Energy AuditPrepared For:
West Morris RHS BOE
L. Douglas Pechanec
Business Administrator/Board Secretary
Prepared By:
Dome-Tech, Inc.
Prepared Under the Guidelines of the State of NJ Local Government Energy Audit Program
September 2010
West Morris
Regional High
School District
FINAL
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
WEST MORRIS REGIONAL HIGH SCHOOL DISTRICT
ENERGY AUDIT REPORT
TABLE OF CONTENTS
1. Executive Summary
2. ECM Summary By Payback
3. Energy Audit Report
Energy Audit Purpose & Scope
Historic Energy Consumption
Facility Description
Greenhouse Gas Emissions Reduction
Energy Conservation Measures
Renewable/Distributed Energy Measures
Energy Procurement
Notes and Assumptions
Operations & Maintenance
Next Steps
4. Appendix
Portfolio Manager/Energy Star
Facilities Total Annual Energy Use
Equipment & Lighting Inventory Lists
ECM Lists
ECM Costs & Calculations
Renewables Calculations
Page 2
510 Thornall Street, Suite 170 Edison, NJ 08837
Tel: 732.590.0122 Fax: 732.590.0129
www.dome-tech.com
Commissioning HVAC Performance Testing Energy Audits Project Management
Retro-Commissioning Facility Management Consulting Energy Procurement
September 17, 2010
Mr. L. Douglas Pechanec Business Administrator/Board Secretary West Morris Regional High School District Administration Building 10 South Four Bridges Road Chester, NJ 07930 Re: EXECUTIVE SUMMARY FOR WEST MORRIS REGIONAL HIGH SCHOOL DISTRICT STATE OF NEW JERSEY LOCAL GOVERNMENT ENERGY AUDIT Dear Mr. Pechanec: Dome-Tech was retained by the West Morris Regional High School District, as a pre-qualified participant in the Local Government Energy Audit Program, to perform an energy audit. The objectives of the energy audit were to evaluate the District’s energy consumption, establish baselines for energy efficiency and identify opportunities to reduce the amount of energy used and/or its cost. The scope of the audit is standardized under the Program, and consisted of the following:
Benchmarking historic energy consumption utilizing EPA Energy Star’s Portfolio Manager
Characterizing building use, occupancy, size, and construction
Providing a detailed equipment list including estimated service life and efficiency
Identifying and quantifying energy conservation measures (ECMs)
Evaluating the economic viability of various renewable/distributed energy technologies
Performing a utility tariff analysis and assessing savings potential from energy procurement strategies
Providing the method of analyses Based upon data received for the twelve month period May 2009 - May 2010, the District had an annual expenditure of:
Electricity: 3,941,116 kWh at a total cost of $612,441
Natural Gas: 226,924 therms at a total cost of $254,242 The following buildings were evaluated:
West Morris Central High School at 259 Bartley Road, Chester, NJ – 212,000 SF
West Morris Mendham High School at 65 ½ E. Main Street, Mendham, NJ – 198,000 SF
West Morris Regional Board Office at 10 South Four Bridges Road, Chester, NJ – 4,000 SF Please refer to Section 2 of this report for a detailed list of identified Energy Conservation Measures (ECMs), along with a summary of their preliminary economics (estimated project cost, estimated annual energy savings, applicable rebate(s), etc.) In this report, all identified ECMs are ranked and presented according to their simple payback; however, please note that the master ECM table can also be sorted by building, by measure type, etc.
Page 3
“Building Performance - Delivered”
If all identified ECMs were to be implemented, they would provide the following estimated benefits to West Morris Regional High School District:
Total annual electrical savings: 801,630 kilowatt-hours; 20%
Total annual natural gas savings: 34,460 therms of natural gas usage; 15%
Total annual cost savings: $158,730; 18%
Total annual CO2 emissions reduction: 466 tons
Total net estimated implementation cost: $547,790
Total average payback on net implementation cost: 3.5 years The projects that are recommended for implementation (at all facilities) include: Upgrading the lighting, select equipment upgrades, replacing boilers, installing fan speed controllers on univents and other equipment, installing vending machine power management devices, and implementing energy awareness programs. The district data was entered into the US EPA ENERGY STAR’s Portfolio Manager database program. The buildings ranged from 55 to 65 scores. Buildings with scores of 75 or higher may qualify for the ENERGY STAR Building Label. Please see report for individual facility scores. Distributed/Renewable Energy Systems were reviewed with the following conclusions:
Dome-Tech considered three different types of wind turbine technologies that consisted of both building-mounted and traditional ground-mounted variety. Due to attractive payback and high potential for energy reduction, the 50 kilowatt ground-mounted wind turbine project appears to be the most attractive option. Should West Morris Regional High School District decide to pursue a wind turbine project, Dome-Tech recommends commissioning a more detailed study.
The District currently has existing plans for implementation of rooftop solar PV systems through a Morris County program. Dome-Tech examined installing additional systems over the parking lots. These additional parking lot systems could generate approximately half of each school’s annual power consumption.
Combined Heat & Power (CHP), Fuel Cells, and Micro-turbines were also researched, but are not recommended due to the lack of thermal requirements in the summertime.
Regarding the procurement of retail energy, Dome-Tech understands that the West Morris Regional High School District facilities are served by eleven electric accounts behind JCP&L, under General Secondary Service 3 Phase rate class. Additionally natural gas is served by five accounts behind PSE&G Large Volume Gas (LVG) and General Service Gas (GSGH) rate classes. Dome-Tech understands that West Morris Regional High School District accounts are currently not contracted with an electric retail energy supplier and New Jersey Natural Gas for natural gas retail energy supplier. Now is an ideal time to seek longer-term rate stability through a fixed price arrangement through a retail supplier.
During the development of this audit, Dome-Tech was assisted by facility personnel, who were both knowledgeable and very helpful to our efforts. We would like to acknowledge and thank those individuals. Sincerely, John Butterly, PE, CEM, CEA Senior Energy Engineer
Page 4
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Energy Audit Purpose & Scope
Purpose:
The objectives of the energy audit are to evaluate the sites’ energy consumption,
establish baselines for energy consumption and identify opportunities to reduce the
amount of energy used and/or its cost.
Scope:
I. Historic Energy Consumption: Benchmark energy use using Energy Star Portfolio
Manager
II. Facility Description – characterize building usage, occupancy, size and construction.
III. Equipment Inventory – detailed equipment list including useful life and efficiency.
IV. Energy Conservation Measures: Identify and evaluate opportunities for cost savings and
economic returns.
V. Renewable/Distributed Energy Measures: evaluate economic viability of various
renewable/distributed energy technologies.
VI. Energy Purchasing and Procurement Strategies: perform utility tariff analysis and assess
potential for savings from energy procurement strategies.
VII.Method of Analysis: Appendices
Page 6
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Historic Energy Consumption
Utility Usage and Costs Summary Time-period: May 2009 – May 2010
Please see Appendix for full utility data and consumption profiles for the Buildings.
