utsoa undergraduate portfoliosoa.utexas.edu/sites/default/disk/online.compressed.pdf · utsoa...
Post on 18-Oct-2020
1 Views
Preview:
TRANSCRIPT
UTSoA Undergraduate PortfolioZoë Brown
2 3
Semester One
4 5
Bus StopA stereometric form designed to occupy a corner of a larger building. The structure would be used as a bus stop.
Performance SpaceMapping observations at the North-East corner of Colorado and 5th Street in Austin, Texas. Then mapping the expectations of a performance space that would occupy the corner.
6 7
Performance SpaceFinal model of the proposed performance space. (Right) Final drawings of the project and edited photographs of the interior.
8 9
Semester Two
10 11
Visitor Center at Lady Bird Johnson Wildflower CenterA designed visitor center to be located in a previously untouched landscape. The program included bathrooms, a library and media center, a small kitchen, and a large classroom type space. Some of the initial documentation and study models are shown on these pages. The final model, final drawings, and edited perspective images are found on pages 12-15.
12 13
14 15
16 17
Semester Three
18 19
SOU
TH C
ON
GRE
SS
GIBSON
1/20” = 1’
Austin Green CenterA small office building designed on South Congress in Austin, Texas. The assignment required the building to include an unspecified program. This project combined a parking garage with the office building. The parking structure provided gardening space for the community. Study models and an initial study are shown on these pages.
20 21
Austin Green CenterA further developement challenged the parking structure to be strictly smart car and bike parking, while the office space was woven into the platforms. These study models led to the final one shown on the right. Pages 22-23 show more images of the final model and the final drawings.
22 23
Level 11/8” = 1’
Level 21/8” = 1’
Level 31/8” = 1’
GIBSON
SECTION1/8” = 1’
24 25
Semester Four
26 27
MANCHACA
BLUEBONNET
DEL CU
RTO
S. L
AMAR
OLTORF
KINN
EY AVE
TREADWELL ST.
MARY ST.
BIKE PATHS PEDESTRIAN PATHS BUS ROUTES PROPOSED BRT STOPS
SOUTH LAMAR CORRIDOR CIRCULATION
GREEN SPACE
BUS RO
UTE
PEDESTRIAN
PATHRAILRO
AD
BIKE PATH
RESIDENTIAL OFFICE COMMUNITY RETAIL GREEN SPACE
SOUTH LAMAR CORRIDOR LAND USE
MANCHACA
BLUEBONNET
DEL CU
RTO
S. L
AMAR
OLTORF
KINN
EY AVE
TREADWELL ST.
MARY ST.
500 FEET25050 1000 500 FEET25050 1000
OUTDOOR MARKET
SCUL
PTUR
E GA
RDEN
AMPITHEATER
PUBLIC PARK
MUSEUM PLAZA
DOG PARK
PLAYGROUN
D
OUTDOOR MARKET
SCUL
PTUR
E GA
RDEN
AMPITHEATER
PUBLIC PARK
MUSEUM PLAZA
DOG PARK
PLAYGROUN
D
WEST BO
ULD
IN CREEK
ZILKER NEIGHBORHOODSINGLE FAMILY RESIDENTIAL
ALAMO DRAFTHOUSE CENTERENTERTAINMENT DISTRICT
BUS RAPID TRANSIT LANENEAREST: S.LAMAR + TREADWELL
RETAIL + OFFICE MIXED USE4,800 sqft GROUND FLOOR; 12,000 sqft UPPER THREE FLOORS
PEDESTRIAN PATHINTERIOR BIKE LANE
RETAIL + RESIDENTIAL MIXED USE3,500 sqft GROUND FLOOR; 7,000 sqft UPPER TWO FLOORS
RAIL LINEPOTENTIAL URBAN RAIL
WEST BOULDIN CREEKPOTENTIAL GREENBELT
BOULDIN CREEK NEIGHBORHOODSINGLE FAMILY RESIDENTIAL
50 FEET255 100
Multi-Use Development - Urban HousingA new master plan was designed for the South Lamar cooridor in Austin, Texas after observing several issues along the stretch. A housing development, which was required to be a multi-use development, was designed to be built along the road in a selected site. The new proposed master plan of South Lamar is shown on the left in the form of two maps. Model and section studies for the multi-use housing development are shown on this page. Final drawings of the project, as well as images of the final model, are shown on pages 28-33.
28 29
UNIT 2A
UNIT PH UNIT 1A UNIT 1B
UNIT 1SLW / 3LW UNIT 3LW
UNIT PLANS0 8 24 56UNIT 2B UNIT 3A / 3B UNIT 3C
BLOCK ONE BLOCK TWO BLOCK THREE
BLOCK FOUR
COLLIER
SOUTH
LAM
AR
BIKE A
ND PED
ESTR
IAN P
ATH
PEDESTRIAN PATH BIKE PATH
0 32 96 224
A
B
LOT LINE BLOCK FOUR BLOCK TWO PED/BIKE PATH COLLIERPARKINGCOURTYARD BLOCK THREENEIGHBORING RESIDENCES
0 16 48SECTION A
112
LOT LINE
30 31
PARKINGPARKING
BANK
CAFE
GROUND FLOOR0 16 48 112 0 16 48 112
FOURTH FLOOR
BLOCK FOUR PED/BIKE PATHPARKINGCOURTYARDBLOCK THREE
0 16 48SECTION B
112
LOT LINE SOUTH LAMARBLOCK ONELOT LINE
32 33
34 35
Visual Communications - WatercolorThis piece was created using the lines of simplified geometries of a suculent plant. Watercolor was used to add depth to the drawing.
Visual Communications - Tone drawingTaking an image showing tone and shade and then drawing it by hand with pencils.
36 37
Barley Bean Wall Painting - Commissioned Work After being presented with a list of requirements, I was commisioned to design and paint a wall at the Barley Bean in Austin, Texas.
(Left) Construction II - Brick WallIn small groups, a short brick wall was designed and then built.
38 39
Visual Communications - Wood JointA sketching exercise of hands inspired the creation of a wood joint that related to the gesture. The action of two hands clasping inspired two interlocking pieces which appear solid when joined but individual by color change.
Environmental Controls - LuminereA housing unit for a lightbulb was designed and built in small groups. The whole luminere was adjustable for multiple settings of lighting.
40
Zoë Brown2104 San Gabriel St. #214
Austin, TX 78705972-838-6374
Zoebrown94@gmail.com
EDUCATION8/18/08 – 5/31/12 McKinney Boyd High School McKinney, Texas
8/27/12 – Est. Spring 2017 University of Texas at Austin Austin, Texas Architecture
WORK EXPERIENCE8/01/11 – 5/31/12 Jim Wison Architecture Firm 4hrs/week Intern • Practiced designing buildings on drawing programs • Shared ideas for open projects and advertising • Organized and cleaned
09/01/13 – 05/01/14 Tower Pizza Bistro 12hrs/week09/01/14 – 11/22/14 Server 8hrs/week • Serve Food and Drinks
05/20/14 – 08/15/14 Conduit Architecture and Design 16hrs/week Intern • Updated website and contacts • Redlined multiple projects • Sketched schematic designs
05/20/14 – 08/15/14 Churchills Pub 12hrs/week Server • Serve Food and Drinks
02/01/15 – Current The University of Texas, Landmarks Department 25hrs/week Turrell Sky Space Attendant
ACTIVITIES 2013/2014 Undergrad Architecture Student Council 1hr/week P.R. Officer2014 – Current C.A.K.E. Club Founder 2hrs/week Founder and President • Created the club at the University of Texas • Took students kayaking once a week
top related