West Branch of the Ompompanoosuc River River Corridor Management Plan
Strafford, Vermont
October 30, 2006
West Branch of the Ompompanoosuc River River Corridor Management Plan
Strafford, Vermont
October 30, 2006
Prepared by:
Michael Blazewicz Watershed Scientist
And
Mary Nealon
Principal/Aquatic Biologist
Prepared for:
Strafford Conservation Commission
ACKNOWLEGEMENTS Bear Creek Environmental (BCE) would like to thank a number of people for their help with the development of the Strafford River Corridor Management Plan for the West Branch of the Ompompanoosuc River. We thank Mike Kline, Ty Mack, and Ben Copans of the Vermont Department of Environmental Conservation (VDEC) for providing guidance and review comments on the draft Plan. We thank Sally Mansur and other dedicated members of the Strafford Conservation Commission for reviewing the Plan and for supporting the assessment and planning process over the past few years that has allowed for the development of this plan. We also appreciate the help of Ty Mack for mapping the valley walls and for collaborating with us to produce the draft fluvial erosion hazard (FEH) zones.
West Branch of the Ompompanoosuc River River Corridor Management Plan
Strafford, Vermont TABLE OF CONTENTS
1.0 PROJECT OVERVIEW _______________________________________________________________1 1.1 LOCAL PROJECT GOALS _____________________________________________________________2 1.2 STATE OF VERMONT RIVER MANAGEMENT GOALS_______________________________________5
2.0 PROJECT BACKGROUND INFORMATION ___________________________________________7 2.3 ECOLOGICAL SETTING _____________________________________________________________13 2.4 FLOOD HISTORY __________________________________________________________________14 2.5 CHANNEL AND FLOODPLAIN MANAGEMENT HISTORY __________________________________15 2.6 PAST AND PRESENT WATER QUALITY AND BIOLOGICAL DATA __________________________16
3.0 STREAM GEOMORPHIC ASSESSMENT _____________________________________________18 3.1 PHASE 1 STREAM GEOMORPHIC ASSESSMENT RESULTS__________________________________19 3.2 PHASE 2 STREAM GEOMORPHIC ASSESSMENT RESULTS__________________________________20
4.0 WATERSHED SCALE HYDROLOGIC AND SEDIMENT MODIFIERS __________________25 4.1 HYDROLOGIC ALTERATIONS ________________________________________________________25 4.2 SEDIMENT MODIFIERS ______________________________________________________________27
5.0 REACH SCALE STRESSORS ________________________________________________________28 5.1 VERTICAL CONSTRAINTS ___________________________________________________________28 5.2 LATERAL CONSTRAINTS____________________________________________________________29 5.3 BRIDGE AND CULVERTS ____________________________________________________________30
6.0 STREAM ADJUSTMENT, SENSITIVITY, AND FLUVIAL EROSION HAZARD MAPPING 33 6.1 CHANNEL EVOLUTION _____________________________________________________________33 6.2 STREAM SENSITIVITY_______________________________________________________________37 6.3 FLUVIAL EROSION HAZARD ZONES __________________________________________________42 6.4 RIPARIAN CORRIDOR WIDTHS FOR PROTECTION _______________________________________44
7.0 REACH SCALE PROJECT IDENTIFICATION AND PRIORITIZATION _________________44 7.1 RESTORATION APPROACHES ________________________________________________________44 7.2 RIVER CORRIDOR PROJECT TYPES____________________________________________________45 7.3 SPECIFIC PROJECT STRATEGIES ______________________________________________________49
8.0 PRIORITY PROJECT IDENTIFICATION _____________________________________________53 8.1 GENERAL RECOMMENDATIONS FOR PROJECT PRIORITIZATION _______________________________53 8.2 SPECIFIC PROJECT RECOMMENDATIONS FOR STRAFFORD ________________________________55
9.0 PLAN IMPLEMENTATION _________________________________________________________63 9.1 PUBLIC REVIEW AND REVISION OF RIVER CORRIDOR MANAGEMENT PLAN _________________63 9.2 DEVELOP AND ADOPT A RIVER CORRIDOR OVERLAY DISTRICT AND FEH ZONE_____________63 9.3 PROCEED WITH CONSERVATION / RESTORATION PROJECTS______________________________63 9.4 ADDRESS UNDERSIZED STRUCTURES _________________________________________________64
10.0 REFERENCES______________________________________________________________________65
River Corridor Management Plan Strafford, Vermont
Executive Summary
The West Branch of the Ompompanoosuc River (West Branch) in Strafford defines the town’s landscape. A multitude of resources have been spent on protecting property adjacent to the river and restoring the natural characteristics of the river. This River Corridor Management Plan makes recommendations to restore stable channel conditions by providing a structure for identifying and prioritizing river restoration and corridor protection project opportunities and for developing effective approaches. An overriding objective is to reduce the need for maintenance of traditional channel management applications along the West Branch, and shift the focus of management projects from short term control to long term equilibrium and stability. This plan is meant to be used as part of the local planning process and may be incorporated into Strafford’s town plan. Annual review of this plan is suggested to identify where progress has been made and to pinpoint areas in need of improvement. The major goals for the West Branch of the Ompompanoosuc River Corridor Management Plan are to: improve the riverine recreational opportunities; improve public access to the river; improve aquatic habitat; reduce flood and erosion hazard; and restore riparian corridor functions.
Beginning in 2004, fluvial geomorphic assessments of the West Branch, using Vermont Department of Environmental Conservation (VDEC) protocols, were conducted by the Strafford Conservation Commission (SCC) and Bear Creek Environmental (BCE). These assessments studied the condition of the river, and made predictions about how the West Branch will continue to evolve. The results provided by the assessments are useful in determining management strategies that will help people make good decisions about land use within the river corridor. These assessments showed that the West Branch of the Ompompanoosuc is undergoing active adjustment processes. On the majority of the West Branch, historic incision has lowered the elevation of the river bed leaving the floodplain inaccessible. As a result, high flows that would normally access the floodplain are contained within the channel; thereby causing extensive bank
West Branch Ompompanoosuc River Watershed Town of Strafford, Vermont River Corridor Management Plan Page ii
erosion, channel widening, lateral migration, loss of aquatic habitat, and general channel instability. The traditional approach of attempting to control erosion employs bank armoring (rip-rap), which is common on the West Branch, but has lead to further instability in the system. Also, there are many encroachments upon the river corridor in the form of residential and commercial development, as well as roads. The result is a decreased amount of area that is capable of reestablishing equilibrium through lateral channel migration and the creation of a lower floodplain. It is important to protect the few areas that still have the space for the river to move; otherwise, management of the river will become increasingly difficult and expensive.
This report considers the stage of channel evolution, sensitivity, condition, and major adjustment process for each section, or reach, of the West Branch in order to determine management strategies. The results are management approaches that are appropriate for each section rather than a uniform plan for the entire river. The four major project types identified for the West Branch of the Ompompanoosuc River are:
• conservation reaches, • high recovery reaches, • moderately unstable reaches, and • highly unstable reaches.
The project types help to define restoration strategies which range from a do-nothing approach to actively attempting to restore in-channel equilibrium. In addition to identifying restoration strategies, this plan provides recommendations for defining a Fluvial Erosion Hazard zone to further assist the Town of Strafford with managing and restoring the West Branch of the Ompompanoosuc River watershed. The purpose of defining these zones is minimize property loss and damage due to fluvial erosion; prohibit land uses and development in fluvial erosion hazards areas that pose a danger to health and safety; and discourage the acquisition of property that is unsuited for the intended purposes due to fluvial erosion hazards.
West Branch of the Ompompanoosuc River
River Corridor Management Plan Strafford, Vermont
1.0 PROJECT OVERVIEW
Bear Creek Environmental (BCE) was retained by the Strafford Conservation Commission
(SCC) to write a corridor management plan for the area of the West Branch of the
Ompompanoosuc River (West Branch), which flows through the Town of Strafford, Vermont.
The project has been funded through a grant by the Upper Valley Community Foundation.
Data and information for the West Branch Watershed within the Town of Strafford was
obtained from the Vermont Department of Environmental Conservation (VDEC), the Vermont
Center for Geographic Information (VCGI 2003), and the SCC. Phase 1 and 2 Stream
Geomorphic Assessments conducted under the direction of the SCC (Nealon and Blazewicz
2004; Blazewicz and Nealon 2006) were used as the basis for developing the river corridor
management plan. A glossary of stream geomorphic assessment terms is included in the
appendix of this report to assist the reader. These definitions, which were adopted by
Fischenich (2000), are from Appendix Q of the Vermont Agency of Natural Resources’ Stream
Geomorphic Handbook (2004).
This River Corridor Management Plan provides recommendations to restore stable channel
conditions by providing a structure for identifying and prioritizing river restoration and corridor
protection project opportunities and developing effective approaches. An overriding objective
is to reduce the need for maintenance of traditional channel management applications along the
West Branch, and shift the focus of management projects from short term control to long term
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 2
equilibrium and stability. This plan is meant to be used as part of the local planning process
and may be incorporated into Strafford’s town plan. Annual review of this plan is suggested to
identify where progress has been made and to pinpoint areas in need of improvement.
While this document is specific for the Strafford community, it is also important to note that
the VDEC is currently developing a Basin Plan for the entire Ompompanoosuc River. The
Ompompanoosuc River Basin Plan will summarize natural resource information, current and
past water quality assessments, and efforts at the state and local level to protect and restore
water quality. The Basin Plan will identify and prioritize state and local water quality issues,
develop strategies for solving water quality problems, and implement on-the-ground protection
and restoration projects. The purpose of the Basin Plan is to guide state and local efforts, and
to serve as a resource document for the Ompompanoosuc watershed. The draft Basin Plan is
scheduled for completion in late 2006. For the West Branch of the Ompompanoosuc
watershed, the Basin Plan will rely heavily on the information contained in this River Corridor
Management Plan.
This River Corridor Management Plan outlines the goals for the West Branch of the
Ompompanoosuc River in the Town of Strafford, the current condition of the river and its
tributaries, results of field assessments, prioritization of restoration opportunities, and
strategies for implementing corridor protection and restoration.
1.1 Local Project Goals The main goals for the West Branch of the Ompompanoosuc River set out by the SCC are
to increase its value as a recreational resource, improve public access to the river and
streams, improve aquatic habitat, reduce flood and erosion hazard and restore river
corridor function. The goals are outlined below and addressed with general and specific
strategies in sections 7.0 and 8.0 of this document.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 3
1.1.1 Increase the Recreational Value of the West Branch
The Strafford community benefits from various recreational values of the West Branch
and its tributaries. From the Upper Village downstream to Rices Mill, the West Branch
is noted as a class II enjoyable paddle by American Whitewater. Many Strafford
residents enjoy paddling the West Branch during high water in the spring time.
The SCC has a new Trails Committee that would like to develop a walking and/or bike
trail between the two villages along the river, most likely just outside the FEH zone.
Ideally this trail will be lined with trees that the SCC will purchase or donate to the
effort.
1.1.2 Improve Public Access
Currently, access to the river is limited to several public lands. The Robert Murray
Recreational Field in South Strafford Village provides riverfront access from the village.
There is access to a nice swimming hole in the river behind the Robert Murray
Recreation Field. There is also a favorite swimming spot in the Upper Village. Strafford
residents, especially its young residents, would like access maintained at least in these
spots, and improved elsewhere if possible.
Old City Falls and its ravine, a unique natural and historical area, are also owned by the
Town. Residents enjoy use of the picnic area at the Old City Falls parking lot and hiking
trails that go down to the falls. Since this is a publicly owned area, there is easy access
to this beautiful waterfall.
The Strafford Area Lions Club sponsors and maintains a 0.4 mile bicycle and pedestrian
path between the Varney ballfield and Our Lady of the Peace Chapel in South Strafford.
The path provides a picnic area and access to the West Branch (Strafford Planning
Commission 2003).
