vdl mode 4 cosite investigations acp wg-m 9 th meeting, agenda item 3 montreal, october 2004
Post on 27-Mar-2015
217 Views
Preview:
TRANSCRIPT
VDL Mode 4 Cosite Investigations
ACP WG-M 9th Meeting, Agenda item 3
Montreal, October 2004
13-14/10/04COMT31
Cosite Investigations Plan
Developed with the contribution of several parties at a meeting hosted by EUROCONTROL
Identifies the required activities to complete the investigations
Lays out a strategy for the test cases to be investigated
13-14/10/04COMT31
EUROCONTROL Work Plan
Cosite Investigations work organised in three phases Phase 1: development of cosite interference testing scenarios
and detailed testing plans (focus of current work); Phase 2: actual testing using the scenarios and tests defined in
Phase 1; Phase 3: evaluation of test results
13-14/10/04COMT31
Scheduling of work
Q4 2004 Completion of Phase 1 Initiation of test campaign (Phase 2)
Q2 2005 Completion of Phase 2
Q3/Q4 2005 Completion of Phase 3
13-14/10/04COMT31
Other related activities
voice transmissions profile statistical analysis considering both ATC & AOC current usage of VHF voice radio based on data obtained from a major European airline proposes voice usage profile as input to cosite investigations
voice receptions profile preliminary analysis considering signal levels only analytical-based and derives assumptions based on current airspace regimes
13-14/10/04COMT31
Current Work: Phase 1
Current Status development of detailed testing scenarios and testing plans Contract with ISA Telecoms to carry out Phase 1
Details will be presented by ISA TELECOMS
top related