B. Finance, Audit and Facilities Committee Sound Transit University Link Final Design – Project Update This presentation provides a project update to Regents regarding the Sound Transit University Link design. The design development level for the University Station and tunnel civil works is 60% complete and the schematic design completion level for the architectural finishes is 30%. No action is required – this update is for comment and general information only. BACKGROUND: Sound Transit’s operations on campus are governed by the 2000 Memorandum of Agreement (MOA) and the 2007 Master Implementation Agreement (MIA). These two agreements lay out the framework on how Sound Transit is to respond to University requirements, approval process and mitigation procedures, if necessary. The U-Link Light Rail UW Station is a proposed extension of Sound Transit’s Link light rail system from downtown Seattle north to the University District. The facility is an approximately 100’ deep cut-and-cover tunnel station with an entrance near the center of the station platform. The station is located between Montlake Boulevard and Husky Stadium beneath the surface parking lot E11. Below grade facilities include two bored tunnels with track work and related system utilities, a crossover track south of the station platform, vertical circulation, emergency ventilation fans, stairwells, and systems rooms. The North link extension, which is projected to run from Husky stadium to Northgate, was not approved in the November 6, 2007 ballot and therefore not currently in design. U-Link program budget $1.8 Billion Estimated U-Stadium Construction Cost: $610 million Estimated Construction Start: Utilities Dec 08 – Station July 09 Estimated Project Occupancy: Revenue Service fall 2016. AttachmentsSound Transit Executive Summary Schedule dated November 13, 2007 North Link tunnel route NOT approved as part of Prop 1 vote Nov 6, 2007 F–10/202-08 2/21/08
Activity Name Start Finish
Final SEIS 14-Jun-04 A 07-Apr-06 A
Real Estate Acquisition Summary 05-Jan-06 A 29-Aug-08
Record of Decision (ROD) Review 07-Apr-06 A 27-May-06 A
ROD Approved 08-May-06 A
Final Design Consultants Procurement 10-May-06 A 10-May-07 A
Early Design Work 04-Dec-06 A 28-Dec-07
Final Design Engineering 29-Dec-06 A 28-May-09
Begin 60% Civil Design 11-May-07 A
FFGA Application / Approval by FTA 17-Jul-07 A 30-Jul-08
U210 Bid & Award 13-Jun-08 22-Dec-08
U211 Bid & Award 16-Jun-08 24-Nov-08
FFGA Approved - $ available for construction 30-Jul-08
FFGA Approved 30-Jul-08
U820 Maintenance Facility 31-Jul-08 30-Jul-10
U821 Light Rail Vehicles 04-Aug-08 31-Dec-10
U215 Bid & Award 16-Oct-08 02-Jun-09
U211 Demolition & Envir Remediation 25-Nov-08 01-Apr-09
U220 Bid & Award 18-Dec-08 20-Jul-09
U210 Utilities 23-Dec-08 06-Jul-09
U215 I-5 Undercrossing 03-Jun-09 15-Sep-10
U230 Bid & Award 08-Jun-09 14-Jan-10
U220 TBM Tunnel/UW 21-Jul-09 08-Nov-12
U230 Capitol Hill Sta. & Tunnel 15-Jan-10 25-Apr-13
U250 Bid & Award 19-Oct-10 05-May-11
U260 Bid & Award 07-Mar-11 12-Sep-11
U250 UW Station Finishes 09-May-11 21-Oct-14
U260 Trackwork 13-Sep-11 19-Nov-14
U240 Bid & Award 20-Aug-12 04-Mar-13
U830 Bid & Award 01-Mar-13 04-Dec-13
U240 Capitol Hill Station Civil & Finishes 12-Mar-13 23-Jun-15
U830 Systems Construct ion 05-Dec-13 02-Oct-15
Systemwide Testing / Start-up (w/ Float) 05-Oct-15 24-Sep-16
Revenue Service Starts (w/ Float) 24-Sep-16
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q06 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
U-Link Master Schedule LR-UL MS05 - Executive Summary CCB 13-Nov-07 13:41
Remaining Level of Effort
Actual Level of Effort
Actual Work
Remaining Work
Critical .. .