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 4
Improved public access would enhance the value of the river as an educational and
recreational resource for uses such as fishing and swimming, which is an objective for
many in town. Greater public access may encourage people to spend more time in
close proximity to the river, thus resulting in a greater appreciation and recognition of
its value to the community.
1.1.3 Improve Aquatic Habitat
The West Branch and its tributaries are part of the great Connecticut River basin. Long
ago the Connecticut River hosted one of North America's southern-most salmon runs.
Salmon once ascended the mainstem Connecticut River to its very headwaters (as far
north as Beechers Falls, Vermont, nearly 400 miles upstream from the river mouth at
Long Island Sound) and entered all major tributaries not blocked by natural barriers
such as waterfalls (Connecticut River Atlantic Salmon Commission 1998). Experimental
stocking of Atlantic Salmon fry in the West Branch has been discontinued. The West
Branch in Strafford was stocked with 400 brook trout from the Vermont Department of
Fish and Wildlife in May 2006.
Steve Fiske, Aquatic Biologist, VTDEC, Biomonitoring Aquatic Studies Section, has been
studying the effects of the Elizabeth Copper Mine on the West Branch of the
Ompompanoosuc for several years. On the main stem of the West Branch, above
Tyson Road bridge, biological sampling results indicate the stream is in very good
biological health. Downstream, in the area of the Elizabeth Mine, however, Fiske
reports that the stream consistently is found to be in poor biological health (Fiske
2006).
1.1.4 Reduce Flood and Erosion Hazards
Encroachment of corridors from development can be both damaging to the river as well
as to property. The Town of Strafford recognized these concerns and addressed them
by adopting a Flood Hazard Zoning Ordinance on March 6, 1990 (Amended in 1993).
The purpose of these regulations were to, “promote the public health, safety, and
general welfare, to prevent increases in flooding caused by the uncontrolled
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 5
development of lands in areas of special flood hazard, and to minimize losses due to
floods.” The areas to which the regulations apply are designated as special flood hazard
areas on the Town’s Official Flood Hazard Area Map.
Sound floodplain ordinances will prevent some unnecessary loss, but inundation maps
are not updated frequently enough to reflect the changes in inundation hazard areas that
come about as rivers undergo channel adjustment. Nor do inundation maps identify
areas of erosion hazards. This River Corridor Management plan identifies fluvial erosion
hazard (FEH) areas and provides guidance on reducing erosion hazards.
1.1.5 Restore River Corridor Functions
The reference stream type for much of the main stem of the West Branch
Ompompanoosuc between the Strafford/Thetford town lines is an “E” channel as
defined according to the Rosgen stream classification system (Rosgen 1996). “E” type
stream channels are highly dependent upon vegetation for stability. For this reason, it is
recommended that the establishment and protection of vegetated buffers be high
priority in restoration planning and design work. Riparian buffers provide many benefits.
Some of these benefits are protecting and enhancing water quality, providing fish and
wildlife habitat, providing streamside shading, and providing root structure to prevent
bank erosion.
Additionally, effective protection of river corridors will allow flood flows to be handled
by the river system. As mentioned earlier, allowing for a buffer of native vegetation will
enhance the river’s capacity to manage the flood flow and reduce downstream erosion.
Floodplains also can act as sinks for nutrients and sediment that would otherwise
continue downstream and impact receiving waters. Encroachment of floodplains from
development can be both damaging to the river as well as to property.
1.2 State of Vermont River Management Goals
The State of Vermont’s River Management Program has set out several goals and objectives
that are supportive of the local initiative in Strafford. The state management goal is to,
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 6
“manage toward, protect, and restore the equilibrium conditions of Vermont rivers by
resolving conflicts between human investments and river dynamics in the most economically
and ecologically sustainable manner.” The objectives of the Program are to include fluvial
erosion hazard mitigation and sediment and nutrient load reduction as well as aquatic and
riparian habitat protection and restoration. River corridor planning will be conducted in an
effort to remediate the geomorphic instability that is largely responsible for these problems
in a majority of Vermont’s rivers. The Vermont River Management Program will provide
funding and technical assistance to facilitate an understanding of river instability and the
establishment of well developed and appropriately scaled strategies to protect and restore
river equilibrium (Vermont River Management Program, personnel communication, 2006).
1.2.1 Fluvial Geomorphology and its Application to River Management
Geomorphic stability is defined as, “The ability of a stream, over time and in the present
climate, to transport the flow and sediment of its watershed in such a manner that it
maintains its dimension, pattern, and profile without aggrading (building up) or degrading
(eroding down) its channel bed materials” (Rosgen 1996).
Fluvial geomorphic science explains the physical river processes and forms that occur in
different landforms and geologic and climatic settings. In applying fluvial geomorphic
science, it is assumed that:
• Although rivers are dynamic, with a form or geometry that is ever changing
through erosion and depositional processes, there is a central tendency of form
and process that has a predictable relationship with surrounding and watershed
land forms and which may undergo significant change naturally with climate
changes over time;
• Human-related physical change to river channels, floodplains, and watersheds
often mimic and/or change the rate of natural physical processes;
• A scientifically sound river corridor management program can be based in part
on regional channel evolution models that help predict how an altered river
channel may return to a former channel form (or type) when significant
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 7
disturbances end, or how the channel may adjust to develop a new form (or
type) if the disturbances continue; and
• The distribution and condition of stream types, especially those indicative of
reach and watershed scale adjustments, influence erosion and flood hazard risk
levels and aquatic habitat quantity and quality.
In the Vermont Stream Geomorphic Assessment Protocols, the term “in adjustment” is
used to describe a river that is undergoing change in its channel form and/or fluvial
processes outside the range of natural variability. The fluvial processes typically affected
in river reaches that are “in adjustment” are those associated with reach hydrology and
sediment transport. Channel adjustment typically involves erosion, but the terms are
not synonymous. The processes of erosion and sediment deposition are ongoing and
often result in changes in channel form and fluvial processes that are well within the
range of natural variability. Fluvial geomorphic assessments help us understand whether
the observed channel changes (such as eroding banks) are indicative of a river
adjustment process, and if so, to what extent and over what period of time the
adjustment will occur. With this knowledge river managers can weigh the long-term
costs and risks associated with different human activities, including channel and
floodplain encroachments or land use conversions at the watershed scale and manage
river systems for geomorphic stability. (Vermont Agency of Natural Resources 2006a)
2.0 PROJECT BACKGROUND INFORMATION
2.1 Geographic Setting
2.1.1 Watershed Setting
The West Branch has a watershed size of 40.2 square miles measured from a point just
downstream of the Strafford/Thetford town line. The West Branch within the Town of
Strafford is a subwatershed of the Ompompanoosuc River (Figure 1). The
Ompompanoosuc River is a tributary to the Connecticut River which drains south into
Long Island Sound.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 8
Figure 1: Project Location Map, West Branch of the Ompompanoosuc River Watershed
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 9
The highest elevations in the West Branch are the hills in the north of the watershed.
Hawkins Mountain, at 2360 feet above sea level, is the highest point. At its confluence
with the Ompompanoosuc River, the elevation is 550 feet above sea level.
2.1.2 Political Jurisdictions
The West Branch watershed is predominately located in the Town of Strafford. The
headwaters extend into the surrounding towns of Vershire, Chelsea, Tunbridge, and
Sharon. The towns within the West Branch watershed are members of the Two-Rivers
Ottauquechee Regional Planning Commission. The lowest reaches of the West Branch
drain from the hillsides of Thetford. The watershed is predominately within Orange
County; however a small portion of the southern portion lies in Windsor County. The
West Branch is located entirely within the State of Vermont.
2.1.3 Land Use History and Current Condition
According to natural history scientists at the Vermont Department of Fish and Wildlife,
Native Americans inhabited Vermont for 8,000 years prior to European Settlement.
Their impact on the landscape, however, is thought to have been minimal, except along
the shores of some of the larger lakes and more fertile river valleys. (Thompson and
Sorenson 2005).
European settlement of the region began in the mid to late 1700s. Strafford was
chartered on August 12, 1761. Land clearing for agriculture and wood products
increased dramatically around 1800 and approximately 80 percent of Vermont’s land
area was cleared of forests by 1900. The “sweet” soils of the Northern Vermont
Piedmont are derived from calcium-rich bedrock, a factor leading to heavy early
agricultural use in the region. (Thompson and Sorenson 2005). Strafford’s settlement
patterns, transportation and land use have historically been determined by its
waterways. The earliest settlement, “Old City,” was located at Old City Falls, along Old
City Brook. Later settlement of Strafford Village and South Strafford Village were both
along the river valley bottom.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 10
The major land use patterns have also followed the water courses and the hills between
forestry on the steeper slopes with farming and settlements confined to the valleys.
Human use of these resources and associated livestock, first sheep then dairy cattle and
later horse and alpaca, have determined the appearance of the land.
Although much of the forest has now regenerated, the structure and species
composition of presettlement forests has surely been altered. The Northern Vermont
Piedmont remains a region with numerous small farms, forestlands mostly managed for
timber production, and a dense network of roads and settlements that leave few large
areas of unmanaged land. (Thompson and Sorenson 2005).
Increasingly since the mid 1960’s, recreation, summer camps, summer residences, and
new year-round residents have built new homes in the community. A few farms still
operate in the community, although increasingly agricultural land is being utilized for
recreational livestock production (such as horse and alpaca). For the purposes of
property valuation, the State of Vermont lists 21 working farms in Strafford. Dairy
farms now number only six. Just over 2,500 acres of land in Strafford, is devoted to hay
and corn or permanent pasture (Strafford Planning Commission 2003).
The land use within the watershed plays a role in the hydrology of the receiving waters,
and is therefore useful in understanding the impacts that are seen today. The
percentage of urban and cropland development within the watershed are factors which
change a watershed’s response to precipitation. The most common effects of urban and
cropland development are increasing peak discharges and runoff by reducing infiltration
and travel time (United States Department of Agriculture 1986). The land use/land
cover within the stream corridor itself is also an important parameter to evaluate. This
land use/land cover plays an influential role in the sediment deposition and erosion
which occurs during annual flood events (Vermont Agency of Natural Resources
2004b).
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 11
As reported in the Phase 1 Assessment (Nealon and Blazewicz 2004) the dominant
watershed land cover/land use within the West Branch Watershed in Strafford is forest.
Only four of the forty subwatersheds assessed had high impact ratings for land use due
to agricultural and/or development. However, thirty-six of the forty reaches were
measured to have 10% or more of the river corridor in crop or developed land use.
Riparian buffers provide many benefits. Some of these benefits are protecting and
enhancing water quality, providing fish and wildlife habitat, providing streamside shading,
and providing root structure to prevent bank erosion. Twenty-one of the stream
reaches studied in the Phase 1 Assessment were found to have over 75 percent of the
reach with little or no buffer on one or more banks. These stream reaches which lack a
high quality riparian buffer are at a significantly higher risk of experiencing high rates of
lateral erosion (Nealon and Blazewicz 2004).
2.2 Geologic Setting
The West Branch watershed is located within the Northern Vermont Piedmont, or New
England uplands, physiographic region of Vermont. The geologic formation where the West
Branch watershed is located is a plateau-like landscape that rises gradually inland from the
sea (Van Diver, 1987). The rocks of the Northern Vermont Piedmont originated as marine
sediments laid down during the Devonian and Silurian Periods. These were later
metamorphosed into schists, phyllites, and crystalline limestones during the Acadian
Orogeny. These metamorphic rocks of the Northern Vermont Piedmont are generally
calcareous (Thompson and Sorenson 2005).
Between 18,000 and 20,000 years ago, Vermont was covered by the most recent of several
glacial advances that occurred during the Pleistocene. During this, the Wisconsin glaciation,
Vermont was buried under an ice sheet up to a mile thick. During this event, the mountains
and hills of the West Branch watershed were softened further, stripping off the soils and
earlier glacial deposits. All over the West Branch a thin layer of rocks and boulders was
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 12
laid down under the ice. The rocks and boulders found in the Valley’s soil are largely a
product of this glacial deposition.
