damaged by
fungus.
RECOMMENDATION: Remove and replace the damaged door with a new one of
similar material and construction. This bid does not include painting. We
will re-use the existing hardware if practical.
Section 1
3 of 9
WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Report No. Page
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 2131 C 4 of 8
J&T Termite
8B. Subterranean termite damage was noted to the door jamb as indicated on
the diagram.
RECOMMENDATION: Remove and replace the damaged wood members as necessary.
This bid does not include painting.
Section 1
8C. Fungus damaged was noted at the base of the support post as indicated on
the diagram.
RECOMMENDATION: Cut off the base of the post and install concrete in the
void. This bid does not include any painting.
Section 1
8D. The support post extends below the concrete slab indicated on the
diagram.
RECOMMENDATION: Cut off the base of the post and pack with mortar.
Section 2
8E. A plumbing leak was noted at the sink faucet.
RECOMMENDATION: Owner’s to contact a licensed plumber to repair the leak as
necessary.
Section 2
(9) Patios - Decks
9A. Fungus and drywood termite damage was noted to the patio cover as
indicated on the diagram.
RECOMMENDATION: Remove and omit patio. This bid does not include painting.
Section 1
(10) Other - Interior
10A. Excessive moisture and/or fungus damage was found to the wood members
beneath the counter top in the kitchen.
RECOMMENDATION: Remove the counter top material to expose the damaged wood
members for replacement. Remove all of the damaged wood members as needed.
Treat the exposed wood members with Tim-bor (Disodium Octoborate
Tetrahydrate). Install new materials where removed. Install new ceramic tile
of standard grade using mortar.
Section 1
10B. The cabinet shelf below the kitchen sink is damaged by subterranean
termite.
RECOMMENDATION: Remove and replace the damaged shelf. This bid does not
include painting.
Section 1
4 of 9
WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Report No. Page
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 2131 C 5 of 8
J&T Termite
10C. The sink in the master bath was noted to be cracked.
RECOMMENDATION: Owner to contact the services of someone in this line of work
to repair the sink.
Section 2
10D. The toilet in the master bathroom is loose.
RECOMMENDATION: Reset the toilet on a new wax ring and properly bolt to the
floor. If any concealed adverse conditions are found, report findings and
recommendations in a supplemental report.
Section 2
10E. A plumbing leak was noted at the right sink drain in the hall bathroom.
RECOMMENDATION: Owner’s to contact a licensed plumber to repair the leak as
necessary.
Section 2
10F. A plumbing leak was noted at the left sink faucet in the hall bathroom.
RECOMMENDATION: Owner’s to contact a licensed plumber to repair the leak as
necessary.
Section 2
10G. A plumbing leak was noted at the tub shower valve in the hall bathroom.
RECOMMENDATION: Owner’s to contact a licensed plumber to repair the leak as
necessary.
Section 2
10H. The toilet in the hall bathroom is loose.
RECOMMENDATION: Reset the toilet on a new wax ring and properly bolt to the
floor. If any concealed adverse conditions are found, report findings and
recommendations in a supplemental report.
Section 2
10I. Open seams and/or cosmetic damage were found to the master bathroom
floor covering. No adverse condition was found in the wood members as a
result of this condition at this time. This item is for information only.
A bid will be issued upon request for the installation of new floor covering.
All due caution should be observed to keep the floor dry to minimize the
possibility of future deterioration to the underlayment.
Information
(11) Other - Exterior
11A. Fungus damage was noted to the wood trim as indicated on the diagram.
RECOMMENDATION: Remove and replace the damaged wood members as necessary.
This bid does not include painting.
Section 1
5 of 9
WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Report No. Page
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 2131 C 6 of 8
J&T Termite
11B. There is fungus and drywood termite damage noted in the wood member(s)
located at the roof indicated on the diagram.
RECOMMENDATION: Remove the roof covering as necessary to expose the damaged
wood members. Remove and replace the damaged wood members as necessary. This
bid does not include painting.
NOTE: Our cost quotation does not include roof covering repair. The owner is
directed to contact a licensed roofing contractor to make any necessary
repairs to the roof covering after all necessary wood repair/replacement is
completed.
Section 1
11C. There are some cracks in the exterior stucco. No outward indication of
infestation or infection was noted as a result of this condition at this
time.
RECOMMENDATION: The owner should periodically maintain sealants as needed,
maintaining these areas as part of general exterior maintenance.
Section 2
11D. The exterior wood members are weathering and/or paint is peeling in some
areas.
RECOMMENDATION: The owner should maintain all exterior wood, keeping it well
sealed and/or painted during the course of routine general home maintenance
to minimize future decay in these areas.
Section 2
11E. The stucco extends below the exterior grade level and conceals the
foundation. No representation can be made regarding the presence or absence
of any possible concealed infestations. Periodic inspection advised.
Information
WORK DONE BY OTHERS: Repairs were noted to have been done in the past by others. J&T Termite does not guarantee work done by others. Interested
parties should contact the party that performed the work if any questions
arise regarding this work.