AccountAnnual
ConsumptionAnnual Cost $ / kWh Account
Annual
ConsumptionAnnual Cost $ / Therms
10 0072 4254 30 748,850 113,537.05$ $0.152 08-1129-1454-16 116,374 142,075.73$ $1.221
10 00 00 4972 87 1,014,720 154,823.19$ $0.153
10 00 00 4967 76 258,783 $36,795.27 $0.142
10 00 00 4970 30 30,360 $9,622.58 $0.317 08-1129-1753-16 721 1,107.32$ $1.536
10 00 00 4971 88 1,130 $356.71 $0.316
SUBTOTALS 2,053,843 315,134.80$ $0.153 SUBTOTALS 117,095 143,183.05$ $1.223
10 00 00 4969 25 9,428 $1,992.38 $0.211
10 00 00 4966 44 99,280 $16,164.67 $0.163
SUBTOTALS 108,708 $18,157.05 $0.167
10 00 08 7329 66 1,642,200 257,473.81$ $0.157
66 699 738 02
mtr#1785538 86,838 86,659.53$ $0.998
10 00 08 7324 95 10,325 $2,001.47 $0.194
67 699 738 02
mtr#2451767 1,402 1,728.06$ $1.233
10 00 08 7327 76 117,759 $18,058.99 $0.153
68 699 738 02
mtr#3275421 21,589 22,671.70$ $1.050
10 00 08 7326 36 8,281 $1,615.21 $0.195
SUBTOTALS 1,778,565 $279,149.48 $0.157 SUBTOTALS 109,829 $111,059.29 $1.011
TOTAL 3,941,116 $612,441.33 $0.155 TOTAL 226,924 254,242.34$ $1.120
West Morris Regional HSD-
Board Office
Natural Gas
NA
NA
NA
NA
NA
West Morris RHSD -
Mendham High School
Buildings
Electric
West Morris RHSD -
Central High School
NA
Page 7
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Historic Energy Consumption
ENERGY STAR SCORES
Energy Star Score is calculated to establish a facility-specific energy intensity baseline.
Energy Star can be used to compare energy consumption to other similar facilities and to
gauge the success of energy conservation and cost containment efforts.
Buildings with an Energy Star rating/score of 75, or above, are eligible to apply for an official
Energy Star Building label.
Facility Name
Total Floor
Area
Energy Star
Score
Eligible to
Apply for
ENERGY STAR
Current Site
Energy Intensity
(kBtu/SF)
Current Source
Energy Intensity
(kBtu/SF)
West Morris Central High School 212,000 55 NA 88.5 162.5
West Morris Mendham High School 198,000 65 NA 87.9 162.2
West Morris Regional Board Office 4,000 NA NA 94 313.8
NOTE: Score for BOE building is NA due to Portfolio Manager space attributes, Office Gross Floor Area must be greater than or equal to 5,000 (SF).
Page 8
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Historic Energy Consumption (continued)
Portfolio Manager Sign - In
An account has been created for West Morris Regional High School District in
Portfolio Manager. You will have received an email to notify you of the generation of
this account and shared access with Dome-Tech. Please use this to read your facility
information. Please feel free to alter this information when the report is finalized. We
would ask that you leave the sign-in information alone until then. Your District’s
information is currently shared as read only.
When the report is finalized the shared access will be changed so that you can use /
edit the information and change as you wish.
Website link to sign-in:https://www.energystar.gov/istar/pmpam/index.cfm?fuseaction=login.Login
Username: WestMorrisRHSD
Password: DTWestMorrisRHSD
Email for account: dpechanec@wmhsd.org
Page 9
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Building Name: West Morris Mendham High SchoolAddress: 65½ East Main Street, Mendham NJ
Gross Floor Area: High School – 171,900 sf;
Field house – 24,000 sf;
Barn/Maintenance – 2,100 sf
Year Built: 1972, 2007
# Occupants: 1500
Operation: Building is a high school,
open from 7 am until 6 pm
and occasional weekends
and holidays. Only operations and administrative staff are present during July and August. Only
operations and administrative staff are present during July and August.
Construction Features:Facade: High School is multi-story (2-4 depending on section), masonry and brick (<85% glass); field house is
metal; maintenance shop is painted wooden clapboards (<85% glass); all in good condition
Roof Type: High school roof is flat over a metal deck, parts dark membrane, parts light colored polyurethane foam
over membrane;
Field house roof is pitched, green colored, raised-seam metal;
Maintenance shop/ barn roof is pitched, asphalt/fiberglass shingle over a wooden deck.
All roofs are in good condition.
Windows: High school windows cover about 30% of the façade, are metal framed, double glazed, most with the
bottom 1/3 an operable hopper style, some are non-operable ribbon style, all in good condition;
Field house windows cover 20% of the façade, are metal framed, double glazed sliding or hopper style, in
good condition; Maintenance shop has no windows,.
Exterior Doors: High school and field house main entrances are metal frame (<85% glass), other doors are metal with no
window. The maintenance shop has wooden doors and insulated garage doors; all in good condition.Page 10
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Major Mechanical SystemsMendham High School:
Air Handlers / AC Systems / Heating and Ventilation Systems:
The majority of the heating and ventilation throughout the building is via unit ventilators (UVs)
equipped with heating hot water (HHW) coils in the individual classrooms. Certain classrooms and
other spaces that require air conditioning are equipped with either Dx cooled roof top AC units or split
system AC / heat pumps. Exhaust is provided by fifty-eight (58) exhaust fans. Most AC condensing
units are located on the roof with a few scattered on grade around the building’s perimeter. Hot water
fin tube radiators are also located along the building’s perimeter spaces. Some of the AC systems are
nearing or at the end of their service lives. Plans should be made to replace these units with high
efficiency models.
Boilers:
There are 2 Weil McLain cast iron HHW boilers in the main mechanical room which were installed in
1994 and are in good condition. There is a secondary mechanical room in the building’s recent
addition which houses two Pulse condensing hot water boilers installed in 2007. When they reach the
end of their useful lives, the cast iron boilers should be replaced with condensing boilers similar to the
Pulse units or the Aerco units installed at WM Central High School.
Domestic Hot Water:
During the heating season, domestic hot water is produced by a HHW/DHW heat exchanger and
storage tank system. When the HHW boilers are not operating, DHW is provided by a natural gas
fired, storage-type domestic hot water heater. An additional gas fired, storage-type domestic hot
water heater in the secondary mechanical room serves the building’s new section.
Controls:
The building’s mechanical systems are controlled by a digital building management system or BMS.Page 11
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Major Mechanical SystemsMendham High School Field House:
Air Handlers / AC Systems / Heating and Ventilation Systems:
The field house is only heated and ventilated. There is no cooling. Seven (7) Reznor AHUs equipped
with natural gas, direct fired heat exchangers serve the building.
Domestic Hot Water:
Domestic hot water is provided by two (2) natural gas, indirect fired DHW systems. Each system is
served by a Munchkin modulating hot water boiler.
All of the systems in the field house are in fairly new and in good condition.
Mendham High School Maintenance Building/Barn:
Air Handlers / AC Systems / Heating and Ventilation Systems:
The maintenance building is heated by three (3) Stirling fan coil units with direct-fired, natural gas heat
exchangers. The units are suspended from the ceiling. There is no other ventilation and no cooling.
Page 12
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Building Name: West Morris Central High SchoolAddress: 259 Bartley Road, Chester NJ
Gross Floor Area: Central High School – 182,240;
Field house – 24,000 sf;
Barn/Maintenance shop – 5,160 sf;
Year Built: 1958, with additions in 1961, 1964, and 2008
# Occupants: 1500
Operation: Building is a high school; open from
7 am until 6 pm and occasional weekends and holidays
Construction Features:Facade: High School is one story, masonry and brick (<85% glass); field house is metal; maintenance shop is
painted wooden clapboards (<85% glass); all in good condition
Roof Type: High school roof is part pitched, part flat over a metal deck, parts dark membrane, parts light colored
polyurethane foam over membrane;
Field house roof is pitched, red colored, raised-seam metal;
Maintenance shop/ barn roof is pitched, asphalt/fiberglass shingle over a wooden deck.
All roofs are in good condition.