As the glaciers retreated, numerous lakes formed between the ice and the high ground. In
the Connecticut River basin the very large glacial Lake Hitchcock was formed; it extended
all the way up the Connecticut River Valley with fingers reaching up into the
Ompompanoosuc River Valley. The shorelines of these lakes were often the receiving area
for copious fine sediments shed from the melting ice and surrounding barren landscape.
These glacio-lacustrine deposits, as they are known, are often prone to unpredictable
shifting and shearing. Near the Strafford/Thetford town line glacial clay deposits begin to
appear, evident by the large massive streambank failures that occur when they fail (Figure
2).
Figure 2: Glacial lake deposits are found in the lower reaches of the study area.
Except for the valley floors, Strafford is generally quite steep with slopes greater than 15%
and rather shallow soils (Strafford Planning Commission 2003). The dominant surficial
geology of the West Branch consists of alluvium, unsorted glacial till, and several ice contact
deposits. The reaches characterized as “E” channels within the West Branch study area
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 13
have alluvium, till, and ice contact as the dominant geologic material. Alluvium soils are
frequently flooded, however are only slight to moderately erodable. Ice contact soils,
which are formed in lakes, ponds, or streams in contact with glacial ice, are infrequently
flooded, however have severe erodibility. The majority of the A and B type channels have
till as the dominant geologic materials. These soils are rarely flooded and have very severe
erodibility.
No alluvial fans were identified within the study area. Grade control structures such as
ledge and dams were noted during the geomorphic assessment. Channel spanning ledge
was noted in eight of the forty reaches. Ledge acts as a grade control by keeping the base
elevation of a river from being lowered, thus preventing the river from incising in that
location.
2.3 Ecological Setting
Northern hardwood forests and mixed coniferous forests cover the majority of acreage in
the West Branch watershed. According to the Strafford Town Plan, more than 9,000 acres
are mixed coniferous-broadleaf, another 8,000 acres are hardwoods, and about 3,500 acres
are in pine and hemlock (Strafford Planning Commission 2003). The climate of these
forests is cool-temperate and moist. Summers are warm and winters may be severely cold.
Average annual temperatures range from 37º to 52ºF. Annual precipitation ranges from 35
to 50 inches in most areas and is distributed more or less evenly throughout the year.
Average annual snowfall is about 100 inches. Growing season length averages 100 to 110
days. Northern hardwood forests are typically characterized by soils that are neither
extremely dry nor extremely wet. Soil moisture varies with parent material, topography,
and depth to a restricting layer. Soils are mostly developed from glacial till, and bedrock is
close to the surface in some areas. Sandy or gravelly soils derived from glacial outwash are
found only locally, as are soils formed in lake bed deposits (Thompson and Sorenson 2000).
According to the Strafford Town Plan, there are 17 acres of wetlands in the town of
Strafford. In 2003, the forests of Strafford were said to have in excess of 2,230 acres of
deer wintering yards, principally contained in the three wildlife management areas, Podunk,
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 14
Clover Hill, and Kibling Hill. There has only been one officially recognized rare and
endangered botanical species in Strafford, it is located in a parcel that has been preserved by
the Upper Valley Land Trust in the Taylor Valley.
2.4 Flood History
There are no USGS stream gauges within the West Branch of the Ompompanoosuc
watershed. In order to better understand the flood history, long term data from the U.S.
Department of the Interior, U.S. Geological Survey (USGS) gauge on Ayers Brook at
Randolph, VT (gauge #01142500) was obtained. The Ayers Brook gauge was selected for a
number of reasons. These reasons are as follows: 1. The Ayers Brook gauge is in close
proximity to the West Branch watershed; 2. the stream flow of Ayers Brook is unregulated;
and 3. the drainage area at the Ayers Brook gauge is 30.5 square miles, which is similar to
the drainage area of the West Branch watershed at the Strafford/Thetford line. Sixty-four
years of record are available for the Ayers Brook gauge at Randolph, VT. The gauge
provides a continuous record of flow from 1940 through the present. Flow data from the
gauge on the Ompompanoosuc River at Union Village, VT could not be used for the flood
frequency analysis because peak discharge is influenced by flow regulation.
The long term record for Ayers Brook shows a 10 year discharge occurred in water year1
1949 and between a 25 and 50 year discharge occurred in 1952. During water years 1973
and 1998, the peak discharge exceeded the projected 50 year discharge. A graph of the
flood frequency analysis is provided in Figure 3 below. The only anecdotal evidence
available to BCE at the time of this report was from the Strafford selectboard. Selectboard
members told the SCC that a bridge on Old City Falls road washed out in 1973, thus
supporting the peak discharge record at the Ayers Brook gauge (personal communication
with Sally Mansur).
1 A water year is a twelve month period from October 1 through September 30
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 15
Ayers Brook at Randolph, VT
0
500
1000
1500
2000
2500
3000
3500
400019
4119
4319
4519
4719
4919
5119
5319
5519
5719
5919
6119
6319
6519
6719
6919
7119
7319
7519
7719
7919
8119
8319
8519
8719
8919
9119
9319
9519
9719
9920
0120
03
Year
Disc
harg
e
Annual Peaks 10 yr. discharge 25 yr. discharge 50 yr. discharge
Figure 3: Flood frequency analysis for USGS 01142500 Ayers Brook at Randolph Vermont. Peak streamflow data from 1940 through 2003 were used in the analysis.
2.5 Channel and Floodplain Management History
Natural and anthropogenic impacts may alter the delicate equilibrium of sediment and
discharge in natural stream systems and set in motion a series of morphological responses
(aggradation, degradation, and widening and/or planform adjustment) as the channel tries to
reestablish a dynamic equilibrium. Small to moderate changes in slope, discharge, and/or
sediment supply can alter the size of transported sediment as well as the geometry of the
channel; while large changes can transform reach level channel types (Ryan 2001). Human-
induced practices that have contributed to stream instability within the West Branch
Ompompanoosuc watershed include:
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 16
• Forest clearing
• Channelization and bank armoring
• Removal of woody riparian vegetation
• Floodplain encroachments
• Urbanization
• Poor road maintenance and installation of infrastructure
• Loss of wetlands
These anthropogenic practices have altered the delicate balance between water and
sediment discharges within the West Branch watershed. Channel morphologic responses
to these practices contribute to channel adjustment that may further create unstable
channels. The most common adjustment processes observed in the West Branch
watershed are widening and planform migration as a result of historic degradation within
the channel. Degradation is the term used to describe the process whereby the stream bed
lowers in elevation through erosion, or scour, of bed material. Aggradation is a term used
to describe the raising of the bed elevation through an accumulation of sediment. The
planform is the channel shape as seen from the air. Planform change can be the result of a
straightened course imposed on the river through different channel management activities,
or a channel response to other adjustment processes such as aggradation and widening.
Channel widening occurs when stream flows are contained in a channel as a result of
degradation or floodplain encroachment or when sediments overwhelm the stream channel
and the erosive energy is concentrated into both banks.
2.6 Past and Present Water Quality and Biological Data
The following sections are meant to provide a current summary of the ecological and
chemical health of the West Branch and its tributaries.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 17
2.6.1 Water Quality Data
The lower West Branch, below the Elizabeth Mine is listed on the State of Vermont
2004 303(d) Impaired Waters list. The listing is due to aesthetic and aquatic life
impairment from heavy metals in the river due to the mining activities at the Elizabeth
Mine. The West Branch upstream of the mine site is listed under Part C, “Waters in
Need of Further Assessment”. The section the Upper Village down to South Strafford
Village is listed as being possibly impaired for aesthetics and aquatic life due to
geomorphic instability. Further assessment, including information generated by the
Phase 1 and 2 and River Corridor Management Plan will assist in informing the 2006
303(d) list.
2.6.2 Benthic Macroinvertebrate Data
Vermont DEC Aquatic Biologist Steve Fiske has been monitoring the health of benthic
macroinvertebrates2 in the lower reaches of the West Branch for several years in order
to determine impacts of the Elizabeth Copper Mine on the health of the river. The
control site for these studies is located near the Strafford/Thetford town line just
upstream of the Tyson Road Bridge. In 2005, this site was rated at the upper end of
very good with higher density, richness and EPT numbers then seen in recent years at
the site. These results are typically a signal of benign enrichment, however the Bio
Index at the reach was very low and EPT/EPT&c high, indicating that any enrichment
stress at the reach has not altered the community composition (Fiske, 2006).
2.6.3 Fisheries Data
Very little data exists for the health of fish populations in the West Branch. In 2001, a
fish community evaluation of the West Branch was conducted by the Agency of Natural
Resources to document impacts from the drainage of the defunct Elizabeth Copper
Mine on the fish community. According to Rich Kirn, District Fisheries Biologist, “All
2 Freshwater benthic macroinvertebrates are animals without backbones that are larger than ½ millimeter (the size of a pencil dot). These animals live on rocks, logs, sediment, debris and aquatic plants during some period in their life. The benthos include crustaceans such as crayfish, mollusks such as clams and snails, aquatic worms and the immature forms of aquatic insects such as stonefly and mayfly nymphs.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 18
West Branch sites {both upstream and downstream of the copper mine} were rated as
having a low quality (brook trout) fisheries. The acid mine drainage study provided
evidence that the length of the river in non-compliance with the Vermont Class B water
quality standards for the fish community due to the impact of the mine is limited to, less
than 1.4 miles downstream of the confluence.” (Langdon 2002)
State Fisheries biologists from the Vermont DEC sampled Old City Brook in August of
2002. The brook contained an excellent community assemblage of brook trout, slimy
sculpin and blacknosed dace in the brook according to DEC records for this sampling
event.
3.0 STREAM GEOMORPHIC ASSESSMENT
The Vermont Agency of Natural Resources has developed protocols for conducting
geomorphologic assessments of rivers. Various trainings have been held to provide consultants
and regional planning commissions with the knowledge necessary to make accurate and
consistent assessments of Vermont’s rivers.
The stream geomorphic assessments are divided into three phases. The phase one assessment
is a rough analysis of the condition of the stream using aerial photographs, maps, and
preliminary field data collection. The phase two assessment is a more detailed analysis of the
stream by determining what adjustment processes are taking place and predicts how the river
will continue to evolve in the future. Phase three is the identification and implementation of
restoration projects.
Bear Creek Environmental was retained by the Strafford Conservation Commission to conduct
Phase 1 & 2 geomorphic assessments and bridge and culvert assessments of the West Branch of
the Ompompanoosuc River (Nealon and Blazewicz 2004, Nealon 2005, Blazewicz and Nealon
2006). These Phase 1 and 2 assessments were funded through a grant from the Upper Valley
Community Foundation. These data helped to pinpoint areas of concern and set the stage for
restoration work needed within the watershed.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 19
3.1 Phase 1 Stream Geomorphic Assessment Results
The Phase 1 geomorphic assessment evaluates parameters that may cause channel
adjustment. These parameters are grouped into four major categories: land use, instream
modifications, floodplain modifications, and bed and bank windshield survey. On the West
Branch, fourteen of the reaches had high impact ratings for channel modifications; these
reaches were mostly on the main stem and near the mouths of the tributaries (Figure 4).
The West Branch also had high impact scores for berms and roads, channel migration, and
bank erosion. Figure 5 shows a general trend of decreasing impact rating (i.e. improved
geomorphic stability) upstream of reach M11 and downstream of M06 on the mainstem.
Impact Rating for West Branch of Ompmpanoosuc River (out of possible 80)
0 10 20 30 40 50 60 70 80 90 100
Watershed Land UseCorridor Land Use
Riparian BufferFlow Regulation
Bridges and CulvertsBank Armoring
Channel Modif icationsDredging
Berms and RoadsRiver Corridor Dev.