MilestoneUniverity Link -
Executive Summary TASK filters: LR Level 1 Report, LR-UL MS05 - Executive Summary CCB.
(c) Primavera Systems, Inc.
ADAM
S LA
NE
N
METRO TRANSIT BUS LAYOVER
N26
N9
N10
N11
N12
E14
N25
N24
E16
C19
N24
N22
W42
W10
W39
W12
W13
C14
E17
E10
E11
E10
W34
C20
S17
C12
W11
S12
E97
E98
S99
E6
E8
E16
E2
E1
E5
N5
N4
N3
N3
N6
N6
N7
N13
N14
N15
C15
C12
E11
E12
E12
C21
S5
S6
S7
S1
S8
S9
S8
W24
W28W35
W40
W9W8
W6
W5W6
W13W14
W29
C8
C1
C3
C5
C2
C4
C5
C6
C7
W2
W3
W4W41
W4V
N28
E15
H12
H12
E4
E3
E9
E9
N1
N2
N7
C17
C15
C12
M N P
Q
U
V
BLAKELEY VILLAGE(SEE INSET BELOW)
C10
C7
N8
(____)
W14
W26
W99
C10
N16 N18 N
20
N21
E10
(____)
(____)
(____)
C10
E13
BLAKELEY VILLAGE INSET
BLAKELEY VILLAGE(SEE INSET BELOW)
W40
R S
T
CCDC2
Y
WX
PARKING GARAGEWEST CAMPUS
N. E. 44TH ST.
N. E. 43RD ST.
N. E. 45TH ST.
5TH
AV
E. N
. E.
N. E. 47TH ST.
NORTHLAKE WAY
N. E
. 42N
D S
T.
N. E. 40TH ST.
N. E.
UNION BAY
N. E. 40TH ST.
PARRINGTON LAWN
SNOHOMISH LANE
EAST
LAKE
AVE
. E.
N. E. BOAT ST.
PASA
DENA
PLA
CE N
. E.
7TH
AV
E. N
. E.
ADA
MS LA
NE
COWLITZ ROAD
N. E. 42ND ST.
15TH
AV
E. N
. E.
8TH
AV
E. N
. E.
9TH
AV
E. N
. E.
ROO
SEV
ELT
WA
Y N
. E.
11TH
AV
E. N
. E.
12TH
AV
E. N
. E.
N. E. 42ND ST.
BRO
OKL
YN
AV
E. N
. E.
N. E. 43RD ST.
UNIV
ERSI
TY W
AY
N. E
.
15TH
AV
E. N
. E.
N. E 47TH ST.
15TH
AV
E. N
. E.
COLUMBIA ROAD
MO
NTLA
KE B
RIDG
E
RAINIER VISTAMASON
ROAD
CHEL
AN
LANE
PIERC
E LA
NEKING LANE
STEV
ENS
WA
Y
GARF
IELD
LA
NE
ISLAND LANE
LEWIS LANE
THURSTON LANE
LANE
SPOKANE LANE
BENTON LANE
BENTON LANE
YAKI
MA
LA
NE
WAHKIAKUM LANE
PEND OREILLE
19TH
AV
E. N
. E.
KLIC
KITA
T L
ANE
N. E. 45TH ST.
MEM
ORI
AL
WA
Y
KLICK
ITAT
LANE
CLA
LLA
M
LA
NE
16TH
AV
E. N
. E.
17TH
AV
E. N
. E.
18TH
AV
E. N
. E.
STEVENS WAY
WHI
TMA
N CO
URT
20TH
AV
E. N
. E.
21ST
AV
E. N
. E.
N. E. 46TH ST.
DOUG
LAS
ROA
D
WAHKIAKUM LANE
BURK
E-GI
LMAN
TRA
IL
WAL
LA R
OAD
WAL
LA
CANA
L R
OAD
WAHKIAKU
M
N. E. 44TH ST.
WHATCOM
WALLA W
ALLA ROAD
N. E. 45TH ST. VIADUCT
25TH
AV
E. N
. E.
