Two Years Ago

PRESENT

Current Capital Projects

Project Est. Completion Date

Velasco Phase 2 Area I – 3.5 acres COMPLETED

Dock 5 Trench Drain Repairs COMPLETED

Berth 5 Mooring Improvements 09/2015

Berth 7 Backland Paving – 20 acres COMPLETED

Turning Basin Road Widen and Overlay COMPLETED

Parcel 25 Asphalt paving & Drainage COMPLETED

Administration Building 02/2016

Dock 2 Floodwall Modification / 408 Permit 06/2016

Estimated Total Cost: $40 million

Project Est. Completion Date

Pete Schaff Repairs 2015

Parcel 19 Stabilization 2016

Transit Shed 2 Demolition 2016

Parcel 14 Development 2017

• Rail, Open Storage, Warehousing

Continuation of Velasco Terminal Build Out 2019

Pump Station Outfall, Backlands Area Development, Berths 8 & 9,

Gate 12, 3 Container Cranes and Upgrade Power Grid

Freeport Harbor Channel Improvement Project2019

Estimated Total Cost: $250 + million

Future Capital Projects

Harbor Volume Outlook

New Business

Procurement of Container Cranes

MSC/Chiquita

Tenaris

Hoegh Autoliner New Service – June 2015

General Motors

ARI Chiquita Brands Dole Fresh Fruit MSC Hoegh Autoliners Mammoet Tenaris Vulcan Materials

Key Inter-Harbor Customers

BASF DOW Chemical Freeport LNG Phillips 66 Enterprise Kirby Inland Marine Zachry/CB&I

Key Channel Customers

0

500

1000

1500

Vessel Calls – Freeport Harbor Channel

New Administration Building

0

1

2

3

4

5

6

7

8

9

10

Highlights:

OVERALL RESULTS ARE CONSISTENT OR UP OVER BUDGET AND PRIOR YEAR

• Operating Income• Up 5% from PY• 20% over Plan

• Operating Cashflows• Up 50% from PY• 3% over Plan

• Operating Expense• Up 9% over PY• 12% under Plan

• Operating Revenues• Up 8% over PY• 8% under Plan

FY 2015 OPERATING RESULTS

FY 2015 CARGO movement

0

550000

Highlights:

Over all cargo activity is Up

• 2,119,933 tons handled through the Inter-harbor and Velasco for a 17% increase over PY, 17% over plan

• 14,387,480 tons handled through the dedicated facilities for an 9% decrease from the PY

• Total volume through Port facilities totaled 16,507,413 tons

• Vessel activity is 38 call behind the PY and 14 calls against plan

Vessel

Barge

Total

Prior Year

244 22 266

Budget237 19 256

Actual 202 29 231

#1 Freeport Harbor Channel Improvement

Feasibility project completed Jan 2013 Water Resources Reform and Development Act Bill

approved June 2014 General Re-evaluation and Review (GRR) approved

April 2015• DOW thumb – Phillips 66 Berth #2

Construction of channel through G.O. Bonds Construction start – late 2018 Phase #2 Deeper water- Customer Driven

#1 Freeport Harbor Channel Improvements

#2 Rail Development

Hwy 36A rail corridor• Connecting Freeport and Rosenberg

• Access to U.P.R.R., B.N.R.R., and K.C.S.R.R.Continued economic growth for region

Joint effort between Fort Bend County, Brazoria County and Port Freeport – rail district formed, “Brazoria – Ft Bend Rail District”

Current Study will evaluate if there is a business case for investment?

(Cont’d)

How will communities along corridor benefit?

• Economic DevelopmentRosenberg by 2035

• 5,000 – 10,000 new jobs support Distribution/ManufacturingPort Freeport by 2035

• 10,000 – 20,000 new jobs supporting marine operations, distribution & manufacturing

$44 million State Sale Tax increase per year by 2035

Can the private sector play a role – 3P?

#2 Rail Development (Cont’d)

#3 1495 Bridge Construction Rebuild of bridge by TxDOT Need to make communities aware of traffic

impact Alternative routings 12 – 18 month construction

#4 East End Land Acquisition

Acquisition made by Port - currently owns 65% of properties• Developing plan will have minimal impact to home owners

Alternative route to Hwy 288

Avoid Houston congestion

Enhanced hurricane evacuation

#5 Hwy 36 Widening

www.portfreeport.com

Questions and Comments