Depositional FeaturesMeander Migration
Belt WidthAverage Wavelength
Bank ErosionIce Debris Jam Potential
Channel Modifications
Floodplain Modifications
Land Use
Bed & Bank Windshield Survey
Figure 4. Impact Rating for West Branch Ompompanoosuc River Watershed by Parameter and Category
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 20
Impact Ratings from Downstream to UpstreamMain Stem of the West Branch Ompompanoosuc River
0
5
10
15
20
25
M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13
Reach Number
Tota
l Im
pact
Sco
re
Figure 5. Impact Ratings from downstream to upstream on the main stem of the West Branch of the Ompompanoosuc River
3.2 Phase 2 Stream Geomorphic Assessment Results
A Phase 2 Stream Geomorphic Assessment of targeted reaches was conducted within the
West Branch watershed by Bear Creek Environmental in 2005 (Blazewicz and Nealon
2006). The study included ten reaches on the main stem of the West Branch River and the
six lowest reaches of six tributaries. The sixteen targeted reaches were further divided into
22 segments based on changes in confinement, stream type and stage of channel evolution
stage.
Information from the study came from the VDEC, the Vermont Mapping Program, and the
Vermont Center for Geographic Information, the Town of Strafford, and field data collected
by Bear Creek Environmental. The Phase 2 Rapid Stream Assessment included field
observations and measurements that are used to verify the Phase 1 stream geomorphic
data, to provide field evidence of channel adjustment processes, and rate the health and
condition of the riparian corridor and aquatic habitat. The channel dimensions were
measured within each of the segments using a tape and measuring rod as shown in Figure 6.
The collection and synthesis of the Phase 2 information can be used in watershed planning,
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 21
for the establishment of erosion hazard zones, and for the identification of watershed
improvement projects.
Figure 6. Ben Copans of the Vermont DEC measures the cross-sectional area of the Upper West Branch during summer 2005.
The Phase 2 Rapid Geomorphic Assessment (RGA) provides information on the
geomorphic condition of each segment within the study area (Figure 7 and Table 1). The
condition rating relates to the degree of adjustment a channel is undergoing. A channel in
“Reference” condition is not undergoing significant adjustment. “Good” condition indicates
some minor adjustments are occurring. The majority of Strafford streams fall into the
“Fair” geomorphic condition rating indicating major active adjustments are occurring. In the
worst scenario a “Poor” rating indicates extreme geomorphic adjustment Many of the
tributaries and the main stem of the West Branch in Strafford are experiencing high rates of
bank erosion. The bank erosion has been accelerated due to land use activities and channel
and floodplain modifications. Significant channel straightening, bank armoring, berming, and
floodplain encroachment have occurred within this river system both on the mainstem and
on the lower ends of the tributaries. These impacts have resulted in the loss of natural
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 22
energy dissipation of the river system via meandering and flooding the fields along the river.
Over time, the river has down cut into the streambed resulting in loss of floodplain access
and increased energy within the channel. The increased energy within the channel has lead
to severe bank erosion and subsequent channel widening. Along much of the main stem, the
river channel is currently migrating laterally to recreate a new floodplain at a lower
elevation to dissipate the energy and to become more stable (see Figure 8).
The disturbance and removal of the riparian vegetation in Strafford has decreased the
resistance of the streambanks to the erosive forces of the river. Rates of lateral adjustment
are influenced by the presence and condition of riparian vegetation. As the river works
toward a more stable equilibrium, the Strafford Community has the opportunity to
reestablish floodplain, improve riparian vegetation and protect the river from further
encroachments.
Table 1. Phase 2 Geomorphic Condition for West Branch Ompompanoosuc
Segment Number Existing Stream
Type RGA Score Reach Condition
M03 B3c 0.71 Good – Minor Adjustments
M04 B3c 0.50 Fair – Major Adjustments
M05 B4c 0.38 Fair – Major Adjustments
M06 C5 0.40 Fair – Major Adjustments
M07 C5 0.49 Fair – Major Adjustments
M08 C4 0.41 Fair – Major Adjustments
M09-A E4 0.58 Fair – Major Adjustments
M09-B E4 0.63 Fair – Major Adjustments
M10 C4 0.45 Fair – Major Adjustments
M11-A E4b 0.84 Good – Minor Adjustments
M11-C E4 0.58 Fair – Major Adjustments
M12 C3b 0.71 Good – Minor Adjustments
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 23
Table 1. Phase 2 Geomorphic Condition for West Branch Ompompanoosuc
Existing Segment Number RGA Score Reach Condition Stream
Type T2.01-A G3 0.48 Fair – Major Adjustments
T2.01-B C4b 0.63 Fair – Major Adjustments
T3.01-A E4b 0.59 Fair – Major Adjustments
T3.01-B G3 0.50 Fair – Major Adjustments
T4.01-A G4 0.53 Fair – Major Adjustments
T4.01-B E4b 0.58 Fair – Major Adjustments
T5.01 E4b 0.48 Fair – Major Adjustments
T6.01 C4b 0.68 Good – Minor Adjustments
T7.01 B3 0.56 Fair – Major Adjustments
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 24
Figure 7: Phase 2 Geomorphic Condition of the West Branch Ompompanoosuc Watershed
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 25
New Floodplain Bench, Fresh Deposition of Sediment
Figure 8. The West Branch is working to create a new floodplain bench in many areas.
4.0 WATERSHED SCALE HYDROLOGIC AND SEDIMENT MODIFIERS
Changes to the West Branch watershed have resulted in changes to the volume and timing of
runoff as it makes its way down into the stream channels. Changes in land use have also
affected the amount and sources of sediment that enter the river system.
4.1 Hydrologic Alterations
Hydrology refers to the study of water as it moves over (and within) the land. Channel
shape and pattern develops over time in relationship to climatic and landscape conditions.
Abrupt changes to the landscape or the amount and velocity of water as it moves into a
stream will have significant effects on the characteristics of the stream channel.
4.1.1 Land uses and wetland loss
During rain storms and snow melt events, the amount of water running over the surface
of the land increases, and in severe storms, flooding may result. Many wetlands,
particularly floodplain wetlands, have the capacity to temporarily store flood waters,
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 26
during high runoff events. As flood waters recede, the water is released slowly from the
wetland soils. By holding back some of the flood waters and slowing the rate that water
re-enters the stream channel, wetlands can reduce the severity of downstream flooding
and erosion.
In watersheds where wetlands have been lost, flood peaks may increase by as much as
80 percent (Vermont Agency of Natural Resources 2006b). Wetlands within and
upstream of urban areas are particularly valuable for flood protection. The impervious
surface in urban areas greatly increases the rate and timing of runoff.
Although data are lacking, it is likely that many wetlands in Strafford have been either
drained or filled and put to use – usually for agriculture. Loss of wetlands and an
increase in clearing and impervious surfaces (roads, driveways, rooftops, parking lots,
etc.) leads to changes in the hydrology of this watershed and therefore affects the flood
hazard, geomorphology, and habitat of the streams. Protection of existing wetlands in
the West Branch watershed is a good land use goal for the Town of Strafford.
4.1.2 Roads According to the Vermont 911 GIS road data layer, the West Branch of the
Ompompanoosuc River study area has a combined total of 89 miles of improved road
(not including driveways, logging roads, and or other unimproved roads). That is a
density of 2.2 miles of improved road per square mile of watershed. Although runoff
from the impervious surface of these road networks can transport sediment and other
materials into streams, in mountainous and hilly terrain the greater culprit seems to be
the ditches along the roads that intercept slow moving groundwater and convert it to
fast-moving surface water. The increased runoff in a watershed as a result of these
roads may increase the rates and extent of erosion, reduce groundwater recharge rates,
alter river channel morphology, and increase downstream flooding as well as flood
frequency (Forman and Alexander 1998).
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 27
4.2 Sediment Modifiers
From a geomorphic perspective, researchers and land managers are increasingly interested
in the response of erosion and sedimentation to changes occurring on watershed hillslopes
or in stream channels. Managers need to predict how land use will alter erosion and
sedimentation rates and the relative importance of different sediment sources in order to
assign priorities for erosion control. They also must anticipate where sediment will be
deposited, how long it will be stored, and how it will be re-mobilized.
Common modifiers of sediment load and transport in the West Branch study area are:
Increase Sediment Load:
Unvegetated tilled cropland – is exposed to wind and water. Nine percent of the
Town of Strafford (2,541 acres) was thought to be in hay/crop/farm use in 1995
(Strafford Planning Commission 2003).
Cleared, exposed soils from forestry, agriculture, or for development – are exposed
to wind and water. Sedimentation of the West Branch can be limited if such clearing is
followed by measures that minimize erosion and encourage regeneration of vegetation
on the site.
Sanding of town roads and storage of sand – increases the amount of fine sediment
that may run off of the landscape. At the time of this plan, the Town of Strafford has
voted to relocate the town sand storage yard and is working to implement this project.
Accelerated bank erosion due to riparian vegetation removal and/or channel
alterations – major channel adjustment, which is occurring in seventeen of twenty-one
reaches, adds sediment to the river system as the river erodes its banks and bed.
Decrease Sediment Load (and therefore increases bank erosion and channel migration):
Gravel extraction from the river channel – decreases available sediment that river
needs to move thus making it sediment deficient and causing erosion or scour
downstream. Gravel extraction in the West Branch watershed has been limited to only
one permit in 2005.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 28
Increase Sediment Transport:
Straightened stream channels – increase the velocity of the stream and therefore its
ability to transport sediment. Seven of the ten main stem reaches included in this River
Corridor Management Plan had greater than 30% of the channel length straightened.
Stormwater ditches - increase the velocity of water and therefore its ability to
transport sediment. Twenty-eight stormwater inputs were found during the Phase 2
geomorphic assessment.
Decrease Sediment Transport:
Undersized stream crossings – capture sediment in unnatural patterns, may create
scour downsteam. The 2004 Bridge and Culvert survey of public stream crossings
identified 39 undersized structures in the West Branch watershed.
Overwidened channels – are unable to move sediment effectively through them.
Channel widening was found to be a current adjustment process on half of the Phase 2
reaches.
5.0 REACH SCALE STRESSORS
Stream condition and stability is determined by a combination of many factors. Often, small
impacts tend to accumulate into reach scale impairment. The maps in the Appendix depict
some of the major impacts that are occurring within the study area. The maps are laid out
from upstream to downstream starting near the intersection of Taylor Valley Road and the
Justin Morrill Highway.
5.1 Vertical Constraints
Grade controls are critically important features in maintaining bed elevation and overall
channel stability, and in determining upstream migration of many aquatic organisms,
primarily fish. By definition, grade controls must extend across the entire bankfull channel
from bank to bank in order to function as true controls. Natural and man-made features
which may serve as grade controls include:
Waterfall - Bedrock that extends across the channel and forms a vertical, or near vertical, drop in the channel bed
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 29
Ledge - Bedrock that extends across the channel and forms no noticeable drop in the channel bed, or only a gradual drop in the channel bed Dam - High cross-channel structures Weir - At-grade or low cross-channel structures
There were only four grade control features found in the West Branch study area. These
features were all located in the upstream portion of the stream. Channel spanning ledge
was found below the Upper Village in reach M09-A just upstream of Eastburn Drive. Above
the Upper Village, at reach M10, the remnants of an old dam still span the channel of the
West Branch providing grade control. In the tributaries, grade control was found at the
upstream end of Brook Road Brook (T6.01). Channel spanning ledge was also found on
Old City Falls Brook (T7.01) upstream from the Justin Morrill Highway bridge.
5.2 Lateral Constraints
Though we often associate floodplains with large rivers, over time, even streams in semi-
confined valleys will have created a certain amount of floodplain. In addition to providing
floodwater storage and attenuation, a floodplain is often the space (or river corridor)
through which stream channels meander over time, undergoing planform adjustment and
thereby slope adjustment. The availability of space for slope adjustment is critical to the
stream in reaching equilibrium with the size and quantity of sediment produced in the
watershed. A stream cut off from its floodplain may have less room to meander and be
forced into a higher gradient form. If this higher gradient translates into stream power that
can move even larger particles in the stream bed, the channel may begin to degrade (or
incise), cutting down into its streambed and initiating the channel evolution process
(Vermont Agency of Natural Resources 2005a).