Windows: High school windows cover about 30% of the façade, are metal framed, double glazed, most with the
bottom 1/3 an operable hopper style, some are non-operable ribbon style, all in good condition;
Field house windows cover 20% of the façade, are metal framed, double glazed sliding or hopper style, in
good condition; Maintenance shop has no windows,.
Exterior Doors: High school and field house main entrances are metal frame (<85% glass), other doors are metal with no
window. The maintenance shop has wooden doors and insulated garage doors; all in good condition.
Page 13
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Major Mechanical Systems
Central High School:
Air Handlers / AC Systems / Heating and Ventilation Systems:
The majority of the heating and ventilation throughout the building is via unit ventilators (UVs)
equipped with heating hot water (HHW) coils in the individual classrooms. Certain classrooms and
other spaces that require air conditioning are equipped with either Dx cooled roof top AC units or split
system AC / heat pumps. Exhaust is provided by 114 exhaust fans. Most AC condensing units are
located on the roof with a few scattered on grade around the building’s perimeter. Hot water fin tube
radiators are also located along the building’s perimeter spaces. The building’s HVAC could be broken
down into two major installation periods. All HVAC equipment associated with the building’s 2007
addition is new and in good condition while the majority of the remaining HVAC units are older and
many nearing the end of their functional lifetime. Plans should be made to replace these units with
high efficiency models.
Boilers:
Heating hot water is created by ten (10), recently installed Aerco Benchmark condensing hot water
boilers located in the central mechanical equipment room.
Domestic Hot Water:
Domestic hot water is created by two (2) gas fired, storage-type domestic hot water heaters in the
mechanical room. These are in good condition.
Controls:
The building’s mechanical systems are controlled by a digital building management system or BMS.
Page 14
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Major Mechanical SystemsCentral High School Field House:
Air Handlers / AC Systems / Heating and Ventilation Systems:
The field house is only heated and ventilated. There is no cooling. Seven (7) Reznor AHUs equipped
with natural gas, direct fired heat exchangers serve the building.
Domestic Hot Water:
Domestic hot water is provided by two (2) natural gas, indirect fired DHW systems. Each system is
served by a Munchkin modulating hot water boiler.
All of the systems in the field house are in fairly new and in good condition.
Central High School Maintenance Building/Barn:
Air Handlers / AC Systems / Heating and Ventilation Systems:
The maintenance building is heated by three (3) Stirling fan coil units with direct-fired, natural gas heat
exchangers. The units are suspended from the ceiling. There is no other ventilation and no cooling.
Page 15
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Building Name: West Morris Board of Education OfficeAddress: 10 South Four Bridges Road, Chester NJ
Gross Floor Area: 4,000
Year Built: 1980’s
# Occupants: 8
Operation: Offices; operated M-F 7 am until 6 pm;
closed weekends and holidays
Construction Features:
Facade: One story, painted wood clapboards (prefabricated building); in good condition
Roof Type: Light colored, pitched, wood deck, asphalt shingles at end of life.
Planned for replacement.
Windows: Covering approximately 30% of façade, vinyl/metal framed double glazed, operable,
double hung, in good condition
Exterior Doors: Two; vinyl/metal frame door with small window, in good condition
Page 16
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Facility Information
Major Mechanical Systems
WM BOE:
Air Handlers / AC Systems / Heating and Ventilation Systems:
The heating throughout the building is via electric baseboard heat radiators in the individual
rooms. There are also electric booster heaters located in the AC ducts.
There are four (4) Trane split system AC units located on the roof with two (2) AHU’s above
the ceiling in individual rooms and two AHUs located in the attic.
Domestic Hot Water:
The building’s domestic hot water is generated by a 15 gallon AO Smith electric storage-type
domestic hot water heater.
Page 17
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Greenhouse Gas Emission Reduction
Implementation of all the identified ECMs will yield:
776,850 kilowatt-hours of annual avoided electric usage.
34,460 therms of annual avoided natural gas usage.
This equates to the following annual reductions:
466 tons of CO2;
-OR-
81 Cars removed from road;
-OR-
127 Acres of trees planted annually
The Energy Information Administration
(EIA) estimates that power plants in
the state of New Jersey emit 0.666 lbs
CO2 per kWh generated.
The Environmental Protection Agency
(EPA) estimates that one car emits
11,560 lbs CO2 per year.
The EPA estimates that reducing
CO2 emissions by 7,333 pounds
is equivalent to planting an acre of
trees.
Page 18
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Notes and Assumptions
Project cost estimates were based upon industry accepted published cost data, rough order of
magnitude cost estimates from contractors, and regional prevailing wage rates. The cost estimates
presented in this report should be used to select projects for investment grade development. The cost
estimates presented in this report should not be used for budget development or acquisition requests.
Estimated energy and cost savings are based on individual projects being implemented and do not
account for potential synergies if multiple projects are implemented concurrently. Therefore, cumulative
energy and cost savings shown in this report may or may not be representative of actual results.
The average CO2 emission rate from power plants serving the facilities within this report was obtained
from the Environmental Protection Agency’s (EPA) eGRID2007 report. It is stated that power plants
within the state of NJ emit 0.66 lbs of CO2 per kWh generated.
The EPA estimates that burning one therm of natural gas emits 11.708 lbs CO2.
The EPA estimates that one car emits 11,560 lbs CO2 per year.
The EPA estimates that reducing CO2 emissions by 7,333 pounds is equivalent to planting an
acre of trees.
The following utility prices provided were used within this study:
School
Electric
$/Kwh
Natural Gas
$ / therm
West Morris Central High School $0.153 $1.223
West Morris Mendham High School $0.157 $1.011
West Morris Regional Board Office $0.167 NA
Page 19
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Energy Conservation Measure #1:Vending Machine Power Management
Dome-Tech recommends installing a VendMiser vending machine power
management device on all vending machines.
The device uses a passive infrared sensor to power down the machine when the
area surrounding it is vacant. Then it monitors the room’s temperature and
automatically re-powers the cooling system at one- to three-hour intervals,
independent of sales, to ensure that the product stays cold.
The microcontroller will never power down the machine while the compressor is
running, eliminating compressor short-cycling. In addition, when the machine is
powered up, the cooling cycle is allowed to finish before again powering down
(reduces compressor wear and tear).
Central
HS
Mendham
HSTOTAL
Estimated Annual Savings: $1,620 $2,220 $3,840
Gross Estimated Implementation Cost: $1,610 $2,150 $3,760
NJ Rebate: $0 $0 $0
Net Estimated Implementation Cost: $1,610 $2,150 $3,760
Simple Payback (years): 1.0 1.0 1.0
Annual Avoided CO2 Emissions (tons): 4 5 9
Page 20
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 2: At EOL, Replace Electric Stove w/ Natural Gas Fired Fuel Switch
Central high school’s kitchen is equipped with a 4 element
electric stove.
The school’s electric cost is over $0.15 per kilowatt hour. The
equivalent natural gas cost is $5.101 per therm (assuming a
95% efficient natural gas unit). The actual price for natural
gas is approximately $1.223 per therm (less than 1/3 the price
of electric on a Btu basis).
Replacing the electric stove at the end of its service life with a
natural gas unit will provide about $360 in annual savings.Electric Stove Fuel Switch
Central HS
Estimated Annual Savings: $360
Gross Estimated Implementation Cost: $5,550
NJ Rebate: $0
Avoided Cost (Like and Kind Replacement):* $5,000
Net Estimated Implementation Cost: $550
Simple Payback (years): (Net and without Avoided Costs) 1.5 / 15.4
Annual Avoided CO2 Emissions (tons): 0
* Note: Avoided Cost = Cost of Like and Kind replacement. Payback is based on incremental cost.