CLARK ROAD
LANE
N. E. 44TH ST.
N. E. 42ND ST.
N. E. 43RD ST.
N. E. 41ST ST.
MARY GATES MEMORIAL DRIVE N. E.
35TH
AV
E. N
. E.
N. E. 4
5TH PL.
36TH
AV
E. N
. E.
36TH
AV
E. N
. E.
37TH
AV
E. N
. E.
37TH
AV
E. N
. E.
AVE.
N. E
.
39TH
AVE
. N. E
.
N. E. BLAKELEY ST.
UNIVERSITY VIEW N. E.
UNION BAY PLACE N. E.
N. E. 47TH ST.
N. E. PACIFIC ST.
38TH
N. E. PACIFIC ST.
ROAD
EAST
LAKE
AVE
. E.
BURKE-GILMAN TRAIL
MILLER
STUDENT UNIONBLDG.
N. E. 44TH ST.
N. E. 43RD ST.
N. E. 45TH ST.
5TH
AV
E. N
. E.
N. E. 47TH ST.
NORTHLAKE WAY
N. E
. 42N
D S
T.
N. E. 40TH ST.
N. E.
GATE 2
HAGGETT
CLIMBING ROCK
WIN
G RR
WING G
GATE 4
ARTS BUILDING
MERCER
FACILITY
STADIUMCONCESSION
MERCER
AUDI
TORIU
M
1415
TOWER
HAGGETT
ARCHERY RANGE
DENNY
YARD
WARMEMORIAL
GREIG
GARD
EN
MEDICINALPLANT
GARDEN
SALMONHOMINGPOND
THEGLADS
SCULPTURE
SNOHOMISH LANE
COLUMNSAND
SYLVAN THEATER
EMERGENCY HELISTOP
SPORTS FIELD 2INTERMURAL ACTIVITIES
EXPERIMENTAL
TRIANGLEPARKINGGARAGE
MARY GATES
OPE
RATI
ONS
PLA
NT
CLAR
K
LABORATORY
CERAMIC
WILSON
RUSSIAN HOUSE
STEVENS COURT
BRYANTS BUILDING
J
K
WING
WING EAFISHERIES CENTER
SOUTH
CLINIC
OCEANOGRAPHY
KINCAID
WING I
WING H
HITC
HCOC
K
HS ANNEX
OFFICECONSTRUCTIONSOUTH CAMPUSARCHITECT
MARINE SCIENCES
1429
SOUTH CAMPUS
BLDG.
CENTER
LABO
RATO
RY
HYDR
AULIC
S
HARR
IS
WING K
GATE 6
WING J
LOADINGDOCK
FISHERIESTEACHINGRESEARCHBLDG. STUDIES
MARINE
BLDG.
COM
PUTE
RA
CADE
MIC
PARKING GARAGEWEST CAMPUS
CENT
ER
D
BC
C
M
L
A
B
3902
STA
FFSE
RVIC
ESBL
DG.
PURC
HASI
NG &
ACC
OUN
TING
3900
PHYSICS/ASTRONOMY
1GUTHRIE
2
ANNEXESGUTHRIE
ARC
HITE
CTUR
E
LABORATORY
BLOEDEL
WING SW
WING BB
WIN
G D
WING AAWIN
G B
WING C
WIN
G A
WING T
T-COURT
WIN
G F
WIN
G H
WING E
WING NN
WIN
G NN
WING EE
WIN
G SS
WING SE
WING NW
WING EB
ANDERSON
WINKENW
ERDER ANNEXWILS
ON
GREENHOUSE
BOTANY
PLANT
BENSON
CHEM
ISTR
Y
CENTERRESEARCHQUATERNARY
GEOPHYSICSATMOSPHERIC
CHEMISTRY
LIBRARY
SCIENCES-
CUNN
INGH
AM
ANN
EX A
JOHN
SON
BAGLEY
JOHNSON
MUELL
ER
ROBE
RTS
GUGGENHEIM ANNEX
GUGGENHEIM
AEROSPACE
LABO
RATO
RYA
ERO
DYNA
MIC
S
RESEARCH& ENGR.