Berms and roads, and the hardened embankments often used to protect them, limit the
lateral adjustments of the stream within the corridor and may contribute to onset of
vertical adjustments within the channel. Developed land, including highways, roads, and
railroads, in close proximity to the stream may be a clue that the stream bank has been
bermed to protect the infrastructure and investments. In the West Branch watershed,
there are several dominant lateral constraints that have impacted the channel. Route 132
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 30
and the Justin Morrill Highway both have, in areas, considerably limited the area within
which the West Branch is able to adjust laterally. Hard armoring placed in order to protect
this infrastructure has led to increased instability in the system. In addition to these two
major roads, minor roads in the watershed impact tributaries in numerous places.
Structures that encroach into the river corridor are not only threatened by the river, but
the armoring and berming of the river banks often deemed necessary to protect these
investments may pose a threat to downstream areas, by limiting slope adjustments and
increasing flood velocities and stream power of the confined stream. Floodplain
encroachments typically concentrate flow in the channel during floods, increasing the stress
of flood flows on the channel bed and banks. They can also effectively turn a response or
depositional stream into a transfer stream, which may lead to an increase in sediment
loading and aggradation, as well as bank erosion, in downstream reaches.
5.3 Bridge and Culverts
Stream crossings can disrupt the sediment transport and/or the movement of fish and
wildlife within a stream reach. Forman and Alexander (1998) summarize bridge and culvert
impacts on stream morphology and hydrology. They write that, “Streams may be altered for
considerable distances both upstream and down-stream of bridges…. The fixed stream (or
river) location at a bridge or culvert reduces both the amount and variability of stream
migration across a floodplain. Therefore, stream ecosystems have altered flowrates, pool-
riffle sequences, and scour, which typically reduce habitat-forming debris and aquatic
organisms.”
Furthermore, the Vermont Department of Fish and Wildlife (2005) states, “The biological
consequences of improper culvert installation to aquatic communities are many, and may
include:
• direct loss of aquatic habitat • loss of resident aquatic populations (by preventing recolonization of upstream habitat
after catastrophic events, such as floods or toxic discharges) • loss of access to critical spawning, rearing, feeding or refuge habitat for aquatic
organisms • altered aquatic community structure (e.g. species composition, distribution)
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 31
• altered genetic composition of aquatic populations”
Bear Creek Environmental was retained by the Strafford Conservation Commission (SCC)
to conduct a Bridge and Culvert Assessment of the West Branch of the Ompompanoosuc
River watershed limited to the Town of Strafford. The Vermont Agency of Natural
Resources Bridge and Culvert Assessment and Survey Protocols (dated April 2004) were
used to conduct a rapid assessment of stream crossings. The study relied on volunteers
from the SCC to assist with the field data collection. The objective of the study was to red-
flag structures that are potential barriers to fish and wildlife movement and/or are flood or
erosions hazards. A total of 39 bridges and culverts within the Town of Strafford were
surveyed during September 2004. The stream crossings included 28 bridges and 10 culverts
on state and town roads and one private bridge within reach M07 (Nealon 2005). All of the
structures surveyed were red flagged by the VDEC’s database as being geomorphologically
incompatible due to flood and/or erosion hazards. Eleven of these structures were
designated Priority I structures. Bridges and culverts with channel widths of approximately
50 percent of the bankfull width or less, which were significantly impeding natural sediment
transport were placed in Category 1. Structures which block aquatic organism passage
were also generally placed in the Priority 1 category. Therefore, the Priority 1 category
contains structures that have highest priority for replacement due to geomorphic
incompatibility and aquatic organism passage (see Figure 9 or map of priority structures).
Long term stability of stream channels and structures is more likely when the geomorphic
context and sediment transport needs of a stream channel are given consideration when
designing new and rehabilitating existing structures. The Town of Strafford could establish
ordinances or identify zoning requirements which would ensure adherences to proper siting
and design practices for future development, especially on private crossings.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 32
Figure 9: Priority 1 Structures for replacement in Strafford, Vermont within the Ompompanoosuc River
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 33
6.0 Stream Adjustment, Sensitivity, and Fluvial Erosion Hazard Mapping
6.1 Channel Evolution
The stability of a stream channel is based on maintaining a certain flow of water, shape and
slope of the channel, and sediment load. When any of these change significantly, the river
channel must change, typically resulting in erosion of the stream bed or banks. Between the
1700's and the 1800's, the building of roads and railroads within the floodplains,
deforestation, and moving streams to accommodate agricultural fields and villages resulted
in unstable river channels. Even in recent decades, large-scale channelization practices have
been employed to reclaim damaged lands after large flood events. The 1970's and 1980's
were also a period of extensive gravel mining in many Vermont streams. Post-flood channel
straightening and gravel mining of point bars have the effect of steepening stream channels.
A steep channel in a relatively flat valley may initiate a bed degradation, or downcutting
process. Once a stream begins to degrade, it will typically erode its way through an
evolution process until it has created a new floodplain at a lower elevation in the landscape.
The common stages of channel evolution, as depicted in Figure 10 include:
• A pre-disturbance period
• Incision – Channel degradation
• Aggradation and channel widening
• The gradual formation of a stable channel with access to its floodplain at a lower
elevation.
The bed erosion that occurs when a meandering river is straightened in its valley is a
problem that translates to other sections of the stream. Localized incision will travel
upstream and into tributaries eroding sediments from otherwise stable streambeds. These
bed sediments will move into and clog reaches downstream leading to lateral scour and
erosion of the streambanks. Channel evolution processes may take decades to play out.
Even landowners that have maintained wooded areas along their stream and riverbanks may
have experienced eroding banks as stream channel slopes adjust to match the valley slopes.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 34
I STABLE
II INCISION
III WIDENING
IV STABILIZING
V STABLE
FLOODPLAIN
Q1.5
Q10
Q10
Q10
Q1.5
TERRACE 1
TERRACE 1
TERRACE 2
(Headcutting)
(Bank Failure)
Figure 10: Typical Channel Evolution Model following incision.
It is difficult for streams to attain a new equilibrium where the placement of roads and
other infrastructure has resulted in little or no valley space for the stream to access or to
create a floodplain. Landowners and government agencies have repeatedly armored and
bermed reaches of Vermont’s rivers to contain floodwaters in channels. These efforts have
proven to be temporary fixes at best, and in some cases have lead to disastrous property
losses and natural resource degradation. A more effective solution is to limit
encroachments within the riparian corridor and maintain a buffer of woody vegetation
between the stream and adjacent land uses. Maintaining vegetated riparian corridors and
offsetting development limits the conflict between property investments and the natural
processes of flooding and channel migration that occurs gradually over time. Given room, a
channel can adjust its shape and slope to changes in flow and sediment load. In general, the
space provided by an established riparian corridor allows the river or stream system to be
more resilient to watershed changes, thereby protecting the fish, wildlife, and humans that
depend on Vermont’s rivers and streams (Vermont Agency of Natural Resources 2005d).
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 35
The reach condition ratings of West Branch indicate that many of the reaches are actively,
or have historically, undergone a process of minor or major geomorphic adjustment. The
most common adjustment processes in the West Branch are widening and planform
migration as a result of historic degradation within the channel. Degradation is the term
used to describe the process whereby the stream bed lowers in elevation through erosion,
or scour, of bed material. Aggradation is a term used to describe the raising of the bed
elevation through an accumulation of sediment. The planform is the channel shape as seen
from the air. Planform change can be the result of a straightened course imposed on the
river through different channel management activities, or a channel response to other
adjustment processes such as aggradation and widening. Channel widening occurs when
stream flows are contained in a channel as a result of degradation or floodplain
encroachment or when sediments overwhelm the stream channel and the erosive energy is
concentrated into both banks.
Most of the reaches studied in the West Branch of the Ompompanoosuc River watershed
are undergoing a channel evolution process in response to large scale changes in its
sediment, slope, and/or discharge associated with the human influences on the watershed.
Table 2 below summarizes the channel evolution of each study reach and the primary
adjustment processes that are occurring.
Table 2. Stream Type and Channel Evolution Stage
Segment Number
Incision Ratio
Width to Depth Ratio
Reference Stream
Type
Existing Stream
Type
Channel Evolution
Stage
Major Active Adjustment
Process
M03 1.0 24.8 B B3c 1 None
M04 1.8 24.8 C B3c III Aggradation
Planform Widening
M05 2.6 21.3 C B4c III Aggradation
Widening Planform
M06 1.8 11.7 E C5 IV Aggradation
Widening Planform
M07 1.3 18.5 E C5 III Aggradation
Widening Planform
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 36
Table 2. Stream Type and Channel Evolution Stage
Segment Number
Incision Ratio
Width to Depth Ratio
Reference Stream
Type
Existing Stream
Type
Channel Major Active Evolution Adjustment
Stage Process
M08 1.4 13.0 E C4 III Aggradation
Widening Planform
M09-A 1.3 8.7 E E4 III Aggradation Planform
M09-B 1.1 9.0 E E4 IId Aggradation Planform
M10 1.9 12.5 E C4 III Aggradation
Widening Planform
M11-A 1.0 10.0 E E4b I None
M11-C 1.3 10.8 E E4 III Aggradation Widening Planform
M12 1.0 12.0 C C3b I None
T2.01-A 2.4 8.9 C G3 II Aggradation
Widening Planform
T2.01-B 1.0 15.5 C C4b IId Aggradation
Widening Planform
T3.01-A 1.0 7.4 E E4b IV Aggradation Widening Planform
T3.01-B 2.3 10.1 E G3 II Widening
T4.01-A 2.0 5.8 E G4 II Widening Planform
T4.01-B 1.6 9.3 E E4b III Aggradation Widening Planform
T5.01 2.0 7.8 C E4b II Aggradation
Widening Planform
T6.01 1.2 10.9 C C4b IV Planform
T7.01 1.7 23.0 C B3 III Aggradation Red bold lettering - denotes extreme adjustment process Bold Black lettering – denotes major adjustment process
Black lettering (no bold) – denotes minor adjustment process
The West Branch and the lower reaches of its tributaries are predominately between stages
II and IV of the “F-stage” channel evolution model (Vermont Agency of Natural Resources
2005b; Vermont Agency of Natural Resources 2004). In many reaches the channel has
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 37
undergone historic degradation. Many of the cross sections of study reaches were found to
be incised. The incision ratio ranged form 1.0 to 2.6. Five of the segments were found to
have a bankfull elevation that was at least one mean bankfull depth lower than the top of
the low bank indicating a high level of bed degradation. Along many of the main stem
reaches and near the mouths of the tributaries, the system is actively adjusting to this lower
bed elevation by moving laterally and widening in order to create a new floodplain at a
lower elevation. This widening and planform adjustment is leading to another adjustment
process, aggradation. Aggradation in the West Branch study area seems to be a
combination of endogenous sources of sediment that are brought into the system as the
stream widens and erodes its banks to reestablish a new floodplain as well as from
exogenous processes such as erosion and runoff from gravel roads and land clearing that
bring sediment into the stream channel. Unvegetated mid channel bars, point bars in “E”
type channels, side bars and impending neck cutoffs confirm the channel is undergoing
extensive lateral migration.
Several segments within the West Branch study area fell into another channel evolution
model. The “D-stage” channel evolution model applies to reaches where there may have
been some minor historic incision; however, the more dominant active adjustment process
is aggradation, which then in turn leads to channel widening and planform adjustment. This
evolution is occurring in reaches M09-B and T2.01-B where aggradation is a major channel
adjustment process. In the IId stage, a stream channel becomes extremely depositional.