Page 21
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 3: Lighting Upgrade
Although most of the current light fixtures have first generationT-8 fluorescent lamps and
ballasts, improved lamp designs will further reduce lighting energy costs. Some of the
gyms have older technology HID lighting and should be retrofitted with High Output T5
fixtures.
Many areas were observed to have lights on regardless of occupancy. Installing
occupancy sensors in these areas will automatically turn lights on/off according to actual
occupancy by sensing the presence of people in the room. Occupancy sensors will
reduce lighting energy costs by approximately 30%*.
*Source: Turner, Wayne, Energy Management Handbook, 1999.
Central HS Mendham
HS
BOE
BuildingTOTAL
Estimated Annual Savings: $44,000 $39,900 $1,930 $85,830
Gross Estimated Implementation Cost: $98,600 $95,600 $7,060 $201,260
NJ Rebate: $3,950 $5,790 $1,060 $10,800
Net Estimated Implementation Cost: $94,650 $89,810 $6,000 $190,460
Simple Payback (years): 2.2 2.3 3.1 2.2
Annual Avoided CO2 Emissions (tons): 95 85 4 184
Page 22
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 4: At EOL, Replace Window AC Units
The schools have installed multiple window air conditioning unitsto provide localized cooling for small private offices and storageareas. Many units are in poor physical condition, and inefficientcompared to today’s standards.
Dome-Tech recommends replacing these units with new higherefficiency units.
New 10.8 SEER (Seasonal Energy Efficiency Rating) units areestimated to be at least 14% more efficient at full/part loads thanthe existing equipment.Picture: Central HS
Window AC Unit
Central HS Mendham HS TOTAL
Estimated Annual Savings: $220 $180 $400
Gross Estimated Implementation Cost: $2,500 $2,000 $4,500
NJ Rebate: $0 $0 $0
Avoided Cost (Like and Kind Replacement):* $1,880 $1,500 $3,380
Net Estimated Implementation Cost: $620 $500 $1,120
Simple Payback (years): (Net and without Avoided Costs) 2.8 / 11.4 2.8 / 11.1 2.8 / 11.3
Annual Avoided CO2 Emissions (tons): 0 0 0
* Note: Avoided Cost = Cost of Like and Kind replacement. Payback is based on incremental cost.
Page 23
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 5: Upgrade Kitchen Appliances with Energy Star Models
* Note: Avoided Cost = Cost of Like and Kind replacement
Some of the kitchen equipment at the High Schools (specifically reach-in refrigerators,
dish washers and ice machines) is older and less efficient than newer models.
Replacing this equipment with higher efficiency, Energy Star labeled equipment will
provide at least $10,000 in annual savings.
Improvements in kitchen equipment include lower idle rates, better insulation which
reduces the amount of standby losses through sides and top, and premium efficiency
compressor and fan motors.
Central
HS
Mendham
HSTOTAL
Estimated Annual Savings: $4,930 $5,660 $10,590
Gross Estimated Implementation Cost: $19,900 $19,900 $39,800
NJ Rebate: $0 $0 $0
Net Estimated Implementation Cost: $19,900 $19,900 $39,800
Simple Payback (years): 4.0 3.5 3.8
Annual Avoided CO2 Emissions (tons): 11 12 23
Page 24
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 6: Replace Boilers with High Efficiency Modular/Modulating Condensing Boilers
Mendham High School is equipped with two Weil-McClane cast iron, natural gas fired, hot waterboilers located in the original building’s MER.
These boilers are approximately 15 years old and are half way to the end of the equipment service life(ASHRAE states the service life of similar equipment to be 25 years).
The ages, sizes, types and configurations of the boilers do not lend themselves to efficient operation.Generally, as boilers age, the efficiency degrades and the boilers must consume more fuel in order toproduce the same rated output. In addition, there is a direct correlation between risk of equipmentfailure (tube breaks & meltdown, shell cracks, furnace surface area failure) and equipment age.
If the existing boilers could be replaced by high efficiency, modulating or modular condensing boilers,savings will be realized in two ways.
Modulating boilers, usually 1,000 MBH or smaller, employ multiple burners to meet the heating load. Each burneroperates independently, eliminating the “all on/all off” operation of single burner boilers. As building loadincreases only those burners necessary to meet the load are fired. This allows each burner to run at optimalefficiency. Modular boilers operate under the same principal but for larger installations. In this case multipleboilers are used rather than multiple burners. Modular boilers usually are employed in 1000, 2000 or 3000 MBHsizes.
Condensing boilers recover energy from the exhaust gas thus allowing high efficiencies of 90% and above.
When a boiler is both a modulating/modular type and a condensing type, extremely high efficienciescan be realized.
The new Fulton Pulse boilers installed at Mendham High and the Aerco boilers at Central High areexamples of the equipment recommended by this ECM
Picture: Old HHW Boiler (WM MHS) Picture: New HHW Boiler (WM MHS)
Page 25
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM #6: Replace Boilers with High Efficiency Modulating Condensing Boilers (continued)
NOTE: The presented economics should be used for planning purposes only. If the client decides to proceed with any boiler replacement project,
these economics should be refined with an investment grade analysis.
Mendham HS
Estimated Annual Savings: $35,000
Gross Estimated Implementation Cost: $146,000
NJ Rebate: $9,000
Net Estimated Implementation Cost: $137,000
Simple Payback (years): 4.2
Annual Avoided CO2 Emissions (tons): 203
Page 26
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 7: At EOL, Replace Aging Packaged Roof Top Units with High Efficiency Units
Some of the existing rooftop units (RTUs) are near or beyondthe end of their estimated equipment service life (EESL) perASHRAE standards. (The EESL for package rooftop units is15 years.)
Replacing these RTU’s with new, higher efficiency units willsignificantly reduce annual energy and maintenance costs.
New Jersey SmartStart offers rebates that usually pay for theincremental cost to upgrade to higher efficient units.
Typical Energy Efficiency Ratios**
**Energy Efficiency Ratios: EER is the rating of cooling
output (Btu) divided by the electrical energy input (watts).
The higher the EER, the more efficient the unit.
Unit Capacity (tons) Existing Proposed
5 13.0 14.3
10 10.1 12.3
Central HS Mendham
HSTOTAL
Estimated Annual Savings: $4,900 $13,100 $18,000
Gross Estimated Implementation Cost: $201,000 $498,000 $699,000
NJ Rebate: $13,000 $25,000 $38,000
Avoided Cost (Like and Kind Replacement):* $141,000 $398,000 $538,600
Net Estimated Implementation Cost: $47,000 $75,000 $122,000
Simple Payback (years): (Net and without Avoided Costs) 9.6 / 41.0 5.7 / 38.0 6.8 / 36.7
Annual Avoided CO2 Emissions (tons): 11 28 39
* Note: Avoided Cost = Cost of Like and Kind replacement. Payback is based on incremental cost.
Page 27
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 8: Walk-In Cooler Controllers
Typically the walk-in cooler evaporator fans run continuously.
However, full airflow is only required 50% of the runtime.
In the most common applications (those that use single-phase
power), motors for the fans are typically shaded-pole or
permanent-split-capacitor types, both of which are very inefficient.
Inexpensive controllers are currently available that slow these
fans when full-speed operation is unnecessary.
Reducing the operating speed reduces the energy consumption of
the fan. In addition, the motor produces less heat at slower
speeds, which means that the compressor has less heat to
remove from the refrigerated compartment.
