HPHT Conference London Nov, 2011 “Use of MPD on Mandarin eHPHT Well”
November 15th, 2011
Sigve Krohn Naesheim BG Norge WE Team Leader
Where Mandarin Fits into the Regional NS HTHP Environment
2
3
North
UK Norway
Judy/Joanne
Jasmine
Jade
Elgin/Franklin
Jackdaw
Mandarin Regional Location
Mandarin
Mandarin 1/3-12S Overview
4 Overview
• 20” Surface casing set at 1132m.
• 13 5/8” intermediate casing weighing 1.3 million lbs set at 4202m.
• 9 7/8” x 10 ¾” prod casing weighing 1.65 million lbs set at 5400m.
• 8 ½” Hole drilled to TD at 5932m.
• Mud used in 8 ½” was Magmatec
• Pressure in Kimmeridge was 17,500 psi (5560m MD).
• Mud weight from 5560m was 2.23 sg/ 18. 6 ppg.
• Temperature was appr. 210 deg / 400+ F at TD.
• FIT at 9 7/8” shoe was 19.5 ppg/ 2.33 sg.
• Open hole FIT in kick interval was 19.1 ppg/ 2.29
5
Line allows conventional hole fill practise if required, when RCD bearing installed.
MPD flow path
7875 RCD
Line allows the application of SBP rig mud pump during connection.
Or ability to divert flow to MGS mud gas content increases.
3” automated choke for application of SBP. Note identical back up on opposite leg.
Flow meter for 1. Flow Out 2. MW Out 3. Temperature
Weatherford RGVI - MPD Layout & Flow Path
Returns to rig flow line
GC Tracer real time gas in mud detection probe.