NOTE: The interior has been recently painted. Fresh paint can conceal
evidence active infestation and infection. J&T Termite will not accept any
responsibility for conditions concealed by recent painting. Periodic
inspections are advised.
6 of 9
WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Report No. Page
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 2131 C 7 of 8
J&T Termite
Areas Not Inspected: This report is limited to those portions of the diagrammed structure that were
open and visible. We did not inspect any concealed areas to which there is no access without moving
appliances, furniture, storage, floor coverings, insulation, cabinets, finished materials, etc. We did
not water test and do not certify against leakage, any appliances, plumbing over finished ceilings,
roof coverings or decks. We make no guarantee against infestation, infection, leakage, or any adverse
conditions which may exist in such areas or which may develop or become evident in any areas after this
date. If information about the areas not inspected is desired, we recommend further inspection be
performed after they are rendered accessible by the owner.
Guarantee: Fumigations performed by J&T Termite are guaranteed for three (3) years. Wood repairs and
ceramic tile replacement performed by J&T Termite is guaranteed for one (1) year from the date of
completion. The guarantee for localized chemical treatment is limited to the area(s) treated for one
(1) year, except secondary substandard measurements which are not guaranteed. Vinyl floor covering,
plumbing repairs, glass work, grouting, caulking or any measures for control of moisture completed by
J&T Termite are guaranteed for ninety (90) days.
Reinspection: This Company will re-inspect repairs done by others within 4 months of the original
inspection. A charge, if any, can be no greater than the original inspection fee for each re-
inspection. The re-inspection must be done within ten (10) working days of request. The re-inspection
is a visual inspection and if inspection of concealed areas is desired, inspection of work in progress
will be necessary. Any guarantees must be received from persons or companies performing the repairs.
Wood-destroying Organisms: This inspection is to disclose actual infestations, infections and
conditions that are conducive to infestation or infection. This is not a general pest inspection (ants,
spiders, cockroaches, fleas, rodents, etc.), but concerns only wood destroying pests and organisms and
conditions conducive to such.
Competitive Business Practices: The Structural Pest Control board encourages competitive business
practices among registered companies. Reports on this structure prepared by various registered
companies should list the same findings (i.e. termite infestations, termite damage, fungus damage,
etc.). However, recommendations to correct these findings may vary from company to company. Therefore,
you have a right to seek a second opinion from another company.
Structural and Roof Inspection: This is not a structural inspection. If information concerning
electrical, heating, foundation and any other conditions beyond the scope of a Wood Destroying
Organisms inspection is desired, the appropriate inspecting firm should be consulted. The exterior
surface of the roof was not inspected. If you want the water tightness of the roof determined you
should contact a roofing contractor who is licensed by the contractor’s state license board.
Plumbing: This firm inspects and reports only visible plumbing leaks on the day of the inspection.
This firm does not guarantee against hidden or future leaks. The owner should contact a plumber for
further information regarding plumbing.
Mold: This property was not inspected for the presence or absence of health-related molds or fungi. By
California Law, we are not qualified, authorized nor licensed to inspect for health-related molds. If
you desire information about the presence or absence of health-related molds, contact the California
Department of Health Related Services.
Asbestos: No representation is made regarding the presence or absence of asbestos, a material commonly
used in structures prior to 1983. If interested parties desire information concerning asbestos, a
proper contractor should be consulted.
Mill Patterns: It may not be possible to match the existing mill patterns and materials used in the
original construction. We will replace damaged wood members with materials which resemble, as closely
as possible, the existing wood members with standard grade materials currently in stock and available.
Standard Materials: Our bid for vinyl and tile is based on “Standard Grade” material. If interested
parties desire an upgrade of materials to be used, costs will be additional. Contact this office for
information.
7 of 9
WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT
Building No. Street City Zip Date of Inspection Report No. Page
848 PEACH AVE. SUNNYVALE 94087 10/26/2017 2131 C 8 of 8
J&T Termite
Lead-based paint: When applicable repairs by this company in residences built prior to 1978 may
disturb materials containing lead-based paint and may release debris or dust contaminating lead. Lead
is a chemical known to the State of California to cause cancer and birth defects or other reproductive
harm. For further information, contact your health care provider or an industrial hygienist. A licensed
pest control inspector is not an expert in lead, lead-based paint, or exposure to lead. This report is
not intended to identify the presence or absence of lead or lead-based paint in the building inspected.
Whether lead-based paint is present can be determined only by a certified lead inspector. For a list of
certified lead inspectors, call the California Dept. of Health Services' Lead-Related Construction
Information Line at (800) 597-5323.
Exterior: Where applicable the structure was inspected from the ground level only. Portions of the
structure that extend more than 12 feet from the ground level were visually inspected only. Visual
inspection above 12 feet is limited by height. Accuracy above this point cannot be guaranteed. Wood
members showing visible signs of infestation or infection were pick-tested to determine the nature and
extent of the finding. The inspector did not get up on the roof to inspect wood members accessible from
the roof.