Central
HS
Mendham
HSTOTAL
Estimated Annual Savings: $200 $200 $400
Gross Estimated Implementation Cost: $1,850 $1,850 $3,700
NJ Rebate: $0 $0 $0
Net Estimated Implementation Cost: $1,850 $1,850 $3,700
Simple Payback (years): 9.3 9.3 9.3
Annual Avoided CO2 Emissions (tons): 0 0 0
Page 28
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM # 9: VFD’s on Univent Blower Fans
Currently, all of the fans in the unit ventilators (univents) run at a constant speed.
Installation of fractional horsepower variable speed drives on the fans will reduce
fan energy by slowing the fans when setpoints have been achieved.
The West Morris RHS BOE schools have over 140 univents serving the
classrooms and offices.
Central
HS
Mendham
HSTOTAL
Estimated Annual Savings: $1,990 $2,320 $4,310
Gross Estimated Implementation Cost: $23,100 $26,300 $49,400
NJ Rebate: $0 $0 $0
Net Estimated Implementation Cost: $23,100 $26,300 $49,400
Simple Payback (years): 11.6 11.3 11.5
Annual Avoided CO2 Emissions (tons): 4 5 9
Page 29
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM #10: Creation of an Energy Awareness & Education Program
West Morris Regional High School District currently has no observed program in place.
Educational institutions are where our nation’s youth spend a significant portion of their
time. As such, educators can have a potentially large impact on promoting an energy
conscious and conservation-minded society that starts at their school, leading to energy
cost reductions, environmental benefits, and national energy independence.
In addition, schools can receive recognition for their efforts and possible media coverage,
which can contribute to enhanced school spirit, and individual feelings of accomplishment
and connection.
Estimated Annual Savings: $10,000 - $15,000*
Gross Estimated Implementation Cost: $1500 each
Expected Rebate / Energy Efficiency Credit: None
Net Estimated Implementation Costs: $1500
Simple Payback (yrs): Varies
Annual Avoided CO2 Emissions (tons): Varies
Cost per Ton CO2 Reduction ($/ton): Varies
Page 30
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
ECM #24: Creation of an Energy Awareness & Education Program (continued)
Page 31
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Operations and Maintenance Items
Icing and deteriorated insulation on refrigerant lines:
Condition:
Dome-Tech noticed several AC refrigerant supply lines with deteriorated or missing insulation.
Issue:This results in the compressor having to expend more energy to overcome the heat gain suffered by the exposed supply lines.
In some cases, icing is occurring which could indicate low refrigerant levels.
Solution:
WM RHS District should implement an annual inspection program for all refrigerant lines. Missing insulation should be replaced. Foam insulation should be protected from UV damage by a coating of exterior latex paint.
Any icing, leaks or other problems should be investigated and corrected.
Page 32
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable/Distributed Energy Measures
Distributed Generation & Renewable Energy
Distributed Generation (on-site generation) generates electricity from many small energy sources. These sources can be renewable (solar/wind/geothermal) or can be small scale power generation technologies (CHP, fuel cells, microturbines)
Renewable energy is energy generated from natural resources (sunlight, wind, and underground geothermal heat) which are naturally replenished
Photovoltaics (solar) are particularly popular in Germany and Spain and growing in popularity in the U.S.
Wind power is growing as well, mostly in Europe and the U.S.
Page 33
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: Wind
Wind turbines generate electricity by harnessing a wind stream's kinetic energy as it spins the turbine airfoils. As with most renewable energy sources, wind
energy is subject to intermittent performance due to the unpredictability of wind resources.
Chester Wind Speed
As previously stated, wind speed is critical to the successful wind turbine installation. According to average wind data from NASA’s Surface Meteorology and
Solar Energy records, the average annual wind speed for the Chester/ West Morris area is 5.0meters per second. Ideal wind speeds for a successful
project should average over 6 meters per second.
For Chester, Dome-Tech considered three (3) types of wind turbine technologies; building integrated wind turbines (1 kW each) and traditional ground
mounted wind turbines (5 kW & 50 kW).
Building Integrated Wind Turbines
Model: AeroVironment AVX1000
Height: 8.5’
Rotor Diameter: 6’
Weight: 130 lbs.
Cut-In Wind Speed: 2.2 m/s
Maximum Generating Capacity: 1 kW
5 kW Ground Mount
Model: WES5 Tulipo
Height: 40’
Rotor Diameter: 16’
Weight: 1,900 lbs.
Cut-In Wind Speed: 3.0 m/s
Maximum Generating Capacity: 5.2 kW
50 kW Ground Mount
Model: Entegrity EW50
Height: 102’
Rotor Diameter: 50’
Weight: 21,000 lbs.
Cut-In Wind Speed: 4.0 m/s
Maximum Generating Capacity: 50 kW
Page 34
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: Wind
Wind Turbine Pros & Cons
Pros Cons
Annual reduction in energy
spend and use can be
potentially reduced by almost
$17,000 (5% reduction).
Typical equipment life span is
15-30 years.
Reduction of annual
greenhouse gas emissions by
39 tons per year.
A wind turbine project could
be incorporated into science
and other curriculums to raise
student awareness of energy
alternatives.
High visible “green” project.
Payback period is significant
(9 years).
Average area wind speed is
not ideal and impacts
performance.
Prone to lighting strikes.
Bird collisions are likely, but
may be reduced with avian
guard (building integrate only).
Zoning may be an issue.
Check with local zoning
regulations.
Wind turbines do create
noise, although below 50 dB (a
typical car ride is over 80 dB).
The project economics and wind turbine pros and cons are presented in the following tables:
Due to attractive payback and high potential for energy reduction, the 50 kilowatt ground mounted wind
turbine project appears to be the most attractive option. Should the West Morris Regional High School
District decide to pursue a wind turbine project, Dome-Tech recommends commissioning a more detailed
study.
Wind Turbine Economics CENTRAL HIGH SCHOOL
Building
Integrated
Ground Mount
5 kW
Ground
Mount 50 kW
Gross Installation Cost Estimate $130,000 $62,400 $250,000
NJJ SSB Rebate $47,498 $37,483 $98,436
Net Installation Cost Estimate $82,502 $24,917 $151,564
Annual Energy Savings $2,277 $1,797 $16,950
Simple Payback 36.2 yrs. 13.9 yrs. 8.9 yrs.
System Capacity 20 kW 10 kW 50 kW
Annual Avoided Energy Use 14,843 kWh 11,713 kWh 110,472 kWh
Annual CO2 Emmisions, Therms 5 4 39
% of Annual Electric Use* 0.7% 0.6% 5.4%
West Morris Central High School: 2053843 kWh/Year.
Page 35
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: Wind
Wind Turbine Pros & Cons
Pros Cons
Annual reduction in energy
spend and use can be
potentially reduced by about
$17,000 (6% reduction).
Typical equipment life span is
15-30 years.
Reduction of annual
greenhouse gas emissions by
39 tons per year.
A wind turbine project could
be incorporated into science
and other curriculums to raise
student awareness of energy
alternatives.
High visible “green” project.
Payback period is significant
(over 8 years).
Average area wind speed is
not ideal and impacts
performance.
Prone to lighting strikes.
Bird collisions are likely, but
may be reduced with avian
guard (building integrate only).
Zoning may be an issue.
Check with local zoning
regulations.
Wind turbines do create
noise, although below 50 dB (a
typical car ride is over 80 dB).
The project economics and wind turbine pros and cons are presented in the following tables:
Due to attractive payback and high potential for energy reduction, the 50 kilowatt ground mounted wind
turbine project appears to be the most attractive option. Should the West Morris Regional High School
District decide to pursue a wind turbine project, Dome-Tech recommends commissioning a more detailed
study.