Lateral migration is extensive as the stream shifts through different channels and flood
chutes and actively erodes its outside banks. Eventually, if the sediment supply stabilizes,
the channel width will begin to narrow through the development of large bar features,
which will eventually recolonize with shrubs and trees. A riffle-pool sequence will
redevelop as the stream reconnects with a floodplain. Both segments M09-B and T2.01-B
appear to be in the IId stage.
6.2 Stream Sensitivity
Sensitivity refers to the likelihood that a stream will respond to a watershed or local
disturbance or stressor, such as; floodplain encroachment, channel straightening or
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 38
armoring, changes in sediment or flow inputs, and/or disturbance of riparian vegetation.
Assigning a sensitivity rating to a stream is done with the assumption that some streams,
due to their setting and location within the watershed, are more likely to be in an episodic,
rapid, and/or measurable state of change or adjustment. A stream’s inherent sensitivity may
be heightened when human activities alter the setting characteristics that influence a
stream’s natural adjustment rate including: boundary conditions; sediment and flow regimes;
and the degree of confinement within the valley. Streams that are currently in adjustment,
especially those undergoing degradation or aggradation, may become acutely sensitive
(Vermont Agency of Natural Resources 2005a).
Figure 11 is a map presenting the existing stream types found in the West Branch
watershed. Most of the reaches are Rosgen (1996) “E” or “C” channels by reference. E
and C channels have wide valleys and moderate to gentle gradients. The difference
between E and C channels is largely due to the difference in the shape of the channel. E
channels have very low width to depth ratios and are highly sinuous by reference. This
means that E channels are narrow and deep and have a long channel length relative to the
valley length. C channels are typically wider and shallower and have moderate to high width
to depth ratios and sinuosity. B channels have moderate to steep slopes and have narrower
valleys than E or C channels. The stream sensitivity of these reaches, generalized according
to stream type and condition are depicted in Table 3 and in Figure 12.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 39
Figure 11. Phase 2 Existing Stream Types
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 40
Table 3. Stream Sensitivity for Phase 2 Reaches
Segment
Number
Reference
Stream
Type
Existing
Stream
Type
Stream
Type
Departure
Geomorphic
Condition
Sensitivity
M03 B3c B3c No Good Moderate
M04 C4 B3c Yes Fair High
M05 C4 B4c Yes Fair High
M06 E5 C5 Yes Fair Very High
M07 E5 C5 Yes Fair Very High
M08 E4 C4 Yes Fair Very High
M09-A E4 E4 No Fair Very High
M09-B E4 E4 No Fair Very High
M10 E4 C4 Yes Fair Very High
M11-A E4b E4b No Good High
M11-C E4 E4 No Fair Very High
M12 C3b C3b No Good Moderate
T2.01-A C4b G3 Yes Fair Extreme
T2.01-B C4b C4b No Fair Very High
T3.01-A E4b E4b No Fair Very High
T3.01-B E4b G3 Yes Fair Extreme
T4.01-A E4b G4 Yes Fair Extreme
T4.01-B E4b E4b No Fair Very High
T5.01 C4 E4b Yes Fair Very High
T6.01 C4b C4b No Good High
T7.01 C3b B3 Yes Fair High
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 41
Figure 12: Phase 2 Stream Sensitivity Map
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 42
6.3 Fluvial Erosion Hazard Zones
Of all types of natural hazards experienced in Vermont, flash flooding represents the most
frequent disaster mode and has resulted in by far the greatest magnitude of damage suffered
by private property and public infrastructure. While inundation-related flood loss is a
significant component of flood disasters, the predominate mode of damage is associated
with the dynamic, and oftentimes catastrophic, physical adjustment of stream channel
dimensions and location during storm events due to bed and bank erosion, debris and ice
jams, structural failures, flow diversion, or flow modification by man made structures.
These channel adjustments and their devastating consequences have frequently been
documented wherein such adjustments are related to historic channel management
activities, floodplain encroachments, adjacent land use practices and/or changes to
watershed hydrology associated with land use and drainage.
The purpose of defining Fluvial Erosion Hazard Zones is to prevent increases in fluvial
erosion resulting from uncontrolled development in identified fluvial erosion hazard areas;
minimize property loss and damage due to fluvial erosion; prohibit land uses and
development in fluvial erosion hazards areas that pose a danger to health and safety; and
discourage the acquisition of property that is unsuited for the intended purposes due to
fluvial erosion hazards.
The basis of a Fluvial Erosion Hazard Zone is a defined river corridor which includes lands
adjacent to and including the course of a river. The width of the corridor is defined by the
lateral extent of the river meanders, called the meander belt width, which is governed by
valley landforms, surficial geology, and the length and slope requirements of the river
channel. The width of the corridor is also governed by the stream type and sensitivity of
the stream. River corridors, defined through VDEC Geomorphic Assessments (2004), are
intended to provide landowners, land use planners, and river managers with a meander belt
width which would accommodate the meanders and slope of a balanced or equilibrium
channel, which when achieved, would serve to maximize channel stability and minimize
fluvial erosion hazards. Figure 13 represents a draft Fluvial Erosion Hazard Map for the
Town of Strafford.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 43
Figure 13: DRAFT Fluvial Erosion Hazard (FEH) Map for Strafford, VT.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 44
6.4 Riparian Corridor Widths for Protection
It is important to note that the area deserving consideration for conservation, restoration,
or protection from encroachment may extend beyond FEH zones. For example, riparian
buffers measuring back from the top of an existing stream bank may extend beyond an FEH
zone in order to capture some of the other ecological and water quality benefits of buffers
above and beyond the erosion hazard risk that is outlined in the FEH zone. Riparian
landowners are encouraged to work on a voluntary basis with the Strafford Conservation
Commission to protect and enhance riparian corridors along the West Branch through the
implementation of river corridor projection projects.
7.0 REACH SCALE PROJECT IDENTIFICATION AND PRIORITIZATION
7.1 Restoration Approaches
The restoration of the West Branch may focus on one or a combination of the following
strategic approaches.
Active Geomorphic: This approach seeks to restore or manage rivers to a geomorphic
state of dynamic equilibrium through an active approach that may include human-
constructed meanders, floodplains, and bank stabilization techniques. This approach tends
to have high upfront cost. Typically, the active approach involves the design and
construction of a management application or river channel restoration project in an attempt
to achieve stability in a relatively short period of time. This approach may involve restoring
sections of river to their reference condition or may involve recognizing new valley
conditions imposed by human constraints and working within those constraints. Active
riparian buffer revegetation and long-term protection of a river corridor is essential to this
alternative.
Passive Geomorphic: A passive geomorphic approach is targeted at allowing rivers to
return to a state of dynamic equilibrium by removing constraints from a river corridor
thereby allowing the river, utilizing its own energy and watershed inputs to re-establish its
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 45
meanders, floodplains, and self maintaining, sustainable equilibrium condition over an
extended time period. This approach is typically less expensive, however, may take much
longer to achieve desired results. Active riparian buffer revegetation and long-term
protection of a river corridor is also essential to this alternative. (Vermont Agency of
Natural Resources 2005c)
7.2 River Corridor Project Types
The State of Vermont River Management Program has outlined five project types to further
identify opportunities and address major issues on a reach level. River restoration within
the West Branch will likely combine a variety of these project types in order to manage for
systemic equilibrium. These five project types are:
Conservation Reaches - least disturbed, where river structure and function and
vegetation associations are relatively intact. Remnant or refuge reaches would provide a
good base to work out from, into more degraded reaches in the watershed.
High Recovery Reaches. These reaches show signs or potential for self-adjustment, in a
manner that fits the present-day setting and stream type. Management efforts that work
with the current tendencies of the river could achieve quick and visible success. High
Recovery Reaches are those undergoing lateral adjustments, where minimally invasive
approaches to increase bank stability will accelerate recovery while meeting the concerns of
the landowner.
Moderately Unstable Reaches - Moderately unstable reaches may be defined as over-
widened with only localized vertical instability and have a reasonable potential to recover.
An active geomorphic approach would require an invasive management strategy (consisting
of changes to dimension and some bed form restoration). In most cases, restoration of
moderately unstable reaches is best done where watershed deposition and transport
stressors have been evaluated and have either been treated or deemed to pose only minor
risk to the stability of the project.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 46
Incising Reaches - These are very high priority river reaches which are sensitive to
disturbance, and where adjustments may trigger off-site responses (There were no incising
reaches found in the Phase 2 assessment; however, they may exist within the watershed).
These projects involve a pro-active management strategy. If action is not taken at these
sites, the adjustments set in motion may lead to watershed-scale changes that would be
uncontrollable without inordinate, impractical expense. The key example is the
management of nick points (incision) or bed level instability. If incision issues are not
addressed, significant upstream and downstream instability could develop.
Highly Unstable Reaches - typically involve large scale vertical adjustments where the
river/floodplain relationship is significantly different from that of equilibrium conditions. An
active geomorphic approach would require an invasive management strategy (consisting of
changes to dimension, pattern, and profile). Highly unstable reaches have a natural recovery
potential considered in terms of decades (10-50 yrs.) and are found to be high-sediment
source and/or accumulation zones. Given the costs and risks associated with actively
restoring vertically unstable reaches, highly unstable reaches may be ideal candidates for a
passive geomorphic approach. Physical intervention in highly-unstable reaches is often
expensive with an uncertain outcome. In most cases, restoration is best done once
upstream (and in some cases, downstream) sites have been dealt with and watershed-wide
sediment and vegetation management plans have been implemented.
Based on Phase 2 Geomorphic Assessment results, classification of river corridor project
types have been identified in Figure 14 and in Table 4.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 47
Table 4: Classification of River Corridor Project Types
Segment Number Stream Condition River Project Type
M03 Good Conservation Reach
M04 Fair Highly Unstable Reach
M05 Fair Highly Unstable Reach
M06 Fair Highly Unstable Reach
M07 Fair Highly Unstable Reach
M08 Fair Highly Unstable Reach
M09-A Fair Highly Unstable Reach
M09-B Fair Moderately Unstable Reach
M10 Fair Highly Unstable Reach
M11-A Good Conservation Reach
M11-C Fair Highly Unstable Reach
M12 Good Moderately Unstable Reach
T2.01-A Fair Highly Unstable Reach
T2.01-B Fair Moderately Unstable Reach
T3.01-A Fair High Recovery Reach
T3.01-B Fair Highly Unstable Reach
T4.01-A Fair Highly Unstable Reach
T4.01-B Fair Highly Unstable Reach
T5.01 Fair Highly Unstable Reach
T6.01 Good High Recovery Reach
T7.01 Fair Highly Unstable Reach
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 48
Figure 14: Restoration project types.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 49
7.3 Specific Project Strategies The following sections provide information on the six river corridor project types defined
by the VDEC. Each project type includes a table outlining major strategies that may be
employed at specific reaches. Following the table are general recommendations for action
adopted from the VDEC worksheet, “Using geomorphic assessment data to guide the
development of River Corridor Management Plans to achieve: Fluvial Erosion Hazard (FEH)
Mitigation; Sediment and Nutrient Load Reduction; ecological-based River Corridor
Conservation”.
7.3.1 Conservation Reaches
Conservation reaches are generally in stable geomorphic condition and need little
restoration work. In Strafford, only two conservation reaches were identified on the
mainstem. These reaches typically have a healthy riparian buffer (see Figure 15) which
lend to their stability. Conserving a riparian corridor along these reaches is good policy.
General strategies for restoration may include the following:
• IMPLEMENT FEH ZONES • PROTECT RIVER CORRIDOR • REPLACE UNDERSIZED STRUCTURES IF NECESSARY
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 50
Figure 15: Reach M03, has a healthy riparian buffer that provides an opportunity for conservation.