TUNNELW
INDKIRSTEN
PUBLICATIONSERVICES BLDG.
NORT
HLA
KEBL
DG.
HENDERSON
THEATREPLAYHOUSEHUGHES
MUSEUM
MEANY
LIBRARYUNDERGRADUATE
ODEGAARD
STATEWASHINGTON
MEMORIAL
CENTER/THEATERINSTRUCTIONAL
THEATREPLAYHOUSE
CULT
URA
L
PARKING GARAGELANDER-TERRY
CHIL
D CA
RECE
NTER
ETHN
IC
LANDER-TERRY
CENT
ER
BROOKLYNCONDON
EMPLOYMENTSTAFF
COM
MO
DORE
-DU
CHES
S
GOULD
CENTERVISITORS` INFORMATION
3
GATE 5
4
SCHMITZ
SOCI
AL
WO
RK/S
PEEC
H &
SCIE
NCES
BLD
G.
EAGLESON
GOWEN
GERBERDING
GARAGE
CENTRALPLAZA
SUZZALLOLIBRARY
KANE
PARR
INGTON
SAVER
Y
LIBRARYALLEN
SMITH
MUSIC
BALM
ER
DENNY
OBSERVATORY
ART
RAITT
MACKEN
ZIE
LEWIS
HUTCHINSON
BURKEHANSEE
WAT
ERFR
ONT
CANOEHOUSE
ACTIV
ITIES
CEN
TER
ANNEX 1
SHELLHOUSE
TENN
IS C
ENTE
R
NORD
STRO
M
POOL
PAVI
LIONWILCOX
STAD
IUM
GATE 8SOFTBALL FIELD
WOMEN'S FASTPITCH
EDMUNDSON PAVILION
ROBE
RTS
MORE
ANNE
X
MOREANNEX
GRAV
ES
ANNEXESOPERATIONS
ANN
EXEN
GINE
ERIN
G
ENGI
NEER
ING
MEC
HANI
CAL
LOEW
LIBRARY
ENGINEERINGFACILITIESUNIVERSITY
ANNEX
PLANT
4
26
3
GRAV
ESAN
NEX
SHELLHOUSE
CONIBEA
R
BASEBALL GRANDSTAND
SAFETY STORAGEENVIRONMENTAL
PLAN
TPH
YSIC
AL
UNIV
ERSI
TYFA
CILI
TIES
5
PADEL
FORD
PARK
ING GARAGE
ANNE
X 2LEWIS
CYCL
OTR
ON
McM
AHO
N
ANNE
X 1
LEWIS
GATE 3
SHO
P
MCC
ART
Y
NORTH PHYSICS
PARKINGHAGGETT
GARAGE
LABORATORY
SOCCER FIELD
RANGE BLDG.
GOLF DRIVING
ENVIRONMENTALSAFETY STORAGE
BLDG.
SERVICESPLANT
SERVICES BLDG.TRANSPORTATION
MERRILL
ISAACSON
SOCIETYHORTICULTURAL
LAUREL VILLAGE
CERAMIC & METAL
CORPORATIONYARD BLDGS.
CONSERVATORYDOUGLAS RESEARCH
RESEARCHBLDG. 2
OCEAN
BANK O
F AMER
ICA
EXEC
UTIVE E
DUCA
TION
CENTE
R
SAN JUAN ROAD
UNIV
ERSI
TY B
RIDG
E
EAST
LAKE
AVE
. E.
PORTAGE BAY
PORTAGE BAY PLACE E.
N. E. BOAT ST.
ADA
MS LA
NE
COWLITZ ROAD
COW
LITZ
RO
AD
LINCOLN WAY
N. E. CAMPUS PARKWAY
N. E. CAMPUS PARKWAY
N. E. 41ST ST.
ROO
SEV
ELT
WA
Y N
. E.