Wind Turbine Economics MENDHAM HIGH SCHOOL
Building
Integrated
Ground Mount
5 kW
Ground
Mount 50 kW
Gross Installation Cost Estimate $130,000 $62,400 $250,000
NJJ SSB Rebate $47,498 $37,483 $98,436
Net Installation Cost Estimate $82,502 $24,917 $151,564
Annual Energy Savings $2,330 $1,838 $17,339
Simple Payback 35.4 yrs. 13.6 yrs. 8.7 yrs.
System Capacity 20 kW 10 kW 50 kW
Annual Avoided Energy Use 14,843 kWh 11,713 kWh 110,472 kWh
Annual CO2 Emmisions, Therms 5 4 39
% of Annual Electric Use* 0.8% 0.7% 6.2%
West Morris Mendham High School: 1778565 kWh/Year.
Page 36
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: Solar Photovoltaic
Solar Photovoltaic
Sunlight can be converted into electricity using photovoltaics (PV).
A solar cell or photovoltaic cell is a device that converts sunlight directly into electricity.
Photons in sunlight hit the solar panel and are absorbed by semiconducting materials, such as silicon. Electrons are knocked loose from their atoms, allowing them to flow through the material to produce electricity.
Solar cells are often electrically connected and encapsulated as a module, in series, creating an additive voltage. The modules are connected in an array. The power output of an array is measured in watts or kilowatts, and typical energy needs are measured in kilowatt-hours.
Can be recommended in this application for placement on additional schools / areas.
Page 37
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: Solar Photovoltaic
West Morris RHS BOE
West Morris RHS BOE is participating in Morris County’s solar PV program which will result in the installation of sizable PV systems on each of the two high schools’ roofs.
Accordingly, Dome-Tech did not assess roof-top solar PV systems at the schools. However, the BOE requested Dome-Tech estimate how much additional solar power could be generated by PV systems on structures installed over the parking lots (a.k.a. “carport PV systems”).
The following tables contain the results of these analyses. Details including the areas considered appropriate for installation are included in the appendices.
Note that these figures are based on estimated placement and configuration of the PV systems. Actual site-specific engineering could significantly change the location and/or the generating capacity of the final design.
Best practices dictate that PV systems should not be designed to produce more kWh than a site consumes annually. The capacity of the rooftop PV systems installed by the County could effect the size of any PV systems installed over the parking lots.
Page 38
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: Solar Photovoltaic
Solar Photovoltaic Systems
System Capacity, kw-dc (maximum utilization of space) 911 kw dc
Estimated Annual AC Energy Produced by Proposed Solar PV System 959,801 kwh
Total Annual Facility Electric Use, kwhrs 2,053,843 kwh
Proposed % of Total Annual kWh supplied by Solar PV 47%
All-In Rate for Electric Year 1 $0.153 / kwh
Year 1 Electric Cost Savings $146,850
Year 1 Maintenance Costs $18,213
Estimated Year 1 SREC Value: $640 / SREC
Estimated Year 1 SREC Revenue: $613,956
Actual Payback 8.9 years
IRR (25 Years) 8.7%
Net Present Value (25 yrs, 3% discount rate) $3,334,447
Cost per kW installed $6,500
System Installed Cost (does not include value of tax credits) $5,919,079
NJ CEP Rebate ($1/watt for systems < 50 kW) $0
Federal Business Energy Tax Credit (0%) $0
Install Parking Lot Mount Solar Photovoltaic System(s)
Assumptions
Financial Results
Cost and Rebate / Tax Incentives
WEST MORRIS CENTRAL HIGH SCHOOL
Page 39
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: Solar Photovoltaic
Solar Photovoltaic Systems
System Capacity, kw-dc (maximum utilization of space) 963 kw dc
Estimated Annual AC Energy Produced by Proposed Solar PV System 1,014,746 kwh
Total Annual Facility Electric Use, kwhrs 1,778,565 kwh
Proposed % of Total Annual kWh supplied by Solar PV 57%
All-In Rate for Electric Year 1 $0.153 / kwh
Year 1 Electric Cost Savings $155,256
Year 1 Maintenance Costs $19,255
Estimated Year 1 SREC Value: $640 / SREC
Estimated Year 1 SREC Revenue: $649,102
Actual Payback 8.9 years
IRR (25 Years) 8.7%
Net Present Value (25 yrs, 3% discount rate) $3,525,330
Cost per kW installed $6,500
System Installed Cost (does not include value of tax credits) $6,257,921
NJ CEP Rebate ($1/watt for systems < 50 kW) $0
Federal Business Energy Tax Credit (0%) $0
Install Parking Lot Mount Solar Photovoltaic System(s)
Assumptions
Financial Results
Cost and Rebate / Tax Incentives
WEST MORRIS MENDHAM HIGH SCHOOL
Page 40
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Solar Photo Voltaic System
Non-Financial Benefits of Solar PV
The district is currently planning to implement PV
projects. This planned implementation of solar PV
projects at West Morris would place your facilities at
the forefront of renewable energy utilization. This
allows the District the opportunity to not only gain
experience with this energy technology, but also to
win recognition as an environmentally sensitive,
socially conscience institution. Additionally, these
projects could be incorporated into science
education and additional curriculums to raise
awareness of current energy alternatives to the
younger generations.
Page 41
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Renewable Energy Technologies: CHP/Cogeneration
CHP (combined heat and power) or cogeneration is the use of a heat engine to simultaneously generate both electricity and useful heat.
Fuel Cells are electrochemical conversion devices that operate by catalysis, separation the protons and the electrons of the reactant fuel, and forcing the electrons to travel through a circuit to produce electricity. The catalyst is typically a platinum group metal or alloy. Another catalytic process takes the electrons back in, combining them with the protons and oxidant, producing waste products (usually water and carbon dioxide).
Microturbines are rotary engines that extract energy from a flow of combustion gas. They can be used with absorption chillers to provide cooling through waste heat rather than electricity. Microturbines are
best suited for facilities with year-round thermal and/or cooling loads.
CHP is not recommended for West Morris Regional High School District due to the lack of thermal requirements in the summertime.
Page 42
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Utility Tariff and Rate Review: Electricity
Accounts and Rate Class: West Morris Regional High School District has three facilities with
eleven electric accounts with service behind Jersey Central Power & Light Company under
rate classes General Service Secondary 3 Phase.
Electric Consumption and Cost: Based on the one-year period studied, the total annual
electric expenditure for the District is about $612,000 and the total annual consumption is
about 3,941,000 kilowatt-hours (kWh).
Average/Effective Rate per kWh: For the one year period studied, the District’s average
monthly cost per kilowatt-hour ranged from 13.4 ¢/kWh to 67.9 ¢/kWh, inclusive of utility
delivery charges. The District’s overall, average cost per kilowatt-hour during this period was
15.5 ¢/kWh.
o Note that these average electric rates are “all–inclusive”; that is, they include all supply service
(generation and commodity-related) charges, as well as all delivery service charges. The supply
service charges typically represent the majority (60-80%) of the total monthly bill. It is the supply
portion of your bill that is deregulated, which is discussed on subsequent slides in this section.
Page 43
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Utility Tariff and Rate Review: Natural Gas
Accounts and Rate Class: West Morris Regional High School District has two facilities with
five natural gas accounts behind Public Service Electric and Gas Company and New Jersey
Natural Gas under rate classes Large Volume Gas (LVG) and General Service Gas (GSGH &
GSL).
Natural Gas Consumption and Cost: Based on the one-year period studied, the total
annual natural gas expenditure for the District is about $254,000 and the total annual
consumption is about 227,000 therms (th). Natural gas is used predominantly throughout the
winter period for heating purposes.
