WATER QUALITY MONITORING PROJECT FOR DEMONSTRATION OF CANAL REMEDIATION METHODS  FLORIDA KEYS 

Report #1: Canal Water CharacterizationFKNMS Canal Subcommittee Meeting

01/16/2015

Henry O. Briceño & Alexandra Serna

Southeast Environmental Research CenterFlorida International University

Miami, FL 33199

Phase 1Characterization of canal waters before remediation

Phase 2Monitoring water quality changes after remediation. 

SELECTED CANALS FOR REMEDIATION AND CONTROLControl canals highlighted in yellow

Organic Removal

Weed Barrier & Organic Removal

Pumping Backfilling

#137 Plantation Key Treasure Harbor

#148 Lower Matecumbe Key Mate‐Lido Beach

#287 Big Pine Hollerich Subdivision

#290 Big Pine Between Ave I & J

#266 Big Pine. Dr Arm Subdivision

#278 Big Pine. Eden Pines Colony Subdivision

#277 Big Pine. Tropical Bay Subdivision

#459 Geiger. Boca Chica Ocean Shores Subdivision

#29 Key Largo Sexton Cove Estates Subdivision

#472 Geiger. Geiger Mobile Homes Subdivision

#132 Plantation Key 

#147 Matecumbe K

#282 Big Pine #458 Geiger # 28 Key Largo

Culvert Installation

#293 Big Pine

Weed Barrier

Reduction of weed wrack loading

Installation of culverts and/or 

pumps

Removal of accumulated 

organic sediments

Backfilling of canalsACTION

Reduction of Organic 

Matter Load

Increase Water 

Exchange and Flushing

Reduce Bottom Water Hypoxia

Reduce Excessive Depth to Improve 

Circulation

Reduction Benthic Flux

Higher Seawater 

Contribution

Bacterial Population

H2S ReductionDOM & POM Nutrient 

Load

Mixing Rate

Stratification

Benthic Community

GOAL

PROBA

BLE CH

ANGE

S

TOC DOH2S

pH

N & PqPCR SAL TURINDEX

Algae Bloom

PROFILESDEPTH   KdTEMP    SALDO         H2SCHLa     TUR         pH          DOM

KdDOM

CHLa

CDOM Parafax

PAM

BENT

HIC 

COMMUN

ITY

SURV

EYS

FieldLab

Legend

CONCEPTUAL MODEL FOR MONITORING DESIGN

02468

1012141618

0 0.5 1 1.5 2 2.5

Dep

th (ft)

Oxygen  (mg/L)

024681012141618

0 400 800 1200 1600 2000

Dep

th (ft)

PAR/ Irradiance

024681012141618

37.0 37.5 38.0 38.5

Dep

th (ft)

Salinity (PSU)

02468

1012141618

23.0 23.5 24.0 24.5 25.0 25.5

Dep

th (ft)

Temperature ᴼC

024681012141618

34.0 38.0 42.0 46.0 50.0 54.0 58.0 62.0

Dep

th (ft)

CDOM (mg/m3)

024681012141618

0 5 10 15 20 25 30

Dep

th (ft)

%DO Saturation

0%

12%

24%

36%

48%

60%

72%

84%

96%

108%

% Exceedances of %DO Saturation

0.000

0.010

0.020

0.030

0.040

0.050

0.06002

8A ‐ B

028A

 ‐ S

029A

 ‐ B

029A

 ‐ S

029B

 ‐ B

029B

 ‐ S

132A

 ‐ B

132A

 ‐ S

137A

 ‐ B

137A

 ‐ S

137B

 ‐ B

137B

 ‐ S

147A

 ‐ B

147A

 ‐ S

148A

 ‐ B

148A

 ‐ S

148B

 ‐ B

148B

 ‐ S

266A

 ‐ B

266A

 ‐ S

266B

 ‐ B

266B

 ‐ S

277A

 ‐ B

277A

 ‐ S

277B

 ‐ B

277B

 ‐ S

278A

 ‐ B

278A

 ‐ S

278B

 ‐ B

278B

 ‐ S

282A

 ‐ B

282A

 ‐ S

287A

 ‐ B

287A

 ‐ S

290A

 ‐ B

290A

 ‐ S

290B

 ‐ B

290B

 ‐ S

293A

 ‐ B

293A

 ‐ S

458A

 ‐ B

458A

 ‐ S

459A

 ‐ B

459A

 ‐ S

459B

 ‐ B

459B

 ‐ S

472A

 ‐ B

472A

 ‐ S

472B

 ‐ B

472B

 ‐ S

FKC01 NO3‐N(ppm)

0.000

0.020

0.040

0.060

0.080

0.100

0.120

028A

‐B

028A

‐S

029A

‐B

029A

‐S

132A

‐B

132A

‐S

132B

 S

132B

‐B

137A

‐B

137A

‐S

137B

 S

137B

‐B

147A

‐B

147A

‐S

148A

‐B

148A

‐S

266A

‐B

266A

‐S

277A

‐B

277A

‐S

278A

‐B

278A

‐S

278B

 S

278B

‐B

282A

‐B

282A

‐S

287A

‐B

287A

‐S

290A

‐B

290A

‐S

293A

‐B

293A

‐S

458A

‐B

458A

‐ S

459A

‐B

459A

‐S

472A

‐B

472A

‐S

FKC02 NO3‐N(ppm)

0.00

0.02

0.04

0.06

0.08

0.10

0.12

028A

 ‐ B

028A

 ‐ S

029A

 ‐ B

029A

 ‐ S

132A

 ‐ B

132A

 ‐ S

137A

 ‐ B

137A

 ‐ S

147A

 ‐ B

147A

 ‐ S

148A

 ‐ B

148A

 ‐ S

266A

 ‐ B

266A

 ‐ S

277A

 ‐ B

277A

 ‐ S

278A

 ‐ B

278A

 ‐ S

282A

 ‐ B

282A

 ‐ S

287A

 ‐ B

287A

 ‐ S

290A

 ‐ B

290A

 ‐ S

293A

 ‐ B

293A

 ‐ S

458A

 ‐ B

458A

 ‐ S

459A

 ‐ B

459A

 ‐ S

472A

 ‐ B

472A

 ‐ S

472B

 ‐ B

472B

 ‐ S

NO3‐N(ppm) NO3‐N(ppm)

WQ Samples DIEL Profiles EC DO384                288                414           288                     41,886       

76 64 92 94 17,636       

20% 22% 22% 33% 42%

Proposed Work

Done

Phase 1Characterization of canal waters before remediation

IS DONE

Phase 2Monitoring water quality changes after remediation.

TO BE DONE

Strategies

‐ Monitoring will begin in remediated canals six month after remediation and will be performed quarterly.

‐ Non remediated canals will be monitored at least once per year