vietnam vung tau 1h20 - psa international€¦ · facilities final container berths 4 quay length...
Post on 07-Oct-2020
1 Views
Preview:
TRANSCRIPT
Facilities FinalContainer berths 4Quay length (m) 1,200Area (ha) 54Max depth at Chart Datum (m) 14.5Quay cranes 12Designed capacity 2,200(’000 TEUs)
Current2
60027
14.54
740
MID
DLE
EA
STSO
UTH
ASI
AN
ORT
HEA
STA
SIA
EURO
PE &
MED
ITER
RAN
EAN
SOU
THEA
STA
SIA
VIE
TNA
M
THE
AM
ERIC
AS
SP-PSA INTERNATIONAL PORT
VIETNAMVUNG TAU
SP-PSA International Port (SP-PSA) is well positioned to serve the fast growing container traffic of Vietnam and to become a major hub for Indochina.
Ideally Iocated near the mouth of the Cai Mep- Thi Vai river, SP-PSA will be well equipped to handle large vessels at its deep water berths. SP-PSA is poised for strong growth with the development of extensive road and inland waterway networks linking it to Ho Chi Minh City and the rest of the burgeoning South Vietnam industrial hinterland.
The terminal will be developed in two phases. The first phase became operational in May 2009.
When both phases come onstream, the terminal will have a projected annual capacity of 2.2 million TEUs.
contactSP-PSA International Port Co LtdCai Mep-Thi Vai Linking-port Road,Phu My Ward, Phu My Township,Ba Ria - Vung Tau Province, Vietnam
michael chiaDeputy General Director
Email : cmichael@globalpsa.comTel : +84 64 3924567Fax : +84 64 3924555Website : www.sp-psa.com.vn
1H20
CA
I MEP
- TH
I VA
I RIV
ER
legend:Sailings
TRANSPORTATION NETWORK
HARBOUR LAYOUT
TERMINAL LAYOUT
top related