Average/Effective Rate per Therm: For the one year period studied, the District’s average
cost per therm ranged from $0.70 to $4.73 per therm, inclusive of utility delivery charges. The
District’s overall, average cost per therm during this period was $1.12 per therm.
o Note that these average natural gas rates are “all–inclusive”; that is, they include all supply service
(interstate transportation and commodity-related) charges, as well as all delivery service charges. The
supply service charges typically represent the majority (60-80%) of the total monthly bill. It is the supply
portion of your bill that is deregulated, which is discussed on subsequent slides in this section.
Page 44
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Utility Deregulation in New Jersey: Background and Retail Energy Purchasing
In August 2003, per the Electric Discount and Energy Competition Act [N.J.S.A 48:3-49], the
State of New Jersey deregulated its electric marketplace thus making it possible for customers
to shop for a third-party (someone other than the utility) supplier of retail electricity.
Per this process, every single electric account for every customer in New Jersey was placed
into one of two categories: BGS-FP or BGS-CIEP. BGS-FP stands for Basic Generation
Service-Fixed Price; BGS-CIEP stands for Basic Generation Service-Commercial and
Industrial Energy Pricing.
At its first pass, this categorization of accounts was based on rate class. The largest electric
accounts in the State (those served under a Primary or a Transmission-level rate class) were
moved into BGS-CIEP pricing. All other accounts (the vast majority of accounts in the State of
New Jersey, including residential) were placed in the BGS-FP category, receiving default
electric supply service from the utility.
The New Jersey Board of Public Utilities (NJBPU) has continued to move new large energy
users from the BGS-FP category into the BGS-CIEP category by lowering the demand (kW)
threshold for electric accounts receiving Secondary service. Several years ago, this threshold
started at 1,500kW; now, it has come down to 1,000 kW. So, if an account’s “peak load share”
(as assigned by the utility) is less than 1,000 kW, then that facility/account is in the BGS-FP
category. If you are unsure, you may contact Dome-tech for assistance.
Page 45
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Utility Deregulation in New Jersey: Background and Retail Energy Purchasing (cont.)
There are at least 3 important differentiating factors to note about each rate category:
1. The rate structure for BGS-FP accounts and for BGS-CIEP accounts varies.
2. The “do-nothing” option (ie, what happens when you don’t shop for retail energy) varies.
3. The decision about whether, and why, to shop for a retail provider varies.
Secondary (small to medium) Electric Accounts:
o BGS-FP rate schedules for all utilities are set, and re-set, each year. Per the results of our State’s BGS
Auction process, held each February, new utility default rates go into effect every year on June 1st. The
BGS-FP rates become each customer’s default rates, and they dictate a customer’s “Price to Compare”
(benchmark) for shopping purposes. To learn more about the BGS Auction process, please go to
www.bgs-auction.com.
o A customer’s decision about whether to buy energy from a retail energy supplier is, therefore, dependent
upon whether a supplier can offer rates that are lower than the utility’s (default) Price to Compare. In
2009, and for the first time in several years, many BGS-FP customers have “switched” from the utility to
a retail energy supplier because there have been savings. This may be the same case in 2010.
Primary (large) Electric Accounts:
o The BGS-CIEP category is quite different. There are two main features to note about BGS-CIEP
accounts that do not switch to a retail supplier for service. The first is that they pay an hourly market
rate for energy; the second is that these accounts also pay a “retail margin adder” of $0.0053/kWh. For
these large accounts, this retail adder can amount to tens of thousands of dollars. The adder is
eliminated when a customer switches to a retail supplier for service.
o For BGS-CIEP accounts, the retail adder makes a customer’s decision about whether to switch
relatively simple. However, the process of setting forth a buying strategy can be complex, which is why
many public entities seek professional assistance when shopping for energy.
o For more information concerning hourly electric market prices for our region, please refer to
www.pjm.com.
Page 46
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Utility Deregulation in New Jersey: Background and Retail Energy Purchasing (cont.)
Natural Gas Accounts:
o The natural gas market in New Jersey is also deregulated. Unlike the electric market, there are no
“penalties”, or “adders”, for not shopping for natural gas. Most customers that remain with the utility for
natural gas service pay rates that are market-based and that fluctuate on a monthly basis. While natural
gas is a commodity that is exceptionally volatile and that is traded minute-by-minute during open trading
sessions, market rates are “settled” each month, 3 business days prior to the subsequent month (this is
called the “prompt month”). Customers that do not shop for a natural gas supplier will typically pay this
monthly settlement rate to the utility, plus other costs that are necessary to bring gas from Louisiana up
to New Jersey and ultimately to your facility.
o For additional information about natural gas trading and current market futures rates for various
commodities, you can refer to www.nymex.com.
o A customer’s decision about whether to buy natural gas from a retail supplier is typically dependent
upon whether a customer seeks budget certainty and/or longer-term rate stability. Customers can
secure longer-term fixed prices by enlisting a retail natural gas supplier. Many larger natural gas
customers also seek the assistance of a professional consultant to assist in their procurement process.
Page 47
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Retail Energy Purchasing: Recommendations and Resources
Electric
o Based on current and recent market conditions, and actual bid processes run by Dome-Tech for various
clients during 2010, we have seen customers with BGS-FP accounts save approximately 10-20% in
projected energy costs by switching to retail energy supplier. The District could secure this type of
agreement, this could represent an annual savings of approximately $61,000 for the larger accounts at
the District. It is important to note that actual rates and potential savings will be dependent on several
factors, including market conditions, account usage characteristics/load profile (load factor), volume, and
contract term. For the period studied, the District utilized South Jersey Energy as a third party supplier
for electricity.
Natural Gas
o Based on current and recent market conditions, and actual bid processes run by Dome-Tech for various
clients during 2010, we have seen many customers entering into longer-term contracts for fixed natural
gas rates. These rates vary substantially based on load type, volume, and term. For the period studied,
the District was not utilizing a third party supplier for natural gas.
Energy Purchasing Co-Operatives
Many public entities participate in various energy aggregation buying groups. Sometimes, an entity will
have multiple options to choose from. These might include purchasing through a County co-operative,
or purchasing through a trade-type association (for instance, many schools participate in NJASBO’s
ACES program). Co-operative purchasing may not necessarily get you the lowest rates; however, there
is often substantial volume, and it can represent a good alternative for entities with limited energy
consumption who can have a difficult time getting energy suppliers to respond to them on a direct,
singular basis.
To determine whether a savings opportunity currently exists for your entity, or for guidance on how to get
started, you may contact Dome-Tech to discuss. There is also additional information provided below.
Page 48
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Retail Energy Purchasing: Recommendations and Resources (cont.)
To learn more about energy deregulation, visit the New Jersey Board of Public Utilities website:
www.bpu.state.nj.us
For more information about the retail energy supply companies that are licensed and registered
to serve customers in New Jersey, visit the following website for more information:
http://www.bpu.state.nj.us/bpu/commercial/shopping.html
Provided below is a list of NJ BPU-licensed retail energy suppliers:
Company Electricity Natural Gas Website
Hess X X hess.com
Sprague X X spragueenergy.com
UGI X X ugienergyservices.com
South Jersey Energy X X southjerseyenergy.com
Direct X X directenergy.com
Global X X globalp.com
Liberty X libertpowercorp.cm
ConEd Solutions X conedsolutions.com
Constellation X newenergy.com
Glacial X glacialenergy.com
Integrys X integrysenergy.com
Suez X suezenergyresources.com
Sempra X semprasolutions.com
Woodruff X woodruffenergy.com
Mx Energy X mxenergy.com
Hudson X hudsonenergyservices.com
Great Eastern X greateasterngas.com
*Note: Not every Supplier serves customers in all utility territories within New Jersey.