N. E 47TH ST.
15TH
AV
E. N
. E.
COLUMBIA ROAD
MO
NTLA
KE B
RIDG
E
PACIFICPLACE
RAINIER VISTA
WAL
LA W
ALLA
ROA
D
ROAD
CHEL
AN
LANE
GRANT LANESTEVENS WAY
OKANOGAN LANE
STEV
ENS
WA
Y
LEWIS LANE
THURSTON LANE
GEO
RGE
WA
SHIN
GTO
N
SPOKANE LANE
BENTON LANE
STEV
ENS
WAY
JEFF
ERSO
N R
OA
D
MAS
ON
RO
AD
YAKI
MA
LA
NE
SKAGIT
LANE
WAHKIAKUM LANE
PEND OREILLE
19TH
AV
E. N
. E.
KLIC
KITA
T L
ANE
N. E. 45TH ST.
KITSAP LANE
KLICK
ITAT
LANE
CLA
LLA
M
LA
NE
16TH
AV
E. N
. E.
17TH
AV
E. N
. E.
18TH
AV
E. N
. E.
STEVENS WAY
20TH
AV
E. N
. E.
21ST
AV
E. N
. E.
22ND
AVE
. N. E
.
N. E. 46TH ST.
DOUG
LAS
ROA
D
MO
NTLA
KE B
OUL
EVAR
D N.
E.
BURK
E-GI
LMAN
TRA
IL
WAL
LA R
OAD
WAL
LA
CANA
L R
OAD
WAHKIAKU
M
N. E. 44TH ST.
WHATCOM
WALLA W
ALLA ROAD
N. E. 45TH ST. VIADUCT
25TH
AV
E. N
. E.
CLARK ROAD
N. E. 45TH ST.
LANE
N. E. 44TH ST.
N. E. 42ND ST.
N. E. 43RD ST.
N. E. 41ST ST.
35TH
AV
E. N
. E.
N. E. 4
5TH PL.
36TH
AV
E. N
. E.
URBAN HORTICULTUREFIELD HOUSE
3710
3716
3937
3945
3930
3939
3935
4001-7
1209
SCIENCESBUILDING
SCIENCESFISHERY
B-COURT
BUS
BUS
SHELTER
SHEL
TER
1303
FOUNTAINDRUMHELLER
ANNEXWINKENWERDER
ANNEX
1401
3947
4038
4042
36TH
AV
E. N
. E.
37TH
AV
E. N
. E.
37TH
AV
E. N
. E.
AVE.
N. E
.
39TH
AVE
. N. E
.
N. E. BLAKELEY ST.
UNIVERSITY VIEW N. E.
UNION BAY PLACE N. E.
N. E. 47TH ST
N. E. PACIFIC ST.
TEACHING BLDG.OCEANOGRAPHY
CENTER ON HUMANDEVELOPMENTAND DISABILITY
OCEANOGRAPHY
DOCK OCEANOGRAPHY
STORAGE
ALL
EN C
ENTE
R
GALL
ERY
HENR
Y A
RT
GATE 1
FOR
VIS
UAL
ART
S
38TH
ASO
TIN
P
L.
OCEAN
NORTHWEST
McM
AHO
NPA
RKIN
G GA
RAGE
REDSQUARE
EDUCATION UNIT
THOMSON
CENT
ERFA
CULT
Y
HEALTHCENTER
HALL
PADELFORD
COMMUN
ICATIO
NS
FLUK
E
ACTIVITIES
INTRAMURAL
SIEG
DEM
PSEY
INDO
OR
ADDITION
WING K
EC
GATE 7
ANNEX 5DOUGLAS
ANNEXES 1 - 4DOUGLAS
4
N. E.
N. E. NORTH LAKE PL.
N. E. NORTHLAKE WAY
BRYANTS
BURKE-GILMAN TRAIL
SURGERYPAVILION
PAUL G. ALLENCENTER FOR
COMPUTER SCIENCE
& ENGINEERING
2
1 THRU 3
ELECTRICAL ENGINEERING
WING NE
SOUTH CAMPUS
PARKING GARAGE
QUADRA
NGLE
PLANTPOWER
WING CC
CYCLOTRON
BUILDING
4534-1/2
4507
4500
45454516
4518
4522
4512
4100 UNIVERSITYWAY N. E.
BRO
OKL
YN A
VE.