7.3.2 High Recovery Reaches
High recovery reaches are generally in good to fair geomorphic condition and exhibit
expected channel dimensions, profile, and patterns (Figure 16). These reaches may have
already undergone significant adjustment or may be prevented from undergoing a major
adjustment process through proactive work. Restoration of these reaches is best
approached with a passive or light active approach to restoration. General strategies
for returning these river segments to health may include the following:
• PLANT RIPARIAN BUFFERS • IMPLEMENT FEH ZONES • PROTECT RIVER CORRIDOR • REPLACE UNDERSIZED STRUCTURES IF NECESSARY • ATTENUATE STORMWATER IF NECESSARY • TREAT STREAMBANK FAILURE THROUGH MINIMALLY INVASIVE APPROACHES IF THERE IS A THREAT TO PROPERTY OR INFRASTURE. • CONDUCT PHASE 3 (IF NECESSARY)
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 51
Figure 16: Reach T2.01-B, Downer Forest Brook, is an exemplary high recovery reach.
7.3.3 Moderately Unstable Reaches
Moderately unstable reaches may not have expected channel dimensions, patterns, or
profile (see Figure 17). Moderately unstable reaches are best approached through
conducting alternatives analysis in order to determine the best strategy for restoration.
General strategies for implementation may include the following:
• IMPLEMENT FEH ZONES • PROTECT RIVER CORRIDOR • REPLACE UNDESIZED STRUCTURES • PLANT RIPARIAN BUFFERS • ATTENUATE STORMWATER IF NECESSARY • CONDUCT A PHASE 3 ASSESSMENT AND ALTERNATIVES ANALYSIS
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 52
Figure 17: Reach M12, which begins at the confluence of Tunbridge Brook, is moderately unstable.
7.3.4 Highly Unstable Reaches
Restoration of highly unstable reaches is best approached with caution. These reaches
are often severely incised, aggrading, or exhibiting major planform or widening
processes (see Figure 18). Passive restoration techniques are preferred, as active
geomorphic restoration of unstable reaches is often very expensive and unsuccessful.
The very dynamic nature of these streams lends to the challenge of active restoration.
The best technique may be to relieve the stream of obvious stressors such as
undersized structures or other impairments to sediment transport and then to look for
opportunities to develop a new floodplain. General strategies that are appropriate for
these river segments are to:
• IMPLEMENT FEH ZONES • PROTECT RIVER CORRIDOR • REPLACE UNDERSIZED STRUCTURES • PLANT RIPARIAN BUFFERS (SET AWAY FROM THE TOP OF BANK) • ATTENUATE STORMWATER IF NECESSARY
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 53
Figure 18: M07 is a highly unstable reach that is undergoing major geomorphic adjustment.
8.0 PRIORITY PROJECT IDENTIFICATION
8.1 General Recommendations for Project Prioritization
The following topics have been prepared by the Mike Kline (ANR) to help guide communities in prioritizing river restoration projects. Prioritizing River Corridor Protection: Higher Priority – Give higher priority for river corridor protection for highly sensitive reaches that are critical for attenuating floodwaters and sediment (from upstream to downstream) or sensitive reaches where there is a major departure from equilibrium conditions and development is threatening the stream corridor. Lower Priority – Wooded corridors experiencing very little threat from encroachment and less sensitive reaches not playing a significant role in storing floodwaters and sediment in the watershed may be given lower priority for river corridor protection. Prioritizing River Buffer Planting: Higher Priority – It is important to establish a buffer of vegetation on all reaches from a water quality and habitat standpoint. From a stream stability standpoint, give higher priority to tree planting, as a stand alone treatment or in combination with stream bank stabilization, on those sensitive reaches that are vertically stable.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 54
Lower Priority – Give lower priority to tree planting, as a stand alone treatment or in combination with streambank stabilization, on those reaches, while exhibiting stable conditions, are extremely sensitive due to their watershed location. On areas where active adjustment is occurring, use low cost native grasses and shrubs in the near bank region and more expensive tree stock that may mature and lend to long term stability should the stream migrate to the outer extent of its belt width. Prioritizing Streambank Stabilization: Higher Priority - Give priority to geomorphically stable reaches where stabilization would slow down lateral movement enough to allow for the re-establishment of a riparian buffer. Also give priority to areas where human-placed structures are at high risk and not taking action may result in increased erosion risk to lands that may otherwise have the opportunity to establish a riparian buffer. Lower Priority - A lower priority may be given to reaches where there is no conflict with the erosion process and the increase in sediment to downstream reaches may contribute beneficially to the floodplain development process. Prioritizing the Arresting of Streambed Incision: Higher Priority - Reaches where the bed lowering process will lead to a significant loss of floodplain and/or human-placed structures if a channel evolution process were to be initiated may be given high priority for arresting streambed incision. Lower Priority – Reaches where natural grade controls exist upstream of the nickpoint and where the reach is sensitive to high bed load deposition and the nickpoints are a result of meander cutoffs and braiding may be given lower priority for arresting migrating nickpoints. In these instances floodplain reconnection may be a relatively rapid process. Prioritizing Berm Removal: Higher Priority – Reaches where a significant (>50%) portion of the river corridor would become accessible to the stream for meander redevelopment and/or floodplain access, if the berm were removed, may be given higher priority. Berm removal is also of higher priority if the berm constitutes the predominate reason why the reach is incised and/or human structures would not be at greater risk to flood inundation or erosion if the berm were removed. Lower Priority – Berms vegetated with mature trees may be given lower priority for removal. The removal of such berms may cause major land disruption and habitat impacts, and the benefits to the channel are less certain. Berm removal as a stand alone treatment on reaches that would be severely incised even if the berm were removed may also be of lower priority. Prioritizing the Removal or Replacement of Structures: Higher Priority – Those structures which are derelict (i.e., no longer serving as stream crossing or flow control structure), which contribute to a significant increase in erosion
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 55
hazard due to a constriction-related disruption of sediment transport in the system (i.e., major aggradation upstream and/or degradation downstream of the constriction) and/or are likely to result in an avulsion of the channel during a storm event due to blockage or alignment issues may be given higher priority for the removal or replacement of structures. Lower Priority – Those structures which, if removed, would result in little change in level of erosion hazard at the site and the removal would potentially result in the need for restoration of the channel due to changes in stream conditions and/or sediment transport may be given lower priority. Prioritizing Restoration of Incised Reaches: Higher Priority – Give higher priority to restoration of incised reaches where it is possible, due to the lack of encroachment, to either passively or actively restore some degree of floodplain function at a lower elevation. This may include the rare, but important, opportunities to restore the river from a recent channel avulsion that has disconnected from the former floodplain. Lower Priority – Reaches with little to no opportunity to restore meanders and floodplain and the restoration would mainly involve placing structures to minimize erosion hazards, ensure sediment transport, and improve habitat may be given lower priority for restoration. Also of lower priority is the active restoration of reaches that incised due to changes in the hydrologic and sediment regimes of the watershed. Prioritizing Restoration of Aggraded Reaches: Higher Priority – Reaches aggrading and widening at a localized scale due to bank erosion are more likely to benefit from active restoration. Lower Priority – Active restoration of reaches that are aggrading due to changes in the hydrologic and sediment regimes of the watershed may be of lower priority. 8.2 Specific Project Recommendations for Strafford
Specific project recommendations are made in Table 5 and Figure 19. The following paragraphs offer further explanation for management of the West Branch. Reach M12: This is a transitional reach between steeper headwater reaches and the valley bottom of the West Branch. It has been historically straightened and seems to have accepted this new channel. The long term stability of this channel may be assisted in the long term if the existing riparian buffer were widened and protected. - See Prioritizing Buffer Planting. Reach M11-C: This reach is undergoing major adjustments and may be left to develop its own course. Historic channel straightening and armoring in this reach has only prolonged the channel evolution process. The best approach is to protect a wide corridor around this reach and to prevent further disturbance of the corridor. – See Prioritizing River Corridor Protection
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 56
Reach M11-B: This reach appears to have retained floodplain access and sediment storage due in part to the work of beavers. No active restoration work is recommended for this reach. – See Prioritizing River Corridor Protection Reach M11-A: This seems to be a stable reach. Long term stability may be encouraged by preventing further encroachment and encouraging buffer regeneration. – See Prioritizing River Corridor Protection Reach M10: Due to historic channel straightening this reach has become highly unstable. Left untouched, the reach will continue to widen and undergo planform adjustment. Because of its proximity above the Upper Village, this reach may be considered for an alternatives analysis to determine if an active geomorphic restoration project in portions of this reach may benefit the watershed. – See Prioritizing Restoration of Incised Reaches Reach M09-B: This reach is likely being impacted by channel straightening and loss of floodplain in Reach M10. Past channel stabilization projects have failed due to instability upstream. The channel is likely to continue to actively adjust in this reach and may be allowed to do so. Access to floodplain will assist long term stability at this site and therefore the berm on the left bank may be considered for removal. – See Prioritization of Berm Removal Reach M09-A: Historic channel management in this reach has caused it to incise and become highly unstable. Limited benefit to upstream and downstream reaches would be realized by conducting an expensive active geomorphic approach at this time. It is best to allow this reach to continue to adjust and to protect the river corridor through this reach in order to allow for future adjustment. – See Prioritizing River Corridor Protection Reach M08: Historic channel management in this reach has also caused it to incise and become highly unstable. Some benefits to the reach and surrounding property may be realized by replacing the undersized bridge on the Justin Morrill Highway that crosses this reach. Replacing this bridge may help reduce localized adjustment. The rest of the reach would benefit by protecting the river corridor through this reach in order to allow for future adjustment. – See Prioritizing River Corridor Protection and Prioritizing Structure Replacement Reach M07: This is a highly active reach that is undergoing major adjustments. Protection of the river corridor in order to continue to allow the stream to adjust through this section is recommended. A private bridge could be replaced in order to ensure future access for the landowner while improving sediment and water transport in the area of the structure. – See Prioritizing River Corridor Protection and Prioritizing Structure Replacement Reach M06: This reach has been impacted by historic floodplain encroachment. An alternatives analysis in this reach may show that increasing floodplain (while maintaining and possibly enhancing land use expectations for the community) in this reach may contribute to stability through the village. – See Prioritization of Incised Reaches
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 57
Reach M05: This reach is an incised channel that has lost access to much of its floodplain. Removal of the town sand storage facility is recommended. A floodplain redevelopment project may be investigated in association with this relocation project as the reach would benefit from improved floodplain access. – See Prioritization of Incised Reaches Reach M04: This reach is fairly stable. If an opportunity arises, the community may want to investigate replacing the Tyson Road Bridge, as it is undersized and causing localized instability. – See Prioritization of Structure Replacement Reach M03: The river corridor along this reach may be protected from encroachment and the stream allowed to maintain its dynamic stability. – See Prioritizing River Corridor Protection Reach T7.01 (Old City Brook): No further encroachment of the river corridor would benefit the stream. – See Prioritizing River Corridor Protection Reach T6.01 (Brook Road Brook): This reach would benefit from an agriculture assistance program such as the Conservation Reserve Enhancement Program (CREP) in order to minimize the impacts from farming on this reach. – See Prioritizing River Corridor Protection Reach T5.01 (Alger Brook): This reach may be allowed to adjust naturally. The stream corridor would benefit from protection. – See Prioritizing River Corridor Protection Reach T4.01 (Carpenter Hill Brook): This reach would also benefit from an agriculture assistance program such as CREP in order to minimize the impacts from farming on this reach. The lower part of this reach (segment A) would benefit from being allowed to adjust naturally. The stream corridor could also be protected for maximum long term protection. – See Prioritizing River Corridor Protection Reach T3.01 (Route 132 Brook): This reach may be maintained in its current configuration through the village in order to reduce flooding to existing property owners. The lower portion of the reach (Segment A) may be allowed to adjust naturally. It is important to limit further encroachment of the stream corridor. – See Prioritizing River Corridor Protection Reach T2.01 (Downer Forest Brook): The upper portion of the brook would benefit from protection from development in the stream corridor, and adjacent, highly unstable valley walls. The lower portion (segment A) may be maintained in its current configuration through the village. – See Prioritizing River Corridor Protection
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 58
Table 5: Prioritization of River Corridor Project Types
Specific Strategy
Project ID
Number
Segment Number
River Project Type
River
Corridor Protection
Replace Undersized Structure(s)
Develop New
Floodplain and Plant
Buffer
Plant Riparian Buffer
Other
Project Description
(including Potential Constraints and/or Opportunities)
Priority
1 M12 MU √ √
Maintain and expand existing buffer for long term stability L
2 M11-C HU √
This reach is redeveloping floodplain; Recommend allowing river to adjust naturally. Protection of the river corridor through this reach would be beneficial to encourage long term stability.