Page 49
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Historical Energy Futures Settlement Prices
Below please find graphs that show the last several years’ worth of market settlement prices for both natural gas and
electricity. Each of these graphs shows the average closing prices of a rolling 12-month period of energy futures
prices. The graphs are representative of the commodity, alone; they do not include any of the additional components
(capacity, transmission, ancillary services, etc.) that comprise a retail energy price. They are meant to provide an
indication of the level of pricing that a particular customer might expect to see, but the graphs do not account for the
specific load profile of any individual energy user.
Henry Hub 12 month strip PJM West 12 month strip
PJM West Electricity - 12 Month Strip
49.5050.10
56.46
102.02
74.2384.08
70.53
62.06
52.10
48.82
0.000
20.000
40.000
60.000
80.000
100.000
120.000
140.000
4/1/2003
6/1/2003
8/1/2003
10/1/2003
12/1/2003
2/1/2004
4/1/2004
6/1/2004
8/1/2004
10/1/2004
12/1/2004
2/1/2005
4/1/2005
6/1/2005
8/1/2005
10/1/2005
12/1/2005
2/1/2006
4/1/2006
6/1/2006
8/1/2006
10/1/2006
12/1/2006
2/1/2007
4/1/2007
6/1/2007
8/1/2007
10/1/2007
12/1/2007
2/1/2008
4/1/2008
6/1/2008
8/1/2008
10/1/2008
12/1/2008
2/1/2009
4/1/2009
6/1/2009
8/1/2009
10/1/2009
12/1/2009
2/1/2010
4/1/2010
Trade Date
$/M
WH
Henry Hub Natural Gas - 12 Month Strip
4.87
8.22
12.71
10.09
7.14
8.62
8.29
13.33
8.10
0.000
2.000
4.000
6.000
8.000
10.000
12.000
14.000
16.000
4/1/2003
6/1/2003
8/1/2003
10/1/2003
12/1/2003
2/1/2004
4/1/2004
6/1/2004
8/1/2004
10/1/2004
12/1/2004
2/1/2005
4/1/2005
6/1/2005
8/1/2005
10/1/2005
12/1/2005
2/1/2006
4/1/2006
6/1/2006
8/1/2006
10/1/2006
12/1/2006
2/1/2007
4/1/2007
6/1/2007
8/1/2007
10/1/2007
12/1/2007
2/1/2008
4/1/2008
6/1/2008
8/1/2008
10/1/2008
12/1/2008
2/1/2009
4/1/2009
6/1/2009
8/1/2009
10/1/2009
12/1/2009
2/1/2010
4/1/2010
Trade Date
$/M
MB
tu
3.9
Page 50
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Potential Project Funding Sources
Through the NJ Clean Energy program, the New Jersey Board of Public Utilities currently
offers a variety of subsidies or rebates for many of the project types outlined in this report.
More detailed information can be found at: www.njcleanenergy.com
NJ Smart Start Buildings – Equipment Rebates noted in ECMs where available.Equipment Rebates - Water Heaters, Lighting, Lighting Controls/Sensors, Chillers, Boilers, Heat
pumps, Air conditioners, Energy Mgmt. Systems/Building Controls, Motors, Motor-ASDs/VSDs,
Custom/Others http://www.njcleanenergy.com/commercial-industrial/programs/nj-smartstart-
buildings/nj-smartstart-buildings
Pay for Performance Program – Performance-Based Incentives for installations.
Provides up to 50% of total project costs. Based on findings in this study, up to $550,000 in
incentives for project implementation could be provided under this program. A minimum
reduction target of 15% compared to baseline must be achieved. Energy modeling of building and
systems and energy reduction plan is required (incentives provided to pay for part of study costs.)
Energy Savings Improvement Program (ESIP) Public entities can contract with energy
serving companies in up to 20-year lease purchases enabling public entities to implement energy
conservation measures to their facilities and pay for the costs using the value of energy savings that
result from the improvements. www.nj.gov/dca/lgs/lfns/09lfns/2009-11.doc
Page 51
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Potential Project Funding Sources (continued)
Clean Energy Solutions Capital Investment Loan/GrantThe EDA offers up to $5 million in interest-free loans and grants to promote the concept of "going
green" in New Jersey. Under this program, scoring criteria based on the project's environmental and
economic development impact determines the percentage split of loan and grant awarded. Funding
can be used to purchase fixed assets, including real estate and equipment, for an end-use energy
efficiency project, combined heat and power (CHP or cogen) production facility, or new state-of-the-art
efficient electric generation facility, including Class I and Class II renewable Energy.
http://www.njeda.com/web/Aspx_pg/Templates/Npic_Text.aspx?Doc_Id=1078&menuid=1360&topid=72
2&levelid=6&midid=1357
Clean Renewable Energy Bonds (CREBs) – For Renewable Energy ProjectsFederal Loan Program for Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass,
Hydroelectric, Geothermal Electric, Municipal Solid Waste, Hydrokinetic Power, Anaerobic Digestion,
Tidal Energy, Wave Energy, Ocean Thermal
http://www.irs.gov/irb/2007-14_IRB/ar17.html
Renewable funding for PV & wind, plus federal credits currently available: http://www.njcleanenergy.com/renewable-energy/programs/renewable-energy-incentive-
program/applications-and-e-forms-renewable-ener
Page 52
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Potential Project Funding Sources (continued)
Direct Install Program – NJ Clean Energy makes the investment in energy efficiency upgrades by
initially covering 60% of the cost to install the recommended energy efficiency measures. If eligible, the
entity will pay ONLY 40% of the total cost to install the energy efficiency measures.
http://www.njcleanenergy.com/commercial-industrial/programs/direct-install
We encourage you to contact the program directly for further information on this particular program for the
following buildings: BOE Building, Barns, Field House & maintenance/garage buildings.
Steps to Participate for Buildings under 200KW / month
1. CONTACT THE PARTICIPATING CONTRACTOR IN YOUR AREA
Identify the contractor assigned and trained to provide Direct Install services in the county where your project is located. Using the contact
information provided, call or email the Participating Contractor to discuss your project. The contractor will schedule an Energy Assessment and work
with you to complete the Program Application and Participation Agreement. If you’re unable to contact the Participating Contractor or have
questions, you may contact us at 866-NJSMART or send an e-mail to DirectInstall@trcsolutions.com..
2. REVIEW RESULTS
After the Energy Assessment, the contractor will review results with you, including what measures qualify and your share of the project cost.
3. DECIDE TO MOVE FORWARD
You will sign a Scope of Work document to proceed with implementation of qualifying measures.
4. ARRANGE INSTALLATION
You and the Participating Contractor will set a convenient start date for the installation.
5. CONFIRM INSTALLATION
Once the Participating Contractor completes the installation, you accept the work by signing a Project Completion Form. A program representative
will approve the project as complete.
6. COMPLETE TRANSACTION
You pay the Participating Contractor your share of the project cost and the program pays its share.
Page 53
West Morris Regional High School District, Chester, NJ FINAL Energy Audit Report, September 2010
Next Steps
The following projects should be considered for implementation:
Take steps to install vending machine power management and walk-in
cooler/freezer controls
Implement recommended lighting upgrades
Implement a program to replace aging RTUs with high efficiency units at the end
of their service lives
Implement a program to replace HHW pump motors premium efficiency units at
the end of their service lives
Initiate a detailed design study to replace the old boilers at Mendham High
School at the end of their service lives with modular condensing equipment.
Start Energy Awareness Program
Energy Procurement (Electricity & Gas)
Note that additional “Phase 2” engineering may be required to further develop these projects, to
bring them to bidding and implementation.
Consider applying for Pay-For-Performance Program