N. E
.
UNIV
ERSI
TY W
AY
N. E
.
UNIVERSITY VILLAGESHOPPING CENTER
(3842)
BUILDINGS
NORDHEIMCOURT
50252923
4909
25TH
AVE
. N.
E.
BURKE-GILMAN TRAIL
UNIO
N BA
Y PL
ACE
N. E
.
N. E. BLAKELEY ST.
N. E. 47TH ST.
N. E. 48TH ST.
N. E. 49TH ST.
UNIVERSITY VILLAGESHOPPING CENTER
NC2
NC1
NC3
NC4
NC5
NC7 NC
8
NC6 BVE
BVCC
BVG
BVH
BVJ BVK
4725
BVA
BVD
BVC
BLAKELEY
VILL
AGE
BVF
BVB
WES
TRE
CEIV
ING
STA
TIO
N
BOTANYGREENHOUSE
ANNEX
MEDICINALPLANT
GARDENLABORATORYPLANT
ANNEX 1
4046
TENN
ISCO
URTS
TENNIS COURTS
TENNIS
COUR
TS
DENNY FIELD
SPORTS FIELD 4
TENNIS COURTS INTERMURAL ACTIVITIES
TENNIS COURTS
SPORTS FIELD 1INTERMURAL ACTIVITIES
GOLF DRIVING RANGE
(MULTI-PURPOSEATHLETIC COURTSUNDER BRIDGE)
SKAMANIA LANE
FLAG POLE
WATERFRONTTRAIL
PARKING AREA IS BENEATHGRANDSTAND (TYP. 7 PLACES)
STRUCTURE IS BENEATH GRANDSTAND(TYP. 2 BUILDINGS)
4041
3941
QUADRA
NGLE
GENO
ME S
CIENC
ES
BIOEN
GINE
ERIN
G
12
3
4
WILLIAM H. GATES
2 THRU 6
ANNEX 7OPERATIONSPLANT
725
272
108
163
789
217
097
716
096
716
716
926
716
784
716
198
247
247 247
247
247
247
247
785
783
266
007
153
049
273
249
116
106
772
157708
078
235
237
787
147
703
218
213
732
053
780
716
143
148
252
238
242
702
267752
276
247
241
744
786
763
271
110
107
212 145
150
146
184
182
233
214
118
165
759231
769933
183
024
080
117
224
232
269
259
172
019
240
151
735
792
758
743253
152
154
257
261
258
236
189255
222
208
207
127713
228
278
216
009
089
234
159
226
225
227
048
101
270
191
123 144
083
001
192
045
161
160
275
193
097
124
200
279730
239
277
139
3
4
077
6
082
751
197
140
022
219
038
104
204
100
099
265
268
211
747
196
250
170
220
733
036
731
251
560
199
209
573
169
205
168
215
194
254
203
262
788
230
245
264
248
201
736
749
162
182
182
182
182
182
146
145
141
280
229
115
217
182
184
933
767
765
532
757
758
528
519
516
549
563
091
068
230
217
126
775
008
910
716
716
103070
114
934
930
142
146
146142
185
149
184
146
181182
182182
190
221
221
263
005
210
762
762
762
244
246
206
247
553
552
515
514
710
762
260
781
755
754
773
274
753
595
907
907
907
907
907
907
907
907
907
907
907
907
907
907
907
9
762
240
904
904
904
929
911
(405
8)
(405
7)
INTERDISCIPLINARYBENJAMIN D. HALL
RESEARCH BLDG.
GARAGE B
GARAGE A
BLDG. T
4301
BLDG. S
BLDG. CW45
W46
BLDG. A4328
BLDG. O
UW TOWER
COLLEGIANA
1107
top related