Val Lines
*
*
*Senior project manager responsible for the quality assurance practice at Motorists Mutual Insurance Company
*Over 25 years of IT experience, primarily in insurance and banking on mainframe systems
*IT experience as a developer, tester, project manager, resource manager and now quality assurance practitioner
*Contact Val*Val.Lines@motoristsgroup.com
*614.225.8626
*www.linkedin.com/in/vallines
*Primarily mainframe applications for our production systems
*Low personnel turnover
*High reliance on subject matter experts for each application
*QA position created in 2012
*No standardized testing practices in place
*
*Transformation to agile project methodology*Agile team members work on multiple projects and
production support*QA functions are spread throughout the team & multiple
locations*QA practices are based on tester experience
*Test automation framework is nonexistent*Batch test cycles*Agile seminars, conferences, etc. all focus on testing with
tools that aren’t readily available for the mainframe
*Test data management in shared regions
*
*Metrics*Rethinking mainframe development process into user stories
that fit in a single, 2-week sprint*Usually not deployable at the end of one sprint
*End-to-end system testing*Testing of date driven processes*Production deployment activities are time consuming*Rally vs. ALM/Quality Center
*Rally does a great job with user stories, sprints, etc.*ALM/Quality center does a great job with traceability,
automated testing integration with QTP
*
*
*Business and IT management are committed to agile
*Management exception is needed to run a waterfall project
*Agile coach conducts scrum training for all agile team members (includes product owner)
*Product owners are very involved in the daily scrum and project activities
*Agile community of practice
*Plan – Do – Check –Adjust
*
*
*
*
*
*Focus on basic regression scripts to build an automated testing script library*Can also be used to expedite data entry testing
*Establishing procedures so Operations can execute
*Established an agile project to give the team time and priority to work on the scripts
*Started an automation community of practice that meets monthly to discuss what we are learning*Members are all using QTP for scripting mainframe, object
oriented, vendor package applications
*
*Scheduler to run the test batch cycle
*Controlled by one parameter card for all integrated systems
*All test jobs follow the same naming conventions
*Created a user ID that runs the jobs that does not have access to production files
*Training on how to run a batch test cycle is easier
*Job output is stored the same way our production job output is stored
*PDF generator to create pdf output from mainframe jobs
*Challenge test planners to be as efficient as possible with the cycles that are needed
*
*
*Five test regions to be kept up to date*Created a series of jobs that copy executable code from
the production region to the test regions* Developers can update a parameter to prevent overlaying
work in progress
* No source code is overlaid
*Automated the schedule to execute this process weekly, after hours
*Projects are scheduled into specific regions
*Test data management is a very manual process
*
*
*
*
*Challenge team to break down stories* In some cases the stories have been moved from one
sprint to the next or broken down into part 1 and part 2 when it became evident it was too big
*Better approach is to break out what can be done on a story in a sprint and make multiple stories * Acceptance criteria may involve having another developer
review the interim deliverables
*Grooming involves all involved parties to get a better sizing estimate
*Pair programming*Plan – Do – Check –Adjust
*
*
*Front load as much testing as possible in each sprint*Acceptance testing for stories is thorough
*Each test cycle is a user story and moves through any date driven processes that are required
*With good user story acceptance testing already done, the end-to-end testing moves a little faster before the release
*
*
*
*
*ALM/QC is fully baked for test management*Traceability
* Integration with QTP
*Metrics
*Rally is fully baked for user story management and improving on the testing functions*Traceability isn’t intuitive
*No integration with QTP
*Testing metrics
Contact Info:Val.Lines@motoristsgroup.com614.225.8626www.linkedin.com/in/vallines