Certification: Certification applies to visible and accessible areas of the structure observed at the
time of original inspection. This certification does not constitute a guarantee that parties in
interest will not inherit hidden infestations, infections and adverse conditions. J&T Termite assumes
no liability for such hidden conditions. If a problem is discovered that was not disclosed during our
inspection, do not disturb the area. Contact our office immediately to inspect the problem area and
allow proper determination.
Limitations: Inspection of fences, screeds and detached structures is not included in this report
unless otherwise stated. In any slab floor areas or areas where siding extends below the exterior grade
level, it is possible for termite infestations and damage to be present but not evident at the time of
inspection. Our inspection of any insulated attic spaces, where applicable, is limited to viewing the
area from the access hatch. If interested parties provide catwalks for sure footing and request further
inspection, we will return to make a closer inspection of any attic space at an additional charge.
State Law requires that you be given the following information: CAUTION-PESTICIDES ARE TOXIC CHEMICALS.
Structural Pest Control Operators are licensed and regulated by the Structural Pest Control Board, and
apply pesticides which are registered and approved for use by the California Department of Pesticide
Regulation and the United States Environmental Protection Agency. Registration is granted when the
State finds that based on existing scientific evidence there are no appreciable risks if proper use
conditions are followed or that the risks are outweighed by the benefits. The degree of risk depends
upon the degree of exposure, so exposure should be minimized. If within 24 hours following an
application you experience symptoms similar to common seasonal illness, comparable to the flu, or after
fumigation with sulfuryl fluoride, anyone entering the structure experiences symptoms of dizziness,
nausea, reduced awareness, slowed movement, garbled speech or difficulty breathing, abdominal pain or
any other symptoms of overexposure, contact J&T Termite (408) 826-7573, your physician, and/or your
Poison Control Center. For the Poison Control Center, contact the following: (1-800-876-4766). The
warning agent chloropicrin can cause symptoms of tearing, respiratory distress and vomiting. Entry into
the space during fumigation can be fatal.
For further information, contact any of the following: J&T Termite (408) 826-7573; for Health
Questions-The County Health Department (408) 885-4214; for Application Information-The County
Agricultural Commissioner (408) 918-4600, and for Regulatory Information-the Structural Pest Control
Board (800) 737-8188 located at 2005 Evergreen Street, Suite 1500, Sacramento, CA 95815-3831.
8 of 9
J & T Termite 48 Goldenrain Drive
San Jose CA 95111
Tel: (408) 826-7573
jttermite@gmail.com
WORK AUTHORIZATION
The following items refer to our Standard Inspection Report #2131 C dated 10/26/2017.
Property address: 848 PEACH AVE. SUNNYVALE CA 94087
Section 1:
1A $ 1935.00 1B $ 150.00 1C $ 1450.00 1D $ 150.00
1E $ 285.00 8A $ 550.00 8B $ 365.00 8C $ 150.00
9A $ 465.00 10A $ 1820.00 10B $ 175.00 11A $ 225.00
11B $ 310.00
Section 2:
1F, 2A, 8D, 8E, 10C, 10D, 10E, 10F, 10G, 10H, 11C, 11D
Further Inspection: None
NOTICE TO ESCROW: Should work not be completed before close of escrow, it will be necessary
that one and one-half times the amount shown on this authorization be held in escrow to cover
the work as outlined per the attached report, as well as any concealed damage found during the
course of our repairs. No work will be performed by this company unless this condition is met.
Payment for work is due upon completion. Inspection fee is not included and will be
billed separately. Treated areas will be retreated at no charge if reinfestation occurs
within one year. This agreement covers only the work stipulated herein; however, should
concealed damage be exposed during the performance of this work, it will immediately be
brought to the attention of the undersigned by means of a Supplemental Report reflecting
additional findings and cost.
If additional work, over and above what is recommended in this report, is required by
the City or County Building Inspector, such work will not be performed under this
agreement; a separate quotation will be made.
Late payment charge of 1 1/2% per month will be added to delinquent accounts plus court
costs and attorneys fees in the event action for collection is required.
Above estimate is binding to J & T Termite for a period not to exceed sixty (60) days
from date hereof.
ALL SECTION I ITEMS CIRCLED ITEMS ONLY TOTAL: $________ PREFERRED FUMIGATION DATE: _____________
Authorized By (signature): ______________________ (print): _________________________________
Billing Address:____________________________________________________________________________
Daytime Phone (home):____________ (work):_____________ Method of Access:_______________
Send Bill To (check one): Title Co. Seller Buyer Agent_______
Escrow Information: __________________________________ Close Of Escrow (date): ________
NOTICE: Under the Mechanics Lien Law (California Code of Civil Procedure, Section 1181 ET
SEQ.), any contractor, subcontractor, laborer, supplier or other person who helps to improve
your property but is not paid for his work or supplies, has a right to enforce a claim
against your property. This means that, after a court hearing, your property could be sold
by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can
happen even if you have paid your own contractor in full, if the subcontractor, laborer, or
supplier remains unpaid.
9 of 9