L
3 M11-A CR √ √ √
Protect and
enhance existing buffer
Although a few houses are within the river corridor, this reach has a fairly healthy buffer. An undersized bridge in this reach could be removed.
M
4 M10 HU √ √ √
This reach suffers from historic straightening. Landowners may want to consider an alternatives analysis for floodplain redevelopment project. Attenuation of floodwaters and sediment in this reach may reduce pressure on the stream as it passes through the Upper Village.
H
5 M09-B MU √ √ Remove berm
A berm on the left bank downstream of the Brook Road bridge may prevent the stream from accessing its floodplain. This reach is also likely being impacted by increased sediment transport in reach M10 which is leading to excessive sediment deposition in this reach.
H
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 59
Table 5: Prioritization of River Corridor Project Types
Specific Strategy
Project ID
Number
Segment Number
River Project Type
River
Corridor Protection
Replace Undersized Structure(s)
Develop New
Floodplain and Plant
Buffer
Plant Riparian Buffer
Project Description Priority (including Potential Constraints
Other and/or Opportunities)
6 M09-A HU √
Historic photographs show this reach has been greatly straightened. Limited existing infrastructure to protect, therefore consider letting the channel adjust on its own.
L
7 M08 HU √ √ Replace bridge over Justin Morrill Highway to remove channel and floodplain constriction.
M
8 M07 HU √ √
Replace undersized private bridge to allow future access for private landowner. Landowner recognizes river’s movement and has voluntarily planted floodway to help create roughness during high flows.
M
9 M06 HU √ √
Landowners may consider determining the feasibility of a project in this area. Remove high spot at bend in river next to soccer field to create floodplain and help reduce flood hazard through village. Existing recreational use of this small area would need to be discontinued.
H
10 M05 HU √ √
Relocate town sand storage. Landowners may consider a floodplain redevelopment project at this site. Also consider floodplain project at beginning of rec path; existing land use, existing stream conditions, and public connection make this a good project.
H
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 60
Table 5: Prioritization of River Corridor Project Types
Specific Strategy
Project ID
Number
Segment Number
River Project Type
River
Corridor Protection
Replace Undersized Structure(s)
Develop New
Floodplain and Plant
Buffer
Plant Riparian Buffer
Project Description Priority (including Potential Constraints
Other and/or Opportunities)
11 M04 HU √ √
Consider replacing undersized bridges on this reach in order to improve sediment transport and reduce potential flood hazard.
L
12 M03 CR √ Preserve existing buffer
The entire reach is well forested, conservation of the corridor will provide for long-term benefits to the river.
M
13 T7.01 HU √ This reach would best be maintained as a transport reach to protect existing infrastructure.
L
14 T6.01 HR √ √ √
Remove berm at lower end;
Livestock exclusion
This reach would benefit from a CREP project that would exclude livestock from the stream, locate an alternative watering source, and plant a riparian buffer. Also there are berms at the lower end that could be removed to improve floodplain access.
H
15 T5.01 HU √
This reach is highly incised. Existing land use is pasture and field. Recommend allowing to adjust naturally.
L
16 T4.01-B HU √ Livestock exclusion
This reach would benefit from a CREP project that would exclude livestock from the stream, locate an alternative watering source, and plant a riparian buffer.
H
17 T4.01-A HU √ This reach is highly incised. Existing land use is field. Recommend allowing to adjust naturally.
L
ment Plan Page 61
Table 5: Prioritization of River Corridor Project Types
Specific Strategy
Project ID
Number
Segment Number
River Project Type
River
Corridor Protection
Replace Undersized Structure(s)
Develop New
Floodplain and Plant
Buffer
Plant Riparian Buffer
Other
Project Description
(including Potential Constraints and/or Opportunities)
Priority
18 T3.01-B HU √ √
This reach is best maintained as a transport reach in order to protect existing infrastructure through South Strafford Village. Voluntary buffer planting from local landowners could be encouraged.
L
19 T3.01-A HR √ This reach is highly incised. Existing land use is field. Recommend allowing to adjust naturally.
L
20 T2.01-B MU √
The corridor around this reach is a good opportunity to be protected. Land use in the surrounding subwatershed could be encouraged be very careful to not concentrate stormwater towards the very unstable valley walls of this reach.
L
21 T2.01-A HU √ √
This reach has been historically straightened and will likely be maintained in its current configuration to protect property in the Village of South Strafford. Voluntary buffer enhancement could be encouraged.
L
River Corridor Project Type: CR = Conservation Reach HR = High Recovery Reach MU = Moderately Unstable Reach HU = Highly Unstable Reach Priority Ranking: H = Higher M = Medium L = Lower
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Manage
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 62
Figure 19: Project study area map of recommended projects.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 63
9.0 PLAN IMPLEMENTATION
Implementation of this River Corridor Management Plan will require participation of the town,
state, federal, and local organizations and most importantly local landowners.
9.1 Public Review and Revision of River Corridor Management Plan
River Corridor protection is best accomplished at a community level. While specific
landowners may have key roles in restoring certain pieces of the river, the entire watershed
is subject to the quality of stewardship provided to the land by each and every landowner,
whether they live next to the river or up on the ridgeline. Review and continuing revision
of this River Corridor Management Plan by the Strafford community will encourage
community awareness and participation in the restoration of the West Branch of the
Ompompanoosuc.
9.2 Develop and Adopt a River Corridor Overlay District and FEH Zone
The Town of Strafford would benefit from continuing to work with the River Management
Section and the Two Rivers Ottauquechee Regional Planning Commission in a public
planning process to review the role of a River Corridor Overlay District in town planning
and to develop a draft ordinance for public review. Incorporation of FEH maps in the
town planning process may also make Strafford eligible for additional incentives, including
priority for State restoration, flood recovery, and community development funding. More
importantly, however, adoption of an FEH zone will transition the Strafford community
from a reactionary role in river management to a proactive role that recognizes the
dynamic nature of river systems and plans accordingly in order to minimize future flood
damage, minimize maintenance and repair costs of infrastructure, and maximize the health
of the fishery and water quality.
9.3 Proceed with Conservation / Restoration Projects
The Strafford Conservation Commission has a great opportunity to work closely with the
VDEC and river scientists to continue to develop and implement restoration and
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 64
conservation projects in the West Branch watershed based on the recommendations of this
plan.
9.4 Address Undersized Structures
The Town of Strafford would assist the recovery and further impairment of the West
Branch by proactively replacing undersized structures in the watershed. With the
assistance of the Bridge and Culvert survey, the Town could begin to work towards
replacing all Priority I structures in the watershed. The Town of Strafford may also choose
to assist in the design review of new private and public structures in order to prevent
future geomorphic and aquatic life impairment, as well as possible flood hazards that may
result from poorly suited structures.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 65
10.0 REFERENCES
Connecticut River Atlantic Salmon Commission, 1998. http://www.fws.gov/r5crc/documents/strplan.pdf
Fischenich, C. 2000. ERDC TN-EMRRP-SR-01 1-Glossary of Stream Restoration Terms. USAE Research and Development Center, Environmental Laboratory, Vicksburg, MS.
Fiske, S. 2006. Memorandum to John Schmeltzer, VT DEC Elizabeth Mine Site Manager. Vermont Agency of Natural Resources, Department of Environmental Conservation. Waterbury, VT.
Forman, R. T. T. and L. E. Alexander. 1998, Roads and Their Major Ecological Effects: Annual.
Rev. Ecol. Syst. 1998. 29:207–31. Blazewicz, M. and M. Nealon. 2006. Phase 2 Stream Geomorphic Assessment. West Branch
of Ompompanoosuc River Watershed, Town of Strafford, Vermont. Bear Creek Environmental, Middlesex, VT. 56 pp. plus appendices.
Langdon, R. 2002. Draft Memorandum: Fish Community Evaluations for the Waters in the
Area of Elizabeth Mine, Strafford, Vermont. Agency of Natural Resources, Department of Environmental Conservation, Waterbury, Vermont.
Nealon, M. and M. Blazewicz 2004. Phase 1 Assessment Stream Geomorphic Assessment,
Strafford Conservation Commission, Town of Strafford, Vermont, West Branch Ompompanoosuc River. Bear Creek Environmental, Middlesex, VT. 30 pp. plus appendices.
Nealon, M. 2005. Bridge and Culvert Assessment Using Agency of Natural Resources’
Protocol. Strafford Conservation, Town of Strafford, Vermont, West Branch of Ompompanoosuc River Watershed. Bear Creek Environmental, Middlesex, VT. 11 pp. plus appendices.
Rosgen, D. 1996. Applied River Morphology. Wildland Hydrology, Pagosa Springs, CO. Ryan, J. 2001. Stream stability assessment of Lamoille County, Vermont. Washington,
Vermont. Strafford Planning Commission. 2003. Strafford Town Plan: Adopted January 13, 2003.
Prepared by the Strafford Planning Commission with assistance from: Two Rivers-Ottauquechee Regional Commission.
Thompson and Sorenson. 2005. Wetland, Woodland, Wildland: A guide to the natural
communities of Vermont. Capital City Press, Montpelier, Vermont.
West Branch Ompompanoosuc River Watershed – Town of Strafford River Corridor Management Plan Page 66
Town of Strafford. 1993. Flood Hazard Zoning Ordinance. Strafford, Vermont. United States Department of Agriculture. 1986. Urban Hydrology for Small Watersheds. Soil
Conservation Service, Engineering Division, Technical Release 55. Washington, D.C. United States Environmental Protection Agency. 2006. National Assessment Database, 305(b)
List Information Year 2002. http://oaspub.epa.gov/pls/tmdl/enviro_v2.wcontrol?p_id305b=VT14-02
Van Diver, B. 1987. Roadside Geology of Vermont and New Hampshire. Mountain Press
Publishing. Missoula, Montana. Vermont Agency of Natural Resources. 2004. Vermont Stream Geomorphic Assessment,
Appendix C, Channel Evolution Models, Waterbury, Vermont. Vermont Agency of Natural Resources. 2005a. Vermont Stream Geomorphic Assessment
Phase 1 Handbook. Watershed Assessment Using Maps, Existing Data, and Windshield Surveys. Waterbury, Vermont
Vermont Agency of Natural Resources. 2005b. Vermont Stream Geomorphic Assessment
Phase 2 Handbook. Rapid Stream Assessment, Field Protocols. Waterbury, Vermont Vermont Agency of Natural Resources. 2005c. Using geomorphic assessment data to guide the
development of River Corridor Management Plans to achieve: Fluvial Erosion Hazard (FEH) Mitigation; Sediment and Nutrient Load Reduction; Ecological-based River Corridor Conservation (DRAFT). Waterbury, Vermont.
Vermont Agency of Natural Resources. 2005d. Riparian Buffers and Corridors: Technical Papers. Waterbury, Vermont
Vermont Agency of Natural Resources. 2006a. Vermont River Management Program:
Overview of Program Activities and Responsibilities. Waterbury, VT. http://www.vtwaterquality.org/rivers/docs/rv_programoverview.pdf
Vermont Agency of Natural Resources. 2006b. Wetlands: Water Storage for Flood water and
Storm water. http://www.anr.state.vt.us/dec/waterq/wetlands/htm/wl_func-storage.htm Vermont Center for Geographic Information, Inc. (VCGI). 2003. Vermont Hydrography
Dataset. Waterbury, Vermont. Vermont Department of Fish and Wildlife. 2005. Interim Guidelines for Aquatic Organism
Passage through Stream Crossing Structures in Vermont. Vermont.